Ispat Industries Ltd. And Another v. Union Of India And Others
Factual and Procedural Background
The first petitioner, a steel-manufacturing company established in 1998, and its Director–shareholder (the second petitioner) sought a variety of declaratory and mandatory reliefs in a writ petition before the Calcutta High Court. They claimed that private units like themselves were entitled to financial assistance from the Steel Development Fund (SDF) and challenged the alleged exclusive use of that Fund for public-sector undertakings Steel Authority of India Ltd. (SAIL) and Tata Iron & Steel Company Ltd. (TISCO).
A learned Single Judge dismissed the writ petition on 05-08-1999 with costs of ₹10,000 payable to each appearing respondent. The petitioners appealed; a Division Bench on 03-02-2000 affirmed the dismissal while observing that although the petitioner had locus standi, it could not claim parity with public-sector plants regarding SDF loans. The present special-leave petition (SLP) under Article 136 of the Constitution seeks to impugn that appellate judgment.
Legal Issues Presented
- Whether a private steel producer that never contributed to the Steel Development Fund is entitled, on grounds of equality, to claim loans or other financial assistance from that Fund.
- Whether the Union of India’s decision to waive or convert SDF loans in favour of public-sector entities (SAIL and TISCO) to the exclusion of private producers is arbitrary or discriminatory.
- Whether omission to implead TISCO as a party vitiates the maintainability of the writ petition seeking reliefs directly affecting TISCO.
- Whether, in the circumstances, the case merits the Supreme Court’s discretionary leave to appeal under Article 136.
Arguments of the Parties
Petitioners’ Arguments
- Private steel units are “similarly placed” to public-sector plants and therefore should receive equal access to SDF resources.
- Granting financial assistance solely to SAIL and TISCO is arbitrary, discriminatory and unconstitutional.
- The Union of India and Joint Plant Committee (JPC) should be restrained from converting SDF loans into equity for SAIL/TISCO without first considering private applicants.
Respondents’ Arguments (Union of India & Joint Plant Committee)
- The SDF was created administratively for modernisation of “member steel plants” (i.e., SAIL and TISCO) that alone were obliged to add a price element and remit it to the Fund; private “secondary producers” like the petitioner never contributed to the corpus.
- Contributions to the SDF ceased in April 1994, four years before the petitioner began production; hence it has no legal or equitable stake in the Fund.
- The Fund remains in the books of SAIL and TISCO as credit to the Central Government; utilisation is governed by government directions, recently including waiver of SDF loans to SAIL as part of a massive restructuring package.
- The writ is not bona fide: the petitioner priced its products above controlled prices (which had included the SDF element) and failed to implead TISCO, the very entity against which relief was sought.
Table of Precedents Cited
No precedents were cited in the provided opinion.
Court's Reasoning and Analysis
The Supreme Court first noted the deliberate non-joinder of TISCO, questioning the bona fides of the petitioners. Turning to the nature of the Steel Development Fund, the Court traced its origin to a series of administrative notifications issued under Clause 17-B of the Iron and Steel (Control) Order, 1956. Key analytical steps were:
- No statutory basis: The SDF is a creation of administrative orders, not legislation. Its management and utilisation follow Central Government directions.
- Limited contributors and beneficiaries: Only “member steel plants” (SAIL and TISCO) were mandated to add an element to their ex-works prices and remit it to the SDF. Private “secondary producers” like the petitioner never bore this burden.
- Purpose of the Fund: Notifications explicitly confined SDF usage to modernisation and related projects of the main steel plants. The petitioner never challenged those notifications.
- Temporal disconnect: Remittances to SDF stopped in April 1994; the petitioner entered the industry in 1998, undermining any claim of contribution-based entitlement.
- Government’s restructuring decision: The Central Government’s letter dated 18-02-2000 approving waiver of SDF loans to SAIL was within its administrative competence over the Fund.
In these circumstances, the Court concluded that the petitioner lacked any legal right over the corpus of the SDF and found no ground to interfere with the High Court’s dismissal.
Holding and Implications
Special leave to appeal is refused; the SLP is dismissed.
Direct consequence: the Calcutta High Court’s judgment stands affirmed, and the petitioners obtain no relief regarding the Steel Development Fund. The decision reiterates that entitlement to SDF is confined to entities that contributed to it under the relevant administrative scheme; no broader constitutional precedent was set.
