Union Of India Repre... v. M/S. Ibrahim Gulaba ...
Concise Analytical Summary of the Opinion
Factual and Procedural Background
The first respondent (plaintiff below) sued the Union of India, representing the General Managers of South-Eastern Railway (Calcutta), Central Railway (Bombay) and Western Railway (Bombay), in the Court of the 2nd Additional District Judge, Durg, claiming Rs. 13,500 for loss and damage to a consignment of tobacco. The trial Court decreed Rs. 12,500 with costs. The Union of India (representing the South-Eastern Railway, Calcutta) appealed against that decree.
Key factual events (as pleaded and proved in evidence): a consignment of 101 bags of tobacco (133 maunds, 33 seers) was despatched on 11-7-1959 from Bhalej to Durg. On 7-8-1959 the plaintiff sought assessment delivery alleging damage. The Station Master at Durg did not give delivery and delayed or refused delivery pending presence of a Central Excise Inspector. The Central Excise Superintendent agreed to send an inspector (letter dated 11-9-1959) but delivery was still not effected and the goods allegedly suffered further damage.
The plaintiff wrote to railway authorities under Section 77 of the Railways Act on 1-9-1959. On 21-11-1959 the District Commercial Superintendent, Nagpur, directed (Ex. p-6) that delivery may be granted after assessing damages at 45% (which the consignor had agreed) and ordered wharfage charges to be foregone. The Station Master refused to deliver on 23-11-1959 on the ground that the assessed loss (Rs. 7,100) exceeded his authority (limited to Rs. 1,500).
The consignment was advertised for sale. The plaintiff later took delivery under protest on 12-12-1959; panchas assessed damage at 60%. Processing of damaged tobacco was completed on 27-12-1959. The plaintiff claimed Rs. 13,500 under several heads (shortage in weight, completely and partially damaged tobacco, loss of profit at 20%, refund of wharfage and demurrage, miscellaneous expenses). The plaintiff relinquished a small portion and claimed Rs. 13,500.
Defendants other than the appellant allowed the case to proceed ex parte. The written statement was filed only by the appellant and was described by the Court as vague and perfunctory. The trial Court accepted the plaintiff's version and entered a decree for Rs. 12,500 (reducing claimed profit from 20% to 10%). The Union of India appealed.
Legal Issues Presented
- Whether the appeal is barred by limitation given allegations concerning who obtained the certified copies of the judgment and decree and whether time can be excluded under Section 12 of the Limitation Act.
- Whether the certified copies of judgment and decree filed with the appeal should be disregarded because they were allegedly used by the appellant against the wishes of the respondent (i.e., whether the appeal is properly constituted under Order 41 Rule 1, CPC).
- Whether the application to make up deficit court-fee after filing rendered the appeal barred by limitation and whether the Taxing Officer's certificate of bona fide delay should be sustained.
- On the merits: whether the consignee/plaintiff could insist on open (assessment) delivery before taking delivery; whether, by insisting on assessment delivery and delaying taking delivery, the plaintiff contributed to the deterioration of goods so as to preclude recovery for subsequent loss or fall in market price.
- Whether the plaintiff is entitled to recover (a) the full amount claimed for shortage and damage, (b) refund of wharfage and demurrage, (c) loss of profit, and (d) miscellaneous expenses (notice, typing charges).
- Whether the District Commercial Superintendent's letter (Ex. p-6) assessing damages at 45% and directing waiver of wharfage bound the Railway Administration or gave the plaintiff a right enforceable against the Station Master’s refusal to deliver.
Arguments of the Parties
Appellant's Arguments (as recorded)
- Preliminary objections: the appellant argued the appeal was barred by time because the appellant was not entitled to exclude any time under Section 12 of the Limitation Act; the certified copies of the judgment and decree filed with the appeal had not been obtained by the appellant (they were allegedly obtained by the respondent and later misappropriated by the respondent's trial counsel), so no time for obtaining those copies can be excluded.
- It was also contended that certified copies used with the memo of appeal were used fraudulently or against the wishes of the plaintiff and thus should be ignored, rendering the appeal improperly constituted under Order 41 Rule 1 CPC.
