Darjeeling Himalayan Railway Company Ltd., (In Liquidation) And Ors. v. Jetmull Bhojraj And Anr.

Calcutta High Court
Mar 15, 1956
Important Paras
Please sign up to view Important Paras.
Smart Summary (Beta)

Structured Summary of the Opinion

Factual and Procedural Background

The plaintiff firm, Jetmull Bhojraj, sued for damages after part of a consignment of textile goods was received in a damaged condition. The consignment (259 bales booked on 10 May 1946 from Wadibunder on the G.I.P. Railway to Geillekhola on the Darjeeling Himalayan Railway) was consigned to the Political Officer, Sikkim. While 369 bales reached destination and were delivered on or about 7 June 1946, 90 bales were noted as not delivered on the Railway receipt. The missing 90 bales were later traced to Gadkhali (detained there) and reached Geillekhola in December 1946, at which time the contents were found much damaged. Open delivery was granted on 12 February 1947 and the damage was assessed at about Rs. 27,920 by inspectors.

The Plaintiff sued certain State-managed railways (represented by the Dominion/Union of India) and the Darjeeling Himalayan Railway Company Ltd. The Subordinate Judge decreed part of the plaintiff's claim against the Darjeeling Himalayan Railway Company Ltd. and dismissed the suit against the Dominion of India. The Darjeeling Himalayan Railway Company Ltd. appealed; during appeal it went into liquidation and the liquidators were substituted. The plaintiff filed a memorandum of cross-objection seeking the balance of the claim and a decree against the Union of India. Procedural issues arose concerning valuation and payment of court-fees on the memorandum of cross-objection and subsequent service on the Union of India; the appeal and cross-objection were reheard with appearances for all parties.

Legal Issues Presented

  1. Whether the Darjeeling Himalayan Railway Company Ltd. can be held liable under Section 80 of the Indian Railways Act when the plaintiff has not proved that the damage occurred while the goods were in the custody of that particular railway system.
  2. Whether the plaintiff had locus standi to sue when the consignment was addressed to the Political Agent, Sikkim (alleged actual owner).
  3. Whether the plaintiff's claim against the State-managed railways (Union of India) was maintainable in the absence of a notice under Section 77 of the Railways Act within six months of delivery for carriage.
  4. Whether correspondence and other communications constituted sufficient compliance with the statutory notice requirement under Section 77 of the Railways Act.
  5. Whether the plaintiff's claim was barred by limitation under Articles 30 and/or 31 of the Indian Limitation Act.
  6. The allocation of burden of proof on the plaintiff to prove on which railway the loss/damage occurred when multiple railways were involved.

Arguments of the Parties

Plaintiff's Arguments

  • The plaintiff claimed ownership/interest such that it had locus standi to sue despite consignment being addressed to the Political Agent, Sikkim (the trial Court accepted locus standi).
  • The plaintiff alleged damages as assessed at open delivery (about Rs. 27,920) and sought that amount plus additional claimed sums (difference between ex-mill price and retail price, and proportionate refund of freight).
  • The plaintiff asserted that notice under section 80 of the Code of Civil Procedure had been sent to the Government (note: text uses "section 80 of the Code of Civil Procedure" in para 6 as alleged by plaintiff).
  • To meet the Section 77 objection, the plaintiff contended either that (a) in the special facts of the case no notice under Section 77 was required, or (b) correspondence between the plaintiff/Sikkim Durbar and railway administrations sufficed to satisfy Section 77.

Darjeeling Himalayan Railway Company Ltd.'s Arguments (Appellant)

  • Challenged plaintiff's locus standi on the ground that the consignment was addressed to the Political Agent, Sikkim, who was the actual owner.
  • Asserted that no damage occurred while the goods were in the charge of the Darjeeling Himalayan Railway and therefore no liability under Section 80 of the Indian Railways Act could be fastened on it.
  • Pleaded that the claim was barred by limitation.
  • Contended that the plaintiff's suit was barred because no notice under Section 77 of the Railways Act had been served within six months from the date of delivery for carriage.
  • Questioned the correctness of the valuation of the goods on which damage was assessed at open delivery.

