Fuljit Kaur v. State Of Punjab And Others

Supreme Court Of India
Jun 3, 2010
Important Paras
Please sign up to view Important Paras.
Smart Summary (Beta)

Factual and Procedural Background

The appellant applied on 23-02-1987 for allotment of a 400-sq-yd residential plot in Urban Estates, S.A.S. Nagar, Punjab. Within 48 hours, on 25-02-1987, the Estate Officer issued an allotment letter for Plot No. 702 (Sector 70), fixing only a “provisional” price of ₹93,000 payable in four instalments up to 15-10-1989 because the final (tentative) price had not yet been worked out.

On 25-03-1992 the Estate Officer raised an additional demand of ₹2,19,000 calculated in accordance with the Punjab Urban Estate (Sale of Sites) Rules, 1965 and the Punjab Urban Estates (Development and Regulation) Act, 1964. Rather than pay, the appellant filed Writ Petition No. 4763 of 1992 before the Punjab & Haryana High Court alleging arbitrariness in the demand. By judgment dated 21-12-1999 the High Court dismissed the petition, upholding the additional price. The present civil appeal challenges that decision.

Legal Issues Presented

  1. Whether withdrawal of the State’s special-leave petitions in D.S. Laungia v. State of Punjab (AIR 1993 P&H 54) amounted to this Court’s approval of that High Court decision and attracted the doctrine of merger.
  2. Whether the principle of equality (Article 14) entitled the appellant to the same benefit allegedly obtained by Shri D.S. Laungia and other similarly situated allottees.
  3. Whether the impugned additional demand of ₹2,19,000, calculated under the 1964 Act and 1965 Rules, was arbitrary, unreasonable, or otherwise illegal.

Arguments of the Parties

Appellant's Arguments

  • The High Court erred in relying on Preeta Singh v. HUDA (1996 8 SCC 756).
  • In D.S. Laungia the High Court had quashed a similar additional demand and directed re-determination; the State withdrew its SLP, so that decision allegedly attained finality and should apply equally to the appellant.
  • No recovery has yet been made from Shri Laungia, demonstrating discriminatory treatment.

Respondent's Arguments

  • The High Court correctly applied Preeta Singh; calculations strictly followed Rules 2(aa) & 2(e).
  • Withdrawal of the SLP in D.S. Laungia does not amount to approval by the Supreme Court; therefore that judgment is not binding precedent.
  • The same additional price will be (and is being) recovered from Shri Laungia and all other defaulters; hence no discrimination.

Table of Precedents Cited

PrecedentRule or Principle Cited ForApplication by the Court
Preeta Singh v. HUDA (1996 8 SCC 756) Allottee must bear full sale price including additional price and development costs. Relied upon as the governing authority validating additional price demands calculated under the Rules.
D.S. Laungia v. State of Punjab, AIR 1993 P&H 54 High Court decision quashing additional demand. Distinguished; not binding because SLP was withdrawn, and negative equality cannot be claimed.
Kunhayammed v. State of Kerala (2000 6 SCC 359) Effect of dismissal of SLP in limine; doctrine of merger. Cited to show that non-speaking dismissal of SLP does not affirm or merge with High Court judgment.
Workmen v. Cochin Port Trust (1978 3 SCC 119) Dismissal of SLP does not create precedent or res judicata. Part of chain of authorities supporting the same proposition as Kunhayammed.
State of Maharashtra v. Digambar (1995 4 SCC 683) Earlier acceptance of an adverse judgment does not bar the State from contesting similar matters later. Reinforces that failure to appeal in one case does not preclude contesting others.
Coromandel Fertilizers Ltd. v. Union of India 1984 Supp SCC 457 Article 14 does not sanction negative equality or perpetuate illegality. Used to reject appellant’s plea for parity with Laungia on the basis of an allegedly erroneous benefit.
Chandigarh Admn. v. Jagjit Singh (1995 1 SCC 745) Benefit obtained through mistake does not confer enforceable right on others. Cited to repudiate claim founded on a past irregular allotment.
Bangalore Development Authority v. Syndicate Bank (2007 6 SCC 711) Authority may revise price where allotment was expressly at tentative/provisional price. Supports legality of later enhancement of price in present case.
T.N. Housing Board v. Sea Shore Apartments Owners’ Welfare Assn. (2008 3 SCC 21) Allottees aware that final price was yet to be fixed cannot complain of later revision. Reinforces respondents’ position that demand was within contractual and statutory framework.
S.P. Kapoor v. State of H.P. (1981 4 SCC 716) Post-haste actions may evidence arbitrariness/mala fides. Used to criticise the extraordinary speed of the appellant’s original allotment, though Court declined to cancel it.