- Appellant argued only Rs. 1,500 (or limited liability) could be considered by Station Master and that the plaintiff could not insist on assessment delivery; by insisting on open delivery for four months the plaintiff contributed to delay and subsequent deterioration and/or fall in market price and thus could not recover losses caused after he persisted in insisting on open delivery.
- On court-fee: the appellant acknowledged that only a Rs. 5 court-fee stamp was affixed at filing and the deficit was made up later; appellant sought to challenge the Taxing Officer's certification of bona fide delay.
Respondent's Arguments (as recorded)
- The respondent filed an affidavit alleging that the certified copies of judgment and decree had been obtained by him from the Court below and that the defendant's trial counsel borrowed those copies and subsequently misappropriated them by sending them to the railway authorities; this was advanced to oppose the appellant's claim for exclusion of time and to challenge use of the copies by the appellant.
- On the merits, the respondent relied on the facts that Ex. p-6 (letter of 21-11-1959 from the District Commercial Superintendent) agreed to assess damages at 45% and to forego wharfage charges, that the plaintiff had personally shown Ex. p-6 to the Station Master who still refused delivery, and that the plaintiff had taken delivery only under protest and suffered specified losses, as particularised in the plaint.
Table of Precedents Cited
| Precedent | Rule or Principle Cited For | Application by the Court |
|---|---|---|
| Purshattam Narayan v. Sugan Chand Pannalal, AIR 1964 Madh Pra 27 | That for the purposes of Section 12 Limitation Act the time to be excluded is that requisite in obtaining "the" certified copies of the judgment and decree which are actually filed with the appeal; it is immaterial who obtained those copies. | The Court relied on this authority to reject the appellant's contention that exclusion under Section 12 was not available because the appellant had not itself obtained the certified copies filed with the appeal. |
| Jusaf and Ismail Co. v. Governor-General-in-Council, ILR (1947) Nag 335 : (AIR 1948 Nag 65) | That a Railway Administration is not bound to give open delivery on the demand of the consignor/consignee; consignee has no absolute right to inspection/open delivery before being called upon to take delivery; remedy is to take delivery and sue for damages. | The Court cited this case as part of the established position that the plaintiff could not insist on open/assessment delivery as a matter of right and should take delivery and claim damages; applied to criticize the plaintiff's insistence on open delivery. |
| Ambalal v. Union of India, S.A. No. 485 of 1950 D/-15-9-1954 (Nag) | Same general principle concerning non-entitlement to open delivery and the proper course being taking delivery and suing for damages. | Used together with other precedents to establish the settled position of law that railways are not bound to grant open delivery on request. |
| G.I.P. Rly Co. v. Firm Manikchand Premji, AIR 1931 Nag 29 | Authority supporting the principle that railway administrations are not required to permit inspection/open delivery prior to delivery; consignee should accept delivery and seek remedy by action. | Relied upon to show the settled legal position relied on by the Court in assessing the plaintiff's conduct in not accepting delivery earlier. |
| G. G. in Council v. Firm Badri Das Gauri Dutt, AIR 1951 All. 702 | Further authority for the general principle that the consignee has no right to open delivery/inspection on railway premises before delivery is effected. | Cited with other cases to demonstrate settled law that the plaintiff could not insist on open delivery as a matter of right. |
| Dominion of India v. Netai Chandra, AIR 1952 Cal 726 | Authority reinforcing the principle that the railway is not bound to give open delivery and the consignee's remedy is to take delivery and sue for damages. | Relied upon as part of the body of precedent establishing the legal position applied by the Court on the issue of open delivery and liability for subsequent deterioration. |
| Union of India v. Gendmal, First Appeal No. 135 of 1956, D/-27-11-1959, 1960 M.P.L.J. (Notes) No. 23 | Another decision cited for the settled proposition that railways are not bound to grant open/inspection delivery and that loss due to refusal to permit inspection may not be recoverable if consignee did not take delivery and sue. | Placed alongside other authorities to support the Court's general statement of the law concerning open delivery and the consignee's obligations. |
Court's Reasoning and Analysis
The Court addressed the matters in stages: preliminary objections first, then merits.
