Abdul Kader Laskar And Others v. St. Of West Bengal And Others

Calcutta High Court
Jan 10, 1966
Important Paras
Please sign up to view Important Paras.
Smart Summary (Beta)

Structured Summary of the Opinion

Factual and Procedural Background

The present matter is an appeal from an order of Banerjee, J., dated 9 August 1965, which discharged a Rule issued under Article 226 of the Constitution. The appellants are owners of lands (0.49 acres comprised in specified dag numbers) in Ukhila Paikpara, 24 Parganas. On 3 August 1961 a notification under section 4 of the Land Acquisition Act stated that 1.68 acres were likely to be needed for construction of a Students' Home for the Ram Krishna Mission. Objections to the proposed acquisition were filed by the appellants (and others); those objections were overruled. A memorandum of agreement dated 22 October 1962 under section 42 (Part VII) and a declaration under section 6 were published in the Calcutta Gazette on 23 October 1962.

The appellants moved the Court under Article 226 on 26 March 1963 challenging the legality of the section 6 declaration; a Rule Nisi was issued by Banerjee, J., limited to specified grounds. Various affidavits and supplementary affidavits were filed by the parties and by land acquisition officers. Banerjee, J., discharged the Rule on 9 August 1965; the appellants appealed from that judgment. The appellants also filed a separate appeal complaining that Banerjee, J., had limited the grounds on which the Rule issued. The High Court agreed to hear the appellants on any grounds they wished to urge and proceeded accordingly.

Legal Issues Presented

  1. Whether the provisions of section 5A of the Land Acquisition Act were complied with—specifically, whether the appellants were given the opportunity of being heard and whether the officer who conducted the section 5A enquiry had authority to do so.
  2. Whether the making of further enquiries and the comments of a Special Land Acquisition Officer (after the Collector's report recommending dropping the acquisition) without giving the objectors further opportunity of hearing vitiated the section 5A proceedings.
  3. Whether sections 5A and 40 of the Land Acquisition Act are mutually exclusive, i.e., whether a section 40 enquiry may be held in addition to a section 5A enquiry, and whether the presence of both enquiries invalidates the section 6 declaration.
  4. Whether the agreement entered into under section 41 complied with clause (5) of section 41 (i.e., whether the terms securing public user were adequate; specifically whether clause (8) of the agreement sufficed where no rules/regulations had been framed by the acquiring company).
  5. Whether clause (aa) of section 40(1) (introduced by Act XXXI of 1962) applied to justify the acquisition because the Ram Krishna Mission is a company engaged in a public purpose and the Students' Home subserves that purpose.

Arguments of the Parties

Appellants' Arguments

  • The appellants contended that section 5A had not been complied with because they were not given the opportunity of being heard as required by section 5A(2).
  • They argued that the Additional Land Acquisition Collector who purported to hold the section 5A enquiry had no authority to do so and only a Collector (as contemplated by the Act) could conduct that enquiry and submit the requisite report.
  • They further contended that the Additional Land Acquisition Collector, having recommended dropping acquisition, was undermined by a Special Land Acquisition Officer (S.N. Das Gupta) conducting further inquiries and making comments behind the objectors' backs; those further enquiries and materials prejudicial to objectors, collected without further hearing, vitiated the section 5A process.
  • The appellants argued that sections 5A and 40 are mutually exclusive; consequently, since a section 5A enquiry was held, a subsequent section 40 enquiry (and use of both reports to justify the declaration under section 6) rendered the declaration bad.
  • They also argued that the agreement's clause (8) merely stated that the public may use the land subject to Ram Krishna Mission's rules and regulations and that, because no rules/regulations had been framed, clause (8) did not satisfy clause (5) of section 41; they relied on authority (Ram Kumar Agarwala) for the proposition that such a covenant may be insufficient.
  • Procedurally, they complained that the trial judge limited the Rule Nisi to certain grounds and should have issued a Rule on all grounds in paragraph 20 of their petition.