Dominion/Union of India (State Railway Administrations) — Contentions in Written Statements

  • Raised objections that the suit was barred as no proper notice had been served either under Section 77 of the Railways Act or under section 80 of the Code of Civil Procedure (as pleaded in the written statements).
  • Asserted that the claim was barred by limitation.
  • Generally denied other statements made in the plaint, noting lack of access to portions of official records regarding carriage of the disputed goods.

Table of Precedents Cited

Precedent Rule or Principle Cited For Application by the Court
G.I.P Railway v. Jugol Kishore (I.L.R 52 Allahabad 238) Illustrates that when goods are booked over several independent railways by through booking, the aggrieved party may sue either the railway with which the contract was entered into and/or the administration on whose line the injury occurred (interpretation of Section 80). The Court relied on this to explain the statutory option given by Section 80 — that liability may be fastened on contracting railway and/or the railway on whose line the loss occurred.
Bristol & Exter Railway Company Ltd. v. Collin (1879) 7 H.???, 194 English authority that where a contract is made with one railway company for delivery at a station on another line, it may be regarded as an entire contract with the first company alone (agency argument). The opinion noted this English view but observed that it was not fully accepted by all judges; used as background to reject agency/partnership reasoning superseding Section 80.
Dekhori Tea Co., Ltd. v. A.B Railway Co., Ltd. (I.L.R 47 Cal. 6, 17) Contrasting view (Rankin, J.) to the English authority on whether contract with a railway makes it the sole contracting party rather than an agent. Cited to show judicial difference of opinion on the principal–agent characterisation; Court held Section 80's statutory scheme governs irrespective of agency theory.
Governor-General in Council v. Sukdeoram Marwari (A.I.R 1949 Patna 329) Authority supporting that Section 80 lays down specific liability rules for different railways and those rules prevail over agency or partnership considerations. The Court invoked this authority to reject attempts to import principal/agent reasoning into Section 80's statutory scheme.
E.I Railway Company v. Nopechand Magniram (19 C.L.J 434) Held that when goods are carried by different railways and are lost in transit, to fix liability on any particular railway it is necessary to prove the loss occurred on that railway's line. The Court applied this rule as central: plaintiff must prove loss occurred while goods were on the line of the railway sought to be charged (applied to Darjeeling Himalayan Railway).
Sri Gangajee Cotton Mills Co., Ltd. v. E.I Railway Company (I.L.R 44 Allahabad 763) Reiterated that damage while on transit over a particular railway system must be proved to fasten liability on that railway. Used to support the proposition that plaintiff bore the onus to prove loss on the relevant railway; the plaintiff failed to do so for the Darjeeling Himalayan Railway.
Darbarimal v. Secretary of State (I.L.R 6 Lahore 499) Another authority emphasising the need to show loss occurred on a particular railway when multiple systems involved. Cited in support of the Court's approach to burden of proof on the plaintiff.
Madras and Southern Marhatta Railway v. Chinna Nagiah (A.I.R 1946 Mad. 227) Case cited among those requiring proof of damage occurring on the particular railway sought to be held liable. Relied on as consistent precedent for the rule that liability requires proof of where damage occurred.
G.I.P Railway v. Sham Monohar (I.L.R 34 Allahabad 422) Held that in view of Section 80 no decree can be passed against a railway without a finding that the loss occurred on that railway (where no evidence showed possession or loss on that line). Applied directly: because no evidence showed the goods had come into possession of the Darjeeling Himalayan Railway and loss occurred there, decree could not stand.
Nursingdas v. G.I.P Railway (I.L.R 7 Lahore 319) Interprets "loss" in Section 77 as including loss by the carrier and by the owner (mis-delivery or non-delivery). Used to characterise the plaintiff's claim as one for deterioration/loss requiring notice under Section 77 within six months.
East Indian Railway v. Jogpat Singh (A.I.R 1924 Cal. 725) Authority on time computation: time for Section 77 notice is calculated from date of delivery of goods for carriage, not from eventual delivery at destination (as held in some decisions). Cited to support the proposition that the six-month period for Section 77 runs from the date goods were delivered for carriage.
Governor-General in Council v. Sarbeswar Das (88 C.L.J 165) Included among authorities on time computation for notice under Section 77. Referenced to support the Court's understanding of the computation of time for Section 77.
Jankidas Marwari v. Governor-General in Council (A.I.R 1946 Pat. 336) Decision of the Patna High Court relied on by plaintiff (Court summarises and critiques it). The Court considered and rejected that decision as wrong — holding it overlooked the principle that a contracting railway cannot be held liable if not guilty of negligence or default.

