Jespar I. Slong v. State Of Meghalaya And Others

Supreme Court Of India
May 7, 2004
Important Paras
Please sign up to view Important Paras.
Smart Summary (Beta)

Factual and Procedural Background

The State of Meghalaya owns a weighbridge at Morkjniange. Initially, the State leased the weighbridge through a tender process in which Smt. Nila Niangti’s bid of Rs 1.21 crore was accepted. A competing bidder challenged that award before a Single Judge of the Gauhati High Court, alleging the bid was “speculative and predatory.” On 15-3-2002 the Single Judge set aside the award, tentatively valuing the contract at Rs 40,29,600 and directing the State to invite fresh tenders and reassess the value.

During retendering the Tender-Acceptance Committee, using both the enforcement staff’s report and Public Works Department traffic data, estimated annual revenue at Rs 2.11 crore and fixed the tender value at Rs 2 crore. Twenty-seven bids were received. After procedural rejections, C. Yonbon’s bid of Rs 1.75 crore was the highest valid offer, followed by the appellant’s bid of Rs 62,70,797 and three identical bids of Rs 40,29,600 (Respondents 4, 5 and 6).

The Transport Minister, citing potential contempt of court for deviating from the earlier Single Judge’s figure, rejected the Committee’s recommendation and preferred one of the Rs 40,29,600 bidders. When the State sought an extension of time, the Single Judge (22-7-2002) attempted a “King Solomon” division of the contract among three equal bidders for successive years. A Division Bench set aside that order and gave three weeks for fresh settlement. The authorities then selected the 4th respondent, reasoning that he alone proved financial capacity.

Two rival equal-amount bidders failed in writ petitions challenging that choice. After their defeat, the appellant—whose higher bid had never been considered—filed a writ appeal. The Division Bench dismissed it on the merits. The present Supreme Court appeal challenges that dismissal and the underlying acceptance of the 4th respondent’s lower bid.

Legal Issues Presented

  1. Whether the appellant’s writ appeal before the Gauhati High Court was maintainable despite his not filing an initial writ petition.
  2. Whether the High Court’s earlier tentative valuation of Rs 40,29,600 was binding on the State in the retender process.
  3. Whether the concept of “predatory/speculative pricing” justified rejecting bids higher than Rs 40,29,600 for this type of lease contract.
  4. Whether the State’s eventual acceptance of the 4th respondent’s lower bid and rejection of higher, otherwise qualified bids (including the appellant’s) was arbitrary and illegal.

Arguments of the Parties

Appellant's Arguments

  • The Single Judge erred in characterising higher bids as “predatory”; the lease involves only revenue to the State and no sensitive commodity or public-distribution concern.
  • The enforcement staff’s report was only one data source; other reliable traffic data supported the Committee’s higher valuation.
  • The Minister wrongly assumed the High Court’s figure of Rs 40,29,600 was binding; valuation lies within the executive domain.
  • Because his higher bid was never considered and he lacked notice of its rejection, the appellant was entitled to challenge the award on appeal.

4th Respondent's Arguments

  • The appellant’s appeal was not maintainable; he “sat on the fence” and filed only after others failed.
  • The Single Judge correctly fixed Rs 40,29,600 as a reasonable value based on the enforcement report; bids above that were speculative, risked cartelisation and could coerce transporters to pay more fees.
  • Public interest, not just revenue, must guide State largesse; accepting inflated bids could foster malpractice or abandonment of the contract.

Table of Precedents Cited

Precedent Rule or Principle Cited For Application by the Court
Union of India v. Hindustan Development Corporation, (1993) 3 SCC 499 Discusses “predatory pricing,” cartels and the need for non-arbitrary State contracting. The Court held the principles from that case did not apply to a lease of a weighbridge where fees are fixed and no third-party pricing is affected.

Court's Reasoning and Analysis

Maintainability of Appeal: The Supreme Court agreed with the Division Bench that the appellant could appeal because he lacked prior notice of the rejection of his higher bid; insisting on a new writ would be futile.

State’s Power to Reassess Value: The earlier High Court order expressly allowed the State to “re-examine and reassess” tender value while considering (but not being confined to) the enforcement report. Hence, the Tender-Acceptance Committee lawfully used additional PWD data and fixed a value of Rs 2 crore.

Error by the Minister: The Minister erred in treating Rs 40,29,600 as binding and in ignoring the Committee’s reassessment, leading to an arbitrary choice of a lower bid.