D.P Wadhwa, J.— The petitioners seek leave to appeal under Article 136 of the Constitution from the judgment dated 3-2-2000 of the Division Bench of the Calcutta High Court.
2. The first petitioner is engaged in the manufacture of steel. The second petitioner is a shareholder of the first petitioner and is also a Director. The first petitioner established its factory for production of steel in 1998. The petitioners in the writ petition filed in the High Court claimed the following reliefs:
“(a) A declaration do issue declaring that the petitioners and similarly-placed other units in the Steel Industry are eligible and entitled to avail of financial assistance from the Steel Development Fund.
(b) A declaration do issue declaring that granting of financial assistance and/or loans out of the Steel Development Fund, to the fifth respondent, TISCO and Rashtriya Ispat Nigam Ltd., to the exclusion of the petitioners and similarly-placed other units in the Steel Industry is arbitrary, discriminatory, unconstitutional, illegal and bad in law.
(c) A writ of mandamus do issue commanding the respondents not to convert the loans, granted to the fifth respondent and others out of the Steel Development Fund, into equity share capital in any manner whatsoever.
(d) A writ and/or in the nature of mandamus do issue commanding the respondents to grant financial assistance and/or loans to the petitioners out of the said Steel Development Fund.
(e) A writ and/or in the nature of mandamus do issue directing the respondents concerned and each of them to forthwith recover the loans granted by them to the fifth respondent, TISCO and Rashtriya Ispat Nigam Ltd. so that such funds, upon realisation may be utilised for the new projects of the petitioner Company and similarly-situated other new entrants in the Steel Industry.
(f) Writ of prohibition prohibiting the respondents concerned and each of them, their men, servants and agents, from converting any part of the loans and/or interest owned by the fifth respondent, TISCO and Rashtriya Ispat Nigam Ltd. into equity share capital in any manner whatsoever and also from granting any further loan or financial assistance, directly or indirectly, to the said fifth respondent, TISCO and Rashtriya Ispat Nigam Ltd.
(g) A writ of certiorari do issue directing the respondents concerned and each of them to certify and transmit to this Hon'ble Court all records pertaining to the decision of conversion of loans into equity, so far as the fifth respondent is concerned and decision for renewal of loans for a long period at a nominal rate of interest so far as TISCO is concerned so that such purported decisions and/or proposals may be quashed and/or set aside and conscionable justice may be done.
(h) Rule nisi in terms of the prayers above.
(i) An injunction do issue restraining of respondents concerned and each of them, their servants and agents from converting the loans granted to the fifth respondent and/or TISCO or Rashtriya Ispat Nigam Ltd. into equity share capital and also from granting any further intention or renewal of the loans granted to the said respondent in any manner whatsoever.
(j) An order do issue directing Respondents 1 to 4 to forthwith take steps for (illegible) of the outstanding (illegible) to the fifth respondent and others with interest accrued thereon and not to grant any renewal of the outstanding loans or any fresh loans without first considering the case of the petitioners.
(k) Ad interim order in terms of the prayers above.
(l) Cost of and incidental to this application be borne and paid by the respondent.
(m) Such further order or orders be made and/or direction or directions be given as this Hon'ble Court may deem fit and proper.”
3. In effect the petitioners want restraint on the Union of India and the Joint Plant Committee from utilisation of the Steel Development Fund for the sole benefit of SAIL and TISCO. Learned Single Judge of the High Court by his order dated 5-8-1999 dismissed the writ petition and imposed cost of Rs 10,000 on the petitioner in favour of each of the appearing respondents intervening in the proceedings. Aggrieved, the petitioners filed appeal before the Division Bench of the High Court which, as noted above, was dismissed by judgment dated 3-2-2000 by concluding:
“To sum up:
1. The petitioner-appellant has locus standi and can invoke the jurisdiction under Article 226 of the Constitution of India.
2. The appellant cannot claim parity with the plants/industries in the public sector.
3. Steel plants/industries in public sector can be treated differently than the plants/industries in the private sector, including the matter of loan advanced from the Steel Development Fund.
4. In case of public sector industries (SAIL) Government can waive the interest or even can write off the loan itself.
5. If Government decides to extend any financial help to private sector industries out of the amount available in the Fund (amount available out of the Fund means corpus of the Fund excluding loan advanced to SAIL and TISCO), the representation of the petitioner for loan/financial assistance from the Steel Development Fund may be considered along with other similarly-situated steel plants/industries in private sector.