Court's Reasoning and Analysis

The Court proceeded in a stepwise fashion, applying statutory provisions and precedents to the facts before it:

  1. Section 80 of the Indian Railways Act creates a statutory right to sue the railway administration with which the contract of carriage was entered and/or the administration on whose line the injury occurred. The Court emphasised that Section 80 prescribes specific rules governing liabilities of different railways and these rules override considerations based on agency or partnership (paras 13–18).
  2. The Court reiterated settled precedent that the onus is on the plaintiff to prove that the loss occurred while the goods were on the line of the particular railway sought to be held liable (paras 18–20). Multiple authorities were cited to substantiate this allocation of burden.
  3. Applying that legal principle to the evidence in the case, the Court found there was no evidence that the damage occurred while the goods were in the custody of the Darjeeling Himalayan Railway Company Ltd. The 90 bales had been misdirected to Gadkhali and detained there; correspondence indicated detention under instruction of the B. & A. Railway and a traffic intimation that the goods were received from B. & A. Railway in a damaged condition when opened. The Darjeeling Himalayan Railway's Commercial Inspector who attended the open delivery had no knowledge of when or where the damage occurred and the plaintiff's witnesses could not identify the time or circumstances of the damage (paras 20–23).
  4. On that footing, the Court concluded that the decree against the Darjeeling Himalayan Railway Company Ltd. could not be sustained because the plaintiff failed to prove negligence, default, or that the loss occurred while the consignment was in that railway's custody (para 23).
  5. Turning to the plaintiff's claim against the State-managed railways (Union of India), the Court addressed Section 77 of the Railways Act which requires a written claim for compensation for loss or deterioration of goods to be preferred to the Railway Administration within six months from the date of delivery for carriage (paras 24–26).
  6. The plaintiff argued that Section 77 did not apply in the special facts or that ongoing correspondence sufficed as notice. The Court rejected this contention, holding that the extensive correspondence did not indicate any claim for compensation; it only showed requests for inquiry and early delivery and therefore did not satisfy Section 77's requirement. Consequently, claims against G.I.P. and E.I. Railway administrations were barred under Section 77 (paras 27–31).
  7. The Court also considered limitation under Articles 30 and 31 of the Limitation Act. Article 30 prescribes one year from when the loss or injury occurred for suits for injuring goods, but here there was no proof of when the injury occurred, making application of Article 30 problematic. Under Article 31 (suits for non-delivery/delay), one year runs from when the goods ought to have been delivered; since a substantial portion of the consignment was delivered on 7 June 1946 and the suit was filed on 9 April 1948, Article 31 would bar the suit. Because the Court resolved the case on other grounds (Section 80 and Section 77 failures), extended consideration of limitation was not necessary (paras 34–36).
  8. The Court further observed that a contracting railway is not always liable in any event; if the contracting railway discharged duties without negligence or fault, it would be absolved of responsibility (paras 31–33). The Court rejected the Patna High Court decision in Jankidas Marwari as wrongly asserting contrary principles (para 33).

Holding and Implications

Holding: The Court allowed the appeal, dismissed the plaintiff's cross-objection, and dismissed the plaintiff's suit.

More specifically:

  • DISPOSITION: The decree passed by the Subordinate Judge in favour of the plaintiff against the Darjeeling Himalayan Railway Company Ltd. was set aside because the plaintiff failed to prove the damage occurred while the goods were in the custody of that railway.
  • The plaintiff's claim against the Union of India (representing State railways) was dismissed because the required notice under Section 77 of the Railways Act had not been served within six months and correspondence did not constitute sufficient compliance.
  • The cross-objection (seeking the balance disallowed by the trial court and a decree against the Union of India) was dismissed.
  • The Court directed that, considering the special circumstances, the parties would bear their respective costs in both the Courts.