Predatory Pricing Inapplicable: The lease is not a supply contract affecting commodity prices; weighment fees are statutorily fixed (Rs 30 loaded / Rs 10 unloaded). High bids merely enhance State revenue and do not harm public interest. Therefore, classifying higher bids as “predatory” was legally baseless.

Safeguards against Default: Contract terms already require six-month advance payments and security, minimising abandonment risk. Additional indemnity could be taken if needed.

Outcome: Because the State’s acceptance of the 4th respondent ignored the valid higher bids and misapplied legal standards, it was arbitrary and unsustainable. Both lower-court judgments upholding it were consequently set aside.

Holding and Implications

HOLDING: The appeal is ALLOWED; all impugned orders and the 19-9-2002 contract in favour of the 4th respondent are set aside.

Implications: The State of Meghalaya must issue a fresh tender and finalise a new contract by 1-7-2004, maximising revenue while following its guidelines. The 4th respondent may operate the weighbridge only until 30-6-2004, with any excess advance refunded thereafter. The judgment clarifies that “predatory pricing” concepts do not govern revenue-leasing contracts where public fees are fixed, reinforcing executive discretion to reassess tender value on reliable data and the judiciary’s limited role to curb arbitrariness.

Show all summary ...

N. Santosh Hegde, J.— Heard learned counsel for the parties.

2. Leave granted.

3. In this appeal the appellant questions the correctness and legality of the judgment of the High Court of Gauhati dated 28-1-2003 made in Writ Appeal No. 710 of 2002 confirming the judgment dated 7-11-2002 made by the learned Single Judge of the same High Court at Shillong Bench in WP (C) No. 355 (SH) of 2002. The facts necessary for the disposal of this appeal are as follows:

The State of Meghalaya owns a weighbridge at Morkjniange which it had decided to lease out to dcontractors who were willing to take it on lease on yearly basis. For the said purpose it issued a notice inviting tender (NIT) from interested persons for operating the said weighbridge. Pursuant to the said notification a number of tenderers offered their bids. On 11-2-2002, the respondent State accepted the bid of one Smt Nila Niangti, Respondent 5 herein, which was for a sum of Rs 1.21 crores and the contract was settled in her favour. One of the bidders who participated in the said tender challenged the said acceptance of the bid before the High Court in WP No. 34 (SH) of 2002, inter alia, on the ground that the said acceptance was contrary to the prescribed guidelines and the bid amount accepted was speculatory and predatory in nature. The learned Single Judge who heard the said writ petition accepted the contention of the writ petitioner that the bid offered by the 5th respondent herein was speculatory and predatory in nature. According to the learned Judge the approximate value of the contract would have been only Rs 40,29,600 which figure the learned Judge arrived at by taking into consideration a report submitted by the enforcement staff of the Department of Transport. On the said basis, while setting aside the acceptance of the bid of the 5th respondent herein the Court directed the respondent to call for fresh tenders and re-examine and reassess the value of tender keeping in view the observations made in the said judgment. A further direction was given that a fresh tender should be called for and the exercise of acceptance of that tender should be made within a period of 45 days from the date of the said judgment.

4. In compliance with the directions issued by the High Court in the abovesaid judgment, the Tender-Approval Committee made a fresh assessment of the approximate value of the tender. While doing so it took into consideration the abovementioned report of the enforcement staff of the Department of Transport as also traffic census data provided by the Public Works Department and came to the conclusion that the annual collection from the weighbridge fees would be to the tune of Rs 2.11 crores and the said Committee evaluated the value of the tender at Rs 2 crores. This assessment was made by the said Tender Committee after considering the above two reports. In the meantime, it is to be noted that a fresh tender was called for and in the said tender 27 bids were received. The highest bid was for Rs 3,03,33,333 and the next highest bid was for Rs 2,53,60,333. These two bids were rejected by the Tender Committee because the said bid forms were not affixed with the necessary court fees stamp. The 3rd highest bid was of Mr C. Yonbon for Rs 1,75,00,567. The 4th and 5th bids were for Rs 1,63,00,987 and Rs 1,35,00,867 which were withdrawn by the tenderers concerned. The 6th highest bid was for Rs 97,77,777 but the said tenderer has not pursued the matter any further for whatever reason. The 7th bidder who is the appellant now before us offered a bid for Rs 62,70,797, the 8th, 9th and 10th bidders are Respondents 5, 6 and 4 respectively in this appeal who offered identical bids of Rs 40,29,600 each which was actually the figure identified by the learned Single Judge in his order dated 15-3-2002. It is not necessary for us to go into the particulars of the other bids for the purposes of disposal of this appeal, hence, we will not refer to those particulars.

