Biswanath Prasad v. Union Of India And Others

Supreme Court Of India
Aug 14, 1964
Smart Summary (Beta)

Factual and Procedural Background

Biswanath Prasad purchased Dhobidih Colliery from Bengal Coal Co. Ltd. on 29 November 1956 for Rs 20,000. The colliery had not been worked since 1948. Prasad claimed he resumed operations immediately and raised approximately 4,200 tons of coal during 1957-58; the Union Government and the Coal Board disputed this and maintained the mining was either not carried on or was done illegally without the requisite permission under Rule 39 of the Coal Mines (Conservation and Safety) Rules, 1954.

In October 1957 the Coal Board formally refused permission to reopen the colliery, citing lack of need for that grade of coal. Despite continued representations by Prasad, the refusal was reiterated and the grade earlier allotted to the mine was withdrawn in February 1958. On 1 July 1961 and 6 February 1962 the Central Government issued two notifications under Section 4(1) of the Coal Bearing Areas (Acquisition and Development) Act, 1957, expressing its intention to prospect for and ultimately acquire the colliery area. Prasad lodged no objections under Section 8 of the Act.

He first approached the Patna High Court under Article 226, alleging that the acquisition was unlawful and mala fide; the High Court dismissed the application (MJC No. 1069 of 1962). Prasad then filed (i) a special-leave civil appeal against that order (Civil Appeal No. 143 of 1964) and (ii) an independent petition under Article 32 raising additional grounds and placing new documents before the Supreme Court. Both matters were heard together by a Constitution Bench and disposed of on 14 August 1964.

Legal Issues Presented

  1. Whether the Central Government was barred by Section 4(4) of the Coal Bearing Areas (Acquisition and Development) Act, 1957 from acquiring the colliery because “coal mining operations were actually being carried on.”
  2. Whether Rule 39 of the Coal Mines (Conservation and Safety) Rules, 1954, requiring prior written permission to reopen a closed mine, was ultra vires Section 17 of the Coal Mines (Conservation and Safety) Act, 1952.
  3. Whether Rules 37 and 48 of the Mineral Concession Rules, 1949, regulating and restricting transfer of mining leases, were ultra vires Section 5 of the Mines and Minerals (Regulation and Development) Act, 1948.
  4. Whether the notifications under Section 4(1) of the Coal Bearing Areas Act were vitiated by mala fide or by discriminatory treatment contrary to Article 14 of the Constitution.

Arguments of the Parties

Petitioner's / Appellant's Arguments

  • The mine had been lawfully reopened and was producing coal; therefore Section 4(4) prohibited its acquisition.
  • Rule 39 was beyond the rule-making power conferred by Section 17 of Act 12 of 1952; alternatively, even if valid, the Coal Board’s refusal under the rule was mala fide, intended solely to circumvent Section 4(4).
  • Rules 37 and 48 of the Mineral Concession Rules, 1949 went beyond the scope of Section 5 of the 1948 Act and hence did not affect the validity of his purchase.
  • The Coal Board had discriminated in his case, as permission to reopen was granted in 1959 to the neighbouring Kabari Bad Colliery—which had also been closed for about ten years—while his request was refused.
  • The sequence of refusals, delays and acquisition notifications evidenced collusion between the Coal Board and the Union Government.

Respondents' Arguments

  • The colliery had remained closed since 1948; any extraction shown by Prasad was sporadic, unlawful and contrary to Rule 39, so Section 4(4) was inapplicable.
  • Rule 39 is a valid measure for coal conservation and safety, duly authorised by Section 17 of the 1952 Act.
  • Rules 37 and 48 validly regulate transfers of mining leases; Prasad’s purchase without Central Government approval violated those rules, undermining his locus standi.
  • Allegations of mala fide and conspiracy were vague, unsupported and untenable; administrative delay did not amount to bad faith.
  • No discrimination occurred; the demand for Grade III-B coal in 1959/1963 justified permission to Kabari Bad Colliery, whereas Prasad’s request had been assessed on material dates in 1957-58.

Table of Precedents Cited

PrecedentRule or Principle Cited ForApplication by the Court
Mason, Herring and Brooks v. Harris (1921) 1 KB 653 Linguistic scope of the word “grant” in property law Cited to illustrate that “grant” can, in some contexts, exclude assignments, but the Court distinguished that context and held “grant” in Section 5 of the 1948 Act broad enough to cover transfers.