Respondents' Arguments

  • The respondents produced the Calcutta Gazette (11 June 1959) showing notification No. 10747 LA dated 29 May 1959 appointing Sri Sudhirendranath Ganguly as an Additional Land Acquisition Officer empowered to perform functions of a Collector for acquisitions for public purposes and for companies; thus Ganguly had authority to conduct the section 5A enquiry.
  • They argued that the appellants were represented by counsel at the section 5A hearing (before Ganguly) and that the Government considered the Collector's report together with the Special Land Acquisition Officer's comments and an enquiry under section 40; on that basis the Government decided to proceed with acquisition.
  • Relying on precedent (Samuruddin Sheikh), respondents contended that notes or further enquiries by a superior officer do not oblige further hearings of objectors if the statutory hearing before the Collector had been given.
  • They relied on the Supreme Court's observation in F.N. Roy that there is no rule of natural justice entitling a person to a personal hearing at every stage, to counter the submission that every further enquiry required another personal hearing.
  • Regarding clause (5) of section 41, respondents argued the Students' Home is directly useful to a section of the public (students) and therefore falls within section 40(1)(b); accordingly clause (8) together with other clauses (4, 5 and 6) of the agreement sufficed to meet section 41(5).
  • They also argued (and relied on R. L. Arora) that clause (aa) of section 40(1), introduced by Act XXXI of 1962, applied to the agreement and declaration (which were dated after the amendment came into force), and that the agreement complied with clause (4A) of section 41 read with clause (aa) of section 40(1).

Table of Precedents Cited

Precedent Rule or Principle Cited For Application by the Court
Samuruddin Sheikh v. Sub-Divisional Officer, A.I.R. (1954) Assam 81 Held that when the Collector (or officer acting as Collector) has given the objectors an opportunity of being heard, a superior officer's notes or further enquiries do not entitle objectors to another hearing under section 5A. The court relied on this authority to support the proposition that further comments and enquiries by a superior or special officer (here S.N. Das Gupta) did not by themselves violate section 5A where the Collector's hearing had been given.
F.N. Roy v. Collector of Customs, (1957 S.C.A 764) (reported reference in text) There is no rule of natural justice that a person is entitled to a personal hearing at every stage of administrative or quasi-judicial process. The court invoked this principle to reject the argument that objectors were entitled to a personal hearing at the stage when the Special Land Acquisition Officer made enquiries and comments after the Collector's report.
Ram Kumar Agarwala v. State of West Bengal, A.I.R. (1965) S.C. 995 Interpretation that a clause like clause (8) alone may be insufficient to satisfy section 41(5) if the work is not directly useful to the public as required by section 40(1)(b); sections 40(1)(b) and 41(5) must be read together. The court noted this authority but distinguished it on the facts: here the construction (Students' Home) was held to be directly useful to a section of the public and other agreement clauses supported compliance with section 41(5).
State of West Bengal v. P.N. Talukdar, A.I.R. (1965) S.C. 646 : (1965) 1 S.C.A. 593 Held that hostel buildings and playgrounds for students are directly useful to a section of the public and fall within clause (b) of section 40(1). The court relied on this decision to conclude that construction of a Students' Home is directly useful to a section of the public (students), supporting compliance with section 40(1)(b) and with section 41(5) when read with the agreement clauses.
Chirkut Tewari… v. State of West Bengal & Ors., 70 C.W.N. 1 Held that absence of rules/regulations (mentioned in an agreement clause providing public user "subject to rules and regulations") does not render the agreement bad and the public would have unrestricted right to use the works subject to the agreement. The court cited this decision to support the proposition that the absence of specific rules and regulations under clause (8) did not invalidate the agreement or make it contrary to section 41(5).
R. L. Arora v. State of U.P., A.I.R. 1964 S.C. 1230 : (1965) 1 S.C.A. 12 Interpretation of clause (aa) of section 40(1): acquisition under clause (aa) applies where the company is engaged, or taking steps to engage, in an industry or work for a public purpose and the building or work to be constructed subserves that public purpose. The court relied on this interpretation to note that clause (aa) (added by Act XXXI of 1962) could potentially justify the acquisition for the Ram Krishna Mission, but declined to rest its decision solely on clause (aa) because it had already upheld acquisition under section 40(1)(b).