Court's Reasoning and Analysis

1. Effect of withdrawn SLPs. Relying on a long line of authority culminating in Kunhayammed, the Court held that withdrawal or non-speaking dismissal of an SLP does not affirm the High Court judgment, nor does it create a binding precedent; consequently, D.S. Laungia does not control the present dispute and the doctrine of merger is inapplicable.

2. Negative equality under Article 14. Citing several decisions beginning with Coromandel Fertilizers, the Court reiterated that Article 14 forbids “negative equality”; an illegality committed in favour of one allottee cannot be invoked to perpetuate the same error for another. Therefore, any benefit allegedly obtained by Shri Laungia cannot be claimed by the appellant.

3. Statutory framework distinguishes provisional and tentative price. The Court analysed Rules 2(aa), 2(e), 4 and 5-A of the 1965 Rules. “Tentative price” is calculated after taking into account land-acquisition compensation and development costs, whereas “provisional price” is an interim figure. Nothing in the Act or Rules bars the authority from demanding the tentative price once determined; indeed, Rule 5-A makes the allottee liable for the additional price within 30 days of demand.

4. Reasonableness of the calculation. Detailed cost components (land cost, solatium, interest, internal and external development, establishment and escalation charges) were reproduced in the judgment, showing a computed reserve price of ₹520 per sq yd and a tentative price of 1½ times that figure for 400-sq-yd plots. The appellant did not dispute these figures with any concrete material.

5. Consistency with earlier precedent. The Court found the present demand indistinguishable from that upheld in Preeta Singh. Later authorities such as BDA v. Syndicate Bank and T.N. Housing Board further affirmed that where allotment is expressly at a tentative or provisional price, subsequent enhancement is lawful.

6. Alleged discrimination in recovery. An affidavit from the Chief Administrator, Greater Mohali Development Authority, demonstrated that recovery was in fact being pursued against all defaulters, including Shri Laungia, refuting assertions of selective enforcement.

7. Irregular haste in original allotment. Although the Court condemned the 48-hour allotment as prima facie arbitrary and violative of Article 14, it refrained from cancelling the plot because the appellant had already developed the property.

Holding and Implications

APPEAL DISMISSED. The additional demand notice dated 25-03-1992 stands upheld; the appellant must pay the determined tentative and additional price in accordance with law.

Implications: The decision re-affirms that (i) dismissal or withdrawal of SLPs does not create binding precedent; (ii) negative equality cannot be invoked to perpetuate illegality; and (iii) allottees who accept plots at provisional prices remain liable for subsequently determined tentative/additional prices calculated under the statutory scheme. No new legal doctrine was created, but existing principles were reinforced, giving public bodies clear authority to recover appropriately re-computed development costs from allottees.

Show all summary ...

Dr. B.S Chauhan, J.— This is a unique case which reveals that an influential person can have allotment of a residential plot in discretionary quota within 48 hours of submission of application and then assert in court that she has a right to have a land on a throwaway price and not to deposit the sale price for quarter of a century.

2. This appeal has been preferred against a judgment and order dated 21-12-1999 in Writ Petition No. 4763 of 1992 of the High Court of Punjab and Haryana at Chandigarh, dismissing the petition against the demand notice of additional price for residential plot.

