Kores (India) Limited v. Bank Of Maharashtra And Others
Factual and Procedural Background
M/s Jyoti Chemicals leased its industrial undertaking in Andhra Pradesh to the appellant on 9 January 1990 for 11 years at an annual rent of Rs. 20 lakhs, against which the appellant deposited Rs. 11 lakhs as security (with Rs. 1 lakh to be adjusted every year). Jyoti Chemicals had earlier borrowed from Bank of Maharashtra and hypothecated its machinery.
On 14 December 1993 the Bank filed Suit 307/1994 before the Bombay High Court to recover its dues and sought appointment of a receiver over Jyoti Chemicals’ assets, including the leased undertaking. A Single Judge rejected the receiver application, but a Division Bench, by interim order dated 4 April 1996, appointed the Court Receiver who in turn retained the appellant as agent and directed payment of:
- Rs. 20 lakhs per year (later Rs. 19 lakhs after security adjustment) as “rent” to Citi Bank, another creditor, and
- Separate royalty for plant and machinery, to be fixed by the Receiver.
The Receiver valued the 20-year-old machinery at Rs. 74.44 lakhs (written-down value) and fixed royalty at 10% thereof (≈ Rs. 8.46 lakhs p.a. or Rs. 70,000 p.m.). That determination survived challenges before the Debts Recovery Tribunal (DRT), the Debts Recovery Appellate Tribunal (DRAT) and a Division Bench of the Bombay High Court.
The appellant, having surrendered the undertaking on 30 September 2000, deposited Rs. 34,99,232.87 as directed during the pendency of proceedings and approached the Supreme Court in the present civil appeal.
Legal Issues Presented
- Whether the appellant could, despite earlier unchallenged interlocutory orders, dispute its liability to pay royalty for the plant and machinery over and above contractual rent.
- If liability existed, what was the appropriate quantum of royalty payable for the period 5 July 1996 – 30 September 2000?
Arguments of the Parties
Appellant’s Arguments
- The lease, consented to by the Bank in 1990, fixed the appellant’s obligations; a creditor’s later suit and receiver appointment could not enlarge those obligations.
- Reliance on Anthony C. Leo v. Nandlal Bal Krishnan to stress that a lessee’s liabilities remain governed by the lease regardless of receiver appointment.
- The Receiver’s valuation grossly over-estimated 20-year-old machinery; royalty at even 10% of Rs. 74.44 lakhs was excessive.
- The appellant was not bound to appeal every interlocutory order; hence could challenge liability and quantum in the present appeal.
Respondent Bank’s Arguments
- The appellant acquiesced in the Division Bench direction to pay separate royalty and therefore could no longer question liability.
- The valuation adopted by the Receiver was reasonable and remained unchallenged for years; royalty at 10% was fair.
- Any modification would adversely affect Citi Bank, which is not a party before the Supreme Court.
Table of Precedents Cited
| Precedent | Rule or Principle Cited For | Application by the Court |
|---|---|---|
| Anthony C. Leo v. Nandlal Bal Krishnan (1996) 11 SCC 376 | A lessee’s obligations are confined to the lease terms; receiver appointment does not enlarge liability. | Cited by appellant to contest additional royalty; Court considered but declined to disturb liability due to procedural factors. |
| Moheshur Sing v. Bengal Govt. (1859) 7 MIA 283 | No obligation to appeal every interlocutory order; such orders can be challenged in appeal against the final decree. | Relied on to reject Bank’s waiver/acquiescence argument in principle. |
| Satyadhyan Ghosal v. Deorajin Debi AIR 1960 SC 941 | Supreme Court not bound by Section 105(2) CPC; may examine earlier remand orders. | Cited to reinforce ability to examine prior interlocutory orders. |
| Lonankutty v. Thomman (1976) 3 SCC 528 | Same principle as above regarding remand orders. | Same contextual reliance. |
| Nain Singh v. Koonwarjee (1970) 1 SCC 732 | Finality of remand orders in High Court. | Noted in comparing Supreme Court’s broader powers. |
| Sita Ram Goel v. Sukhnandi Dayal (1971) 3 SCC 488 | Finality of remand orders for High Courts. | Same as above. |
Court's Reasoning and Analysis
1. Challenge to Liability. The Court accepted the doctrinal position that interlocutory orders can ordinarily be questioned in appeal against the final order. However, it declined to adjudicate liability on two pragmatic grounds: (a) non-joinder of Citi Bank, which receives the “rent” portion under the High Court scheme, and (b) the appellant’s acquiescence by continuing as the Receiver’s agent and not setting out a specific ground in the memorandum of appeal. Consequently, the liability to pay royalty was allowed to stand.