Court's Reasoning and Analysis

1. Existence of lawful mining operations: The Court accepted the High Court’s factual findings that Prasad had not been carrying on coal mining operations “in conformity with law.” Any limited extraction was contrary to Rule 39 which required prior written permission. Consequently, Section 4(4) of the 1957 Acquisition Act did not bar acquisition.

2. Validity of Rule 39: Reading Section 17 of the 1952 Act with the Act’s objective of coal conservation and safety, the Court held Rule 39 intra vires. By controlling the reopening of dormant mines, the rule conserved resources and thus furthered the statutory purpose.

3. Validity of Rules 37 and 48 (Mineral Concession Rules 1949): The term “grant” in Section 5(1) of the 1948 Act was interpreted broadly to include transfers or assignments of leases. Accordingly, Rules 37 and 48, which require prior Central Government approval for such transfers, were upheld. As Prasad had purchased the colliery without such approval, his title was itself in breach of these valid rules.

4. Allegations of mala fide: The Court found the pleadings vague; mere administrative delay or hostility of an NCDC superintendent did not constitute evidence of conspiracy between the Coal Board and the Union Government. Hence, the acquisition notifications were not tainted by bad faith.

5. Alleged discrimination: Permission granted in 1959/1963 to Kabari Bad Colliery did not prove unequal treatment because market demand for Grade III-B coal had changed and each application was evaluated on facts prevailing at distinct times. Therefore, Article 14 was not violated.

Holding and Implications

Petition under Article 32 DISMISSED. Each party to bear its own costs.

Civil Appeal No. 143 of 1964 DISMISSED. No order as to costs.

Immediate effect: the Central Government’s acquisition notifications stand affirmed, and Prasad gains no relief. Broader implication: the judgment upholds the validity of Rule 39 (Coal Mines Conservation and Safety) and of Rules 37 & 48 (Mineral Concession Rules 1949), reinforcing governmental control over reopening dormant mines and over transfers of mining leases; however, it sets no new constitutional precedent beyond these affirmations.

Show all summary ...

WITH

Civil Appeal No. 143 of 1964.
Appeal by Special Leave from the Judgment and Order dated 23rd May, 1963 of the Patna High Court in MJC No. 1069 of 1962.
BISWANATH PRASAD . . Appellant;
Versus
NATIONAL COAL DEVELOPMENT CORPORATION (P) LTD . . Respondent.
The 14th day of August, 1964.
Present:
The Hon'ble The Chief Justice P.B GAjendragadkar
The Hon'ble Justice M. Hidayatullah
The Hon'ble Justice J.C Shah
The Hon'ble Justice Raghubar Dayal
The Hon'ble Justice S.M Sikri
For the Petitioner (In WP No. 14 of 1964) and Appellant (In CA No. 143 of 1964): C.B Agarwala, Senior Advocate (K.K Sinha, Advocate, with him).
For the Respondents (In WP No. 14 of 1964 and CA No. 143 of 1964): S.V Gupte, Additional Solicitor-General of India (B.R.G.K Achar, Advocate, with him).

The judgment of the Court was delivered by

Sikri, J.— There are two matters before us for disposal. One is an appeal by special leave against the judgment of the Patna High Court, dismissing an application filed by Biswanath Prasad under Article 226 of the Constitution. The other is a petition filed under Article 32 of the Constitution. In the petition under Article 32, some points have been raised which were not debated before the High Court and some documents which were not produced before the High Court have been filed in this Court. In the circumstances it seems convenient to proceed to dispose of the petition first, but we will, where appropriate, indicate the finding and reasoning of the High Court on a particular point. To decide the points raised by Mr C.B Agarwala, the learned counsel for the petitioner, it is necessary to state the facts somewhat in detail, for, inter alia, he submits that the action of the Union Government in acquiring the petitioner's mines was mala fide.

2. The petitioner, by deed of sale dated November 29, 1956, purchased a colliery, called Dhobidih Colliery, for Rs 20,000 from the Bengal Coal Co. Ltd., Calcutta. He held a certificate of approval granted to him under Rule 6 of Mineral Concession Rules, 1949. According to him, he started working the colliery immediately. This is denied by the respondents. This is one of the issues debated before the High Court, which found it against the petitioner. This point is of crucial importance for the Union Government is prohibited by sub-section (4) of Section 4 of the Coal Bearing Areas (Acquisition and Development) Act (20 of 1957) from acquiring “that portion of land in which coal mining operation are actually being carried on in conformity with the provisions of any enactment, rule, or order for the time being in force.” The respondents relying on this provision, however, say further that even if it be assumed that the petitioner worked the mines, this was not done in accordance with law. On this point, the High Court also held against the petitioner.