Court's Reasoning and Analysis

The Court proceeded through the contested points in sequence, applying statutory definitions, the evidentiary record, and precedents as cited in the record:

  1. Authority to conduct section 5A enquiry: The Court observed that the expression "Collector" in section 3(c) of the Land Acquisition Act includes "any officer specially appointed by the appropriate Government to perform the functions of a Collector under this Act." The respondents produced a Gazette notification showing that Sri Sudhirendranath Ganguly had been appointed to perform the functions of a Collector for acquisitions for public purposes and for companies. The record and Ganguly's affidavit and report showed he had heard the objections under section 5A and made his report. On these facts the Court found no substance in the contention that Ganguly lacked authority.
  2. Raising the authority point belatedly: The Court noted that the appellants had not specifically raised lack of authority of the Additional Land Acquisition Collector in their Article 226 petition (paragraph 14 only alleged no opportunity of being heard) nor had they taken that point in the memorandum of appeal. Because determination would involve factual investigation and the respondents had no opportunity to meet that point in their affidavits, the appellants could not be permitted to raise it on this appeal.
  3. Effect of further enquiries/comments by Special Land Acquisition Officer: The Court examined the report of Ganguly (recommendation to drop acquisition) and the later comments and enquiries by the Special Land Acquisition Officer, S.N. Das Gupta, who concluded the objections should be overruled due to urgency and other considerations. The Court relied on the Samuruddin Sheikh decision and the Supreme Court observation in F.N. Roy that there is no right to a personal hearing at every stage, and concluded that the further enquiries and comments by the Special Officer did not vitiate the section 5A proceedings where the objectors had been given a hearing before the Collector. The Court also observed that some objections had evidently been accepted (the declared extent was reduced), showing that the process had effect.
  4. Relationship between sections 5A and 40: The Court rejected the appellants' submission that the two provisions are mutually exclusive. It explained that section 5A applies where objections are filed and requires a report by the Collector; section 40 deals with acquisition for companies and contains matters on which the Government must be satisfied before consenting. The Court held that where the report under section 5A does not cover all matters envisaged in section 40, a supplementary enquiry under section 40 may be necessary. Thus there is no legislative intention making the two provisions mutually exclusive.
  5. Compliance with section 41(5) (public user): The appellants argued clause (8) of the agreement ("The public shall be entitled to use the land subject to the rules and regulations of the Ram Krishna Mission") was insufficient, particularly since no rules had been framed. The Court analysed precedent (Ram Kumar Agarwala and P.N. Talukdar) and concluded that because construction of a Students' Home is directly useful to a section of the public (students) within the meaning of section 40(1)(b), and because clauses 4, 5, 6 and 8 of the agreement taken together provide for public user, the requirements of section 41(5) were satisfied. The absence of specific rules/regulations did not invalidate the agreement (relying also on Chirkut Tewari).
  6. Applicability of clause (aa) of section 40(1) (amendment Act XXXI of 1962): The Court noted the agreement (22 October 1962) and the section 6 declaration (23 October 1962) were made after the amending Act came into force. It observed that clause (aa) could be invoked (citing R. L. Arora) because the Ram Krishna Mission's objects show it is engaged in work for a public purpose and the Students' Home subserves that purpose. The Court considered the argument had force but found it unnecessary to decide finally because the acquisition was supportable under section 40(1)(b).
  7. Procedural pleas and scope of appeal: The Court accepted the parties' agreement that the appellants could argue any grounds before the High Court and heard the appeals on that footing. However, the Court disallowed belated factual contentions that were not raised earlier or in a manner that gave the respondents opportunity to rebut.

Holding and Implications

Holding: The Court concluded that the appellants' challenges to the declaration and the acquisition failed. The appeal "must fail and it is accordingly dismissed with costs to the respondents," and the hearing fee was assessed at five gold mohurs for each set of appearing respondents. The Court further ordered that the operation of its order remain stayed for one week from the date of the judgment.

DISMISSED

Implications:

  • The immediate legal consequence is dismissal of the appellants' appeal and confirmation of the order discharging the Rule issued under Article 226; the acquisition process, declaration under section 6 and the agreement under section 41 were upheld on the grounds set out in the opinion.
  • Costs were awarded to the respondents (hearing fee quantified in the judgment) and the operative effect of the dismissal was temporarily stayed for one week.
  • The Court relied on existing precedents and statutory interpretation to resolve contested statutory points; the opinion applies and reconciles earlier authorities to the facts but does not purport to establish any broad new legal doctrine beyond its factual application of the cited authorities.

This summary is based exclusively on the text of the provided opinion. No additional facts or inferences beyond the opinion's content have been added.

Show all summary ...

The Judgment of the Court was as follows:

Bose, C.J:— This is an appeal from an order of Banerjee, J. dated 9th August, 1965, discharging a Rule issued under Article 226 of the Constitution.

1. The appellants are owners of lands measuring 0.49 acres comprised in Dag Nos. 275—78 in Mouza: Ukhila Paikpara, P.S: Sonarpur, in the District of 24 Parganas.

