5 M & T Consultants, Secunderabad v. S.Y Nawab And Another

Supreme Court Of India
Sep 26, 2003
Important Paras
Please sign up to view Important Paras.
Smart Summary (Beta)

Factual and Procedural Background

The Municipal Corporation of Hyderabad (MCH) needed to rationalise house-numbering and erect street-sign and direction boards in the twin cities of Hyderabad and Secunderabad. Because of severe financial constraints, the Corporation accepted a self-financing “pilot project” proposed by the appellant, M/s 5 M & T Consultants. Under two letters dated 12-9-1994/14-9-1994 the appellant was permitted to erect street-sign boards in Circle 3 and Secunderabad Division and to install direction boards at twenty-seven specified locations, retain limited advertising space for 15 years, meet all costs and maintenance, and pay nominal fees to the Corporation.

The first respondent (writ petitioner), an advertising businessman, alleged that the permission was granted arbitrarily, without public tender, and in violation of Sections 421/422 of the Hyderabad Municipal Corporation Act and Article 14 of the Constitution. His writ petition was dismissed by a learned Single Judge, who found no illegality and noted that only two circles were allotted, leaving other areas open to competitors. On appeal, a Division Bench initially recorded the Corporation’s willingness to extend similar terms to the writ petitioner, but the petitioner did not avail of the offer and continued the litigation. Ultimately, the Division Bench allowed the appeal and ordered termination of the appellant’s contract. The appellant (second respondent before the High Court) obtained special leave, leading to the present Supreme Court decision.

Legal Issues Presented

  1. Whether MCH’s grant of permission/contract to the appellant without public tender or auction was arbitrary, violative of Article 14, or ultra vires the Hyderabad Municipal Corporation Act.
  2. Whether the writ petition constituted a bona fide public-interest litigation or was merely a vehicle to advance the writ petitioner’s private commercial interests.
  3. Whether the Division Bench of the High Court erred in setting aside the learned Single Judge’s dismissal of the writ petition and directing termination of the appellant’s contract.

Arguments of the Parties

Appellant (M/s 5 M & T Consultants)

  • The project was a self-financing public utility scheme undertaken at the appellant’s cost and risk, involving no financial burden on MCH.
  • Permission was granted after one year of discussions, demonstrations, design revisions and sample boards; hence the process was transparent and bona fide.
  • Sections 420/421 of the HMC Act, dealing with private exploitation of corporation property, were inapplicable because the boards would ultimately become Corporation property and served a civic function.
  • The writ petitioner lacked locus and genuine public interest; his petition was a disguised attempt to secure a “pound of flesh” after the project proved successful.

First Respondent (Writ Petitioner)

  • The contract amounted to a grant of “largesse” awarded without advertisement, tender or equal opportunity, violating Article 14.
  • Sections 421 and 422 of the HMC Act require regulation and fees for private advertising; exemption of advertisement fee and ground rent was ultra vires.
  • MCH allegedly refused similar permission to the writ petitioner, demonstrating discriminatory treatment.

Municipal Corporation of Hyderabad (Original Respondent)

  • Endorsed the appellant’s narrative of prolonged negotiations, pilot-project status, and the absence of financial commitment by the Corporation.
  • Asserted that, after public notice dated 21-11-1994, no other advertiser (including the writ petitioner) submitted concrete proposals covering both street-sign boards and direction boards.
  • Maintained that the writ petitioner never supplied designs, financial details or evidence of capacity to execute the work.

