M/S. Veer Prabhu Marketing v. M/S. Sunmoon Printers Pvt. Ltd. And Another

Rajasthan High Court
Nov 23, 1998
Smart Summary (Beta)

Factual and Procedural Background

The appellant, defendant No. 1 in Civil Suit No. 78/98, was sued by the plaintiff respondent No. 1, Sunmoon Printers Pvt. Ltd., Jodhpur, seeking mandatory and perpetual injunction to restrain the appellant from unauthorized construction on industrial plot A-11 that would obstruct light, air, and sunshine to the plaintiff's adjacent industrial plot No. A-12. The plaintiff alleged that the appellant demolished an existing shed and started unauthorized construction, including a basement prohibited by lease conditions, which would interfere with the plaintiff’s right to light and air necessary for his printing business. The defendant No. 2, Rajasthan Industrial Development & Investment Corporation (RIICO), was also a party to the suit. The plaintiff moved for a temporary injunction under Order 39, Rules 1 & 2 read with Section 151 of the CPC, which was granted by the Additional District Judge No. 3, Jodhpur, restraining the appellant from infringing the plaintiff’s rights to light and air and directing compliance with building rules and submission of construction plans to respondent No. 2. The appellant challenged this order by filing the present appeal.

Legal Issues Presented

  1. Whether the plaintiff has acquired a prescriptive right of easement to receive light and air from the north side of his industrial plot.
  2. Whether the appellant’s construction infringes upon the plaintiff’s right to light, air, and sunshine, thereby causing substantial damage or irreparable injury under Section 33 of the Indian Easements Act, 1882.
  3. Whether the appellant is bound to comply with the RIICO Disposal of Land Rules, 1979, including obtaining permission and maintaining prescribed setbacks for construction.
  4. The extent and nature of the right to light and air, specifically the distinction between vertical and lateral light and its applicability in this case.
  5. The correctness and scope of the temporary injunction granted restraining the appellant’s construction activities.

Arguments of the Parties

Appellant's Arguments

  • The sheds were originally constructed by the State Government to minimize construction costs and have no connection with the plaintiff’s right to light and air.
  • The sheds on both plots share a common wall without windows or ventilation; thus, no light or air passes between them from the north side.
  • Construction of the basement is not prohibited by lease conditions, and the appellant is constructing according to rules and directions from respondent No. 2.
  • The appellant is not obligated to leave setbacks on three sides since the plaintiff also did not leave any setbacks.
  • The construction will not obstruct any light or air necessary for the plaintiff’s printing work, and the plaintiff has not acquired any easement right to light and air.
  • The suit is a means to harass and cause loss to the appellant.
  • The appellant has a legal right to raise construction on his plot and permission from respondent No. 2 is not required for plots up to 40,000 sq. meters.
  • The temporary injunction is vague, and the appellant should not be restrained from construction altogether.
  • The plaintiff has failed to prima facie establish irreparable injury or substantial damage as required under Section 33 of the Indian Easements Act, 1882.

Respondent No. 1's Arguments

  • The plaintiff has been receiving light and air from the north side for 35 years, acquiring a prescriptive right of easement.
  • The appellant demolished the existing shed and is constructing unauthorized multi-storey buildings violating lease conditions and building rules.
  • The appellant’s construction will obstruct light, air, and sunshine necessary for the plaintiff’s printing press operations and business comfort.
  • The appellant must maintain setbacks as per the lease deed and rules framed by respondent No. 2.
  • The plaintiff’s right to light and air is protected under Section 33 of the Easements Act, 1882, and obstruction causing substantial damage warrants injunction.
  • The appellant must obtain permission from respondent No. 2 and comply with RIICO Disposal of Land Rules, 1979.
  • The impugned order granting temporary injunction is clear and justified.

Respondent No. 2's Position

  • Respondent No. 2 issued a letter dated 8-7-1998 directing the appellant to ensure construction respects neighbors’ rights to light and air and to maintain proper setbacks.
  • There is no restriction in lease conditions on construction of underground structures, but quarrying is prohibited.
  • The appellant must comply with site plans and building regulations, and permission is required for construction exceeding certain parameters.
  • Respondent No. 2 has authority to sanction construction and ensure compliance with rules to protect rights of adjoining plot holders.