3. After acquiring the colliery, the petitioner, according to him, started working the mine in earnest. He engaged a Mines Manager, who was authorised to act as such by the Chief Inspector of Mines, and deposited Rs 2000 with the Assistant Electrical Engineer, Giridih, to secure an electric connection. He exploited the Hill Seam and had even two shifts in the Mine. He duly submitted returns. He even paid Sales Tax and excise on coal raised, which in the annual return for the year ending December 31, 1958, he claimed, amounted to 4200 tons, including colliery consumption and coal used for making coke. He employed labour, paying during the year 1957 a total amount of about Rs 41,000 for 1103 mandays work. In this connection we were referred to an affidavit filed before the Calcutta High Court on behalf of the Coal Board wherein it is stated the petitioner had “commenced mining operations in contravention of Rule 39(1) of the Coal Mines (Conservation and Safety) Rules, 1954, and further coal was being despatched in contravention of Rule 39(4) of the aforesaid Rules on the basis of an old grade given by the Coal Commissioner prior to the closure of the colliery in the year 1948. The said grade was, however, withdrawn in February 1958.”

4. From these facts it emerges that the petitioner did put up a show of raising coal but all these operations do not add up to carrying on coal mining operations within the meaning of sub-section (4) of Section 4 of the Coal Bearing Areas (Acquisition and Development) Act, 1957. At any rate, argues the respondents' counsel, the coal was raised contrary to law, and at the time of the acquisition by the Government no coal mining operations were being carried on. To this the petitioner's counsel replies that Rule 39 of the Coal Mines (Conservation and Safety Rules) 1954, under which the Coal Board refused permission to open the colliery was ultra vires as the Union Government could not make this rule under Section 17 of the Coal Mines (Conservation and Safety) Act, 1952 (12 of 1952), and it was this illegal refusal to reopen the mines that resulted in the colliery not being worked at the time of the notification. The learned counsel for the petitioner further says that even if Rule 39 is valid, permission was refused mala fide, with the ulterior object of avoiding the prohibition laid down in Section 4(4) of the Coal Bearing Areas (Acquisition and Development Act) 1957. Now what are the facts which are relevant to this part of the case? The Bengal Coal Company, from whom the petitioner had acquired the colliery, stopped working the colliery in 1948. This fact is mentioned in the application which the petitioner submitted on January 19, 1957, for reopening the mines, under Rule 39 of the Coal Mines (Conservation and Safety) Rules 1954. It is further stated in the application that the reasons of closure by previous owner is not known but it appears that due to non-availability of power and transport the raising were very poor and eventually closed. It follows from the statements in the application that when the petitioner acquired the colliery it had been closed for more than eight years. The explanation subsequently given by the petitioner that this application was made through clerical mistake cannot be believed. On October 10, 1957, after some correspondence, the petitioner was informed that the Coal Board had not granted permission to reopen the colliery “as production of more coal of the quality expected from the seams proposed to be worked by you is not now required for the Giridih area.” In spite of this refusal, the petitioner carried on correspondence with the Regional Inspector of Mines, Dhanbad Inspection Region, regarding the working plan of the colliery. This correspondence cannot advance the petitioner's case in any manner. On February 24, 1958, the Coal Board withdrew the Grade III-B fixed for the colliery with immediate effect. The petitioner was further requested not to dispatch any coal from the colliery henceforth. From the above recital it is quite clear that if it is assumed that the petitioner worked the mines, he did it contrary to Rule 39 and, therefore, if the rule is valid the prohibition in Section 4(4) of the Coal Bearing Areas (Acquisition and Development) Act does not come into operation.