5. The Tender-Acceptance Committee recommended to the Minister of Transport for approval of the acceptance of tender of Mr C. Yonbon whose bid was Rs 1,75,00,567 and who was otherwise qualified in all respects as per the tender regulation. However, the Minister disagreed with the recommendations made by the Tender Committee solely on the ground that the High Court as per its order dated 15-3-2002 had directed the respondent State to take into consideration the report submitted by the Enforcement Inspector of the Department of Motor Vehicles as regards the average number of trucks loaded and unloaded plying from Jaintia Hills to Guwahati and vice versa per day while making the retender, hence, any deviation from the above direction would amount to contempt of court and it would be contrary to the mandate of the said judgment to rely on any other source of information like the data supplied by the Public Works Department while making an assessment of the value of the tender. Therefore, he recommended that the tender of one of the persons amongst Respondents 4, 5 and 6 who had offered Rs 40,29,600 each, be accepted.

6. In view of the difference of opinion between the Tender Committee and the Minister, the matter was referred to the Chief Secretary, the Finance Department and the Law Department who were all of the opinion that the matter should be referred to the High Court as to whether the valuation made by the Tender-Acceptance Committee can be relied upon or not. But when the file went to the Chief Minister he directed the acceptance of bid at the level of the Minister himself.

7. At this juncture, since the time stipulated for compliance by the High Court had expired, the respondent State made an application for extension of time before the High Court. In the said application the State had given the particulars of the bids received by it and the reasons for not finalising the tender. The learned Single Judge while considering the said application for grant of extension of time on 22-7-2002 took a decision to do King Solomon's justice and passed the following order:

“(i) The settlement of the weighbridge at Morkjniange, Jaintia Hills be made to and in favour of three bidders who bidded the same amount in the following manner:
(ii) for the first year, the settlement be made in favour of Smt Nila Niangti,
(iii) for the second year, the said weighbridge be settled in favour of Shri Arvotki Sumer, and
(iv) for the third year, the weighbridge be settled to and in favour of Shri Sophiker Pariat.
(v) The aforesaid period of three years would start from the date of issuance of necessary orders by the competent authority for which three weeks' time is granted to the said applicants to do the needful for the ends of justice.”

8. Being aggrieved by the said arrangement made by the learned Single Judge, one of the aggrieved parties by name Mr Sastian Dkhar preferred a writ appeal against the said order of the learned Single Judge. In the said appeal the Division Bench of the High Court set aside the order of the learned Single Judge dated 22-7-2002, holding that the learned Single Judge could not have exercised the power of settling this right by himself in an application filed by the Government for extension of time. It also held that positive directions issued by the learned Single Judge were contrary to the directions issued previously, therefore, while setting aside the order of the learned Single Judge, the Appellate Bench granted three weeks' further time to the respondent authorities for settling the matter in accordance with the directions issued by the High Court.

9. After the matter came back to the authorities, the authorities decided to accept the tender of the 4th respondent herein which was for a sum of Rs 40,29,600 per annum on the ground that the said respondent had proved his financial capacity while the other two equivalent bidders had not done so.

10. Being aggrieved by the aforementioned order granting the lease in favour of the 4th respondent, the other 2 tenderers who had offered identical amounts preferred two writ petitions before the said High Court. The main contention of the writ petitioners in the said petitions was that the acceptance of the bid of the 4th respondent which was identical with theirs solely on the ground of financial capacity was contrary to the guidelines.

11. Learned Single Judge by his judgment dated 7-11-2002 dismissed the said writ petitions. The Court held that the decision of the authorities to choose the 4th respondent on the ground of financial soundness was a relevant consideration for the purpose of assessing the suitability of a tenderer for the settlement of the contract.