Table of Precedents Cited

Precedent Rule or Principle Cited For Application by the Court
Anopchand v. Misrilal, AIR 1963 Raj 184 Right of property owner to enjoy natural advantages and construct on land subject to neighbor's rights; distinction between lateral and vertical light. The court relied on this precedent to affirm that the plaintiff’s right to light is subject to the appellant’s right to build but recognized the plaintiff’s prescriptive right to light from the north side.
Suzan Mal v. Bhanwar Lal, 1984 WLN 195 Requirement to prove substantial damage due to obstruction of light and air. The court held that the plaintiff must prove substantial damage, which prima facie was established in the present case.
Prem Devi v. Sohanlal, 1988 Raj LW 655 Need to prove substantial damage to obtain injunction for obstruction of light. The appellant relied on this case, but the court distinguished it as the plaintiff here prima facie established potential damage.
Indian Oil Corporation Ltd. v. Municipal Board Chaksu & Another, 1998 (2) Raj LW 1204 Principles governing grant of temporary injunctions. The court reiterated these principles in assessing the balance of convenience and irreparable injury favoring the plaintiff.
Dr. K. Panduranga Nayak v. Smt. Jayshree, AIR 1990 Karnataka 236 Recognition of right to vertical light and air, but not lateral light. The court applied this principle to clarify the nature of the plaintiff’s easement rights.
Tejkaran v. Sushil Kumar, 1996 (2) WLC 457 : 1996 AIHC 3064 Competence of neighbor to object to unauthorized construction violating easement rights. The court cited this to confirm the plaintiff’s right to raise objections against unauthorized construction.

Court's Reasoning and Analysis

The court examined the facts and documents including affidavits, photographs, and correspondence. It found that the plaintiff has been receiving light and air from the north side for 35 years, thereby acquiring a prescriptive right of easement. The court rejected the appellant’s argument that the sheds’ construction had no nexus with the plaintiff’s right to light and air, emphasizing that light is all-pervading and not limited to the sun’s direction. The court also held that the plaintiff requires natural light and air for his printing business and office, contrary to the appellant’s claim that offset printing can be done underground without light.

Regarding the appellant’s construction, the court found that the appellant is bound by the RIICO Disposal of Land Rules, 1979 and must comply with building regulations, including maintaining prescribed setbacks and obtaining necessary permissions. The court upheld the lower court’s direction to submit site plans and obtain sanction from respondent No. 2 to ensure compliance with these rules.

The court analyzed precedents establishing that the right to light and air is primarily a right to vertical light and that obstruction must cause substantial damage or irreparable injury to warrant injunction. It found that the plaintiff prima facie demonstrated such potential damage due to deviation from the existing shed pattern and failure to maintain setbacks.

The court further held that the appellant’s reliance on certain precedents was misplaced given the facts of this case. It also rejected the appellant’s contention that the plaintiff’s own violations of setbacks estop him from raising objections, clarifying that illegal acts by one party do not justify similar violations by another.

Consequently, the court agreed with the lower court that the plaintiff has a prima facie case, and the balance of convenience and risk of irreparable injury favor the plaintiff, justifying the temporary injunction. However, the court noted the injunction should be clarified to specify that the appellant shall not construct in a manner that infringes the plaintiff’s right to light and air, particularly towards the south of the appellant’s plot (north of the plaintiff’s plot) and should follow the pre-existing shed pattern and setbacks.

Holding and Implications

The appeal is dismissed with costs.

The court upheld the temporary injunction restraining the appellant from unauthorized construction that would infringe the plaintiff’s right to light, air, and sunshine from the north side. The appellant is directed to comply with the building regulations and maintain the existing pattern of sheds and prescribed setbacks to protect the plaintiff’s easement rights. The decision does not set a new precedent but affirms the application of established principles relating to easements, building regulations, and injunctions in the context of industrial plot construction disputes.

Show all summary ...