Preliminary objections:
- On the contention that exclusion under Section 12 of the Limitation Act was not available because the appellant had not obtained the certified copies filed with the appeal, the Court held that Order 41 Rule 1 CPC requires that "a" certified copy of the judgment and "a" certified copy of the decree appealed against be filed with the appeal; this requirement was fulfilled. Under Section 12, the time to be excluded is that requisite in obtaining the certified copies actually filed with the appeal; it is immaterial who obtained them. The Court relied on Purshattam Narayan v. Sugan Chand Pannalal to this effect and rejected the objection.
- The related contention (that the certified copies had been used by the appellant fraudulently or against the wishes of the respondent so that they should be ignored) was rejected. The Court noted the appeal was filed with those copies on record and that the respondent had not taken steps to restore possession or seek other reliefs once the alleged misappropriation occurred. Accordingly, the Court held the appeal was not improperly constituted for want of certified copies.
- On the short payment of court-fee at presentation of the appeal and subsequently making up the deficit, the Court accepted the explanation (delay in obtaining sanction and funds within the Railway Administration) and the affidavit filed. The Taxing Officer had certified the delay as bona fide. The Court relied upon the rule in the Madhya Pradesh High Court Manual (Rule 9, Chapter II) that ordinarily time will be extended when the Taxing Officer certifies delay to be bona fide. The objection therefore failed.
Merits:
- The Court restated the well-settled position (citing several precedents) that a Railway Administration is not bound to permit open delivery or inspection on demand and that the consignee's proper course is to take delivery in the condition in which it is found (after giving notice as to condition) and then sue for damages. On that general proposition, the plaintiff should have accepted delivery on 7-8-1959 instead of persisting in seeking open delivery.
- However, the Court examined the particular facts and documents. On 21-11-1959 the District Commercial Superintendent issued Ex. p-6 directing that delivery may be granted assessing damages at 45% (which the consignee had agreed) and ordering wharfage charges to be foregone. The plaintiff asserted he handed Ex. p-6 to the Station Master, but the Station Master refused delivery and made the endorsement in Ex. p-7, citing his limited authority (only to effect delivery where assessed loss was up to Rs. 1,500).
- The appellant did not, in its written statement, explain why the damages assessed in Ex. p-6 were not binding. Given that Ex. p-6 indicated the Railway's willingness to assess at 45% and forego wharfage, and that the plaintiff had agreed, the Court held that the plaintiff was entitled to recover damages to the extent of Rs. 7,100 (the assessed loss), despite the general principle that a consignee cannot insist on open delivery.
- The trial Court had accepted plaintiff evidence calculating losses totalling about Rs. 9,994; the defendant had not rebutted this evidence. Nevertheless, the appellate Court found that because the plaintiff substantially contributed to delay and deterioration by insisting on open delivery, he could not recover the entire amount claimed; he was limited to the Rs. 7,100 awarded under Ex. p-6.
- The Court held that wharfage and demurrage (Rs. 1,523.60) must be refunded because Ex. p-6 explicitly directed that wharfage may be foregone and there was no basis for the Railway Administration to claim those charges contrary to its own direction. Wharfage and demurrage were treated as standing on the same footing.
- The Court disallowed the plaintiff's claim for loss of profit because the plaintiff's recoverable damages were limited to Rs. 7,100; consequently profit beyond that was not recoverable. The Court also disallowed Rs. 100 claimed for notice/typing etc., holding that these expenses were not properly proved by accounts in Court.
- The appellate Court adjusted the decree accordingly and granted four months' time for payment; if unpaid, the plaintiff may execute the decree. Counsel fee in the appellate Court fixed at Rs. 250 if certified.