3. The facts and circumstances giving rise to this case are that the appellant made an application on 23-2-1987 for allotment of a residential plot in Urban Estates, SAS Nagar, Punjab. The administration, vide letter dated 25-2-1987, issued the allotment letter in favour of the appellant in respect of Plot No. 702, measuring 400 sq yd in Sector 70, Urban Estate, SAS Nagar, making it clear that as the proper calculation could not be made and tentative price had not been determined, the allottee has to deposit provisional price of Rs. 93,000 in four instalments up to 15-10-1989. Subsequently, vide letter dated 25-3-1992, additional demand of Rs. 2,19,000 was made, however, instead of depositing the said amount, the appellant challenged the said demand notice by filing Writ Petition No. 4763 of 1992 before the High Court of Punjab and Haryana contending that the additional demand was arbitrary and unreasonable. A large number of similar cases were also pending before the High Court and some had earlier been disposed of. However, the writ petition filed by the appellant has been dismissed by the High Court vide impugned judgment and order dated 21-12-1999 upholding the demand dated 25-3-1992. Hence this appeal.

4. Shri Vijay Hansaria, learned Senior Counsel appearing for the appellant, has submitted that the High Court committed an error in dismissing the said writ petition relying upon the judgment of this Court in Preeta Singh v. HUDA (1996) 8 SCC 756. In D.S Laungia v. State of Punjab AIR 1993 P&H 54 such unreasonable and arbitrary demand had been quashed by the High Court and the State Government was issued direction to redetermine the amount taking into consideration the provisions of the Punjab Urban Estate (Sale of Sites) Rules, 1965 (hereinafter called as “the Rules”) and the provisions of the Punjab Urban Estates (Development and Regulation) Act, 1964 (hereinafter called as “the Act”). The said judgment has attained finality as the State had preferred special leave petition against the said judgment and order before this Court but later on, it was withdrawn. After redetermining the additional price, no recovery has been made from Shri D.S Laungia till date. Therefore, the appeal deserves to be allowed.

5. On the other hand, Ms Rachna Joshi Issar, learned counsel appearing for the respondent vehemently opposed the appeal contending that the High Court has rightly relied upon the judgment in Preeta Singh (1996) 8 SCC 756. In D.S Laungia AIR 1993 P&H 54 the State Government, being aggrieved, had challenged the said judgment and order before this Court by filing the special leave petition but it was withdrawn for certain reasons. Therefore, it cannot be held that the judgment in D.S Laungia AIR 1993 P&H 54 stood approved by this Court. Calculations had been made strictly in consonance with the statutory provisions of the Act and the Rules, particularly taking note of Rules 2(aa) and 2(e) of the Rules and it is to be recovered from D.S Laungia also. The High Court was fully satisfied regarding determination of the additional price and therefore, no fault can be found with the impugned judgment and order. Hence, the appeal is liable to be dismissed.

6. We have considered the rival submissions made by the learned counsel for the parties and perused the record. The questions do arise as to whether such an order of withdrawal passed by this Court amounts to confirmation/approval of the judgment and order of the High Court and as to whether the appellant could be treated differently.

7. There is no dispute to the settled proposition of law that dismissal of the special leave petition in limine by this Court does not mean that the reasoning of the judgment of the High Court against which the special leave petition has been filed before this Court stands affirmed or the judgment and order impugned merges with such order of this Court on dismissal of the petition. It simply means that this Court did not consider the case worth examining for the reason, which may be other than merit of the case. Nor such an order of this Court operates as res judicata. An order rejecting the special leave petition at the threshold without detailed reasons therefore does not constitute any declaration of law or a binding precedent. [Vide Workmen v. Cochin Port Trust (1978) 3 SCC 119, AIR 1978 SC 1283, Ahmedabad Mfg. & Calico Printing Co. Ltd. v. Workmen (1981) 2 SCC 663, AIR 1981 SC 960, Indian Oil Corpn. Ltd. v. State of Bihar (1986) 4 SCC 146, AIR 1986 SC 1780, Supreme Court Employees' Welfare Assn. v. Union of India (1989) 4 SCC 187, AIR 1990 SC 334, Yogendra Narayan Chowdhury v. Union of India (1996) 7 SCC 1, AIR 1996 SC 751, Union of India v. Sher Singh (1997) 3 SCC 555, AIR 1997 SC 1796, V.M Salgaocar & Bros. (P) Ltd. v. CIT (2000) 5 SCC 373, AIR 2000 SC 1623, Saurashtra Oil Mills Assn. v. State of Gujarat (2002) 3 SCC 202, AIR 2002 SC 1130, Union of India v. Jaipal Singh (2004) 1 SCC 121 and Y. Satyanarayan Reddy v. Mandal Revenue Officer (2009) 9 SCC 447.]