1. The appellant is defendant No. 1 in Civil Suit No. 78/98 instituted by the plaintiff respondent No. 1 Sunmoon Printers Pvt. Ltd., Jodhpur for the reliefs of mandatory and perpetual injunction for ordering the defendant No. 1 appellant to make construction on the lines of construction already existing on his industrial plot A-11 described in para 2 situated in Industrial Estate, Jodhpur and if permission is granted by the defendant No. 2 to raise construction according to new rules, then to raise the construction leaving proper set backs as per rules and at a height by maintaining an angle of 22 degree of his shed. The defendant No. 1 may be further restrained from obstructing the passage of light, air and sun shine to the plaintiff's industrial plot No. A-12. The defendant No. 2 Rajasthan Industrial Development & Investment Corporation, Jodhpur is respondent No. 2 in this appeal. The respondent No. 1 also moved an application under order 39, Rules 1 & 2 read with S. 151, CPC for temporary injunction. The learned Additional District Judge No. 3, Jodhpur allowed the application by order dated 17-8-98 whereby the appellant was restrained from making any infringement in the right of the plaintiff to receive light, air and sun shine from the north side of his plot; to raise construction with permission and in accordance with the rules and regulations framed by respondent No. 2. The appellant was also ordered to submit the map of the proposed construction to respondent No. 2. The respondent No. 2 was directed to accord sanction for construction in accordance with its rules and regulations after keeping in view the plaintiff's right to receive light, air and sun shine from the north side of his plot. Aggrieved by the aforesaid order, the appellant has preferred this appeal.

2. The plaintiff has stated the facts in his application that State Government introduced the scheme for industrial development in the year 1960 for allotment of industrial plots with constructed sheds at the angle of 22 degree. The defendant purchased in auction industrial plot No. A-11 in the north of the plaintiff's industrial plot No. A-12 from respondent No. 2. The industrial Plot No. 12 is owned by the respondent No. 1 in which he has installed printing press and he is doing his printing works. The construction of the shed in the plaintiff's industrial plot is maintaining 22 degree angle. It receives light and air from northern side. Before purchasing industrial plot by the appellant, the shed existed there with set backs. Now, after purchasing industrial plot No. A-11, the appellant demolished the shed and started construction of the basement illegally because basement is not allowed according to the lease conditions. The appellant is bent upon to construct a multi storey building unauthorisedly on the industrial plot which will obstruct the light, air and sun shine to his shed from the north side required to run his printing press and offset printing. The plaintiff is getting light and sun shine from the north side for the last 35 years. He has acquired a right of easement. The defendant also does not have any right to raise construction without leaving setback 10 ft. wide in three sides. The respondent No. 1, therefore, prayed for the reliefs accordingly in his suit and temporary injunction as stated above.

3. The appellant stated in his reply that the sheds were constructed by the State Government for keeping the cost of construction as low as possible and it has no nexus with the provision of light from the north side to the adjacent shed. The shed of the defendant's plot A-11 and the shed of the respondent No. 1 on A-12 are separated by a common wall in which there are no ventilation or window for light and air. The appellant admitted that he started construction of the under-ground because it is not prohibited by any of the lease conditions. He is constructing according to the rules and the directions by the respondent No. 2. He is not bound to leave set back in three sides because the plaintiff has also not left any set back on his plot. The construction of his shed is on the common wall. The construction by the defendant will not obstruct the passage of light and air. No light and air is required by the plaintiff for his off set printing work. Plaintiff has not acquired any easement of light and air as claimed by him. In the end, it has been stated that the appellant has a legal right to raise construction on his plot and the suit has been filed merely to harass and cause loss to him.

4. The plaintiff further filed counter reply controverting the above facts with the allegation that the appellant is doing construction in violation of the rules and regulations and without sanction of the site plan by respondent No. 2. The respondent No. 2 replied that a letter dated 8-7-98 was addressed to the appellant directing him to construct after taking care of the rights of the neighbours to receive sufficient light and air from the north side. The appellant should not also construct multi-storey building. However there is no restriction in lease conditions for construction of an under-ground because only quarring work is prohibited. The appellant has not taken permission from respondent No. 2, but such permission is not necessary for construction if the size of the plot is 40,000 sq. Mtrs. or less. The appellant is bound to leave set backs as shown in the site plan enclosed with the lease deed. The learned Additional District Judge No. 3, Jodhpur after hearing the learned counsel for the parties and considering the documents and the affidavits submitted by them, passed the impugned order.