2. On 3rd August, 1961, a notification was published in the Calcutta Gazette (Extraordinary) under section 4 of the Land Acquisition Act, dated 3rd August, 1961, intimating that 1.68 acres of land in the said village were likely to be needed for a public purpose, viz., construction of Students' Home at the expense of Ram Krishna Mission. On coming to know of the publication of the said notification objec tions were filed to the proposed acquisition on behalf of the appellants as well as other persons in the locality. In the said objections it is inter alia pointed out that the Ram Krishna Mission had more land by acquisition and|or private purchase at its disposal in the said mouza, Ukhila Paikpara, as well as in certain contiguous villages than what would be required for carrying out the project for which the land was required. But these objections were overruled and on 23rd October, 1962, a notification was published in the Calcutta Gazette (Extraordinary) containing a memorandum of agreement dated 22nd October, 1962, which was entered into between the Ram Krishna Mission and the Governor of West Bengal purporting to be made under section 42 of the Land Acquisition Act. In the same Gazette a declaration under section 6 of the Land Acquisition Act was published. It appears that as the Ram Krishna Mission is a registered society and as such a “Company” within the meaning of the Land Acquisition Act, the said memorandum of agreement dated 22nd October, 1962, was executed in compliance with the provisions of Part 7 of the Land Acquisition Act before a declaration under section 6 of the Act could be published.

3. On 26th March, 1963, the appellants moved this Court under Article 226 of the Constitution challenging the legality of the declaration under section 6 of the Land Acquisition Act and a Rule Nisi was issued by Baner-jee, J., limited to Grounds IV, XIII and XX of the petition.

4. Thereafter an affidavit-in-op-position affirmed on the 26th August, 1963, by the General Secretary of the Ram Krishna Mission was filed on behalf of Ram Krishna Mission, the respondent No. 6 and on the 4th Jan. 1964, a supplementary affidavit affirmed by the same Secretary was filed on behalf of the said Respondent No. 6. A separate affidavit affirmed by one Sri Shyamapada Sen, the Additional Land Acquisition Collector, Alipore, on 7th January, 1964, was filed on behalf of the respondents 1 to 4. On behalf of these respondents a supplementary affidavit affirmed on 11th June, 1965, by one Sri Sudhirendranath Ganguly who was the Additional Land Acquisition Collector, Alipore, at the relevant time was also filed and the appellants filed an affidavit-in-reply affirmed on the 21st of June, 1965. The Rule finally came up for hearing before Banerjee, J., who by his judgment and order dated 9th August, 1965, discharged the Rule as already stated. It is against this judgment and order of Banerjee, J., that the appellants have preferred the present appeal.

5. The appellants have also filed another appeal, being Appeal from Original Order No. 371 of 1963 against the order of Banerjee, J., dated 26th March, 1963, by which he issued a Rule limited only to Grounds VI, XIII and XX and refused to issue Rule on the other grounds set out in paragraph 20 of the petition. The grievance in this appeal is that the learned Judge should have issued a Rule on all the grounds set out in paragraph 20 of the petition.

6. At the hearing of the two appeals before us the learned Advocates appearing for the parties have agreed that this Court should allow the appellants to urge such grounds in the petition as they would like to urge before us and they should not be confined to grounds IV, XIII and XX of the petition on which the Rule Nisi was issued by Banerjee, J. The hearing of these appeals has therefore proceeded before us on this footing.

7. The first point which has been urged by the learned Advocate for the appellants before us is that the provisions of section 5A of the Land Acquisition Act have not been complied with in this case. The contention on behalf of the appellants is that the appellants were not given any opportunity of being heard as required under section 5A of the Land Acquisition Act with regard to their objections and there was no report or no valid report under section 5A of the Act inasmuch as the Additional Land Acquisition Collector who purported to hold the enquiry under section 5A had no authority to do so under the provisions of Section 5A (2) of the Land Acquisition Act, as only a Collector as contemplated in the Act can hear the objections and submit a report containing his recommendations on the objections to the appropriate Government for the decision of such Government. The further contention based on section 5A of the Land Acquisition Act is that in any event no opportunity of a hearing as contemplated in Section 5A (2) of the Act was given to the appellants.