Holding and Implications
APPEAL PARTLY ALLOWED; DECREE REDUCED
Holding: The appeal was partly allowed. Instead of the trial Court's decree for Rs. 12,500, the Court directed that there shall be a decree for Rs. 8,623.60 in favour of the plaintiff-respondent against all the defendants (this sum comprising Rs. 7,100 assessed damages plus refund of wharfage/demurrage Rs. 1,523.60; the Court disallowed profit and Rs.100 miscellaneous). The plaintiff is entitled to proportionate costs from the defendants. Four months' time is allowed for payment; if not paid, execution may follow. Counsel's fee fixed at Rs. 250 in this Court if certified.
Implications for parties: Directly, the plaintiff recovers a smaller sum than awarded by the trial Court (reduction from Rs. 12,500 to Rs. 8,623.60). The Railway Administration succeeds in part by avoiding full recovery of the amounts claimed for deterioration and profit, but must pay the assessed amount (Rs. 7,100) and refund wharfage/demurrage. The appellant's preliminary objections on limitation, constitution of the appeal and court-fee were all rejected.
The opinion does not purport to establish a new legal precedent; it applies settled principles (as cited) to the particular facts, and the Court limited the plaintiff's recovery on the bases set out above.
1. The first respondent had filed a suit in the Court of the 2nd Additional District Judge, Durg, claiming Rs. 13,500/-from the Union of India representing the General Manager, South-Eastern Railway, Calcutta, Central Railway, Bombay and the Western Railway, Bombay. The claim was decreed to the extent of Rs. 12,500/- with costs. Being aggrieved by the said decision, the Union of India representing the General Manager, South Eastern Railway, Calcutta, has filed this appeal.
2. Briefly stated the case of the plaintiff-respondent is as follows: One consignment containing 101 bags of tobacco, weighing 133 maunds and 33 seers, was despatched by Chimmanlal Somabhai and Company on 11-7-1959 from Bhalej Railway Station to be delivered to the plaintiff at Durg. On 7-8-1959, the plaintiff approached the railway authorities at Durg for the assessment delivery of the consignment and submitted an application for that purpose alleging that due to negligence or misconduct of the railway, damage to the consignment had been caused. The Station Master, Durg, did not effect delivery and kept the application pending until 19-8-1959 and then refused to give delivery of the consignment unless the Central Excise Inspector attended the assessment delivery. The plaintiff then approached the Excise Authorities. The Superintendent, Central Excise, Raipur Circle, ultimately agreed vide his letter, dated 11-9-1959, to send the Central Excise Inspector, Durg, at the time of assessment delivery and he informed the Station Master, Durg, to call him. However, the Station Master, Durg, did not effect delivery and this resulted in further damage being caused to the goods.
The plaintiff-respondent then wrote to the District Commercial Superintendent, Nagpur, the General Manager of the South-Eastern Railway, Calcutta, and some other railway authorities on 1-9-1959 preferring his claim under Section 77 of the Railways Act. On 21-11-1959, the District Commercial Superintendent, South-Eastern Railway, Nagpur, wrote to the Station Master, Durg, vide his letter (Ex. p-6) that delivery of the consignment may be granted assessing damages at 45p.c. which had been agreed to by the consignor. He also ordered him to forego wharfage charges. However, when the plaintiff approached the Station Master, Durg, he refused to give delivery of the consignment on 23-11-1959 on the ground that the value of the assessed loss was Rs. 7100/- and the Station Master was authorised to effect delivery in those cases only when the assessed loss was up to Rs. 1500/-. (vide Ex. p-7).
3. Thereafter, the consignment was advertised for sale because no delivery was taken by the plaintiff. The plaintiff on being apprised of the sale notice, dated 28-11-1959, again asked the Station Master to effect delivery of the consignment and on his refusal to give delivery after passing qualifying remarks and reweighment without instructions of the District Commercial Superintendent, Nagpur, the plaintiff ultimately took delivery of the consigned tobacco under protest on 12-12-1959 in the presence of the panchas who assessed the extent of damage at 60p.c. The plaintiff then obtained permission from the Central Excise Department for processing damaged tobacco and the processing was completed on 27-12-1959. The plaintiff claimed in his suit the sum of Rs. 13,500/- as damages under the following heads:
Loss of weight at Rs. 116-12 per maund at bijak rate 12 maunds, 31 seers and 8 chhataks.