5. The learned Additional District Judge found prima facie case in favour of the plaintiff. The learned Additional District Judge took the view on the basis of the letter dated 8-7-1998 written by respondent No. 2 that the sheds were constructed in the year 1960 also keeping in view the facility of light and air to the sheds and a particular pattern was adopted for this purpose. The glasses were fitted at a certain height on the sheds towards north side in 60 ft. length and the applicant has been receiving the light in his shed which is evident from the photographs. The contention on behalf of the appellant was not accepted that the construction of the shed had no relevancy with the arrangement of light and air. The learned Judge prima facie held that plaintiff has acquired a right to receive light in his shed from north side. The learned counsel for the appellant argued that this finding is erroneous and based on wrong assumption that the Unit of the appellant is towards the south of the Unit of respondent No. 1. Moreover, it has not been considered that the respondent No. 1 is getting sufficient light from southern, eastern and western sides. The Sun rising in the East sets in the West via southern side. Therefore, there is no question of receiving or obstruction of light from the north side. In my view this argument is not tenable because it cannot be said that if the sun sets in the West with inclination towards south then there cannot be any right to passage of light from the north because light is all pervading, sun being throughout vertical on the Earth; it does provide light to the north side also all the time throughout the day, may be more or less light for some hours in a particular direction. I have perused the impugned order wherein it has been mentioned that appellant's unit is towards the south of the respondent's Unit but the learned Judge has clearly held that from the inception of the sheds in the industrial plots as shown by the photographs and also by virtue of its construction pattern, light is being received from the north side. Therefore, mentioning of the wrong direction of the situation of the Units has no material bearing on the question of right to light and air.

6. It is also not acceptable that the respondent No. 1 do not need any natural light and air for his printing work and offset press. My attention was drawn towards the affidavit of one Manish Vyas, Proprietor, Dynamic offset Printers, Sardarpura, Jodhpur, who has sworn that he is doing printing work in the under-ground. The offset press of Rajasthan Patrika is also on the under-ground floor. No light and sun shine is required for this work and it can be conveniently done in the under-ground. The argument on behalf of the learned counsel for the respondent No. 1 is plausible that the respondent is doing other printing work and running his office also besides offset printing press. It cannot be laid down that offset printing cannot be done on the ground floor and light is not required for it. Dhirendra Kumbhat respondent No. 1 has filed counter-affidavit that Manish Vyas does not need light and air for his offset printing because he does black and white printing for his newspaper. Lodha Printers and Rajasthan Patrika do not run the printing works in the under-ground. I agree with the view of the learned Judge that the respondent No. 1 needs light for his printing work and business. There is no site map on record to show at this stage whether the respondent No. 1 is getting the required quantity of light from other sides and he does not need protection from the disturbance of light from the north side. Therefore, the case A.V. Kuppuswamy Iyer v. S.K. Subramanian, AIR 1998 Madras 268 do not render assistance to the appellant.

7. I do not find any force in the contention that since construction has been made by the respondent also on the land of set back, it does not lie in the mouth of respondent No. 1 to object against the appellant about the alleged encroachment of the set backs. The unauthorised or illegal act by the opposite party does not vest any authority or justification to commit the same violation. It is open to the appellant to seek appropriate legal remedy against the respondent No. 1. Therefore, the respondent No. 1 is not estopped from pleading his grievance against the appellant about the alleged construction in the set backs. The learned counsel for the appellant vehemently argued that the respondent No. 1 is making construction leaving 5 ft. wide space from the common wall which will provide virtually 6 ft. wide space in between the construction of the appellant and the shed of the respondent No. 1 on the common wall. It will provide passage for light and air. The easement right for light and air is only for vertical light and not for any lateral light. The right does not extend to compel the neighbour to leave a particular piece of land or space. He strenuously argued that the respondent No. 2 has categorically replied that permission for construction is not required by the appellant. Therefore, the direction to the appellant to seek permission from respondent No. 2, is without any basis. The temporary injunction issued by the learned Court is vague and entire construction has been stayed over the plot. It is contended that the learned Court has erred in not considering the correct legal position regarding the right of easement to light and air. The respondent No. 1 has to show that he is going to suffer an irreparable injury or substantial damages as envisaged in S. 33 of the Indian Easements Act, 1882. The respondent No. 1 has failed to prima facie establish the same. In support of his arguments, the learned counsel for the appellant relied upon 1988 Raj LW 655 (Prem Devi v. Sohanlal), AIR 1963 Raj 184 (Anopchand v. Misrilal) 1984 WLN 195 (Suzan Mal v. Bhanwar Lal and AIR 1990 Karnataka 236 (Dr. K. Panduranga Nayak v. Smt. Jayshree).