8. It appears however that no such point as to want of authority on the part of the Additional Land Acquisition Collector who held the enquiry under section 5A of the Land Acquisition Act was specifically raised in the petition under Article 226 of the Constitution. All that is alleged in paragraph 14 of the petition is that the Respondent-Collector did not give any opportunity to the appellants of being heard in respect of the objection to the acquisition; nor does it appear that any such point Was raised before the learned trial Judge. Moreover no sucn point is taken in the memorandum of appeal which has been filed in this case. As the determination of this question involves investigation into facts and as the respondents had no opportunity of meeting this point by setting out facts in their affidavit-in-opposition, the appellants cannot be allowed to agitate this point at the hearing of this appeal before us. It may be pointed out however that the expression “Collector” has been defined in section 3 (c) of the Land Acquisition Act as follows:

“The expression “Collector” means the Collector of a district, and includes a Deputy Commissioner and any officer specially appointed by the appropriate Government to perform the functions of a Collector under this Act”.

9. At the hearing before us the learned Advocate for the Respondents have produced before the Court, the Calcutta Gazette dated 11th June, 1959 to show that by a notification No. 10747 LA. dated 29th May, 1959 Sri Sudhirendranath Ganguly was, in exercise of the powers conferred by clause (c) of Section 3 of the Land Acquisition Act, appointed to be an Additional Land Acquisition Officer, 24 Parganas, to perform the functions of a Collector under the Act in relation to the acquisition of lands for public purposes (except the purpose of the Union) and for Companies.

10. It is clear from the affidavit of Sudhirendranath Ganguly and the copy of the report under section 5A of the Land Acquisition Act which is part of the records of this case that this Su-dhrendranath Ganguly was the person who heard the objections under section 5A (2) of the Act and made his report under that section. Therefore, there is no substance in this contention of the learned Advocate appearing for the appellants.

11. The other contention based on section 5A of the Land Acquisition Act to the effect that in the facts and circumstances of this case there was no power of hearing of objections given under the provisions of Section 5A of the Act appears to be equally of no substance. The argument advanced on behalf of the appellants on this point is that the report of the Additional Land: Acquisition Collector made under section 5A of the Land Acquisition Act shows that the Additional Land Acquisition Collector, Sudhirendanath Ganguly recommended that the proceeding for acquisition of the lands in question should be dropped as there was no necessity for acquiring these lands for the alleged purpose for which such lands were sought to be acquired. The finding of the Additional Land Acquisition Officer in his report dated 18th November, 1961 is that if the acquisition was proceeded with, then some of the objectors would be rendered homeless and with regard to others the avocations of their lives would be disturbed. Moreover, Ram Krishna Mission had other lands for construction of Students' Home at their disposal and therefore it was not necessary to acquire the lands which are the subject-matter of the declaration for such purpose. It is argued on behalf of the appellants that these findings were arrived at and the recommendation for dropping the proceeding was made after hearing the lawyer of the objectors, one Sri S. Mukherjee, an Advocate. But it appears that after the report together with the records, was sent to the Government, one Sri S.N Das Gupta who described himself as Special Land Acquisition Officer made some comments on the report and he had also made some enquiries and collected further materials behind the back of the objectors and on the basis of such further materials he came to the conclusion that the objections should be overruled and as there was urgent necessity for acquisition of the lands in question the acquisition should be proceeded with. The remarks and the recommendations of the Special Land Acquisition Officer Sri S.N Das Gupta is dated the 22nd November, 1961 and it further appears that this report was placed before the Additional District Magistrate for favour of orders and the Additional District Magistrate, one Mr. B.N Sen accepted the findings and recommendations of the Special Land Acquisition Officer by an order dated 22nd November, 1961. The submission of the learned Advocate for the appellants is that this further enquiry held by the Special Land Acquisition Officer, Mr. Das Gupta behind the back of the objectors and this collection of further materials or evidence behind the back of the objectors without giving them an opportunity of further hearing to contradict or controvert the materials which are prejudicial to the interests of the objectors were wholly unwarranted und?r the provisions of section 5A of the Land Acquisition Act. It is only the Collector who had been authorised to perform the functions of the Collector, that is, Mr. Ganguly who could hear the objections and submit his report containing the recommendations to the Government for their deck sion on the objections and such decision of the Government would be final. But in the present case some other officer had intervened in the matter and had made certain comments and further enquiries and this had the effect of vitiating the proceedigns held under section 5A of the Land Acquisition Act.