5. After this, the petitioner started representing to the Coal Board for cancelling its orders. By its letter dated March 24, 1958, the Coal Board firmly reiterated its stand and warned the petitioner that he had raised and dispatched coal in contravention of Coal Mines Conservation and Safety Rules, 1954. On January 30, 1959, the Government of India refused to interfere with the decision of the Coal Board. On July 20, 1959, the Board declined to revise its decision. But the petitioner was not disheartened. He started representing again and for some reason not apparent on the record, the Coal Board started showing a receptive mind. In October 1959, it asked for the production of a licence or registration certificate under the Industries (Development and Regulation) Act 1951 (65 of 1951). Some letters were exchanged on this topic. Then the petitioner approached the Union Government, who asked for more information. In the reply the petitioner stated that “on receipt of several letters from the concerned department the working of the colliery was stopped from August 1, 1958”. Later, more information was asked for and supplied to the Union Government. Ultimately, the petitioner was informed that it was not necessary for him to have a licence under Act 65 of 1951. From now on the petitioner was time and again told by the Coal Board that the matter was under consideration, while the petitioner continued to press his case. On October 17, 1960, the petitioner was informed that the matter had been refererd to the Government of India, whose instructions were awaited. From now on the scene shifts to the Ministry of Steel, Mines and Fuel, which kept on acknowledging letters addressed by the petitioner. Enquiries were made in April 1961 whether the colliery was unworked. On July 1, 1961, the Central Government issued a Notification No. SO 1581, under sub-section (1) of Section 4 of the Coal Bearing Areas (Acquisition and Development) Act, 1957, giving notice of its intention to prospect for coal in the colliery of the petitioner. Another Notification No. SO 484 under Section 4(1) of the Act of 1957, was issued on February 6, 1962, in respect of another area of 25.15 acres. The petitioner did not file any objections to the proposed acquisition under Section 8 of the Act. It was only on November 23, 1961, that the petitioner was informed by the Government that the area in question appears to have been notified under sub-section (1) of Section 4 of the Act 20 of 1957. In reply to this intimation, the petitioner asserted that he was not bound in law by the aforesaid notification.

6. In para 32 of the petition, the petitioner alleged mala fides thus: “that, thus it is absolutely clear, the whole intent and purpose of the orders of the Respondent 2(i.e the Coal Board) and the notification issued by Respondent 1(i.e the Union Government) and the subsequent lingering of the matter on one plea or another were quite mala fide.” In para 21 it is stated “that the respondents and their authorities colluded and conspired against the petitioner with ulterior motive and collateral reasons and paid no heed to the petitioner's representations.”

7. These allegations are quite vague and are not sufficient to allege a case of conspiracy between the Coal Board and the Union Government to deprive the petitioner of his colliery. Apart from this, the above recital of the facts does not lend any support to any conspiracy existing between the Coal Board and the Union Government. That there was delay in disposing of the petitioner's representations is evident but delay, by itself, is hardly evidence of mala fide, specially as the Coal Board had as long ago as July 1959 declined to revise its earlier decision not to give permission to reopen the mines. There was a proceeding under Section 147 of the Criminal Procedure Code, between the petitioner and the Superintendent of Giridih Colliries, worked by Respondent 3, the National Coal Development Corporation (Pvt.) Ltd., and this litigation is also called in aid for showing mala fides. We are unable to see how the fact, assuming it to be true, that the said Superintendent was on inimical terms with the petitioner, shows mala fide on the part of the Union Government. Consequently, we hold that the Notifications Nos. SO 1581 and SO 484 are not vitiated on account of any mala fides.

8. This takes us to the question whether Rule 39 of the Coal Mines Con-servation and Safety Rules, 1954, is ultra vires. The said Rule 39 and Section 17 of the Coal Mines (Conservation and Safety) Act, 1952, are in the following terms:

“Rule 39 — Opening and reopening of Coal Mines.
(1) No coal mine or seam shall be opened and no coal mine or seam the working whereof has been discontinued for a period exceeding six months shall be reopened and no operation shall be commenced without the prior permission in writing of the Board and except in accordance with such directions as the Board may give.”
“17. (1) The Central Government may, by notification in the Official Gazette and subject to the condition of previous publication, make rules to carry out the purposes of this Act.”
Section 17(2) gives various specific matters on which rules can be made but none of these covers Rule 39. But in spite of this we are of the opinion that the impugned rule is valid. The object of the Act is to provide for the conservation of coal and make further provision for safety in coal mines. Section 7 empowers the Central Government to exercise such powers and take or cause to be taken all such measures as it may deem necessary or proper or as may be prescribed. We consider that Rule 39 is designed, inter alia, to secure conservation of coal. If a mine has to be opened, the Coal Board has to consider whether it is necessary that it should be reopened, it would conserve it for future use, if it is not allowed to be raised. In the particular grade at that time. If a particular grade of coal is not required, it would conserve it for future use, if it is not allowed to be raised, in the result, we hold that Rule 39 is not invalid and it is authorised by Section 17 of the Act (12 of 1952).