12. At this stage the appellant who had bid for Rs 62,70,797 having come to know of the acceptance of the lesser bid of the 4th respondent filed a writ appeal against the judgment of the learned Single Judge dated 7-11-2002 whereby he had approved the acceptance of the offer of the 4th respondent. It was the contention of the appellant in the appeal filed by him that after the offer of the bids no intimation of the acceptance of the bid of any of the persons was made public and since his bid was higher than that of the 4th respondent and he being otherwise qualified, his bid ought to have been accepted since no other qualified and higher bidder had come forward making any such demand. The said appeal of the appellant was opposed by the 4th respondent and the State on the ground that the appellant not having challenged the acceptance of the bid of the 4th respondent before the Single Judge could not be permitted to challenge the same for the first time by way of a writ appeal, hence, his appeal being not maintainable, the same should be rejected. The Appellate Bench of the High Court rejected the objection as to the maintainability of appeal by a person who had not filed a writ petition and decided the appeal on merits but upheld the judgment of the learned Single Judge whereby the challenge to the acceptance of the bid of the 4th respondent was rejected. It is against the said judgment of the Appellate Bench the appellant is now before us in this appeal.

13. Mr R.F Nariman, learned Senior Counsel appearing for the appellant submitted that the finding of the learned Single Judge that the concept of predatory or speculative pricing applied to the contract in hand is wholly erroneous. It is the argument of the learned counsel that this is not a contract for supply of goods. He stated that this contract also did not involve the public distribution system or for that matter, even the supply of an essential commodity. He submitted that this contract also had no effect on the pricing of the coal which was the main goods carried by the vehicles in this region; hence this contract had no public interest involved except the revenue of the State. He contends that this is a pure and simple contract of leasing out a weighbridge which is the property of the State Government where the one and only criterion for consideration would be the interest of revenue of the State. He submitted that the valuation made by the Transport Department is only one of the materials to be relied upon for the purpose of knowing the probable value of the lease and cannot be the sole basis when there are other reliable materials which showed that the volume of transport on the route concerned was much higher. It is also contended that even otherwise from the material on record the Tender-Acceptance Committee was justified in coming to the conclusion that the value of the tender would be as much as Rs 2 crores. In such a situation the respondent State could not have fixed the value of tender at Rs 40,29,600 merely because the High Court in the earlier judgment considered the said value as a reasonable value. It is the submission of the learned counsel that fixation of value of the contract is within the jurisdiction of the authorities concerned and the Court ought not to have embarked upon an exercise of this nature with the limited material available to it. He also submitted that the Minister was wholly wrong in coming to the conclusion that the Government was bound by the figure of Rs 40,29,600 merely because it was the opinion expressed by the Court.

14. Mr Vijay Hansaria, learned Senior Counsel appearing for the 4th respondent firstly contended that the appellant's appeal before the Division Bench was not maintainable inasmuch as he had not challenged the order of acceptance of the 4th respondent's bid by filing a writ petition and it is only when the writ petitions filed by 2 other bidders came to be rejected the appellant who was sitting on the fence all the time chose to file an appeal for the first time as a speculatory litigation. He further submitted that the learned Single Judge was justified in coming to the conclusion that the reasonable bid value of the contract was Rs 40,29,600, which was an amount arrived at by the learned Judge on the basis of the report of the Inspection Inspectorate of Motor Vehicles. He also justified the finding of the learned Single Judge that any amount over and above the said figure offered as a bid would be predatory and speculatory in nature which would encourage bidders to form cartels to oust the other genuine bidders from offering their bids and would also amount to encouraging the monopolistic trade practice. He further submitted that accepting highly inflated bid would not be in public interest because to recover such huge amount the successful bidders would indulge in malpractice of coercing the transporters to pay more fees for the weighment of their vehicles. He also submitted that the State while offering its largesse to the public should not have monetary consideration as the sole criterion but should also bear in mind the interest of the public at large. In the said view of the matter the learned counsel submitted that the acceptance of bid of the 4th respondent was justified.

15. From the arguments addressed by the learned counsel appearing for the parties, many issues arise for our consideration. In this process of consideration of the issues involved in this appeal, we will first consider whether the appeal filed before the Appellate Bench of the Gauhati High Court was maintainable or not. It is an admitted fact that after the Single Judge by his order dated 15-3-2002 set aside the earlier acceptance of bid on the ground that the said bid was predatory or speculatory in nature a fresh tender was called for and the appellant was one such person who offered his bid. It is also not disputed that between the appellant and Respondents 4, 5 and 6 the appellant's bid is very much higher. It is the case of the appellant which, of course, is disputed by the other side that he had no knowledge whatsoever of anyone's bid being accepted much less his bid being rejected. Therefore, when he came to know of the acceptance of the bid of the 4th respondent for the first time after the disposal of the second round of litigation by the learned Single Judge, he approached the Appellate Bench of the High Court because rejection of his bid in preference to the bid of the 4th respondent was arbitrary and contrary to law. The Appellate Bench of the High Court has thought it fit to entertain the appeal of the appellant by rejecting the objections raised by the 4th respondent and the State. We find no reason to interfere with this finding as to the maintainability of the appeal because if really the bid of the appellant was rejected erroneously and the appellant had no knowledge of such acceptance or rejection, the appellant had every right to challenge the said rejection of his bid and also the acceptance of the 4th respondent's bid. And if it is a fact, which we think it is, that the appellant had no knowledge of the same till the disposal of the writ petitions of other two bidders, the appellant was justified in filing the appeal against that judgment because filing of another writ petition would only be an exercise in futility.