8. In State of Maharashtra v. Digambar (1995) 4 SCC 683, AIR 1995 SC 1991 this Court considered a case wherein against the judgment and order of the High Court, special leave petition was not filed but when other matters were disposed of by the High Court in terms of its earlier judgment, the authorities approached this Court challenging the correctness of the same. It was submitted in that case that if the State authorities had accepted the earlier judgment and given effect to it, it was not permissible for the authority to challenge the subsequent judgments/orders passed in terms of the earlier judgment which had attained finality. This Court repealed the contention observing that the circumstances for non-filing the appeals in some other or similar matters or rejection of the SLP against such judgment in limine by this Court, in some other similar matters by itself, would not preclude the State authorities to challenge the other orders for the reason that non-filing of such SLP and pursuing them may seriously jeopardise the interest of the State or public interest.

9. In Kunhayammed v. State of Kerala (2000) 6 SCC 359, AIR 2000 SC 2587 this Court reconsidered the issue and some of the abovereferred judgments and came to the conclusion that dismissal of special leave petition in limine by a non-speaking order may not be a bar for further reconsideration of the case for the reason that this Court might not have been inclined to exercise its discretion under Article 136 of the Constitution. The declaration of law will be governed by Article 141 where the matter has been decided on merit by a speaking judgment as in that case the doctrine of merger would come into play. This Court laid down the following principles:

“(i) Where an appeal or revision is provided against an order passed by a court, tribunal or any other authority before a superior forum and such superior forum modifies, reverses or affirms the decision put in issue before it, the decision by the subordinate forum merges in the decision by the superior forum and it is the latter which subsists, remains operative and is capable of enforcement in the eye of the law.
(ii) The jurisdiction conferred by Article 136 of the Constitution is divisible into two stages. The first stage is up to the disposal of prayer for special leave to file an appeal. The second stage commences if and when the leave to appeal is granted and the special leave petition is converted into an appeal.
(iii) The doctrine of merger is not a doctrine of universal or unlimited application. It will depend on the nature of jurisdiction exercised by the superior forum and the content or subject-matter of challenge laid or capable of being laid shall be determinative of the applicability of merger. The superior jurisdiction should be capable of reversing, modifying or affirming the order put in issue before it. Under Article 136 of the Constitution the Supreme Court may reverse, modify or affirm the judgment-decree or order appealed against while exercising its appellate jurisdiction and not while exercising the discretionary jurisdiction disposing of a petition for special leave to appeal. The doctrine of merger can therefore be applied to the former and not to the latter.
(iv) An order refusing special leave to appeal may be a non-speaking order or a speaking one. In either case it does not attract the doctrine of merger. An order refusing special leave to appeal does not stand substituted in place of the order under challenge. All that it means is that the court was not inclined to exercise its discretion so as to allow the appeal being filed.
(v) If the order refusing leave to appeal is a speaking order i.e gives reasons for refusing the grant of leave, then the order has two implications. Firstly, the statement of law contained in the order is a declaration of law by the Supreme Court within the meaning of Article 141 of the Constitution. Secondly, other than the declaration of law, whatever is stated in the order are the findings recorded by the Supreme Court which would bind the parties thereto and also the court, tribunal or authority in any proceedings subsequent thereto by way of judicial discipline, the Supreme Court being the Apex Court of the country. But, this does not amount to saying that the order of the court, tribunal or authority below has stood merged in the order of the Supreme Court rejecting the special leave petition or that the order of the Supreme Court is the only order binding as res judicata in subsequent proceedings between the parties.”

The Court came to the conclusion that where the matter has been decided by a non-speaking order in limine the party may approach the Court for reconsideration of the case in exceptional circumstances.