8. The learned counsel for the respondent No. 1 has vehemently contended that the respondent's case is squarely covered within the provisions of S. 33 of the Easements Act, 1882. The construction by the appellant will cause substantial damage to him. Explanation 1 provides that if there is material diminution of the value of the dominant heritage, it will be deemed to be a substantial damage. The diminution of the light will prevent the respondent No. 1 from carrying on his business as beneficial as he was doing previously. It will also materially affect his physical comfort. It is further contended that the appellant is bound to construct the building according to the RIICO Disposal of Land Rules, 1979 and circulars. He should also maintain the north side light system provided at the time of construction of the sheds. He has to obtain a permission of the local authorities including the Urban Improvement Trust. The appellant is not authorised to raise multy-storey commercial complex. It is also argued that the plaintiff only wants to enjoy his right of easement to light from north side. The construction by appellant must be according to the rules and regulations and with proper set backs. According to the learned counsel for the respondent No. 1, the impugned order does not suffer from any ambiguity.

9. I have given my earnest consideration to the rival contentions. I have also perused the documents and affidavits filed by the parties. I will first consider the question relating to the permission for construction and compliance of rules and regulations by the appellant. The respondent No. 2 has framed “RIICO Disposal of Land Rules, 1979” and the Building Regulations Form E. Regulation I restrains the plot holder for using the land for any purpose except as a factory and other related purposes as allowed by the Corporation. Regulation 2 lays down that the buildings shall be constructed in accordance with the RIICO/Municipal bye-laws and regulations in force from time to time and also other law, rules and regulations in force and the plans and elevations approved by the officer authorised by the corporation. Rule 2(a) prescribes that no construction work shall be commenced unless plans, elevations and sections have been approved by the corporation. However, the lessee of the plot up to the size of 40,000 sq. mtrs. is authorised to start construction work in accordance with the site plan leaving the prescribed set backs. The set backs for various size of plots have been given in Table 1 and for the plots in the transferred industrial areas and estates in Table 4. Table 4 shows set backs front 25′ sides 10′ and rear 10′ for the plot size above 9,000 sq. ft. up to 1/4 Acre. It may also be noted that Regulation 7(a) mandates that no construction shall be undertaken in any of the set backs in the industrial area which may however be considered for regularisation on payment of prescribed compounding fees. Compounding of the construction in set backs is not allowed where construction is for commercial, residential or other use. The regulations also provide the height of the structures. It, therefore, shows that the appellant is bound to raise construction according to the building regulations of the respondent No. 2 as well as the other local authorities.

10. The respondent No. 1 made representation against alleged violation of the rules and construction in the set backs. The respondent No. 2 addressed a letter to the appellant on 8-7-98 that construction is not being made with proper set backs. The appellant submitted site plan for multi-storey building and the respondent No. 2 has categorically cautioned that construction of multy-storey building will obstruct the passage of light to the adjacent sheds. The respondent No. 2 directed the appellant to construct by leaving set backs shown in the site plan with the lease deed and keeping in view the north light sheds which were constructed with a view to provide lights. The learned lower Court has not committed any error in directing the appellant to comply with the Building Rules and Regulations of the respondent No. 2 and to submit the site plan to the respondent No. 2 ensuring the compliance of such rules and regulations. The respondent No. 2 has also asked the appellant to submit the same in letter dated 8-7-98 because the respondent No. 2 has a right to ensure that Building Rules and Regulations are not violated by any lessee. I agree with the learned counsel for the respondent that nothing can be said at this stage whether the appellant is complying with the rules and regulations or not and whether he is leaving the set backs as shown in the lease deed or 5 ft. space in the north as argued for him because no site plan has been submitted by the appellant in the Court. In these circumstances, I am not inclined to interfere with this part of the impugned order wherein the appellant has been directed to submit the site plan and to take permission from respondent No. 2 for construction in order to ensure the compliance of Building Rules and Regulations.