9. The next point that arises out of the pleadings is whether Rules 37 and 48 of the Mineral Concession Rules, 1949, are ultra vires the Mines and Minerals (Regulation and Development) Act, 1948. This point is raised by the petitioner in his counter-affidavit to defeat the objection of the respondents that the petitioner had acquired the lease of the colliery in contravention of the law and, therefore, has not any right to allege that Rule 39 of the Coal Mines Conservation and Safety Rules, 1954, is violative of Article 19 of the Constitution. The Mineral Concession Rules, 1949, were made in exercise of the powers conferred by Section 5 of the Mines and Minerals (Regulation and Development) Act, 1948. Section 5(1), before it was amended by Act 67 of 1957, reads thus:

“5. Power to make rules as respects mining leases.— (1) The Central Government may, by notification in the Official Gazette make rules for regulating the grant of mining leases or for prohibiting the grant of such leases in respect of any mineral or in any area.”
Rules 37 and 48 are in the following terms:
“37. Transfer of lease.— The lessee may, with the previous sanction of the State Government and subject to the conditions specified in the first proviso to Rule 35 and in Rule 38, transfer his lease or any right, title or interest therein, to a person holding a certificate of approval on payment of a fee of Rs. 100 to the State Government:
Provided that no mining lease or any right, title or interest therein in respect of any mineral specified in Schedule IV shall be so transferred except with the previous approval of the Central Government.”
“48. Transfer or assignment.— No prospecting licence or mining lease to which the provisions of this Chapter shall apply or any right, title or interest in such licence or lease shall be transferred except to a person holding a certificate of approval from the State Government having jurisdiction over the land in respect of which such concession is granted.
Provided that no prospecting licence or mining lease or any right, title or interest in such licence or lease in respect of any mineral specified in Schedule IV shall be transferred except with the previous approval of the Central Government.”
These rules prohibit the transfer of a lease of a coal mine except with the previous approval of the Central Government. It is argued on behalf of the petitioner that these rules do not regulate the grant of a mining lease for the word “grant” does not include transfer or assignment of a lease. It is true that in a particular context, as existed in the case of Mason, Herring and Brooks v. Harris (1921) 1 KB 653 the word “grant” may not include an assignment. But we are not satisfied that the word “grant” in the context of Section 5 has this narrow meaning. The word “grant”, inter alia, connotes transfer of property and mining leases are property. Further, mining leases are usually of long duration and it could not have been the intention not to regulate assignments of such leases. We are fortified in this conclusion by the fact that Parliament, while using the word “grant” in Section 13(1) of Act 67 of 1957, in Section 13(2)(1) specifically provides for rules being made regarding the manner in which and the conditions subject to which a prospecting licence or a mining lease may be transferred. If these rules are intra vires, the result is that the petitioner acquired the colliery in transgression of these rules. Consequently, he has not sufficient interest in the property to raise questions about the constitutional validity of Rule 39 of the Coal Mines Conservation and Safety Rules, 1954.

10. One point urged on behalf of the petitioner now remains, and that is the plea of discrimination. The plea is put in the following terms, in para 31 of his petition:

“That although Respondent 2 refused permission to the petitioner to open the colliery and withdrew the grade on the plea that no more of the quality was required from the Giridih area, it granted permission on June 6, 1959, for reopening of Kabari Bad Colliery in the same area of Karhabaree for raising Grade III-B coal which was lying unworked for the last about 10 years although the colliery lies in the midst of collieries being worked by Respondent 3 due to which the latter had to allow them to use its (NCDC's) own road in the area.”
The respondent's case is that while permission to reopen the mines was refused to the petitioner in October, 1957, it was on June 6, 1959, that the Kabari Bad Colliery was given permission. And more important is the allegation that the grade was fixed for this colliery as III-B on March 30, 1963, i.e five years after this grade was withdrawn from the petitioner. Demand for Grade III-B coal can easily be different after the lapse of five years, and the Coal Board was entitled to decide the case of Kabari Bad Colliery on the facts existing in 1959 and 1963. Under the circumstances, we are not satisfied that there has been any discrimination in violation of Article 14 of the Constitution.

11. In view of our findings above, we dismiss the petition, but in the circumstances of the case, we order that the parties will bear their own costs.

12. No other point arises in the appeal and we dismiss the appeal with no order as to costs.