Abl International Limited & Anr. v. Kolkata Municipal Corporation & Ors.

Calcutta High Court
Sep 1, 2006
Important Paras
Please sign up to view Important Paras.
Smart Summary (Beta)

Concise Analytical Summary of the Opinion

Factual and Procedural Background

The petitioners constructed approximately 12,480 sq. ft. on the terrace of the tenth floor of a multi-storeyed building known as "Air Conditioned Market" at Shakespeare Sarani without obtaining sanction from the Municipal authority. This unauthorised construction arose in early 1980. The Municipal authority assessed annual valuation and collected rates and taxes for the construction from the assessment period commencing GR4/84-85 onwards.

Demolition proceedings were initiated as Demolition Case No. 137-D/2002-2003 under section 400(1) of the Kolkata Municipal Corporation Act, 1980. The Special Officer, Building, disposed of that proceeding by an order dated 18 February 2003 permitting retention of the impugned construction subject to (inter alia) payment of erection/re-erection (building permit) charges at commercial rates and payment for non-provision of 16 car parking spaces at Rs. 60,000 per space, together with other conditions (affidavit, structural certificate, etc.). Both parties accepted that order and did not challenge it.

Subsequently, in pursuance of the Special Officer's order, the Municipal authority issued a bill (Annexure P-13) demanding a total of Rs. 75,61,743 broken down under heads including sanction fees, drainage development fees, water/tax items, surcharge development fees, shortfall of 16 car parks, and D/sketch fees. The petitioners challenged the legality of that demand by filing the present writ petition.

Legal Issues Presented

  1. Whether the Municipal authority validly demanded and could lawfully realise, in addition to building permit (sanction) fees, other charges (drainage development fees, WT+ST+W.S, surcharge development fees, D/Sketch fees, etc.) as set out in Annexure P-13 for regularisation of the unauthorised construction.
  2. Whether the Municipal authority could lawfully charge building permit (sanction) fees at a penal rate for regularising the unauthorised construction, or whether fees must be charged at the normal rate authorised by statute/rules.
  3. At what point in time the appropriate schedule/rate for building permit fees should be determined — i.e., the rate applicable at (a) the time the unauthorised construction was raised, or (b) the time of regularisation (the 2002-2003 schedule) — for the purpose of demanding fees.
  4. Whether the petitioners are obliged to pay the car parking fee for non-provision of 16 parking spaces as specified in the Special Officer's order of 18 February 2003 and, if so, whether that obligation can be re-opened in the writ petition.
  5. Whether penalty under section 610 (and/or provisions of the earlier Calcutta statute) can be imposed on persons responsible for the unauthorised construction, given that the construction was raised before the Kolkata Municipal Corporation Act, 1980, came into operation.

Arguments of the Parties

Petitioners' Arguments (Mr. Mukherjee)

  • Article 265 of the Constitution restricts levy and collection of taxes/fees except by authority of law; delegated authorities cannot impose taxes/fees in the absence of express statutory power (relying on Ahmedabad Urban Development Authority v. Sharadkumar).
  • The Municipal authority's power to demand erection/re-erection (building permit) charges is governed by section 543(2) of the KMC Act and must be realised only in the manner prescribed by Rules 38 and 39 of the Building Rules, 1990; no other heads of charges can be levied for regularisation.
  • The Corporation has no power beyond those conferred by statute (relying on Scotts (P) Ltd. v. Corporation of Calcutta); thus the demand under various other heads is ultra vires.
  • The sanction fee demanded was not calculated according to statutory provisions; if payable, it should be at the rate applicable to the building at the time the unauthorised construction was raised (i.e., the relevant applicable rate for that period).
  • Ultimately the petitioners agreed to pay the building permit fees and the car parking fees as specified in the Special Officer's order (subject to the petitioners' contentions about proper calculation and applicable rates).

Municipal Authority's Arguments (Mr. Ghosh)

  • The petitioners who undertook massive construction without sanctioned plan cannot claim regularisation on payment of merely normal fees under Rules 38 and 39; illegal construction should not be regularised as a matter of course.
  • Under certain circumstances, unauthorised constructions can be regularised upon payment of building permit fees at penal (commercial) rates together with incidental or ancillary charges.
  • The impugned demand was raised on the basis of the schedule of fees and charges for the year 2005-2006 (office circular No. 01 of 2005-2006 dated 18 April 2005), and fees for this building were charged at mercantile (commercial) rates because the building consists of shops and a market.
  • However, in fairness, Mr. Ghosh submitted that the Municipal authority should have levied fees on the basis of the schedule in force at the time of regularisation (2002-2003), not on the 2005-2006 schedule; i.e., the rate should be the rate prevalent at the time of regularisation.
  • Section 610 of the Act may authorise imposition of penalties (per Schedule VI) for erection of unauthorised construction; and the Supreme Court authority (Mahendra Baburao Mahadir v. Subhash Krishna Kanitkar) indicates that payment of development charges does not exonerate one from consequences of the offence.