Implications: The direct consequence was dismissal of the plaintiff's suit and reversal of the decree against the Darjeeling Himalayan Railway. The Court applied existing statutory rules (Sections 77 and 80 of the Railways Act) and established authorities concerning burden of proof and notice requirements. The opinion criticised one High Court decision (Jankidas Marwari) as erroneous, but the judgment primarily applies established principles to the facts; it did not announce a novel doctrinal rule beyond the application of those principles to these facts.

End of summary.

Show all summary ...

The Judgment of the Court was as follows:

Mookerjee, J.:— The Plaintiff firm Jetmull Bhojraj filed a suit for the realisation of damages suffered by them as a portion of a consignment of textile goods had been received in a damaged condition. The claim was preferred against the Dominion of India as it then was, representing certain railway systems under State management and the Darjeeling Himalayan Railway Company Ltd. The learned Subordinate Judge decreed the plaintiff's claim in part against the Darjeeling Himalayan Railway Company Ltd., and dismissed the suit against the Dominion of India.

1. The Darjeeling Himalayan Railway Company Ltd., preferred the present appeal to this Court. During the pendency of the appeal the appellant Company went into liquidation and the Liquidators have been duly brought on the record.

2. A Memorandum of cross objection was filed on behalf of the Plaintiff firm. From the grounds taken in the memorandum it appeared that the Plaintiff intended to contend that the portion of the claim disallowed by the trial Court should not have been dismissed and that the Plaintiff's suit ought to have been decreed against the Dominion of India, now the Union of India, as representing the State-owned Railway systems. After the appeal had been opened and the Respondent was called upon, the attention of the Court was drawn to the fact that the Court fee paid on the memorandum of cross objection was on a valuation of Rs. 5,585-2-6 being the balance of the claim which had been dismissed by the trial Court. As the Plaintiff-cross-objector had taken grounds against the Union of India for the full amount of the claim the cross objection should have been valued on the full amount of the Plaintiff's claim as in the trial Court. No objection had been raised by the office as regards the insufficiency of the Court fee paid. The Plaintiff asked for leave to put in the deficit Court fee on the full value of the Plaintiff's claim. This prayer was allowed, on the cross-objector paying a certain amount to the Appellant for the costs of the hearing which had already taken place. The Plaintiff has now. paid the costs and has also filed the deficit Court fee.

3. It had further transpired that the Union of India had not entered appearance in this Court. As this might have been due to the circumstance that the appeal preferred by the Darjeeling Himalayan Railway Company Ltd., was directed only against the Plaintiff and not against the co-defendants, and further the memorandum of cross objection having been valued at Rs. 5,585-2-6 the Union of India might have been advised not to enter appearance in the appeal. On the valuation of the cross-objection being increased and deficit Court-fees having been paid we directed fresh service of notice on the Union of India both of the appeal and of the cross-objection, indicating the amended valuation.

4. The Union of India has now entered appearance, the appeal and the cross-objection have been re-heard in the presence of the Plaintiff and both the sets of Defendants. As the appeal taken along with the cross-objection is directed against the entire decision by the trial Court we proceed to state the salient facts indicating the points which have been urged in this Court.