The appeal accordingly stands disposed of.”
4. Looking at the prayer in the writ petition, we were at a loss to know as to why TISCO was not made a party. We have not been able to get any satisfactory reply from the petitioners as to why it did not think it necessary to implead TISCO as the respondent when the relief is sought against it. It cannot be just an error. Omission of the name of TISCO from the array of the respondents is deliberate. One expects a party to approach the court honestly and not to play hide and seek. However, TISCO of its own did intervene.
5. We may examine what the Steel Development Fund (SDF) is and how it is utilised.
6. The Central Government in exercise of its powers under Section 3 of the Essential Commodities Act, 1955 issued the Iron and Steel (Control) Order, 1956 (for short “the Order”). Clause 15 of the Order gives power to the Controller to fix the price at which any iron or steel may be sold. Under clause 17-B the Central Government would set up a committee, etc. The Central Government set up a Joint Plant Committee (JPC) under clause 17-B by notification dated 7-4-1971. The composition of the Committee was as under:
“(a) The Joint Plant Committee
Composition
(i) The Iron and Steel ControllerChairman
(ii) One representative each of the main steel plants, that is to say Tata Iron and Steel Company Limited, Indian Iron and Steel Company Limited, Hindustan Steel Limited, Rourkela, Hindustan Steel Limited, Bhilai and Hindustan Steel Limited, DurgapurMembers
(iii) One representative of the Ministry of Railways.”
7. The notification prescribed various functions of the Joint Plant Committee. Para (8) of the notification would be relevant and is as under:
“(8) The Committee may determine, announce and list prices (base prices as well as extras) from time to time of all categories of iron and steel not subject to price control under clause 15 of the Iron and Steel (Control) Order, 1956. The prices so determined will be ex-works prices. The Committee shall add a fixed element of equalised freight to the ex-works prices announced from time to time in order to ensure that buyers of steel all over the country pay the same railway freight irrespective of the distance from the source of supply. The Committee may take such measures as it considers necessary or desirable to ensure that buyers of iron or steel all over the country pay the same price.”
This notification was amended by another notification dated 27-12-1978. Under the heading “Functions” paras (9-A) and (9-B) were inserted, which are as under:
“(9-A) The Committee may add an element to the ex-works price determined under para (8) for constituting a fund for modernisation, research and development with the object of ensuring the production of iron and steel in the desired categories and grades by the main steel plants. In the matter of operation of this fund, the Committee shall perform its functions in accordance with and subject to such regulations or directions as may be issued by the Central Government from time to time.
(9-B) The Committee may also add any other element to the ex-works prices determined under para (8) to enable it to discharge its functions and to implement specific scheme entrusted to it by the Central Government.”
8. There was further amendment to this notification by another notification dated 16-1-1992. All the paras (1) to (13) under the heading “Functions” in the original notification were substituted by the following paragraphs:
“(No. SC-1(6)91-D-III)
(1) The Joint Plant Committee shall be responsible for carrying out generally the functions of coordinating the demand and the supplies of all or any of the categories of iron or steel produced by the members of steel plants in respect of defence, small-scale industries' sector, the exporters of engineering goods and the north-eastern region, and shall also assist the Development Commissioner for Iron and Steel in ensuring supplies thereof on priority in terms of the distribution guidelines.
(2) The Committee may obtain from producers, processors, dealers and consumers of iron and steel such information and data as it may require in discharging the functions specified under this notification as well as for maintaining a comprehensive database in respect of duty-matter including production movement and prices. It may also form such statistical and other units as may be necessary for the discharge of its functions.
(3) The Committee may evolve suitable organisation, methods and procedures to review carefully the general market situation, fluctuations in free-market prices, the trends of production, availability and movement of iron and steel, and for this purpose, the Committee shall arrange for effective and timely flow of information from all concerned, including the iron and steel plants.