2. Assessment of Quantum. The Supreme Court scrutinised the Receiver’s valuation and royalty percentage. Observing that the machinery was 20 years old and the original lease valued it at about Rs. 11 lakhs (as of 1985), the Court considered the written-down value of Rs. 74.44 lakhs excessive but chose, for finality, to retain that figure while reducing the royalty rate from 10% to 6%. This yielded a royalty of Rs. 4,46,676, rounded to Rs. 5 lakhs per annum.
3. Equitable Adjustment. The appellant had already deposited Rs. 34,99,232.87. The Court directed the Debts Recovery Tribunal to:
- Disburse royalty to Bank of Maharashtra at Rs. 5 lakhs per year (plus proportionate interest) for 5 July 1996 to 30 September 2000, and
- Refund the balance (with interest, if any) to the appellant, thereby extinguishing further obligations post-surrender of the undertaking.
Holding and Implications
HELD: The appeal is allowed in part. Royalty payable by the appellant is reduced to Rs. 5 lakhs per year (from Rs. 70,000 per month) for the specified period; corresponding adjustments to be made from the deposited amount. Parties to bear their own costs.
Implications: The decision offers no new legal precedent on lessee liability but recalibrates the financial burden between the parties. The liability structure set by the High Court remains intact; only the quantum of royalty is altered. Citi Bank’s entitlement to Rs. 19 lakhs per year is left undisturbed.
P.K Balasubramanyan, J.— Leave granted. Heard both sides. On 9-1-1990, M/s Jyoti Chemicals leased out its industrial undertaking situate in the State of Andhra Pradesh to the appellant for a term of 11 years on an annual rent of Rs. 20 lakhs. A sum of Rs. 11 lakhs was paid by the appellant as security and every year a sum of Rs. 1 lakh therefrom was to be adjusted towards Rs. 20 lakhs payable for that year. It appears that M/s Jyoti Chemicals had borrowed amounts from Bank of Maharashtra on the security of the properties and had agreed to formally mortgage the properties.
2. On 14-12-1993, Bank of Maharashtra filed Suit No. 307 of 1994 on the Original Side of the High Court of Bombay for recovery of the amount due to it on the basis of the loan transaction and for specific performance of the alleged agreement to mortgage the properties included in Schedule B to that plaint. It was pleaded that a hypothecation had been created in respect of the machineries in favour of that Bank as far back as on 25-11-1982. In that suit, the appellant was not originally made a party. But the Bank moved an application for appointment of a Receiver for the properties of M/s Jyoti Chemicals situate in Thane as well as the industrial undertaking situate in the State of Andhra Pradesh.
3. The application under Order 40 Rule 1 of the Code of Civil Procedure in regard to the industrial undertaking of which the appellant was the lessee, was rejected by the learned Single Judge of that Court. The learned Judge noticed that the loan was advanced by the Bank in the year 1982; that the Bank had consented to the appellant being put in possession as a lessee subject to the appellant paying to the Bank a sum of Rs. 20 lakhs as rent. The Court further noticed that the amount had not been paid by the appellant into the Bank from the year 1982 and the suit was filed by the Bank only in the year 1993. Also, in the meantime, M/s Jyoti Chemicals had entered into an arrangement with Citi Bank for the liquidation of its loan by directing the appellant to pay the amount of Rs. 20 lakhs to that Bank. It was also stated that Bank of Maharashtra had been negligent in not having taken prompt steps for recovery of the amounts and under the circumstances it was not just and convenient to appoint a Receiver.
4. Bank of Maharashtra filed an appeal before the Division Bench. By an interim order dated 4-4-1996, the Division Bench appointed a Receiver, the Court Receiver, High Court of Bombay, for the industrial undertaking. The Court also directed the Receiver to appoint the appellant as his agent in respect of the property on usual terms and conditions without security. The undertaking including the machinery which was already in possession of the appellant as a lessee, was permitted to be continued in the possession of the appellant.