12. In answer to this contention on behalf of the appellants the learned Advocate Mr. Somen Bose appearing on behalf of respondent No. 6, Ram Krishna Mission has invited our attention to a decision of the Assam High Court reported in (1) A.I.R (1954) Assam 81 (Samuruddin Sheikh v. Sub-Divisional Officer). In this case the Sub-divisional Magistrate who was the Collector for land acquisition proceedings had invited objections and heard the parties on those objections and sent record of the proceedings along with the report to the Provincial Government through the regular official channels. These records together with the report had to pass through the hands of the Deputy Commissioner who was the immediate superior of the Sub-Divisional Magistrate. This Deputy Commissioner had made certain notes or comments on the report. The Deputy Commissioner had also made some local enquiries by himself and through some other officer and his recommendation was contrary to the recommendation of the Sub-Divisional Magistrate which contained proposal for dropping the acquisition proceeding. It was argued in that case that as no hearing was given to the objectors in respect of the enquiries that had been made by the Deputy Commissioner, the provisions of Section 5A of the Act had not been complied with as the objectors had not been given a further hearing by the Deputy Commissioner. It was held that the objectors were not entitled to any further hearing before the Deputy Commissioner and therefore there was no violation of the provisions of section 5A of the Land Acquisition Act. The Sub-Divisional Magistrate had given the objectors opportunity of being heard and this was sufficient compliance with the provisions of section 5A of the Act.

13. Reliance was also placed on behalf of the respondents on a decision of the Supreme Court reported in (2) 1957 S.C.A 764 at p. 771 (F.N Roy v. Collector of Customs). In this case it had been observed by the Supreme Court that there is no rule of natural justice that at every stage a person is entitled to a personal hearing. This observation was made by the Supreme Court in repelling a contention that the petitioner in that case had not been given a personal hearing of the appeal that the preferred to the Central Board of Revenue and the application in revision to the Government.

14. It appears however from the affidavit filed and the records of this case, that the appellants were represented by their lawyer at the hearing of the objection by the Additional Land Acquisition Collector, Mr. Ganguly and the Government had considered the objections and the report of the Land Acquisition Collector under section 5A of the Act as also the report of the Special Land Acquisition Officer dated the 22nd November, 1961 and also the report of an enquiry under section 40(1) and (2) of the Land Acquisition Act and upon a consideration of these materials the Government finally decided that the acquisition should be proceeded with. Mr. Ganguly who heard the objections under section 5A of the Land Acquisition Act made his recommendation for dropping the acquisition proceeding on the footing that the Ram Krishna Mission had other lands at their disposal and so it was not necessary to proceed with the acquisition of plots in question but the Special Land Acquisition Officer, Mr. Das Gupta has pointed out that the Land Acquisition Collector, Mr. Ganguly had overlooked an important fact that the proposed plots are pockets covered on three sides by the lands of Ram Krishna Mission and the fourth side by the main road and as there was urgent necessity for construction of the boys' hostel, the objections should be overruled. It also appears that although in the original notification under section 4 it was stated that land measuring 1.68 acres was likely to be needed for the public purpose of the construction of the Students' Home, the declaration which was published under section 6 of the Act stated that land measuring more or less 0.49 acres was needed for the said purpose of construction of Students' Home. So it is quite clear that some of the objections made under Section 5A of the Act had been given effect to and that is why the extent of the acquisition was reduced to the extent mentioned in the declaration made under section 6. It appears to us that merely because the Special Land Acquisition Officer, Mr. Das Gupta had made certain comments and had collected certain further materials in the absence of the objectors, that does not violate the provisions of Section 5A of the Act nor does it vitiate the declaration made under section 6 of the Act.