10. In view of the above, in the fact situation of the case in D.S Laungia AIR 1993 P&H 54, the question of application of the doctrine of merger did not arise and even by no stretch of imagination can it be held that this Court has approved the judgment in D.S Laungia AIR 1993 P&H 54. Rather a different view is required to be taken in view of the fact that this Court had expressed doubts about the correctness of the impugned judgment by making the following observations:

“In the instant matter as also in the matters enumerated in the letter of Mr G.K Bansal, Advocate for the petitioners dated 25-1-1994, seeking withdrawal of all these matters, we are constrained to remark that no reasons have been assigned as to why the State of Punjab is submitting to the impugned orders of the High Court which prima facie appear to us to be unsustainable. The direct result of the withdrawal would not only be compounding to an illegality but would otherwise cause tremendous loss to the State exchequer. We, therefore, direct that the reasons which impelled the State to seek withdrawal of these matters be placed before us in the form of an affidavit by the Chief Secretary, Punjab or the Secretary of the Department concerned justifying the step for seeking withdrawal.”
(emphasis added)

11*. The respondent cannot claim parity with D.S Laungia AIR 1993 P&H 54 in view of the settled legal proposition that Article 14 of the Constitution of India does not envisage negative equality. Article 14 is not meant to perpetuate illegality or fraud. Article 14 of the Constitution has a positive concept. Equality is a trite, which cannot be claimed in illegality and therefore, cannot be enforced by a citizen or court in a negative manner. If an illegality and irregularity has been committed in favour of an individual or a group of individuals or a wrong order has been passed by a judicial forum, others cannot invoke the jurisdiction of the higher or superior court for repeating or multiplying the same irregularity or illegality or for passing a wrong order. A wrong order/decision in favour of any particular party does not entitle any other party to claim the benefits on the basis of the wrong decision. Even otherwise Article 14 cannot be stretched too far otherwise it would make function of the administration impossible. (Vide Coromandel Fertilizers Ltd. v. Union of India 1984 Supp SCC 457, AIR 1984 SC 1772, Panchi Devi v. State of Rajasthan (2009) 2 SCC 589 and Shanti Sports Club v. Union of India (2009) 15 SCC 705.)

12. Thus, even if some other similarly situated persons have been granted some benefit inadvertently or by mistake, such order does not confer any legal right on the petitioner to get the same relief. (Vide Chandigarh Admn. v. Jagjit Singh (1995) 1 SCC 745, AIR 1995 SC 705, Sneh Prabha v. State of U.P (1996) 7 SCC 426, AIR 1996 SC 540, Jalandhar Improvement Trust v. Sampuran Singh (1999) 3 SCC 494, AIR 1999 SC 1347, State of Bihar v. Kameshwar Prasad Singh (2000) 9 SCC 94, AIR 2000 SC 2306, Union of India v. Rakesh Kumar (2001) 4 SCC 309, AIR 2001 SC 1877, Yogesh Kumar v. Govt. of NCT, Delhi (2003) 3 SCC 548, AIR 2003 SC 1241, Union of India v. International Trading Co. (2003) 5 SCC 437, AIR 2003 SC 3983, Anand Buttons Ltd. v. State of Haryana (2005) 9 SCC 164, AIR 2005 SC 565, K.K Bhalla v. State of M.P (2006) 3 SCC 581, AIR 2006 SC 898 and Krishan Bhatt v. State of J&K (2008) 9 SCC 24.)

13. In view of the above, the submissions made by Shri Hansaria, Amicus Curiae in this regard are preposterous and not worth consideration.

14. In the instant case, the High Court has taken into consideration all statutory provisions and calculations made by the respondents as under what circumstances the “tentative price” had been fixed and reached the conclusion that the demand was justified. The Court also rejected the submissions made on behalf of the allottees that judgment in D.S Laungia AIR 1993 P&H 54 was an authority on the issue.