Table of Precedents Cited

Precedent Rule or Principle Cited For Application by the Court
Ahmedabad Urban Development Authority v. Sharadkumar, AIR 1992 SC 2038 Delegated authority cannot impose taxes/fees except by express statutory authority; restrictions under Article 265 require authority of law for levy/collection. The Court relied on this principle to hold that the Municipal Corporation could not lawfully charge heads of fees for regularisation that were not authorised by the statute; the demand under several other heads lacked legal sanction.
Usman Gani J. Khatri v. Cantonment Board, 2002 (2) SCC 455 Support for the proposition that charges should be levied at the rate prevalent at the time of regularisation (as opposed to some other time) — relied on by the Municipal authority for a submission about applicable rates. The Court noted the submission and observed that because parties accepted the 2002-2003 rate for purposes of settlement, it was not necessary to decide the competing contentions about whether the rate should reflect time of regularisation or time of raising the unauthorised construction.
Scotts (P) Ltd. v. Corporation of Calcutta, 79 CWN 883 Corporation has no power or authority except that conferred by the statute which creates it; powers must be traced to statute. The Court applied this principle to conclude that the Corporation could not raise demands under heads for which the statute did not authorise charging for regularisation of unauthorised construction.
Mahendra Baburao Mahadir v. Subhash Krishna Kanitkar, 2005 AIR SCW 1579 Payment of development charges does not, by itself, exonerate the payor from consequences of commission of an offence or from the possibility of prosecution for unauthorised construction. The Court relied on this authority to hold that payment of the building permit fee and/or other charges does not exonerate the person responsible for the unauthorised construction from the consequences of the offence; the respondent remains liable.

Court's Reasoning and Analysis

The Court proceeded by reference to the relevant statutory provisions and rules explicitly cited in the opinion:

  • Section 392 of the Kolkata Municipal Corporation Act, 1980 prohibits erection/commencement of construction without sanctioned plan.
  • Section 396 provides for grant of sanction/provisional sanction for construction.
  • Section 543(2) authorises charging of fees for grant of permission/sanction (i.e., erection/re-erection or building permit fees).
  • Rule 15(2) of the Building Rules, 1990 makes building permit fees payable for obtaining the building permit.
  • Rules 38 and 39 read with section 131(3) permit the Corporation to declare the schedule and mode of calculation of building permit fees and related fees.

Applying these provisions, the Court concluded that:

  1. The statute authorises the Corporation to demand and realise building permit (erection/re-erection) fees for grant of sanction; therefore the Corporation can realise building permit fees from the petitioners for regularising the unauthorised construction.
  2. Both parties, in substance, accepted that the building permit fees should be charged at the rate prescribed at the time of regularisation. In light of that common acceptance the Court directed the Municipal authority to raise the bill for building permit fees at the normal rate notified in the schedule of fees and charges for the year 2002-2003 (the year of regularisation by the Special Officer), and not on the 2005-2006 schedule used in the impugned demand.
  3. The Court rejected the petitioners' submission that fees could not be charged at mercantile/commercial rate because the disputed construction itself might not be used for mercantile purposes. The Court observed that where the building consists of shops and market, the building can be classified as mercantile for the purpose of determining applicable rates for regularisation, and thus commercial/mercantile rate could apply for calculating building permit fees.
  4. With respect to the other charges shown in the impugned bill (drainage development fees, WT+ST+W.S, surcharge development fees, D/Sketch fees, etc.), the Court found no statutory sanction for levying those heads for the purpose of regularisation. Applying the principles in Ahmedabad Urban Development Authority and Scotts (P) Ltd., the Court held those demands to be unsupported by the statute and therefore without legal basis.
  5. The Court held that building permit fees could not be charged at a penal rate because the statute did not authorise realisation of such fees at a penal rate for regularising unauthorised construction.
  6. Regarding the car parking fee for non-provision of 16 parking spaces (Rs. 60,000 per space), the Court held that the petitioners are required to pay that amount under the Special Officer's 18 February 2003 order. The Court declined to entertain a challenge to that aspect because the Special Officer's order attained finality (no challenge was brought in a higher forum).
  7. On the question of penalty under section 610, the Court noted the statutory power to impose penalty (per Schedule VI) for erection of unauthorised construction, but observed doubt as to viability of imposing section 610 penalties where the construction pre-dated the coming into operation of the 1980 Act. The Court did not decide this issue because it was not directly argued or necessary for disposing of the writ petition.
  8. Finally, relying on Mahendra Baburao Mahadir, the Court held that payment of development charges or fees does not exonerate the person responsible for the unauthorised construction from the consequences of the offence; the person remains liable for the offence irrespective of payment.