5. Subsequently, the Division Bench confirmed the order appointing the Receiver. It noticed the contention of the appellant that the Court Receiver was not entitled to claim from the appellant anything more than what the appellant was liable to pay to M/s Jyoti Chemicals. The Division Bench did not answer that contention but directed the appellant to make that submission before the Receiver and observed that the Receiver was bound to take all relevant materials into consideration. The order also directed that the appellant should continue to pay a sum of Rs. 20 lakhs per year to the Receiver who in turn would pay over the said amount to Citi Bank.
6. The order also directed that the Receiver should separately fix and collect royalty in respect of the plant and machinery located in the State of Andhra Pradesh. By a subsequent order, the order was modified by substituting the figure of Rs. 19 lakhs per year as against Rs. 20 lakhs per year as payable by the appellant since Rs. 1 lakh out of Rs. 20 lakhs was to be adjusted out of the sum of Rs. 11 lakhs paid as security.
7. The Receiver purported to get a valuation of the plant and machinery. The valuer suggested a valuation of Rs. 1,15,16,000 and reported that the written-down value on depreciation would be Rs. 74,44,600. It was also suggested by the valuer that 15% of the written-down value would be the quantum of royalty that ought to be collected.
8. In view of the liberty given to the appellant by the Division Bench to raise its contentions regarding the liability to pay royalty and its quantum before the Receiver, the appellant raised the contention that the valuer had grossly overvalued the plant and machinery and has not properly calculated the written-down value of the 20 years old machinery and it was not correct to have taken 15% of the written-down value as the royalty payable by the appellant.
9. It was also contended that the obligation of the lessee to M/s Jyoti Chemicals could not be enlarged merely because a creditor had sued M/s Jyoti Chemicals and had got a Receiver appointed for the properties of M/s Jyoti Chemicals. The Receiver accepted the written-down value suggested by the valuer but reduced the royalty to about 10% of the written-down value and fixed it at Rs. 8,46,000 and directed that a sum of Rs. 70,000 per month had to be paid by the appellant towards royalty for the plant and machinery in addition to the sum of Rs. 20 lakhs payable for the immovable property.
10. When the fixation of royalty thus, was challenged by the appellant before the Division Bench, the Division Bench directed that the appellant could question the amount of royalty fixed by the Court Receiver before the Single Judge and gave liberty to the Single Judge to pass an appropriate order. The appellant thereupon moved the learned Single Judge and questioned the direction to pay royalty at all and further questioned the quantum.
11. Meanwhile, on the constitution of the Debts Recovery Tribunal, the suit filed by Bank of Maharashtra was transferred to the Debts Recovery Tribunal. The Debts Recovery Tribunal dealt with the application of the appellant challenging the liability imposed on it for paying royalty at Rs. 70,000 per month. The Debts Recovery Tribunal rejected the challenge.
12. On the aspect of liability, the Tribunal thought that the appellant having acquiesced in the order of the Division Bench regarding liability, the same could not be questioned and the challenge had to be limited to the quantum and having considered the approach made by the Receiver it held that there was no reason to interfere with the quantum of royalty fixed as payable. The appellant challenged that order before the Debts Recovery Appellate Tribunal. The Appellate Tribunal dismissed the appeal.
13. The appellant thereupon approached the High Court with a writ petition. The High Court took the view that the order dated 17-12-1998 precluded the appellant from challenging the liability itself and on the materials available, there was no reason to interfere with the fixation of royalty at Rs. 70,000 per month. Thus, the writ petition was dismissed by the Division Bench. It is this order that is challenged before us by the appellant.
14. Before considering the contentions raised by learned counsel for the appellant we have to notice that Citi Bank, to whom the sum of Rs. 19 lakhs was payable by the appellant described as rent of the immovable property by the order of the High Court, has not been impleaded in this appeal. It is therefore not possible to pass any order in this appeal that may prejudice Citi Bank or that may interfere with the working of the order passed by the High Court in favour of Citi Bank. This aspect may have relevance when we consider some of the contentions raised on behalf of the appellant by their Senior Counsel.