(4) The Committee may from time to time require the member steel plants to add the element listed below to their ex-works prices of all or any of the categories of iron and steel and to remit the same to the Committee within such periods as may be specified:
“(i) an element of price towards the Steel Development Fund for financing schemes, projects, properties and other capital expenditures for modernisation, research and development, rehabilitation, diversification, renewals and replacement, balancing up additions to capacity, major new investments or any other programme for improving the quantum or technology of efficiency of production of iron and steel or their quality;
Explanation.— The Committee shall perform its functions relating to the Steel Development Fund in accordance with and subject to such orders or directions as may be issued by the Central Government in this behalf from time to time.
(ii) an element of price for enabling the Committee to discharge its functions and to implement specific schemes entrusted to it by the Central Government;
(iii) an element of price towards the Engineering Goods Exports Assistance Fund.
sd/-
Ashok Kumar,
Joint Secretary.”
9. It would be seen that para (9-A) in the first amended notification was substituted by para (4) above. Yet another notification dated 21-4-1994 was issued further amending notification dated 6-4-1971. It amended the original notification as under:
“(No. SC-II(5)93-D-II)
In para (2) of the said notification, in sub-para (a):
(a) in para (4) item (i) shall be omitted and such omission shall not affect the action taken or things done under that item on or before such omission;
(b) after para (4) the following paragraphs shall be inserted namely:
(5) The Committee shall be responsible for the management and operation of the corpus of the Steel Development Fund and interest received and accrued thereon in accordance with and subject to such orders or directions as may be issued by the Central Government in this behalf from time to time.
sd/-
S. Nautiyal, Junior Secretary.”
10. It will thus be seen that SDF has no statutory backing. SDF has been created by administrative orders. Contribution has been from SAIL and TISCO. The question is what does the petitioner have in SDF when it was not even born when the Fund was created and how the petitioner, a competitor, would have any right to claim the Fund. The Fund has not passed into the hands of the Government. It finds mention in the books of SAIL and TISCO as credited to the Central Government. The Joint Plant Committee itself has no role to play in the utilisation of SDF as such. It acts as per the directions of the Central Government. The purpose for which SDF has been created is clearly spelt first in para (9-A) of notification dated 27-12-1978 and then in para (4) of the notification dated 16-1-1992. There is no challenge to either of the two notifications. This petition was filed on 14-2-2000 and came up for admission on 28-2-2000. On 18-2-2000, the Central Government in the Ministry of Steel wrote a letter to SAIL which is as under:
“Sub: Financial and business restructuring of Steel Authority of India Ltd.
Sir,
I am directed to your Letter No. CH/2/2/-C(iv) dated 16th September 1998 and subsequent clarifications/discussions on the above subject and to state that SAIL's proposal seeking approval of the Government for its financial and business restructuring has been considered by the Government and approval for the following proposals is hereby given:
1. Financial restructuring of SAIL by waiving of loans advanced to it from Steel Development Fund to a value of Rs 5073 crores and Rs 381 crores from the Government of India.
2. Provision of government guarantees with 50% interest subsidy for loan and interest thereon of Rs 1500 crores to be raised by SAIL from the market to finance reduction in manpower through voluntary retirement scheme.
3. Provision of government guarantee for loan and interest thereon of Rs 1500 crores (including Rs 500 crores already agreed) to be raised by SAIL from the market primarily for meeting repayment obligation on past loans during 1999-2000.
4. To initiate the process of divestment of the following non-core assets while protecting jobs of the existing employees as per milestones to be indicated separately:
(a) power plants at Bokaro, Durgapur and Rourkela—
— 2 × 60 MW Captive Power Plant-II at Rourkela Steel Plant and Central Power Training Institute at Rourkela,
— 2 × 50 MW Captive Power Plant-II at Durgapur Steel Plant,
— MW (2 × 55 MW plus 12 MW back pressure turbine) Captive Power Plant-I, 3 × z60 MW Captive Power Plant-II and steam generating capacity of 660 MT/hour at Bokaro Steel Plant.
(b) Oxygen Plant-II of Bhilai Steel Plant;
(c) Salem Steel Plant (SSP), Salem;
(d) Ally Steel Plant (ASP), Durgapur;
(e) Visveswaraya Iron and Steel Limited (VISL), Bhadrawati;
(f) Fertilizer plant at Rourkela.