Table of Precedents Cited

Precedent Rule or Principle Cited For Application by the Court
Kasturi Lal Lakshmi Reddy v. State of J&K (1980) 4 SCC 1 State may negotiate contracts without public tender if done bona fide and without mala fides. Supported validity of direct negotiation with the appellant in absence of mala fides.
State of M.P. v. Nandlal Jaiswal (1986) 4 SCC 566 Private negotiations are not per se arbitrary; opportunity for others can cure absence of tender. Cited to show that public notice invited others, including the writ petitioner.
G.B. Mahajan v. Jalgaon Municipal Council (1991) 3 SCC 91 Municipal project executed by private developer on self-financing basis is permissible. Analogised the present project; emphasised managerial and economic flexibility.
Sterling Computers Ltd. v. M & N Publications Ltd. (1993) 1 SCC 445 Executive necessity cannot justify contracts granted to undeserving parties; courts may interfere where public interest harmed. Referenced but distinguished; no evidence of undeserving or mala fide grant here.
Tata Cellular v. Union of India (1994) 6 SCC 651 Judicial review limited to decision-making process; interference only for arbitrariness or irrationality. Guided Court’s restraint in substituting its view for administrative discretion.
G.D. Zalani v. Union of India 1995 Supp (2) SCC 512 Exceptional situations may justify departure from auction/tender. Treated the pilot project as such an exceptional situation.
Delhi Science Forum v. Union of India (1996) 2 SCC 405 Transfer of governmental privilege must be rational, in public interest; challenge only on limited grounds. No irrationality or bad faith found; thus contract upheld.
M.P. Oil Extraction v. State of M.P. (1997) 7 SCC 592 Negotiated contracts permissible if relevant factors considered. Reinforced that MCH considered all relevant factors over a year.
Raunaq International Ltd. v. I.V.R. Construction Ltd. (1999) 1 SCC 492 PIL must be bona fide and genuinely in public interest. Used to characterise writ petition as motivated and not bona fide PIL.
Air India Ltd. v. Cochin International Airport Ltd. (2000) 2 SCC 617 State may choose its procurement method; courts interfere only if process vitiated. Applied to uphold MCH’s choice of method.
W.B. SEB v. Patel Engg. Co. Ltd. (2001) 2 SCC 451 Contracts must respect rule of law and constitutional values. Court found these values satisfied.
Onkar Lal Bajaj v. Union of India (2003) 2 SCC 673 Grants cannot be cancelled en masse without examining individual merits. Cited to underscore need for individualised scrutiny; Division Bench failed to do so.
Subhash Kumar v. State of Bihar (1991) 1 SCC 598 PIL should not cloak private or vested interests. Relied upon to dismiss writ petitioner’s claim as self-serving.

Court's Reasoning and Analysis

The Supreme Court observed that:

  • Displaying street-signs and rationalised house-numbering was an urgent civic necessity, long delayed because of lack of funds.
  • The appellant’s scheme was accepted only after a year of surveys, sample boards and design modifications supervised by MCH officials; it imposed heavy obligations (installation, maintenance, fee payments) on the appellant while sparing the Corporation any expenditure.
  • The contract did not involve transfer of municipal property or financial largesse; hence statutory provisions governing leases, advertisements or disposal of property (Sections 126, 129-A, 148, 420, 421 HMC Act) were “seriously doubtful” in their applicability.
  • Absence of public tender is not, per se, unconstitutional. Relying on decisions such as Kasturi Lal, Nandlal Jaiswal and G.B. Mahajan, the Court emphasised that negotiated contracts are permissible when free from mala fide and undertaken for public good.
  • The writ petitioner ignored MCH’s public notice inviting proposals for other circles, failed to attend the advertisers’ meeting, and never submitted concrete designs or financial details. His litigation was motivated by personal commercial interest, not genuine public interest, attracting the cautionary dicta in Subhash Kumar and Raunaq International.
  • The Division Bench catalogued precedents but did not apply them to the specific facts; its directive to terminate the contract lacked analytical foundation.
  • No arbitrariness, unreasonableness, mala fide intent or procedural impropriety was shown in the award to the appellant; the decision therefore survived the limited scope of judicial review under Article 226.

Holding and Implications

The appeal is allowed; the Division Bench’s order is set aside and the learned Single Judge’s dismissal of the writ petition is restored.

Implications: The appellant’s 15-year permission to erect and maintain street-sign and direction boards remains in force. The decision re-affirms that negotiated, self-financing civic projects are permissible without public tender when they serve public interest and are free from mala fides. No new legal doctrine is created, but the ruling strengthens existing precedent limiting judicial interference in municipal contract-awards absent demonstrable arbitrariness or bad faith.

Show all summary ...

Doraiswamy Raju, J.— Special leave granted.

2. The appellant, who was arrayed as the second respondent in Writ Petition No. 22227 of 1994 before the High Court of Andhra Pradesh, filed by the first respondent in this Court, though succeeded before the learned Single Judge, lost before the Division Bench in Writ Appeal No. 712 of 1995, resulting in this appeal. The writ petition before the High Court was filed seeking for a writ of certiorari to call for the records of the Municipal Corporation of Hyderabad relating to the permission granted by the Corporation to the appellant to erect or display any advertisement/street signs/direction boards/arches on the public roads/colonies etc. within the twin cities of Hyderabad and Secunderabad and the permission granted for display thereon to the second respondent or to any other person and declare the same to be ultra vires the provisions of the Hyderabad Municipal Corporation Act and Article 14 of the Constitution of India. The learned Single Judge dismissed the writ petition on the ground that the writ petitioner was not able to establish any illegality as alleged in the transaction. The learned Judge also adverted to the salient features of the transaction and the circumstances under which the work came to be entrusted to the appellant as well as the further fact that only two circles were taken up for putting up the boards and the other circles are always available for the petitioner or anyone else interested to approach the Corporation and undertake such work. It was also observed therein that the assignment entrusted to the appellant was not shown to be of any grant of largesse, as it did not involve exploitation of any property. Aggrieved, the writ petitioner moved the Division Bench and the Division Bench on 26-9-1995 seems to have passed an order recording the willingness of parties as hereunder:

“After hearing the learned counsel for the parties, we wanted to know from the learned counsel for the Corporation if on similar terms and conditions the Corporation is prepared to award the contract to the writ appellant as was done earlier. The learned counsel submitted that 80% of the work still remained to be completed and the Corporation will have no objection to grant to the writ appellant as well. The learned counsel for the writ appellant also show the willingness of the writ appellant to take the contract on similar terms and conditions on which the second respondent in this writ appeal was granted contract. For settling the terms and the extent of the work to be entrusted to the writ appellant, in pursuance of the mutual agreement expressed before us by the learned counsel for the parties, both of them wanted some time. Accordingly time till 12-10-1995 is granted. Put up on 13-10-1995.”

3. Notwithstanding, the writ petitioner appears to have even thereafter without availing of the said order, pursued the litigation, as if a public interest litigation and the Division Bench of the High Court by its order under challenge in this appeal allowed the appeal, as prayed for and directed termination of the contract and proceeded to make an exercise afresh for the purpose. Certain relevant factual details have to be noticed for a proper appreciation of the respective contentions of the parties and the legal principles that should be really applied in adjudging the same.

4. The Corporation, though of a metropolitan city, seems to have had no road names displayed anywhere and there appears to have been also no proper house-numbering and the one in vogue was of a confusing pattern. The appellant appears to have volunteered to take up the rationalisation of house-numbering in the twin cities by assigning house numbers in continuous series in each locality as house number, street number, locality and also erect street signboards indicating the name of the locality, street number, details of house numbers etc. The Corporation seems to have also had an idea of erecting for the use and benefit of the public road direction boards on various thoroughfares of the twin cities. Though all these were said to have been on the agenda of the Corporation for long, financial constraints seem to have stood in the way of its realisation, due to requirement of substantial sums of money to implement the same. Only at this stage, the appellant was said to have approached in September 1993 the Corporation with a proposal formulated by them, on an in-depth study, in the form of a scheme and project and expressed their willingness to undertake a fresh survey if the Corporation desired to take up the project. The appellant was asked to show various designs formulated by them and display one of them for sample and it appears to have been done at a place near Bakers' Inn on the existing electrical pole showing the direction towards Raj Bhawan Road. The then Commissioner and other officials who inspected the work in November 1993 were said to have been not impressed and wanted the appellant to change the same by doing it without using the electrical pole. After going through the various revised designs submitted by them, one among them appears to have been chosen and the appellants were asked to execute a sample board during the second week of November 1993 which was considered to be satisfactory to the authorities concerned of the Corporation. A detailed project report was said to have been also submitted by the appellant on 25-11-1993 after conducting a survey and the sample street signboards and direction boards were executed, to ascertain the utility of them. As a test venture, the appellant was said to have been asked to find out sponsors for meeting the cost of street signboards and take up the work in Circle No. 3 and Secunderabad Division by a letter dated 30-3-1994. Subsequently, also for further ascertaining the satisfactory nature of the system, the Corporation was said to have asked for the erection of three sample boards at West Marredpally for inspection and on such inspection by the Commissioner, Additional Commissioner (Project), Officer-on-Special Duty, and thereafter, further suggestions were said to have been also given as to increasing the height of the board and after effecting alterations, modifications and corrections, the Corporation seems to have finally asked the appellant to erect street signboards at Marredpally, Secunderabad Division in Gagan Mahal area in Circle No. 3 duly specifying the dimensions, height, shape of board and space to be left for sponsor, in the communication dated 23-6-1994 of the Commissioner of the Corporation. Thereupon it appears the appellant submitted a proposal on 7-9-1994 in respect of road direction boards for erection on main thoroughfares of the twin cities along with a design and model which was said to have been agreed to on principle by the Corporation and asked the appellant to erect a sample of it at Patni Junction, Secunderabad in the communication dated 16-8-1994 of the Director of House Numbering Cell. The appellant thereupon appears to have commenced the work as per the discussions held with the various authorities during the course of the progress of work, who, from time to time, have been inspecting and checking the execution whereof.