Holding and Implications

Core Holding: The writ petition was allowed and the impugned bill/demand (Annexure P-13) raised by the Municipal authority was quashed. The Municipal authority was directed to raise a fresh demand limited to amounts authorised by statute and in conformity with the Special Officer's order.

More specifically, the Court ordered:

  • The Municipal authority shall re-raise the bill for building permit (erection/re-erection) fees at the normal (non-penal) rate that was notified in the schedule of fees and charges for the year 2002-2003 (the year during which the unauthorised construction was regularised by the Special Officer).
  • The petitioners must pay the car parking fees in terms of the Special Officer's order (for non-provision of 16 parking spaces @ Rs. 60,000 per space), and the Court will not entertain reopening that element because the Special Officer's order attained finality.
  • All other charges that had been demanded in Annexure P-13 under various heads for which there was no statutory sanction were quashed as having no legal basis.
  • The Court held that the Corporation was not authorised to charge building permit fees at a penal rate for regularisation under the statute.
  • The Court confirmed that payment of fees does not exonerate the persons responsible for the unauthorised construction from criminal or other consequences of the offence; liability remains possible.
  • The writ petition was allowed; there was no order as to costs; the Court directed issuance of an urgent certified xerox copy if applied for.

Implications: The decision directly affects only the parties — the Municipal authority must reissue its demand confined to statutory heads (building permit fees at 2002-2003 normal rates and the car parking fees pursuant to the Special Officer's order) and other demanded items are quashed. The Court did not purport to lay down a new broad precedent beyond applying established principles about statutory limits on fiscal impositions by municipal authorities.

Show all summary ...

1. The Court: The petitioners constructed about 12,480 sq. ft. on the terrace of the tenth floor of a multi-storeyed building known as “Air Conditioned Market” at Shakespeare Sarani without obtaining any sanction from the Municipal authority. Such construction was raised in early 1980. The annual valuation of such illegal construction was assessed by the Municipal authority for the first time for the Assessment Period commencing from GR4/84-85. Rates and taxes in respect of such unauthorised construction has also been realised regularly by the Municipal authority from the petitioners since then.

2. Subsequently, a demolition proceeding being Demolition Case No. 137-D/2002-2003 was initiated under section 400(1) of the Kolkata Municipal Corporation Act by the Municipal authority. The said proceeding was disposed of by the Special Officer, Building on 18th February, 2003 with the following orders:

“1.(a) The P.Rs shall retain the impugned construction shown in red colour in the D/Sketch of D/Case No. 137-D/2002-2003 of Bor.-VII subject to payment of erection/re-erection charges at commercial rates.

(b) The P.Rs shall pay for non-provision of 16 Nos. of car parking spaces to be charged @ Rs. 60,000/- per car parking space.

2. The P.Rs shall carry out the orders within one month from the date of its communication failing which the orders shall become inoperative and all the impugned constructions marked in red colour in the D/Sketch of D/Case No. 137-D/2002-2003 shall be subject to demolition at the cost and risk of the P.Rs

3. The P.Rs shall swear an affidavit before Magistrate 1st Class to the effect that they shall abide by the existing rules and regulations of CMC and shall not take recourse to anything which may tantamount to violation of the CMC Act, 1980 and Building Rules, 1990 and shall also be held responsible for any misrepresentation of records.

4. The P.Rs shall submit a certificate obtained from CMC empanelled Structural Engineer certifying therein the aspect of structural stability as well as the workmanship and quality of materials so far used in the construction of the premises.

5. The copy of the order shall be communicated to the P.Rs as well as the E.E Bor.-VII for information and necessary action. Each page of the order is signed and the D/Sketch as well as precis countersigned.”