1493/-
Completely damaged tobacco which could not fetch any price higher than Rs. 116-12 per maund (including Govt. duty of Rs. 100/-) 43 maunds, 3 seers and 7 chhataks.
5030/-
Partially damaged tobacco which could be sold at Rs. 170/- per maund only, thus causing loss at Rs. 46-12 per maund (Govt. duty being Rs. 100/- per maund ).
73 maunds, 34 seers and 12 chhataks.
3471/- 4 Loss of profit at the rate of 20% according to prevailing market rates.
2000/-
Refund of wharfage and demmurage which resulted due to negligence of the Railway Authorities in not giving the delivery to the plaintiff for complete four months.
1523.60 Miscellaneous expenditure along with notice, typing charges, etc.
100.00 Total 136,17.85 The plaintiff relinquished the claim of Rs. 117.85 Paise and claimed a decree for Rs. 13,500.00 only.
4. The written statement was filed only on behalf of the appellant. The other two Railway Administrations allowed the case to proceed ex parte against them. In the written statement, the appellant baldly denied all the material allegations in the plaint. It even recklessly denied the fact of the consignment having been booked as alleged in the plaint though it was admitted that the plaintiff took delivery of the consignment. It was not specifically pleaded that the plaintiff was not within his rights in insisting on assessment delivery on 7-8-1959 and, therefore, the defendants could not be held liable for any loss which might have been caused to the goods of the consignment after that date. We may observe that the written statement filed in this case is very vague and perfunctory.
5. The trial Court accepted the version of the plaintiff and passed a decree in favour of the plaintiff for Rs. 12,500/- only reducing the profits which were claimed at 20p.c. of the prevailing market rate at 10p.c. and thus reducing the plaintiff's claim by Rs. 1000/-. It is against this decree that the present appeal has been preferred by the defendant Union of India (appellant).
6. Shri Y. S. Dharmadhikari raises two preliminary objections to contend that the appeal should be dismissed as barred by time. It is urged that the appellant is not entitled to any exclusion of time under Section 12 of the Limitation Act inasmuch as the certified copies of judgment and decree which the appellant filed with the appeal were not obtained by him. The respondent has filed an affidavit alleging that these particular copies were actually obtained by him from the Court below. Subsequently, Shri M. A. Khan, Pleader, defendant's counsel in the trial Court, borrowed these copies on the pretext that he would recommend expeditious payment of the decretal amount. Having borrowed these copies, eventually Shri M. A. Khan misappropriated them by sending them to the railway authorities. The argument is that the appellant having not spent any time in obtaining copies because it was the respondent who had obtained them, no time can be excluded under Section 12 of the Limitation Act.
7. In our opinion, there is no substance in the contention advanced by the learned counsel. So far as this appeal is concerned, it was presented with "a" certified copy of the judgment and "a" certified copy of the decree appealed against. The requirements of Order 41 Rule 1 of the Code of Civil Procedure were thus fulfilled. Under Section 12 of the Limitation Act, the time to be excluded is that which was requisite in obtaining "the" certified copy of the judgment and "the" certified copy of the decree which are filed with the appeal and not the time which might have been taken in obtaining any other copy. The only copies which are to be taken into account for the purposes of Section 12 of the said Act are those which are actually filed with the appeal. It is immaterial who obtained those copies. That was also the view taken in Purshattam Narayan v. Sugan Chand Pannalal AIR 1964 Madh Pra 27. It is not our concern, for the purposes of this appeal, to enquire into the truth of the allegations made in the respondent-plaintiff's affidavit. Assuming that they are correct, it was the look-out of the plaintiff-respondent to resort to such legal remedy for restoration of possession of those copies and other reliefs as he thought he was entitled to, and to move for necessary action against the counsel for the conduct complained of. The first preliminary objection is rejected.