5. Since the project in question to be implemented by the Corporation, was thought to be first of its kind and after an analysis and consideration of all the factors of the project for about a year as noticed above, a decision seems to have been taken to undertake the work as a pilot project, on experimental basis. Accordingly, permission appears to have been granted to the appellant for erection of street signboards in Circle No. 3 and Secunderabad Division by a communication dated 12-9-1994/14-9-1994 of the Commissioner of the Corporation with the following terms and conditions duly specifying at the same time that the work should be completed by 31-12-1994:

“1. Location of the street signboards shall be strictly as per the directions of the Director (HNC), MCH.
2. On erection of street signs in each locality, a nominal charge of Rs 5 (Rupees five only) shall be paid to MCH as cost of erection borne by your organization.
3. You are exempted from the advertisement fee and ground rent, as you are displaying street signboards along with your boards at your own expense. However, MCH will reserve the right to impose the advertisement fee and ground rent if at any point of time, it is observed and substantiated by any impartial survey that the maintenance is poor and/or the advertising space is more than stipulated in the agreement, and/or any other terms and conditions are violated.
4. The advertisement space should not be used for any political or religious matters i.e messages or slogans of whatsoever nature.
5. Periodical maintenance should be done, and boards are to be kept neat and clean by the sponsor.
6. The sizes of street signboards should be as follows:
Sl. No. Description of the Board Height from ground level Dimension of board Sponsor 1. Mainroad boards 9′ 0″ 4′ 3″ × 2′ 3″ 3′ 3″ × 1′ 6″ 2. Street signboards 8′ 6″ Lane boards 7′ 10″ 3′ 0″ × 1′ 6″ 22″ DIA
7. You will meet the entire cost including civil works, fabrication, erection, painting, lettering, maintenance and MCH will not incur any money for this purpose.
8. You can let out space provided for advertising purpose to any of your clients at your own terms and conditions for 15 years from the date of this letter, after which the same may be extended on mutually agreed terms and conditions.
9. You must complete the erection of street signboards with complete information within 15 days from the date of receiving all relevant details/data localitywise from the Director, House Numbering Cell, MCH.
10. M/s 5 M & T Consultants shall execute an agreement on twenty rupees non-judicial stamp paper for due performance of the contractual obligations under this order.
11. M/s 5 M & T Consultants shall alter and align the road direction/street boards depending on the road-widening as and when required.”

6. Further, a similar order was said to have been issued for erection of direction boards also at twenty-seven locations, in a communication dated 12-9-1994/14-9-1994 subject to the following conditions, duly specifying that the work shall be completed before 2-10-1994:

“1. Location of the direction boards shall be strictly as per the direction of the Director (HNC), MCH.
2. On erection of each direction board, a fee of Rs 100 (Rupees one hundred only) shall be paid by M/s 5 M & T Consultants to MCH as the entire cost of erection is borne by your organization.
3. You are exempted from the advertisement fee and ground rent, as you are displaying direction boards along with your boards at your own expense. However, MCH will reserve the right to impose the advertisement fee and ground rent if at any point of time, it is observed and substantiated by any impartial survey that the maintenance is poor and/or the advertising space is more than stipulated in the agreement and/or any other terms and conditions are violated.
4. The advertisement space should not be used for any political or religious matters i.e messages or slogans of whatsoever nature.
5. Periodical maintenance should be done, and the boards are to be kept neat and clean by the sponsor.
6. The space provided for indicating direction to the localities should be strictly followed as given below:
Sl. No. Area of display Size 1. Right and left direction boards (8′ 0″ × 6′ 6″) both sides 2. Along the road direction board (30′ 0″ × 2′ 9″) both sides 3. The advertising board (3′ 9″) Ht at centre (4 — ½′ on either side) 4. Minimum clear height from road level (18′ 0″) 5. Lettering of direction board (radium letters)
7. You will meet the entire cost including civil works, fabrication, erection, painting, lettering, maintenance and MCH will not incur any money for this purpose.
8. You can let out space provided for advertising purpose to any of your clients at your own terms and conditions for 15 years from the date of this letter, after which the same may be extended on mutually agreed terms and conditions.”

6.1 It appears that though the appellant sought for 20-year period from the date of the completion of work for realisation of their investment and other expenditure incurred by them on this project and the maintenance to be undertaken during the currency of the period, the Corporation decided to accord it for a period of 15 years only, to the appellant.