3. Admittedly the said order was accepted by the petitioners as well as by the Municipal authority.

4. Subsequently, a dispute arose when the Municipal authority in pursuance of the order of demolition passed by the Special Officer (B) dated 18 February, 2003 in a proceeding under section 400(1) of the Kolkata Municipal Corporation Act, 1980, raised a bill of charges and/or fees upon the petitioners for payment thereof as a condition for retention of such unauthorised construction. The following charges were demanded from the petitioners towards the retention fees of the unauthorised construction:

“(1) Sanction of fees : Rs. 55,50,923.00 (2) Drainage Dev. fees : Rs. 1,11,532.00 (3) (WT+ST+W.S) : Rs. 3,17,865.00 (4) Surcharge Dev. fees : Rs. 6,13,423.00 (5) Short fall of 16 Nos. Car Park : Rs. 9,60,000.00 (6) D/Sketch fees : Rs. 8,000.00 Total : Rs. 75,61,743.00”

5. The legality of the aforesaid demand has been challenged by the petitioners in this writ petition on the ground that such demand was not raised in conformity with the order passed by the Special Officer (B) on 18th February, 2003.

6. Mr. Mukherjee, learned Senior Advocate, appearing for the petitioners, submitted that Article 265 of the Constitution of India imposes a restriction on levy and collection of taxes except by authority of law. Relying upon a decision of the Hon'ble Supreme Court in the case of Ahmedabad Urban Development Authority v. Sharadkumar, reported in AIR 1992 SC 2038, Mr. Mukherjee submitted that in the absence of express provision, a delegated authority cannot impose tax or fees. According to Mr. Mukherjee, such power of imposition of tax and/or fees by delegated authority must be very specific and as such, there is no scope of implied authority for imposition of such tax and fees. The delegated authority must act strictly within the parameters of the authority delegated to it under the Act and it will not be proper to bring the theory of implied intent or the concept of incidental and ancillary power in the matter of exercise of fiscal power.

7. By referring to section 543(2) of the said Act, Mr. Mukherjee submitted that under the said provision, the Municipal authority for regularisation of such unauthorised construction, may demand erection/re-erection charges, i.e, building permit fees at such rate which was fixed by the Municipal Commissioner with the sanction of the Mayor-in-Council for the period during which such unauthorised construction was raised.

8. Mr. Mukherjee further submitted that the building permit fees can be realised as per the mode as prescribed under Rules 38 and 39 of the Building Rules, 1990. Mr. Mukherjee contended that apart from realisation of the building permit fees in the manner as aforesaid, the Municipal authority is not authorised under the statute to realise any amount on any other head even for regularisation of unauthorised construction.

9. By referring to a decision of this Hon'ble Court in the case of Scotts (P) Ltd. v. Corporation of Calcutta, reported in 79 CWN 883, Mr. Mukherjee submitted that the Corporation has no power to do anything unless those powers are conferred on it by the statute which creates it. Mr. Mukherjee further contended that since the statute does not empower the Municipal authority to realise any other charges and/or fees from the petitioners towards regularisation of the unauthorised construction, the Municipal authority cannot claim any amount under any of the heads, as mentioned in the demand notice excepting sanction fees from the petitioners.

10. Mr. Mukherjee further complained that even the sanction fee was not charged and/or calculated as per the provision of the statute. According to Mr. Mukherjee, the Municipal authority can only realise the building permit fees from the petitioners at the rate applicable to the business building as prescribed at the relevant time, i.e, when such unauthorised construction was raised.

11. Mr. Mukherjee, thus, contended that the charges which was levied on account of (i) drainage development fees, (ii) WT+ST+WS, (iii) surcharge development fees, (iv) shortfall of 16 No. of car park and (v) D/sketch fees, cannot be realised from the petitioners as the Municipal authority imposed such charges and/or fees in excess of its jurisdiction.

12. Mr. Mukherjee, however, ultimately submitted that in addition to the building permit fees, his clients are agreeable to pay the car parking fees in terms of the order passed by the Special Officer (B) on 18th February, 2003.

13. Mr. Mukherjee, thus, invited this Court to quash the demand raised by the Municipal authority vide Annexure ‘P-13’ to this writ petition at page 94 with a further direction upon the Municipal authority to raise a bill of charges payable by the petitioners in terms of the order passed by the Special Officer (B) on 18 February, 2003.