8. The second contention raised by the learned counsel for the respondent (plaintiff) is that as the certified copies of the judgment and decree filed with the memo of appeal are shown to have been utilised by the appellant for purposes of this appeal fraudulently or at least against the wishes of the respondent (plaintiff), as alleged in the affidavit filed on his behalf in this Court, and as this fact has not been controverted in any manner on behalf of the appellant, the said copies should be ignored and the appeal should be dismissed as being not properly constituted according to the requirement of Order 41 Rule 1 of the Code of Civil Procedure.
9. Again, we are unable to agree. The appeal was filed on 13-3-1961. The plaintiff-respondent entered appearance in this Court through his counsel on 26-6-1961. However, no steps were taken at all on his behalf for restoration of possession of those copies or other reliefs to which he may be entitled. The result, therefore, has been that the said documents are on record with the memo of appeal. In our opinion, ignoring this positive fact, it cannot be held that the appeal has been filed without the certified copies of the judgment and decree appealed from. This objection also is, therefore, overruled.
10. Another objection raised by Shri Dharmadhikari is that when the appeal was filed on 13-3-1961, only a court-fee stamp of Rs. 5/- was affixed and the deficit court fee was made on 25-3-1961. However, even after allowing the time which was requisite for obtaining the certified copies of the judgment and the decree, the appeal would be barred by limitation if it had been presented beyond 15-
3-1961. It is urged that the reasons assigned for not paying the full court-fees on 13-3-1961 and for making up the deficiency on 25-3-1961 are wholly inadequate and, therefore, the order of the Taxing Officer certifying the delay in payment of court-fee as bona fide should not be allowed to stand.
11. The reason assigned on behalf of the appellant for not paying the court-fees in time is that sanction by appropriate authorities of the Railway Administration concerned for incurring expenses of filing the appeal took considerable time and, therefore, the necessary amount of money for purchasing the court-fee stamps could not be sent to the counsel for the appellant till 13-3-1961. An affidavit in support of the aforesaid reasons has been filed on behalf of the appellant. It cannot be disputed that the Law of Limitation operates equally for or against a private individual as also Government. However, Rule 9 in Chapter II of the Madhya Pradesh High Court Manual, 1960, provides that when the Taxing Officer certifies the understanding to be bona fide on an application duly made for the purpose by the appellant, "the Court would normally extend time". In the instant case, the Taxing Officer certified the delay in payment of court-fee to be bona fide. We find no special or exceptional circumstances to depart from the normal rule of extending time. This objection also, therefore, fails.
12. On merits, the contention of the teamed counsel for the appellant is that the plaintiff-respondent could not insist on assessment delivery and as he persisted for four months in claiming an open delivery after assessment of damages, the defendant-Railway Administration could not be held liable for the loss resulting from this delay or from the fall in the market price.
13. It is well settled that the Railway Administration is not bound to give open delivery on the demand of the consignor. The consignee has no right that the goods shall be opened and inspected in the railway premises before he can be called upon to take delivery. The proper course for the consignee is that he should take delivery of the consignment in the condition in which it is found after giving notice to the officer giving delivery as to its condition and then sue the Railway Company for damage. See: Jusaf and Ismail Co., Saonerv. Governor-General-in-Council ILR (1947) Nag 335 : (AIR 1948 Nag 65); Ambalal v. Union of India, S.A. No. 485 of 1950 D/-15-9-1954 (Nag) G.I.P. Rly Co. v. Firm Manikchand Premji, AIR 1931 Nag 29; G. G. in Council v. Firm Badri Das Gauri Dutt, AIR 1951 All. 702; Dominion of India v. Netai Chandra, AIR 1952 Cal 726 and Union of India v. Gendmal, First Appeal No. 135 of 1956, D/-27-11-1959, 1960 M.P.L.J. (Notes) No. 23. This being the settled position of law, the plaintiff should have accepted delivery of the goods on 7-8-1959 itself. Unjustifiably, he continued insisting on open delivery after assessment being given to him. Eventually, he took delivery on 12-12-1959. Thus, he himself substantially contributed to the delay and further deterioration of the goods. The manner in which he took delivery on 12-12-1959 could as well have been followed by him on 7-8-1959.