15. The next point which has been urged on behalf of the appellants is that section 5A of the Land Acquisition Act and section 40 of the Land Acquisition Act are mutually exclusive and cnosequently if any enquiry under section 5A is held for hearing the objections, there is no scope for an enquiry under section 40 of the Act and inasmuch as in the present case there was hearing of objections under section 5A and there was also an enquiry under section 40 and on the basis of both these enquiries and reports under section 5A and section 40 of the declaration under section 6 had been made, the said declaration must be held to be bad. It appears to us that there is no force in this contention. The provisions of Section 5A apply to all acquisitions made under the Act except in cases of urgency when acquisition can be made without compliance with the provisions of section 5A of the Act as is made clear by sub-section (4) of Section 17. Furthermore, it is only when objections are filed within the period prescribed in section 5A (1) of the Act that the necessity of a hearing by the Collector of such objections under subsection (2) of Section 5A arises. In other words, if objections are filed as contemplated in section 5A of the Act, then an obligation is cast upon the Collector to give the objector an opportunity of being heard in respect of such objections either in person or through his pleader and he is bound to submit a report containing recommendations on the objections. But if no objection is at all filed, then no question can arise of hearing objections or making a report containing recommendations on objections. In the case of acquisition for a company, before consent can be given by the Government to the acquisition, the Government has to be satisfied in respect of the matters which are set out in the different clauses under sub-section (1) of Section 40 of the Act. It is quite possible that the scope of the objections made in a particular case and the report containing the recommendations on which objections may not cover all the matters on which the Government is required to be satisfied before giving consent under section 40 of the Act. So, in such cases a further enquiry under section 40 of the Act may be necessary. So, in certain cases an enquiry under section 40 may have to be held as supplementary to the enquiry made under section 5A of the Act. So, we do not think that the intention of the Legislature was to make section 5A and section 40 of the Act mutually exclusive. The appropriate Government may in some cases be satisfied only on the report of the Collector under section 5A sub-section (2) whether consent should be given or not, but in certain cases where the report under section 5A is found to be incomplete or as one which does not cover all the matters envisaged in Sec. 40 on which the Government has to be. satisfied, it may… be necessary to hold a further enquiry under section 40 of the Act. So, this contention on behalf of the appellants must be rejected as being of no substance.

16. The next point which has been urged on behalf of the appellants is that the terms of section 41, clause (5) have not been complied with in this case inasmuch as the agreement which is required to be entered into under section 41 of the Act and which was in fact entered into in the present case, does not contain the terms on which the public shall be entitled to use the work as is enjoined by clause (5) of Section 41. It is submitted that the only clause which has reference to the question of user of the land by the public is clause (8) of the agreement which is as follows:—

“8. The public shall be entitled to use the land subject to the rules and regulations of the Ram Krishna Mission”. But such a covenant it is argued is not a sufficient compliance with the provisions of clause (5) of section 41, particularly as no rules and regulations relating to user of land by the public have been framed by the Ram Krishna Mission. It is argued that the Supreme Court has held in the case of (3) Ram Kumar Agarwala v. State of West Bengal, reported in A.I.R (1965) S.C 995, that such a covenant as clause (8) is not a covenant ensuring a right to the public to use the work as of right and so the acquisition of land purported to be made in that case under the provisions of the Land Acquisition Act as it stood before it was amended by Act XXXI of 1962 could not be justified. But it is to be noted that the Supreme Court has pointed out in that case that section 40(1)(b) and section 41(5) of the Land Acquisition Act have to be read together. The Supreme Court also found in that case that the intended acquisition was not for the purpose mentioned in section 40(1)(a) nor could it be said that the proposed construction of work on the land was likely to prove directly useful to the public within the meaning of section 40(1)(b) and in view of this finding the Supreme Court necessarily came to the conclusion that the requiremnts of section 41(5) of the Act had not been complied with by merely inserting a provision like clause (8) of the agreement inasmuch as section 40(1)(b) and section 41(5) have to be read together. But in the case of (4) State of West Bengal v. P.N Talukdar, reported in A.I.R (1965) S.C 646 : (1965) 1 S.C.A 593 the Supreme Court has observed that hostel buildings and play-ground are obviously meant for the students of the institutions and such students as a body are a section of the public are therefore the hostels and play-grounds can be directly useful to this section of the public. The Supreme Court has approved of the view of this Court that constrution of hostel buildings and playgrounds comes within clause (b) of section 40(1) of the Act. In view of this decision of the Supreme Court there is very little room for argument that construction of Students' Home is not a work which is directly useful to the public within the meaning of section 40(1)(b) of the Act and that being the position it cannot be said that clause (8) of the agreement is not a sufficient compliance with the terms of section 41(5) of the Act. It may be pointed out that apart from clause (8) there are other clauses in the agreement being clauses (4), (5) and (6) which also have a bearing on the question of user of the lands sought to be acquired and all these clauses taken together in our view are sufficient compliance with the requirements of section 41(5) of the Act. It is a well-settled rule of construction applicable to all written instruments that the instrument must be construed as a wohle in order to ascertain the true meaning of the several clauses and having regard to the various clauses to which I have made reference and in view of the fact that construction of Students' Home itself is a work which is directly useful to the public, it must be held that the requirements of section 41(5) have been satisfied by the agreement which has been entered into under section 41 of the Act in the present case. The fact that no specific rules and regulations have been framed by the Earn Krishna Mission with regard to the user of the land in question by the public does not make the agreement invalid. This very point was considered by this court in the case of (5) Chirkut Tewari… v. State Of West Bengal & Ors.…, reported in 70 C.W.N 1 and at pp. 12 and 13 my learned brother B.C Mitra, J., who delivered the judgment in this case made the following observations:—