11. I also agree with the learned lower court that the respondent No. 1 has prima facie shown his prescriptive right for the passage of light towards the north of his shed. It remains to be considered as to what extent this right can be exercised by the plaintiff in the facts and circumstances of this case.

12. In Anopchand v. Misrilal (AIR 1963 Raj 184) (supra), it has been held that owner of a house or plot has exclusive right to enjoy it with all natural advantages and to construct over it. The owner of the immovable property has a right to open as many windows as he likes on his land and to receive any amount of lateral light but subject to the right of the owner of adjoining land to shut out the light by making any erection on his own land because the right of a owner to enjoy it by raising any building cannot be curtailed. In this case the plaintiff had not acquired any prescriptive right of light and air and the question of enjoyment of light and air by easement was not in question. The facts of the case Suzan Mal v. Bhanwar Lal (1984 WLN 195) (supra) were that there was a space of 2′2″ in between the house of the plaintiff and the defendants. The flow of air and light was not totally stopped but the flow of light and air diminished. It was held that plaintiff must prove a substantial damage. In Prem Devi v. Sohanlal (1988 Raj LW 655) (supra), the plaintiff could not prove by his evidence that he would suffer substantial damage by closing of the window. Therefore, the plaintiff was not entitled for the relief of perpetual injunction. It is held in Dr. K. Panduranga Nayak v. Smt. Jayshree (AIR 1990 Karnataka 236) (supra) that law recognises right to vertical light and air. A person cannot complain the obstruction to lateral light and air to his property. In the case of 1998 (2) Raj LW 1204 (Indian Oil Corporation Ltd. v. Municipal Board Chaksu & Another, Chaksu), the well recognised principles which apply for grant of temporary injunction have been reiterated.

13. All the above decisions are based on the evidence produced by the parties and facts and circumstances of each case. There is no undeniable position that the plaintiff has to prove substantial damage to him due to obstruction of the passage of light and air. The light lateral or vertical or air enjoyed by way of right of easement cannot be obstructed materially diminishing the value of the plaintiff's immovable property or interferring materially with the physical comfort or preventing the plaintiff from carrying on his business as beneficially as he was doing previous to the instituting the suit.

14. In the instant case, it has been established prima facie that the plaintiff is getting vertical and lateral light from north side in exercise of his right of easement for the last 35 years. It has also been prima facie shown that he likely to suffer substantial damage by the construction raised by the appellant in deviation from the pattern of the sheds existing prior to the demolition by the appellant and without leaving the set backs. In view of the above discussion, I am inclined to agree with the learned lower Court that the plaintiff has a prima facie case in his favour. In these circumstances the necessary ingredients of balance of convenience and irreparable loss are also in favour of the respondent No. 1. The respondent No. 1 being the neighbour whose right of easement to light is being disturbed, is competent to file the suit and also raise objection about construction without sanction and against the rules as held in 1996 (2) WLC 457 : (1996 AIHC 3064) (Tejkaran v. Sushil Kumar). The appellant has not been restrained altogether from making construction on his industrial plot. The cases relied upon by the appellant based on their own facts do not render assistance to him. However, I am of the view that the temporary injunction issued under the impugned order needs a little more certainty in respect of the construction to be made without infringement of the prima facie right of the respondent No. 1 to light and sun shine.

15. In the result, the impugned order is hereby maintained and it is however made clear that the appellant shall not make construction towards the south of his plot A-11 i.e in the north of respondent No. 1's plot A-12 in deviation from the pre-existing pattern of the sheds and the space left for light and air as given by the State Government and the respondent No. 2 in order to ensure access of light and air.

16. The appeal is hereby dismissed with cost.

Appeal dismissed.