14. Mr. Ghosh, learned Advocate, appearing for the Kolkata Municipal Corporation, refuted the said submission of Mr. Mukherjee by contending, inter alia, that the petitioners who raised such massive construction without any sanctioned plan, cannot claim regularisation of such unauthorised construction on payment of normal fees on account of building permit fees in terms of Rules 38 and 39 of the Building Rules.

15. Mr. Ghosh further contended that illegal construction cannot be regularised as a matter of course. However, under certain circumstances, such construction can be regularised upon payment of the building permit fees at a penal rate together with the other incidental and/or ancillary charges.

16. By producing the schedule of fees and charges for the year of 2005-2006, Mr. Ghosh tried to impress upon this Court that the demand, raised by the Municipal authority by the impugned notice, is legal and valid as the said bill was raised on the basis of the schedule of fees and charges for the year 2005-2006 circulated vide office circular No. 01 of 2005-2006 dated 18th April, 2005 by the Building Department.

17. Mr. Ghosh further contended that since the building consists of shops and market, the rate prescribed for the mercantile building, has been charged for regularising such unauthorised construction. Mr. Ghosh pointed out that the other fees which were demanded from the petitioners under different heads were also charged as per the said schedule of fees and charges.

18. Mr. Ghosh in his usual fairness ultimately submitted before this Court that instead of raising the demand on the basis of the schedule of fees and charges notified for the year 2005-2006, the Municipal authority should have raised such demand on the basis of the schedule of fees and charges notified for the year 2002-2003 as the unauthorised construction was regularised by the Hearing Officer (Building) in 2003 by his order dated 18 February, 2003.

19. According to Mr. Ghosh, the charges should be levied at the rate which was prevalent at the time of regularisation of unauthorised construction and not at the rate as prevalent at the time of raising such unauthorised construction as contended by Mr. Mukherjee. In support of such submission, Mr. Ghosh relied upon a decision of the Hon'ble Supreme Court in the case of Usman Gani J. Khatri v. Cantonment Board reported in 2002 (2) SCC 455.

20. Since Mr. Mukherjee ultimately, on instructions from his client, submitted before this Court that his clients are agreeable to pay the building permit fees at the rate as prescribed for the period of 2002-2003 in addition to the car parking fees for not making provision for 16 car parking spaces at the rate as mentioned in the order of the Special Officer (B) dated 18 February, 2003 and further since Mr. Ghosh also contended that charging of fees at the prescribed schedule rate of 2005-2006 cannot be justified, this Court is not required to consider as to whether the petitioners are required to pay the building permit fees at the rate as prescribed for the period 2005-2006 or at the rate which was prescribed at the relevant time of raising such unauthorised construction.

21. Let me now consider the other points of dispute involved in this writ petition.

22. I have already indicated above that neither the petitioners nor the Municipal authority challenged the legality and/or validity of the order of the Special Officer (B) passed in the aforesaid demolition proceeding on 18 February, 2003. Thus, the said order is binding upon both the parties. By the said order, the unauthorised construction was allowed to be retained subject to payment of the following charges:

“1. (a) The P.Rs shall retain the impugned construction shown in red colour in the D/Sketch of D/Case No. 137-D/2002-2003 of Bor.-VII subject to payment of erection/re-erection charges at commercial rates.

(b) The P.Rs shall pay for non-provision of 16 Nos. of car parking spaces to be charged @ Rs. 60,000/- per car parking space.”

23. Mr. Mukherjee also intimated this Court that his clients are agreeable to pay both the aforesaid charges as indicated above, but at the same time Mr. Mukherjee contended that his clients cannot be compelled to pay any other charges which the Municipal authority is not authorised to charge under the statute for regularising such unauthorised construction.

24. Let me now consider as to how far such submission of Mr. Mukherjee can be accepted.

25. Section 392 of the Kolkata Municipal Corporation Act, 1980 prohibits erection and/or commencement of construction of any building without any sanctioned plan. Section 396 of the said Act provides for grant of sanction and/or provisional sanction for construction of a building. Section 543(2) of the said Act provides for charging of fees for grant of permission and/or sanction for such construction. Rule 15(2) of the Building Rules of 1990 provides that building permit fees are payable for obtaining the building permit from the Municipal authority. Rules 38 and 39 of the said rules read with section 131(3) of the Kolkata Municipal Corporation Act authorise the Municipal authority to declare the schedule of rate at which building permit fee and fee for sanction of the revised plan can be levied and the mode of calculation of the building fees at such prescribed rate.