15. It is contended by the learned Senior Counsel that the appellant was a lessee long prior to the filing of the suit by Bank of Maharashtra, a creditor, against M/s Jyoti Chemicals and the lease itself was granted to the appellant by M/s Jyoti Chemicals with the consent of the Bank. Learned counsel submitted that merely because a creditor had filed a suit against M/s Jyoti Chemicals and got a Receiver appointed, the liability and obligation of the lessee could not be enhanced and the obligation of the lessee would remain the same as the one contained in the indenture of lease. Learned counsel sought support from the decision of this Court in Anthony C. Leo v. Nandlal Bal Krishnan (1996) 11 SCC 376, 1996 Supp (7) SCR 669 for this position.
16. This contention is sought to be met on behalf of the Bank mainly on the basis that the appellant had acquiesced in the earlier order of the Division Bench of the High Court directing that Rs. 20 lakhs, the agreed lease amount, is to be paid towards the rent of the immovable property and that the appellant would be liable to pay royalty for the plant and machinery in addition to that amount.
17. We are not impressed with the argument. A litigant is not bound to appeal against every interlocutory order passed against him; he can wait until the final order is passed and in appeal against that final order challenge all orders leading to the final order and affecting that decision. Stated the Privy Council in Moheshur Sing v. Bengal Govt. (1859) 7 MIA 283: (MIA p. 302)
“… We are not aware of any law or regulation prevailing in India which renders it imperative upon the suitor to appeal from every interlocutory order by which he may conceive himself aggrieved, under the penalty, if he does not so do, of forfeiting forever the benefit of the consideration of the appellate court. No authority or precedent has been cited in support of such a proposition, and we cannot conceive that anything would be more detrimental to the expeditious administration of justice than the establishment of a rule which would impose upon the suitor the necessity of so appealing; whereby on the one hand he might be harassed with endless expense and delay, and on the other inflict upon his opponent similar calamities.”
18. The two exceptions to the rule are Section 105(2) of the Code of Civil Procedure which precludes an order of remand being challenged at a subsequent stage, while challenging the decree passed pursuant to the order of remand and Section 97 of the Code where while filing an appeal from the final decree, a litigant is not entitled to question the preliminary decree on which it is based and which had earlier become final.
19. Since the Code of Civil Procedure is not applicable in terms to the Supreme Court, it was held by this Court in Satyadhyan Ghosal v. Deorajin Debi AIR 1960 SC 941, (1960) 3 SCR 590 and in Lonankutty v. Thomman (1976) 3 SCC 528, 1976 Supp SCR 74 at p. 81 that even Section 105(2) of the Code, did not preclude this Court from examining the correctness of the earlier order of remand passed by the High Court in an appeal arising from the decree passed subsequent to the remand. But as regards the High Court, the order of remand would be final. (See the decisions in Nain Singh v. Koonwarjee (1970) 1 SCC 732, (1971) 1 SCR 207 and Sita Ram Goel v. Sukhnandi Dayal (1971) 3 SCC 488, (1972) 1 SCR 836.)
20. Therefore, on principle, the argument that the appellant cannot challenge in this appeal the order holding that he should pay royalty for the plant and machinery in addition to the rent on the ground that as far as the High Court is concerned it had become final, cannot be accepted.
21. But, here we find some difficulty in accepting this contention of the appellant in the absence of Citi Bank from the array of parties. Any finding on liability different from the one rendered by the High Court by us and another arrangement regarding payment, may have an impact on the order of the High Court directing that Rs. 19 lakhs payable by the appellant (after adjusting Rs. 1 lakh from the security) be paid to Citi Bank on the basis that separate royalty is payable for the plant and machinery and that is liable to be paid to Bank of Maharashtra.
22. To counter this position, learned Senior Counsel submitted that the appellant had surrendered the undertaking on 30-9-2000 on the expiry of the term of the lease and Bank of Maharashtra has subsequently sold the undertaking and had recovered substantial amounts towards the liability of M/s Jyoti Chemicals and under those circumstances this Court could pass an order holding that no royalty was payable by the appellant to Bank of Maharashtra.
23. We also find from the particulars furnished by the appellant itself that the appellant was permitted to continue as agent of the Receiver on usual terms and conditions without security and royalty for the plant and machinery was fixed pursuant thereto.