16. The next question for our consideration is: whether the value of the contract fixed at Rs 40,29,600 by the High Court as per its order dated 15-3-2002 was a final value or whether it was open to the State to have refixed that value of contract on the basis of fresh material available before it. Herein we must notice that while setting aside the contract in the first round of litigation the High Court in its order dated 15-3-2002 specifically directed thus:

“It is, however, made clear that the State respondents shall take into consideration the report submitted by the Enforcement Inspectors regarding the average number of trucks loaded (including coal-loaded trucks) and unloaded plying from Jaintia Hills to Guwahati and vice versa, per day as seen in the document marked as Annexure V to the writ petition while making the retender of the said tender. Liberty is also granted to the State respondents to re-examine and reassess the value of the tender keeping in view the observations of this Court in this judgment.”
(emphasis supplied)

17. It is seen from the above directions issued by the Court that the High Court left open the question of reassessing the value of the tender to the State authorities. However, it directed them to take into consideration the report submitted by the Enforcement Inspectors of the Motor Vehicles Department. It did not prohibit the said authorities from taking into consideration any other material which was also available. Therefore, in our opinion, it was open to the authorities to rely upon such other material as was available to it while reassessing the value of the tender but, of course, it also had to consider the report submitted by the Enforcement Inspectors. By its order the High Court had also not specifically held that the reasonable assessment of the tender value made by it at Rs 40,29,600 was a conclusive value and the authorities were bound by the same, because if it was so then there was no need to give the direction to the State authorities to make a reassessment on the material available to it. We think it is clear from the above judgment that the reasonable assessment of the tender value made by the High Court at Rs 40,29,600 was only a tentative expression of opinion. That apart, fixation of a value of the tender is entirely within the purview of the executive and courts hardly have any role to play in this process except for striking down such action of the executive as is proved to be arbitrary or unreasonable. From the above findings of ours, it is clear that the Tender-Acceptance Committee had the necessary authority to reassess the value of the tender which it did by fixing the value at Rs 2 crores. This value was fixed after taking into consideration the report submitted by the Enforcement Inspectors as also the report and data supplied by PWD and if the said authorities thought it fit and safe to rely upon the data supplied by the PWD authorities, we can find no fault with the same. In this context in our opinion, the Minister who disagreed with the recommendation of the Tender-Acceptance Committee was in error in coming to the conclusion that the figure of Rs 40,29,600 fixed by the learned Single Judge in his order was a final value and the State authorities had no right to differ from the same.

18. The next question for our consideration is: does the principle of predatory pricing apply to the contract of the like involved in this appeal? The learned Single Judge who applied this principle had obviously in mind the law laid down by this Court in the case of Union of India v. Hindustan Development Corpn. (1993) 3 SCC 499 wherein this Court did discuss the principle of predatory pricing in the context of cartelling or creating monopolistic rights. The facts involved in the said case pertain to formation of a cartel by some of the manufacturers and the underpricing of their products which on the facts of that case was held to be amounting to unfair trade practice. In our opinion, principles discussed in the said case do not apply to the facts of this case.

19. It goes without saying that the Government while entering into contracts is expected not to act like a private individual but should act in conformity with certain healthy standards and norms. Such actions should not be arbitrary, irrational or irrelevant. The awarding of contracts by inviting tenders is considered to be one of the fair methods. If there are any reservations or restrictions then they should not be arbitrary and must be justifiable on the basis of some policy or valid principles which by themselves should be reasonable and not discriminatory. (See para 7 of Hindustan Development case (1993) 3 SCC 499.) The said judgment also states that any act which excluded competition from any part of the trade or commerce by forming cartels should not be permitted.