7. Simultaneously, the Corporation seems to have issued a press notification on 21-11-1994 by publishing it in the daily newspapers of Telugu, English and Urdu on 23-11-1994 in Eenadu, Newstime and Siasat respectively, in the following terms:

“MCH has taken up the rationalization of house-numbering in the twin cities of Hyderabad and Secunderabad. The present system of wards, blocks, house-numbering is very confusing and is causing a lot of confusion to the common man, visitors, as well as to the departments in their day-to-day urban administration. Instead, MCH proposes to assign house numbers in continuous series in each locality as house number, street number, locality. It is proposed to erect boards indicating the name of the locality, street number, house number from — to — on each board depending upon its location. The boards are designed such that there is space for private advertisement, which the sponsor can utilize. MCH invites the private advertisers to come forward and participate in the programme and avail the opportunity. A meeting is being convened at MCH office at 11.00 a.m on 25-11-1994 for this purpose; advertising agencies may participate. The area available for allotment wardwise is Circles Nos. 1, 2, 4, 5 and 6 of MCH.”

7.1 It could be seen from the above that the very object was to mainly erect street signboards by giving top priority to the said work, and that the project entrusted to the appellant was on a trial basis being a pilot project. So far as other areas are concerned, the Corporation invited advertising agencies to participate in the areas indicated.

8. It is necessary at this stage to refer to the role of the writ petitioner and his attitude and approach to the issue before the Court as also his move towards the project undertaken by the Corporation, for a proper understanding of the nature of the proceedings instituted, his sole aim as well as the merit of his claims. In the writ petition, the claim made was that he was carrying on business in publicity and advertising; that the displays by such advertisers in such manner are regulated by Sections 421 and 422 of the HMC Act; that he approached the Corporation on several occasions for granting permission and offered that he was prepared to erect arches on main roads and junctions at his own cost and he be permitted to display thereon as per the rules but the Corporation allegedly claimed to have informed him that there is no such policy to accord any such permission. It should be noticed at this stage, except self-serving statements like them which were seriously disputed by the Corporation, there is nothing on record/writing to prove any such fancy claims. In the last week prior to the filing of the writ petition in December 1994, it is claimed that he came to know that the Corporation had granted permission to the appellant to erect the arches and display thereon at M.G Road, Secunderabad, near Telegraph Office asserting at the same time vaguely that the grant was opposed to public duties cast on the Corporation, besides being opposed to the principles of law and Article 14 of the Constitution of India, the same being, according to the writ petitioner, arbitrary, unjust and opposed to the principles of natural justice, fair play and equal opportunity to all. It was the further case of the writ petitioner that on coming to know that a circular dated 24-10-1994 was issued to select a few advertisers without calling for any invitation from the general public, he made a representation on 6-12-1994 complaining about the grant of permission to the appellant claiming at the same time for sanction of 200 arches/street signboards across the roads and 1000 direction boards inside various housing colonies, informing that they can undertake the work at the same terms and conditions as offered by the appellant. Such hollow and cryptic claims without details of any of his projects/plans, models or scheme and how he proposes to execute them would belie the hollowness as well no (sic as the) half-hearted nature of the attempts of the writ petitioner. A grievance was sought to be made that no response was received for the same and left with no further scope, he claims to have approached the High Court with the writ petition. The counter-affidavit filed by the Corporation before the High Court categorically denied such claims having been made at any point of time by the writ petitioner except writing the said letter. It was also stated for the Corporation that he never entered into any dialogue with the authorities of the Corporation or sought for any such direction. After the release of the press notification on 21-11-1994 through local newspapers as indicated already inviting proposals for private advertisers for erection of boards in Circles Nos. 1, 2, 4, 5 and 6 of the Corporation, a meeting was said to have been convened on 26-11-1994 in the conference hall which about thirty private advertisers seem to have attended.

9. Though the writ petitioner did not attend the meeting, instead he addressed a letter dated 6-12-1994 to the Corporation requesting for sanction of 200 arches/street signs and 1000 direction boards, without having any relative concept of his capacity to erect so many boards running approximately into several crores of rupees, or in what manner he purports to execute such works. The other thirty private advertisers including the appellant, who participated in the deliberations, were said to have been informed that the street signboards' project and the erection of direction boards have to go hand in hand and, therefore, the participants were asked to give their concrete proposals immediately in order to complete the revision of house-numbering system. The further claim of the Corporation appeared to be that all ad agencies, who were present in the meeting, were asking for work relating to only direction boards but not street signboards or house-numbering and no private advertiser has evinced any interest to give concrete proposal much less the writ petitioner, who never cared to attend the meeting. The entrustment of erection of street signboards and direction boards to the appellant was said to be a pilot project in Circle No. 3 at Secunderabad and in certain junctions was not thrown as a surprise and instead seems to and also claimed to have culminated after a prolonged transaction involving innovative proposals made by the appellant after much deliberations with the Corporation authorities, who, from time to time, seem to have suggested certain improvements and changes to make it not only acceptable but appreciable and at the same time ensure that no financial commitment strain or involvement was made for the Corporation. It was affirmed before the High Court by the Corporation that the work was appreciated by several high dignitaries from different States in the country. The Corporation in the counter-affidavit also stoutly denied vague allegations made against the authorities as well as the appellant. That apart, it appears that when the Division Board passed a consent order to give a chance to the writ petitioner also, the same could not be allotted to the writ petitioner due to lack of ability on his part to execute such works for want of either the technical expertise or the financial ability to perform the work of erecting direction boards and signboards and of maintaining them. After the order of the Division Bench noticed above, the writ petitioner claims to have sent a communication dated 4-10-1995 merely disclosing the list of locations which he desired to take up by vaguely stating that they are willing to take up the work on the same terms as were given to the appellant and followed the same by another letter dated 9-10-1995 merely reiterating the request relating to road direction and street signboards on the same terms and conditions as laid down by the Corporation in the case of the appellants but even without submitting any plans or models of his proposed execution. The Corporation, therefore, seems to have replied on 8-12-1995 that the request for grant of permission was examined and his request could not be considered at that stage since all the work for erection of street signboards was by then being done by the Corporation itself departmentally and no new works are being erected anywhere in the twin cities either departmentally or otherwise, and if in the future any private agency's participation is felt necessary, he will be intimated and given an equal opportunity.