14. But, in the peculiar circumstances of this case, the fact that he did not take delivery without imposing any qualifications on 28-8-1959 is not a complete answer to the plaintiff's claim. On 21-11-1959, by the letter (Ex. p-6), the District Commercial Superintendent of the appellant-Railway directed to effect delivery of the consignment to the plaintiff on assessment of damage at 45p.c. He also agreed by the same letter to forego the wharfage charges. The plaintiff-respondent averred in the plaint that the letter (Ex. p-6) was handed over to the Station Master, Durg, by the plaintiff but even then he did not effect delivery endorsing on its back the note (Ex. p-7) which we have referred to above. In his statement, the plaintiff deposed that he had personally handed over the letter Ex. p-6 to the Station Master, Durg, and had agreed to the calculation of the loss suffered at 45p.c. Shri B. K. Mahti (P.W. 6) was the Station Master then at Durg. He stated that Ex. p-6 was shown to him by the plaintiff but he refused to deliver the goods making the said endorsement. In the written statement, there is not a word said to show why the damages assessed in Ex. p-6 were not binding on the Railway Administration. Thus, though we are of the view that the plaintiff could not in law insist on open delivery and assessment of damages before delivery was effected to him, yet as this contention was not raised in the written statement at all and further as even on 21-11-1959 the District Commercial Superintendent indicated his willingness to assess damages at 45p.c. to which the consignee had agreed, in our opinion the plaintiff is entitled to recover damages to the tune of Rs. 7100/- on the basis of Ex. P-6.
15. No doubt, the trial Court has relied on the plaintiff's evidence to show that the loss sustained by him due to shortage in weight and complete damage to one part of the tobacco and partial damage to the other part, amounts to Rs. 9994/-. It does not appear that any endeavour was made by the defendant to rebut the plaintiff's evidence. But, it is unnecessary to probe deeper into the question inasmuch as we have held that the plaintiff was himself responsible for further deterioration of the goods by not taking delivery without qualifications and by his continued insistence on open delivery being effected after assessment. He is, therefore, not entitled to recovery of the whole of this amount from the defendant. He is entitled only to Rs. 7100/- as held above.
16. We are of the view that the plaintiff is further entitled to the refund of wharfage charges and demurrage. There is no dispute that the plaintiff was required to pay Rs. 1523.60 Paise as wharfage and demurrage when he took delivery of the consignment on 12-12-1959. In Ex. P-6, the District Commercial Superintendent clearly stated that wharfage charges may be forgone. We see no reason on the basis of which in spite of Ex. p-6, wharfage charges could be allowed to be claimed by the Railwy Administration. Wharfage charges and demurrage, in our opinion, stand on the same footing. Therefore, the plaintiff is entitled to the refund of the said wharfage and demurrage charges amounting to Rs. 1523.60 Paise.
17. The plaintiff is not entitled to claim any loss of profit because, in our view, he is not entitled to recover any damages beyond Rs. 7100/-. We, therefore, disallow the claim of the plaintiff on account of loss of profit which has been decreed by the lower Court.
18. The trial Court granted a decree for Rs. 100/- on account of notice, typing charges, etc. In our judgment, the plaintiff is not entitled to this amount also. The trial Court allowed this amount taking into consideration that the plaintiff was required to go to Raipur and to send his representative to Nagpur. These expenses, in our opinion, were not properly incurred and have not been proved by producing proper accounts in Court. The notice expenses also have not been proved. We, therefore, disallow this item also.
19. In the result, this appeal is partly allowed. Instead of the decree for Rs. 12,500/-passed by the trial Court, there shall now be a decree for Rs. 8,623.60 Paise in favour of the plaintiff-respondent against all the defendants. The plaintiff shall be entitled to his proportionate costs from the defendants. We allow four months' time for payment of the decretal amount to the plaintiff by the defendents. If the amount is not paid within the said time, the plaintiff-respondent shall be entitled to recover the decretal amount by the process of execution. Counsel's fee Rs. 250/-in this Court, if certified.