20. Probably, from the above observations of this Court in the case of Hindustan Development (1993) 3 SCC 499 the learned Single Judge in this case came to the conclusion that in the instant case any offer made which is over and above the realistic value of the contract would be predatory or speculatory in nature. The question for our consideration is: is there any factual basis for coming to this conclusion that the bids offered in this case were either predatory or is the bid of a cartel. For this purpose, we will now examine what is the nature of contract involved in the present case.

21. The respondent State owns a weighbridge at Morkjniange. The income from this weighbridge is received from the fees charged for weighment of trucks which pass through the route on which this weighbridge is situated. We are told that these trucks mostly carry coal from Jaintia Hills to Guwahati. As per the notification, the person operating the weighbridge can only charge a sum of Rs 30 for a loaded truck and Rs 10 for an unloaded truck. Therefore, the fee to be collected from the transporters for weighment of their vehicles is fixed and it does not vary with the amount of bid offered by the contractor. This is not a contract of supply where a contractor by manipulating the price may cause loss to the public at large. This is not a contract which would have any effect on the price of coal, since weighment charges are fixed by the Government and the contractor has no right to increase the same. Payment of the bid amount is purely a matter between the contractor and the State. As a matter of fact, obtaining higher revenue by accepting the eligible highest bid would only be in public interest because the State stands to gain more revenue. The offering of the bid after knowing the commercial value of the contract is a matter left to the business acumen or prudence of the tenderer. No third party's interest is involved in such contract. Therefore, in our opinion, application of the principle of predatory pricing is wholly alien to this type of contract. Mere offer of a fancy or high bid by itself does not make the bid a predatory bid in this type of contract. If the State decides to give its largesse to the public it has an obligation to see that it fetches the best possible value for the same, provided otherwise it does not in any manner affect the rights of other citizens. No bidder has any right in law to demand the State to give away its largesse for an amount which he considers to be reasonable even when there are bidders willing to pay more for it. The principle of monopoly also does not come into play in these types of contracts.

22. Therefore, in our opinion, the High Court was in error in coming to the conclusion that because it felt the fair value of the contract is Rs 40,29,600, any bid over and above that would be predatory.

23. Learned counsel for the 4th respondent had contended that acceptance of speculatory bid can lead to abandonment of the contract by such speculative bidders which would cause loss to the State. On facts, this argument has no legs to stand on. We find from the terms of the contract that the successful bidder has to deposit, apart from security amount, six months' equivalent of monthly lease amount in advance and the balance term of the contract will be permitted only if the said contractor deposits in advance the sum equivalent to the next six months' lease amount in advance. Hence the possibility of the contractor defaulting in payment of lease amount is remote. Be that as it may, the State may consider obtaining an indemnity bond from the successful bidder to indemnify the State Government from any loss that it may suffer because of the act of the contractor apart from the advance amount payable as per the terms of the contract.

24. Therefore, we are of the opinion that the rejection of the bid of the appellant or for that matter other bids which were more than the 4th respondent's bid, is unsustainable so also the judgments of the two courts below which have upheld the same.

25. It is seen from the records that pursuant to the acceptance of the bid of the 4th respondent on 19-9-2002 the 4th respondent has been operating the weighbridge, and the tenure of the contract is to come to an end in the normal course on 18-9-2004. Since the acceptance of the 4th respondent's bid is held to be illegal by us the same has to be set aside but we will not issue directions to the respondent State Government to accept the bid of the appellant because in our opinion it is in the interest of justice that a fresh tender should be called for and based on the bids received pursuant thereto, and in accordance with the guidelines, a fresh contract will have to be entered into by the State Government in regard to this weighbridge. At the same time since this process is likely to take some time we do not want to create a void by directing the 4th respondent to hand over possession of the weighbridge to the Government at this stage more so because of the fact that under the guidelines applicable the 4th respondent must have paid the lease amount up to the period of 18-9-2004. Therefore we direct the respondent State to call for fresh tenders and take a decision in regard to acceptance of a fresh bid and grant new contract on or before 1-7-2004. Till such time the 4th respondent will be permitted to operate the weighbridge and on the acceptance of the tender by 1-7-2004 new contractor whose bid is accepted shall be entitled to run the same for the period agreed therein. On the effective termination of the contract of the 4th respondent w.e.f 30-6-2004 if any excess amount is paid by the 4th respondent the same shall be refundable to him by the respondent Government.

26. For the reasons stated above, this appeal succeeds. The impugned orders of the courts below are set aside as also the contract awarded to the 4th respondent by the respondent State as per its order dated 19-9-2002. The appeal is allowed.