10. Reference may now be made to some of the case-law cited on either side. In Kasturi Lal Lakshmi Reddy v. State of J&K (1980) 4 SCC 1 this Court, while dealing with the validity of a contract awarded for tapping of 10 to 12 lakh blazes annually for extraction of resin from the inaccessible chir forests in the State for a period of 10 years, observed that in a given situation, when a private party comes before the State and offers to set up an industry, the State would not be committing breach of any constitutional or legal principle or obligation if it negotiates with him and agrees to provide opportunities/resources. It was also observed therein that unless the terms and conditions of the contract or the surrounding circumstances show that the State has acted mala fide or out of improper or corrupt motive or in order to promote private interests of someone at the cost of the State, the Court will not interfere, merely because no advertisement was given or publicity made or tenders invited. In State of M.P v. Nandlal Jaiswal (1986) 4 SCC 566 it was observed that grant of licences by private negotiations without inviting tenders cannot by itself be held to be arbitrary or unreasonable having regard to the circumstances, exigencies and purpose of such grant, and all the more so when scope was left open to others also to apply for similar grants and obtain it. In G.B Mahajan v. Jalgaon Municipal Council (1991) 3 SCC 91 dealing with the case of a Municipal Council entering into contract with a private developer or builder for construction of a commercial complex involving its execution on self-financing basis subject to handing over to the Municipality the complex free of cost and allotting some shops at a fixed rate/free of cost to certain specified persons while having the right to dispose of the remaining accommodation at one's own discretion to allottees with occupancy rights therein for 50 years and retain the premia received by way of reimbursement of the financial outlays of the developer plus profits, it was observed that a project, otherwise legal, does not become any the less permissible by the mere reason that the local authority had entered into an agreement directly with a developer for its financing and execution. A distinction between proper use and improper abuse of power was considered to be relevant in adjudging the reasonableness of the exercise of power and liberty to adopt appropriate techniques of management of projects with concomitant economic expediencies which really pertain to matters of economic policy, which was conserved in the authority concerned, unless there was any violation of constitutional or legal limits of exercise of such powers itself.

11. In Sterling Computers Ltd. v. M & N Publications Ltd. (1993) 1 SCC 445 it was observed that the so-called executive necessities alone can be no justification to flout the principles and precepts that have to be followed in the public interest and deprecated the grant being made to one who was a proven defaulter affecting the public interest and justified interference when the grant was found to be vitiated on account of irrelevant and extraneous considerations weighing with the decision to make such grant. In Tata Cellular v. Union of India (1994) 6 SCC 651 it was observed that judicial review of administrative action relating to award of contracts is limited to a review of the decision-making process and not the merits of the decision itself and that what is to be seen is whether the action is vitiated by arbitrariness, unfairness, illegality, irrationality or “Wednesbury unreasonableness” i.e when the decision is such as no reasonable person on proper application of mind could take or vitiated by procedural impropriety. In G.D Zalani v. Union of India 1995 Supp (2) SCC 512 it was observed that while selling public property or granting lease, though the normal method is auction or calling for tenders, there may be exceptional situations where adopting of such a course may not be insisted upon. Adverting to the peculiar nature of the case therein, it was also observed that the case before the Court was not a simple case of granting of lease of a government company but one where the government company was trying its best to obtain the best-possible technology to advance its interests and what is to be seen in such cases is only whether the action was fair and what has been done is the best-available arrangement in the circumstances. In Delhi Science Forum v. Union of India (1996) 2 SCC 405 it was observed that parting with privilege exclusively vested with the Government must be reasonably rational and in the public interest besides conforming to law governing the same and the decision pertaining to the same can be questioned only on grounds of bad faith, based on irrational or irrelevant considerations, non-compliance with the prescribed procedure or violation of any constitutional or statutory provision and the onus in respect of establishing the same not only heavily rests on the person alleging it but it is not satisfied by merely raising a doubt in the mind of the Court as to the validity of the decision.