“It v/as however argued on behalf of the appellant that no rules and regulations had been framed by the Parishad as provided in clause (8) of the agreement and therefore it should be held to be bad. In our opinion there is no merit in this contention. The statute does not require any such rules and regulations * * * *. If no rules and regulations have been framed by the Parishad, the public will have unrestricted and unlimited right to use the works in the buildings of the Parishad subject to the terms of the agreement. In our opinion therefore the absence of the rules and regulations as provided in clause (8) of the agreement does not make the agreement itself bad nor can it be held that this agreement is contrary to the terms of section 41(5) of the Act”. So, there is no force in this contention put forward on behalf of the appellants.

17. On behalf of the respondents a point has been raised that the proposed acquisition comes within section 40(1)(aa) of the Act and on that ground also the agreement entered into under section 41 of the Act and the declaration made under section 6 must be held to be valid. It is submitted that the agreement in this case is dated 22nd October, 1962 and clause (aa) in subsection (1) of section 40 was introduced in the Act by the Land Acquisition (Amendment) Act, 1962 (Act XXXI of 1962) which came into force on 12th September, 1962. The declaration under section 6 was made on the 23rd October, 1962. So, as both the agreement and the declaration were made after coming into force of the amending Act, XXXI of 1962, the provisions of clause (aa) of sub-section (1) of section 40 can be invoked to justify the acquisition. In support of this agru-ment reliance is placed by Mr. Somen Bose, the learned Advocate for the respondent No. 6, on a decision of the Supreme Court reported in (6) A.I.R 1964 S.C 1230 : (1965) 1 S.C.A 12, (R. L. Arora v. St. of U.P). In this case the Supreme Court in interpreting clause (aa) of section 40(1) observed as follows:—

“The words ‘building or work’ used in clause (aa) take their colour from the adjectival clause which governs the company for which the building or work is being constructed and acquisition under this clause can only be made where the company is engaged of is taking steps to engage itself in any industry or work which is for a public purpose and the building or work which the company is intending to construct is of the same nature, viz., that it is a building or work which is meant to subserve the public purpose of the industry or work for which it is being constructed”.

18. The learned Advocate for the respondent No. 6 points out that there can be no question having regard to the Memoradum of Association of the Ram Krishna Mission that the Mission is engaged in work which is for a public purpose and the construction of a Students' Home being a work which subserves such public purpose in which the Mission is engaged, there can be no doubt about the applicability of the provisions of clause (aa) of sub-section (1) of section 40 to the proposed acquisition.

19. The learned Advocate for the respondents has further submitted that the agreement in question satisfies the requirements of clause (4A) of Section 41 which is to be read with caluse (aa) of sub-section (1) of section 40. In these circumstances, it is argued that the proposed acquisition can also be justified as having been made under clause (aa) of section 40(1) of the Act. It is also submitted by the learned Advocate that the fact that there is no indication in the agreement that the Government is purporting to acquire the land in terms of the provisions of clause (aa) of section 40(1) of the Act is immaterial, inasmuch as the Government does not generally as pointed out by the Supreme Court in the case of (4) State of West Bengal v. P.N Talukdar, (supra), state in so many words in the agreement whether the proceeding is under clause (a) or clause (aa) OT clause (b) of section 40(1) of the Act. It appears to us that this contention of the learned Advocate for the respondent No. 6 has considerable force, but in view of our finding that the proposed acquisition is justifiable under section 40(1)(b) of the Act, it is hot necessary for us to express any final opinion on this point. This disposes of all the points which have been raised on behalf of the parties appearing before su in this appeal.

20. In the result, this appeal must fail and it is accordingly dismissed with costs to the respondents, hearing fee being assessed at five gold mohurs for each set of appearing respondents.

21. Let the operation of this order remain stayed for one week from this date.

B.C Mitra, J.:— I agree.

S.K.B