15. Rules 2(aa), 2(e), 4 and 5-A of the Rules which have direct bearing on the questions raised in this appeal read as under:

“2. (aa)—‘additional price’ means such sum of money as may be determined by the State Government, in respect of the sale of a site by allotment, having regard to the amount of compensation by which the compensation awarded by the Collector for the land acquired by the State Government of which the site sold forms a part, is enhanced by the court on a reference made under Section 18 of the Land Acquisition Act, 1894, and the amount of cost incurred by the State Government in respect of such reference.
(e)—‘tentative price’ means such sum of money as may be determined by the State Government from time to time, in respect of the sale of a site by allotment, having regard, among other matters, to the amount of compensation awarded by the Collector under the Land Acquisition Act, 1894, for the land acquired by the State Government of which the site sold forms a part.
4. Sale price.—(1) In the case of sale of a site by allotment the sale price shall be,—
(a) where such site forms part of the land acquired by the State Government under the Land Acquisition Act, 1894, and,—
(i) no reference under Section 18 thereof is made against the award of the Collector or such a reference having been made has failed, the tentative price;
(ii) on a reference made under Section 18 thereof the compensation awarded by the Collector is enhanced by the court, the aggregate of the tentative price and the additional price;
(b) in any other case, such final price as may be determined by the State Government from time to time.
(2) In the case of sale of a site by auction, the sale price shall be such reserve price as may be determined by the State Government from time to time or any higher price determined as a result of bidding in an open auction.
5-A. Liability to pay additional price.—(1) In the case of sale of a site by allotment, the transferee shall be liable to pay to the State Government, in addition to the tentative price thereof, the additional price, if any, determined in respect thereto under these rules.
(2) The additional price shall be payable by the transferee within a period of thirty days of the date of demand made in this behalf by the Estate Officer:
Provided that the Chief Administrator may in a particular case, and for reasons to be recorded in writing allow the applicant to make payment of the said amount within a further period not exceeding thirty days.”

16. A perusal of the abovequoted rules shows that the “tentative price” means the price determined by the State Government from time to time in respect of a sale of site by allotment and while doing so, the Government has to take into consideration various factors including the amount paid as compensation. The phrase “additional price” has been defined as the price determined by the State Government having regard to the enhanced compensation payable to the landowners in pursuance of the award passed by the court on a reference made under Section 18 or further appeal under the 1894 Act.

17. The “sale price” is the price payable in respect of an allotment of site. If the site sold by the competent authority forms part of the land acquired by the State Government under the 1894 Act and no reference under Section 18 thereof is made against the award of the Collector or such reference having been made has failed, the sale price is the tentative price as defined in Rule 2(e) of the Rules but if the compensation awarded by the Collector is enhanced by the court on a reference made under Section 18 of the 1894 Act, then the sale price means the aggregate of the tentative price and the additional price. If the site allotted by the competent authority does not form part of the land acquired by the State Government under the 1894 Act, then the sale price would mean such final price as may be determined by the State Government.

18. However, there is nothing in the scheme of the 1964 Act and the Rules from which it can be inferred that tentative price is synonymous with the provisional price, and that a person, to whom the plot has been allotted on provisional price, cannot be asked to pay the tentative price determined by the Government. There is a difference between the “provisional price” and the “tentative price” and it may take a long time for the State to determine the tentative price.

19. In the instant case, the calculations had been furnished by the respondents as on what basis tentative price had been determined.

A. Cost of land

1. Cost of land per acre of Sector 70, SAS Nagar Rs. 90,000 2. Solatium charges @ 30% Rs. 27,000 3. Interest charges from the date of notification till the date of award @ 12% from 1980 to 1984 for four years Rs. 43,000 4. Interest charges 15% from 1984 to 1990 for six years on the cost of land Rs. 1,44,180 Rs. 3,04,380

B. Cost of internal and external development

1. Water supply @ Rs. 1.35 lakhs Rs. 1,35,000 2. Sewerage @ Rs. 59,000 Rs. 59,000 3. Storm water @ Rs. 1,32,000 Rs. 1,32,000 4. Roads @ Rs. 55,000 per acre Rs. 55,000 5. Bridges and others @ Rs. 11,000 per acre Rs. 11,000 6. Horticulture @ Rs. 36,000 per acre Rs. 36,000 7. Street lightening @ Rs. 15,000 per acre Rs. 15,000 8. Electrification @ Rs. 15,000 per acre Rs. 15,000 9. Conservancy charges @ Rs. 9000 per acre Rs. 9000 10. Utility services @ Rs. 20,000 per acre Rs. 20,000 11. Maintenance and resurfacing of roads for five years @ Rs. 63,000 per acre Rs. 63,000 12. Maintenance of public health service @ Rs. 39,000 per acre Rs. 39,000 13. Maintenance and resurfacing of roads beyond five years @ Rs. 45,000 per acre Rs. 45,000 14. Division of HT line @ Rs. 7000 per acre Rs. 7000 15. Earth filling @ Rs. 10,000 per acre Rs. 10,000 Rs. 6,51,000