12. In M.P Oil Extraction v. State of M.P (1997) 7 SCC 592 while dealing with a case where an agreement was entered into by the State with selected industrial units which were commissioned on invitation of the State to undertake oil-extraction operation for assured supply of sal seeds at concessional rates to them, it was observed that though open tender or public auction was preferable, negotiation in certain cases was equally permissible, and the Court's interference would not be called for, if relevant considerations relating to the grant were duly considered before such grant.

13. In Air India Ltd. v. Cochin International Airport Ltd. (2000) 2 SCC 617 it was observed that in awarding contracts the State can choose its own method, and as long as it complied with the norms, standard and procedure, no interference by courts is warranted unless the decision-making process was found to be vitiated on the ground of mala fides, unreasonableness or arbitrariness. In W.B SEB v. Patel Engg. Co. Ltd. (2001) 2 SCC 451 it was observed that rule of law and constitutional values must be adhered to by public authorities when awarding contract and that it was always open to the authority concerned to negotiate with the next lowest bidder for awarding the contract on economically viable price bid. In Onkar Lal Bajaj v. Union of India (2003) 2 SCC 673 while dealing with mass-scale and blanket cancellation of allotments made in respect of retail outlets of petroleum products, LPG distributorships and SKO-LDO dealerships during the entire period commencing from January 2000 till the date of orders of cancellation by one stroke, it was observed that treating all grants on equal basis for cancellation irrespective of the fact whether an individual grant is otherwise meritorious or deserving one, would be bad and that a grant, which is otherwise found vitiated, could not be justified merely on the plea that huge investments have been made after such allotment and serious loss will be caused if cancellations are to be effected thereafter. Reference made to decisions of English courts are found to be not relevant for the case on hand and it would be unnecessary to advert to them when innumerable decisions of this Court itself are available on the legal principles governing an adjudication of the issues raised.

14. In Subhash Kumar v. State of Bihar (1991) 1 SCC 598 it was observed that public interest litigations should not be encouraged when it is evident from the facts on record that the primary purpose/object of the litigation is not to serve any public interest but only to further one's own self-interest, and the so-called public interest is merely a garb to cover up vested interests. In Raunaq International Ltd. v. I.V.R Construction Ltd. (1999) 1 SCC 492 it was observed that the professed public interest litigation should be genuine, bona fide and really for the public good and not merely a cloak for attaining private ends.

15. The facts averred in the writ petition and the stand pursued before this Court also would bring out the real object i.e vindication of his own personal interests and there is nothing in the matter involving any great public interest, which can justify any public outcry through a public interest litigation. The desperateness of the writ petitioner is betrayed by the liberally invented incorrect averments about his alleged approach to the authorities prior to the filing of the writ petition, when the fact remains that notwithstanding the public notice for selection of agents for similar work in other areas, he did not respond like the others and merely approached the court feigning ignorance of all that happened. The manner in which the writ petitioner was attempting to make bald claims after certain orders were passed by the Division Bench pending final disposal of the appeal, to explore possibilities of grant of work in his favour without disclosing for that purpose concrete plans or models to convince the authorities of the genuineness of his moves also demonstrate merely by his attempts to ventilate personal vendetta and exhibit revengeful attitude rather than any of his sincere endeavours to really seek relief even for himself. The writ petition itself deserved summary dismissal and the Division Bench committed a grave error in interfering in the matter. The well-merited order of the learned Single Judge ought not to have been disturbed by the Division Bench of the High Court.