5. Conversion of TISCO into a joint venture with SAIL holding minority shareholding.
The Government noted that this is one of the largest restructuring proposals considered by it involving an amount of over Rs 8000 crores and financial restructuring alone was not a long-term solution. Government has directed that Ministry of Steel sign an MoU with SAIL for implementation of a business restructuring plan with detailed milestones. It has been further decided that a Committee of Secretaries must examine and review at appropriate intervals the business restructuring plan with reference to detailed milestones and submit a progress report on a six-monthly basis to the Cabinet Committee on Economic Affairs (CCEA).”
11. As seen above, SDF was created by notification issued under clause 17-B of the Control Order. Main steel plants form the primary units of the Joint Plant Committee. It were only the member steel plants or the main steel plants who were subjected to add an element of their ex-works price and remit the same towards SDF. SAIL and TISCO were the member steel plants. SAIL was having four plants at Bhilai, Bokaro, Durgapur and Rourkela. Indian Iron and Steel Company Ltd. subsequently got merged with SAIL. By notification dated 16-1-1992 the Central Government withdrew the price restrictions under the Control Order and thereafter by notification dated 21-4-1994 contributions by the member steel producers towards SDF was also discontinued. It is the Central Government, which exercises control over SDF though there is no backing of any statutory provision for creation of SDF. The primary object of SDF was to enable the main steel producers for modernisation, research and development with the object of ensuring the production of iron and steel in the desired categories and grades by the main steel plants. Other steel producers who were known as secondary producers were not members of the Joint Plant Committee. They were not subjected to add an element of ex-works price of steel but could add any element of their choice and not to make remittance of the same to SDF. It does not stand to reason as to how these secondary producers are entitled to claim any amount from the corpus of SDF or to get some directions issued respecting the use of SDF. The petitioner started production only in April 1998 when four years prior to that remittance to SDF had been discontinued. It is not disputed that the petitioner was not a member of the Joint Plant Committee and did not remit any amount towards the corpus of SDF. The question is if in these circumstances the petitioner could advance a claim or exercise a right on SDF in any manner.
12. It were the members of the Joint Plant Committee who were made bound to add an element of ex-works price and to remit that amount for the constitution of SDF. It has been stated by the first respondent, Union of India, through the affidavit filed by the fourth respondent, Joint Plant Committee, that funds out of SDF were disbursed to the member steel plants by the SDF Managing Committee as per directions issued by the Central Government from time to time. It is then submitted that since early 1990s there has been a general recession in the steel industry. SAIL had approached the Central Government for its financial and business restructuring. SAIL had taken over Indian Iron and Steel Company Ltd., a sick company in the year 1978. Indian Iron and Steel Company Ltd. is a wholly-owned subsidiary of SAIL. The proposal given by SAIL to the Central Government contained various components and measures including waiver of loans from SDF made over to member steel plants which were under SAIL. It will be noticed that the amount of SDF was not in fact remitted to the Central Government but was shown as credit to the Central Government in the books of SAIL and its member steel plants. This proposal of SAIL, it would appear, has since been accepted by the Central Government by its letter dated 18-2-2000 which we have reproduced above.
13. While there was price control under the Control Order during the period 1978-94 when the remittance to SDF was made by the main steel producers, the petitioner was nowhere in the picture and was not subjected to any price control like the main steel producers. The petitioner and other steel producers were free to produce and sell the iron and steel products in the market on the prevailing prices. It has been pointed that the price fixed by the petitioner of its products was much higher than the control price which included elements of SDF. While the collection and remittance to SDF has been discontinued w.e.f April 1994, the petitioner made its claim for the first time in 1999 which would appear to be rather incongruous. It is submitted that the claim made by the petitioner is not bona fide and the writ petition has been filed with ulterior motives, which are not difficult to fathom. SAIL had stressed immediate need for restructuring and modernising all the main steel plants. Due to recession, SAIL has been passing through a severe financial position and has to suffer a loss of Rs 1574 crores in 1998-99. It has further to suffer the burden of interest to the tune of Rs 2017 crores per annum for modernisation. In the aforesaid circumstances, the petitioner does not have any right to claim any relief in the writ petition pertaining to utilisation of SDF. It is quite apparent that from the very nature of the creation of SDF, the manner of remittance to SDF and purpose of its utilisation, it is a fund created ultimately for the utilisation by the member steel producers only.
14. We do not think it is a fit case where this Court in the exercise of its powers under Article 136 of the Constitution of India should grant leave to appeal from the impugned judgment of the High Court. Leave to appeal is refused. Special leave petition is dismissed.