C. (i) Establishment charges @ 14% + 3% on the cost of the land. Rs. 51,745 (ii) Interest charges @ 1% for plottable area (55%) Rs. 2662 (iii) Interest charges for three years @ 10% each year on development charges Rs. 1,51,200 (iv) Unforeseen charges as well as escalation charges @ 10% Rs. 1,16,098 Total expenditure per acre Rs. 12,77,064 Total expenditure of 306.59 acres of land Acquired for Sector 70, SAS Nagar Rs. 39,15,34,824 Saleable area 6,74,233 sq yd Rate per square yard 39,15,34,824/6,74,233 = Rs. 580

20**. The plots measuring 100 sq yd were to be allotted at tentative price calculated at subsidised rate of 10% less than the reserve price while plots measuring 150, 200 and 250 sq yd were to be allotted at tentative price equal to the reserve price. The plots measuring 300 and 400 sq yd area are to be allotted at tentative price equal to 1½ times of the reserve price and plots measuring 500 sq yd were to be allotted at tentative price equal to double the reserve price. Taking the overall position into account, the Government fixed the reserve price at Rs. 520 per square yard for calculating the tentative prices, in the above manner, for plots of various sizes. There is nothing on record to show that the tentative price determined by the State could be unreasonable or arbitrary and it is not the case of the allottee that the market value of the land has not been enhanced while deciding the reference under the 1894 Act.

21. While deciding this case, the High Court placed heavy reliance upon the judgment of this Court in Preeta Singh (1996) 8 SCC 756 wherein after taking note of various statutory provisions of the 1964 Act and the 1965 Rules, particularly, Rule 2(aa) and sale price as determined in Rule 4, this Court came to the following conclusion:

“7. A conjoint reading of the above Rules would clearly indicate that the allottee is liable to pay a sale price including the additional price and the cost incurred and also the cost of improvement of the sites. It is to be remembered that the respondent HUDA is only a statutory body for catering to the housing requirement of the persons eligible to claim for allotment. They acquire the land, develop it and construct buildings and allot the buildings or the sites, as the case may be. Under these circumstances, the entire expenditure incurred in connection with the acquisition of the land and development thereon is required to be borne by the allottees when the sites or the buildings sold after the development are offered on the date of the sale in accordance with the regulations and also conditions of sale. It is seen that in the notice dated 9-8-1990, the total area, net area, the payable amount for the gross acreage, the acreage left for the developmental purpose, balance recoverable from the plot-holders, plot-table area have been given for each of the areas and recovery rate also has been mentioned under the said notice. Under these circumstances, there is no ambiguity left in the calculations. If, at all, the appellants had got any doubt, they would have approached the authority and sought for further information. It is not the case that they had sought the information and the same was withheld. Under these circumstances, we do not find any illegality in the action taken by the respondents. The High Court, therefore, was right in refusing to interfere with the order.”

22. In Bangalore Development Authority v. Syndicate Bank (2007) 6 SCC 711, this Court, while considering a similar issue, laid down large number of principles including the following:

“10. (f) Where the plot/flat/house has been allotted at a tentative or provisional price, subject to final determination of price on completion of the project (that is acquisition proceedings and development activities), the development authority will be entitled to revise or increase the price. But where the allotment is at a fixed price, and a higher price or extra payments are illegally or unjustifiably demanded and collected, the allottee will be entitled to refund of such excess with such interest, as may be determined with reference to the facts of the case.”