16. The materials on record substantiated the absolute need and necessity to undertake works of the nature executed by the appellant, in furtherance of great public interest and for larger public and common good. The admitted dire financial position of the Corporation and their inability to undertake such a project at the cost of the Corporation and the fact that the venture was long overdue apparently made the Corporation authorities to avail of the project as unfolded and volunteered by the appellant, subject, of course, to further revisions, modifications and suggestions in the best interests of the Corporation. When it was undertaken as a pilot project on a trial basis there might not have been much certainty about the profitability of the scheme as a business venture for the private party concerned and the appellant was prepared to undertake the said risk and executed the works to the satisfaction of the authorities and appreciation of the public as well. The risk involved is not only in recouping the investments to be made for installations and constructions but to maintain them in good, proper and working condition without also sacrificing the beauty of the installations throughout the duration of 15 years. Conditions imposed on the appellants involve great responsibilities and obligations and necessarily certain concessions had to be shown to keep the project working and maintain them in good shape. Not only the Municipal Corporation had no financial commitments in getting such works by any expenditure therefor, which were to be executed by the appellant only on self-financing basis generating the required funds for installation and continued maintenance and their upkeep from sponsors by collecting premiums for giving them the privilege to avail of the space permitted by the Corporation for advertisements but ultimately the whole works have to be left with the Corporation and it is not to be removed by the appellant. As rightly observed by the learned Single Judge the venture cannot be considered to be the grant of a largesse or lease or contract in the conventional sense. The provisions in the Municipal Corporation Act cannot be said to envisage situations of the nature, when enacted. This appears to be a project more akin to the one considered by this Court in G.B Mahajan case (1991) 3 SCC 91. The fact that no other private advertising agencies, including the writ petitioner could offer to undertake such a venture in the other available areas when their participation was sought for belies the tall claims of the writ petitioner now made, after finding the project to have become successful and apparently fruitful — more perhaps than it could have been thought of initially by everyone. Perhaps irked by this only the interests of the writ petitioner seem to have gained momentum, to try in desperateness for the “Shylock's pound of flesh”, to ruin the very project, unmindful of any concern for the Corporation, the public good and the appellant.

17. A careful and dispassionate assessment and consideration of the materials placed on record does not leave any reasonable impression, on the peculiar facts and circumstances of this case, that anything obnoxious which requires either public criticism or condemnation by courts of law had taken place. It is by now well settled that non-floating of tenders or absence of public auction or invitation alone is no sufficient reason to castigate the move or an action of a public authority as either arbitrary or unreasonable or amounting to mala fide or improper exercise or improper abuse of power by the authority concerned. Courts have always leaned in favour of sufficient latitude being left with the authorities to adopt their own techniques of management of projects with concomitant economic expediencies depending upon the exigencies of a situation guided by appropriate financial policy in the best interests of the authority motivated by public interest as well in undertaking such ventures. Though now, an attempt is sought to be made by the writ petitioner and surprisingly even by the Corporation too, attempting a somersault and claiming non-compliance with certain statutory formalities, we find that such a move is not only a pure afterthought, but really unwarranted and not based upon a firm or sufficient ground or basis. The very applicability of the regulations contained in Sections 126, 129-A, 148, 420 or 421 of the Act to the case on hand would itself be seriously doubtful. On the face of it they involve transactions envisaged therein, when granted in favour of third parties, to be executed with the Corporation funds and involving financial commitments or parting with the property or rights and privileges of the Corporation for value/consideration, and not to a self-financing scheme to be implemented and maintained without any financial commitments or expenditure to the Corporation. Section 124 seems to enable the Commissioner to undertake such ventures even without going before the Committee, as is now sought to be claimed. The provisions relating to Sections 420/421 would also have relevance only when any such installations are to be made for the benefit/utility of a private person/licensee, who executes it and not to a peculiar case like the one wherein the installations are such which are to be normally made and maintained by the Corporation for the public good, but instead being permitted to be made on its behalf and at its behest by a private party for the use and benefit of the public at large, which ultimately have to be left as the property of the Corporation only, and that too when executed on a self-financing basis. The Commissioner or other authorities of the Corporation, who seem to have undertaken this at a point of time when there is no concrete scheme/project or sufficient funds with the Corporation, appear to have embarked upon this venture in good faith, keeping in view not only the public good but also in an earnest endeavour to secure such a novel project executed without any financial commitments or expenditure whatsoever either for the installations or subsequent upkeep and maintenance for at least 15 years. Merely because as an ultimate outcome in the long range, the appellant is able to make some more profit than what was envisaged itself could not render the exercise undertaken or scheme executed vulnerable for being challenged to be either as one in improper abuse of powers or by means of any reprehensible/condemnable conduct, calling for interference at the hands of court of law.

18. The Division Bench, except cataloguing the catena of decisions, has not chosen to objectively consider the extent of their applicability, relevance or otherwise of the principle befitting the merits of the peculiar facts of the case. The case on hand does not constitute or at any rate can by no means be said to be the outcome of any unreasonable or arbitrary exercise of power so as to warrant interference under Article 226 of the Constitution of India. The appeal is allowed, the order of the Division Bench is set aside and the order of the learned Single Judge dismissing the writ petition filed before the High Court shall stand restored. No costs.