24. We may also notice that a specific ground challenging the order holding that royalty was payable is also not set out in the grounds of appeal so as to put the respondent Bank on notice of such a contention though of course reference is made to the decision in Anthony C. Leo (1996) 11 SCC 376, 1996 Supp (7) SCR 669 and the obligations of the appellant as a lessee being confined to the rent payable. The appellant has also acquiesced in this part of the order since the appellant could have, according to us, validly contended that there was no reason to dispossess it during the subsistence of the lease and it would have been for the Court to direct that the sum of Rs. 19 lakhs payable by the appellant should be paid to the Receiver and not to M/s Jyoti Chemicals.
25. We have already indicated that the order we may pass may have an impact on the right of Citi Bank in collecting the sum of Rs. 19 lakhs per year during the subsistence of the lease, since, we may have to find on the terms of the lease deed executed by the appellant that the rent for the immovable property was fixed only at Rs. 60,000 per year and the rest of the rent was royalty for the plant and machinery which was also specified as immovable property therein and that would raise questions as to whether the plant and machinery having been hypothecated to Bank of Maharashtra, it did not have a priority to claim that amount as against Citi Bank. In this situation, we are satisfied that though legally the appellant could have challenged its obligation to pay anything more than the amount agreed upon under the indenture of lease, on the facts and in the circumstances of the case, the appellant has precluded itself from raising that challenge before us by not impleading a necessary party who might be affected by our decision and by acquiescing in that decision. We, therefore, overrule that contention of the learned Senior Counsel for the appellant.
26. Then comes the question as to whether there is any justification in interfering with the quantum of royalty fixed by the Receiver and approved by the Debts Recovery Tribunal and the High Court.
27. Learned counsel for the appellant points out that even at the time of entering into the lease transaction, the parties had valued the plant and machinery at Rs. 11,01,912.44 and that valuation was as on 30-6-1985 and if at all, there was only further depreciation of the value and under the circumstances the valuer had grossly overvalued the plant and machinery at Rs. 1,15,16,000 and in determining the written-down value at Rs. 74,44,600. Learned counsel also submitted that 10% of the written-down value fixed as royalty by the Court Receiver and approved by the Court, was also on the higher side.
28. Learned counsel for the Bank on the other hand contended that there was no proper or tenable objection to the valuation made by the valuer and it was too late in the day for the appellant to question the valuation. Learned counsel further submitted that there was no reason to interfere with the acceptance of that valuation and the fixation of royalty at 10% thereof by the Receiver. He also submitted that 10% of the written-down value was reasonable under the circumstances.
29. We think that on the facts and in the circumstances of the case, taking note of the various aspects that had been projected before us, it would be appropriate to fix the royalty at 6% of the written-down value as found by the valuer. That would mean that the royalty would come to Rs. 4,46,676 per year. We think it appropriate to round off that figure to Rs. 5 lakhs per year. The order of the Receiver as affirmed by the Debts Recovery Tribunal and the High Court fixing the quantum at Rs. 70,000 per month therefore requires modification. We therefore modify that part of the order and hold that the royalty payable by the appellant per year in addition to the sum of Rs. 20 lakhs (minus Rs. 1 lakh to be adjusted out of the security) would be Rs. 5 lakhs and the yearly sum at that rate has to be paid towards liability for the period from 5-7-1996 to 30-9-2000.
30. It is seen that the appellant had deposited a sum of Rs. 34,99,232.87 on 12-10-2004 in the light of the order passed by the Debts Recovery Tribunal and the extension of time granted by this Court for making that payment. Out of this amount, the Debts Recovery Tribunal will disburse to Bank of Maharashtra royalty at the rate of Rs. 5 lakhs per year for the relevant period and refund the balance to the appellant. If the amount deposited had earned any interest, the interest on the sum of Rs. 5 lakhs per year will also be disbursed to the respondent Bank. Since the appellant had surrendered the premises on expiry of the term on 30-9-2000, the above adjustment would put an end to the obligation of the appellant imposed by the Court on appointing a Receiver at the instance of Bank of Maharashtra. The balance amount with interest, if any, would be refunded to the appellant.
31. The appeal is thus allowed as above to the limited extent with a direction to the parties to suffer their respective costs in this Court.
Alert