23. In T.N Housing Board v. Sea Shore Apartments Owners' Welfare Assn. (2008) 3 SCC 21 while deciding the similar issue, this Court held as under:

“18. … So far as price is concerned, in 1991, when the names of the applicants were registered, it was clarified that the price indicated was ‘tentative price’ and it was subject to ‘final price’ being fixed by the Board. In any case when the scheme was altered from seven types to fifteen types of flats, it was stated that the amount shown was merely ‘tentative selling price’. The intending purchasers, therefore, were aware of the fact that the final price was to be fixed by the Board. In fact an agreement to that effect was executed by all prospective allottees wherein they agreed that they would pay the amount which would be finally fixed by the Board.
20. In the circumstances, it cannot be said that the allottees were not aware of the above condition and they were compelled to make payment and thus were treated unfairly or unreasonably by the Board.”

24. The instant case is squarely covered by the aforesaid judgments of this Court and particularly, Preeta Singh (1996) 8 SCC 756 and in view thereof, the appeal is liable to be dismissed.

25. Before parting with the case, it may be pertinent to mention here that the allotment had been made to the appellant within 48 hours of submission of her application though in ordinary cases, it takes about a year. The appellant had further been favoured to pay the aforesaid provisional price of Rs. 93,000 in four instalments in two years, as is evident from the letter dated 8-4-1987. Making the allotment in such a hasty manner itself is arbitrary and unreasonable and is hit by Article 14 of the Constitution. This Court has consistently held that “when a thing is done in a post-haste manner, mala fides would be presumed”. Anything done in undue haste can also be termed as “arbitrary and cannot be condoned in law”. [Vide S.P Kapoor (Dr.) v. State of H.P (1981) 4 SCC 716, AIR 1981 SC 2181, M.P Hasta Shilpa Vikas Nigam Ltd. v. Devendra Kumar Jain (1995) 1 SCC 638, (1995) 29 ATC 159, Bahadursinh Lakhubhai Gohil v. Jagdishbhai M. Kamalia (2004) 2 SCC 65, AIR 2004 SC 1159 and Zenit Mataplast (P) Ltd. v. State of Maharashtra (2009) 10 SCC 388.] Thus, such an allotment in favour of the appellant is liable to be declared to have been made in arbitrary and unreasonable manner. However, we are not inclined to take such drastic steps as the appellant has developed the land subsequent to allotment.

26. We further find no force in submission made by Shri Vijay Hansaria, Senior Advocate, that in spite of making recalculation in view of the directions issued by the High Court in D.S Laungia AIR 1993 P&H 54, the State could not make any recovery from Shri Laungia. This Court, vide order dated 20-5-2010, asked the respondents to explain this aspect and file an affidavit of the administrator of the authority. In response thereto, an affidavit had been filed by the Chief Administrator, Greater Mohali Development Authority, explaining the entire position in respect of the allotment and recovery of dues furnishing all details and according to this affidavit, the money is being recovered from all defaulters including Shri D.S Laungia along with interest.

27. In view of the above, we find no force in the appeal, it lacks merit and is, accordingly, dismissed. No order as to costs.

Civil Appeal No. 3546 of 2007

28. We have heard Ms Rachna Joshi Issar, learned counsel appearing for the appellant. In spite of notice, the respondent did not enter appearance. We requested Shri Vijay Hansaria, learned Senior Counsel for the respondent, to assist the Court as amicus curiae.

29. For the reasons recorded in Civil Appeal No. 5292 of 2004 in Fuljit Kaur v. State of Punjab decided on this date, the appeal stands allowed. The judgment and order of the High Court dated 6-12-2006 is set aside and the demand notice is upheld. The appellant is entitled to make recovery in accordance with law.

Civil Appeal No. 3392 of 2007

30. We have heard Ms Rachna Joshi Issar, learned counsel appearing for the appellant. In spite of notice, the respondent did not enter appearance. We requested Shri Vijay Hansaria, learned Senior Counsel for the respondent, to assist the Court as amicus curiae.

31. For the reasons recorded in Civil Appeal No. 5292 of 2004 (Fuljit Kaur v. State of Punjab) decided on this date, the appeal stands allowed. The judgment and order of the High Court dated 6-12-2006 is set aside and the demand notice is upheld. The appellant is entitled to make recovery in accordance with law.