26. Since the Kolkata Municipal Corporation Act authorises the Municipal authority to demand building permit fees for grant of sanction for construction, the said Corporation can realise the building permit fees from the petitioners for regularising the unauthorised construction.

27. Furthermore, since the learned Counsel appearing for both the parties basically accepted that building permit fees is realisable at the rate prescribed at the time of regularising the unauthorised construction, this Court directs the Municipal authority to raise the bill on account of building permit fees at the normal rate which was notified in the schedule of fees and charges for the year 2002-2003 during which the unauthorised construction was regularised by the Municipal authority,

28. This Court, however, does not find any substance in the submission of Mr. Mukherjee to the effect that since the disputed construction is not utilised for any mercantile purpose, the fees/charges cannot be realised at the rate which was applicable to the mercantile building. Even assuming that the disputed construction is not used for any mercantile purpose, still then the building which consists of shops and market, can be classified as mercantile building and as such, for regularisation of any unauthorised construction in such building, building permit fees can be demanded at the commercial rate which is applicable to a mercantile building.

29. With regard to the charges which were demanded on other heads, this Court does not find any legal sanction behind such demand as the statute which created the said Corporation does not authorise the Corporation to raise such demand for regularising the unauthorised construction. In this regard, reliance may be placed on the decision of the Hon'ble Supreme Court in the case of Ahmadabad Urban Development Authority v. Sharadkumar (supra) as well as on the decision of this Hon'ble Court in the case of Scotts (P) Ltd. v. Corporation of Calcutta (supra).

30. Even the building permit fees cannot be charged at the penal rate, as the Municipal authority is not authorised under the statute to realise such fees at the penal rate for regularising any unauthorised construction.

31. Article 265 of the Constitution of India imposes a restriction on the statutory authority on levy and/or collection of charges except by authority of law.

32. This Court, however, makes it clear that in addition to the building permit fees, the petitioners are also required to pay the car parking fees for not making provision of car parking spaces for 16 cars, in terms of the order of the Special Officer (B) passed on 18 February, 2003 irrespective of the fact that such fees is legally realisable from the petitioners or not, as challenge with regard to car parking spaces, cannot be entertained by this Court at this stage in view of the fact that the order of the Special Officer (B) attained its finality, as nobody challenged the same in higher forum.

33. The impugned bill/demand which was raised by the Municipal authority vide Annexure ‘P-13’ to this writ petition at page 94 stands quashed. The Municipal authority is directed to raise a demand afresh in the light of the observations made hereinabove.

34. Before parting with, this Court also feels it necessary to deal with another submission of Mr. Ghosh regarding the authority of the Corporation to impose penalty upon the person responsible for raising such unauthorised construction. Mr. Ghosh submitted that section 610 of the said Act authorises the Municipal authority to impose penalty at the rate prescribed in Schedule VI thereunder for raising such unauthorised construction. It is no doubt true that the said Act recognises the power and/or authority of the Corporation to impose penalty upon the person whoever contravenes any provision of any section, sub-section, clause or provisos or any other provision of the said Act mentioned in column 1 of Schedule VI. Erection of unauthorised construction without obtaining sanction under sub-section (2) of section 392 is punishable as per the said Schedule.

35. But here in the instant case the disputed construction was raised before the Kolkata Municipal Corporation Act, 1980, came into operation. As such, imposition of penalty upon the person responsible for such construction by resorting to section 610 of the said Act is doubtful. Of course, section 537 of the Calcutta Municipal Act also provides for imposition of penalty for construction in violation of provision of section 381(6) of the said Act. This Court, however, is not required to decide the said issue as to which provision can be resorted to here, inasmuch as, such an issue is neither involved in this writ petition nor this Court was addressed on the said issue by either of the parties.

36. However, this Court can say this much that the citation relied upon by Mr. Ghosh in the case of Mahendra Baburao Mahadir v. Subhash Krishna Kanitkar, reported in 2005 AIR SCW 1579 supports such contention of Mr. Ghosh. In the said decision, it was held by the Hon'ble Supreme Court that payment of development charges by itself, therefore, did not lead to exoneration from the consequences of commission of an offence or regularisation of unauthorised construction. Following the said principle, this Court holds that the person responsible for such unauthorised construction in the instant case is not exonerated from the consequences of commission of offence.

37. The writ petition, thus, stands allowed. There will be, however, no order as to costs.

38. Urgent xerox certified copy of this order, if applied for, be given to the parties, as expeditiously as possible.

Jyotirmay Bhattacharya, J.:

Writ petition allowed.
A.D