5. The case as made by the Plaintiff in the Plaint was that a consignment consisting of 259 bales of textile goods were booked on the 10th May, 1946, from Wadibunder, a Station on the G.I.P Railway to Geilekhola, a station on the Darjeeling Himalayan Railway. The goods were consigned to the Political Officer, Sikkim. Out of the said consignment 369 bales reached the destination and were delivered on or about the 7th June, 1946. The fact of non-delivery of the remaining 90 bales was noted on the Railway receipt. Repealed requests for early delivery were made by the Plaintiff firm and by the Sikkim Darbar to the different Railway Administrations. The consignment was to be carried over the G.I.P Railway, E.I Railway, B.A Railway and the Darjeeling Himalayan Railway. Except the last one the rest were State-managed ones. In September, 1946, the Plaintiff was informed by the Railway Administration that the 90 bales had been traced at Gadkhali, a Station on the Bengal. Assam Railway now included in the State of Pakistan after the partition in 1947. These 90 bales reached Geillekhola in December, 1946, and the contents were found to be in a very damaged condition. The Plaintiff neither had nor could have any information about the damaged condition until the goods arrived at Geillekhola. The Plaintiff demanded open delivery. On the 12th February, 1947, open delivery was granted and the damage was assessed by the Claims Inspector of the Bengal Assam Railway and the Commercial Inspector, Darjeeling Himalayan Railway at Rs. 27,920/- and odd As none of the Defendants admitted liability the Plaintiff filed the present suit for compensation claiming in addition to the amount assessed at the time of open delivery a further sum being the difference between the ex-mill price and the retail price at the relevant time and a proportionate refund of the Railway freight. It was alleged by the Plaintiff that notice under section 80 of the Code of Civil Procedure had been duly sent to the Government.

6. The Darjeeling Himalayan Railway Company Ltd., questioned the locus standi of the Plaintiff firm to file the suit when the consignment had been addressed to the Political Agent, Sikkim. The Political Agent was claimed to be the actual owner of the goods. It was further asserted that no damage had been done to the consignment while the same was being carried on the Darjeeling Himalayan Railway. In any view the claim was barred by limitation. It was further pleaded that the Plaintiff's suit was barred as no notice under section 77 of the Railways Act had been served upon the Defendants within six months from the date of the delivery of the consignment at the forwarding station. The correctness of the value of the goods on which the damage had been assessed at the time of the open delivery was also questioned. Other contentions in the Plaint were also denied.

7. Two sets of written statements were filed on behalf of the Dominion of India, one representing the East Indian Railway Administration and the other the G.I.P Rly. It may be noticed that by the time the written statement was filed the Bengal and Assam Railway as a railway system within the Union of India had become merged in the East Indian Railway. In both the written statements objections were raised that the suit was barred as no proper notice had been served either under section 77 of the Railways Act or under section 80 of the Code of Civil Procedure and that the claim was barred by limitation. There was a general denial about the other statements made in the Plaint as no portion of the official records about the carriage of the disputed goods were available to the administration.

8. Various issues were raised. The learned Subordinate Judge held on the materials before him that the goods in fact belonged to the Plaintiff and the firm had locus standi to maintain the present suit. For reasons which will be referred to later on it was held that in the special circumstances of this case the suit was not barred. As regards the service of notice it was found that no notice had been served on any one of the Railway Administrations under the management of the Government. The Government Railway systems were therefore not liable. Though no formal notice had been served on the Darjeeling Himalayan Railway Company Ltd., but reading the correspondence as a whole the trial Court came to the conclusion that the Darjeeling Himalayan Railway Company Ltd., would not be deemed to have had notice under section 77 of the Railways Act. The learned Subordinate Judge passed a decree against the Darjeeling Himalayan Railway Company Ltd., for the amount assessed at the time of the open delivery disallowing the additional claims.

9. As stated already the Darjeeling Himalayan Railway Company Ltd., preferred the present appeal and a memorandum of cross-objection has been filed for the balance of the claim disallowed by the trial Court and for a decree against the Union of India.

10. Although an objection had been raised in the trial Court about the locus standi of the Plaintiff to file the present suit the issue had been decided in favour of the Plaintiff. A faint objection was raised in this Court also but we do not think that there is any sufficient reason why the conclusion reached by the learned Subordinate Judge on this point should be modified. The references made to the correspondence and the oral evidence as adduced support the Plaintiff's contention.

11. We proceed to deal with the subject-matter of the appeal on behalf of the liquidators of the Darjeeling Himalayan Railway Company Ltd.

12. It is contended that under section 80 of the Indian Railways Act no claim is sustainable against the Darjeeling Himalayan Railway Company Ltd., unless it is proved that the damages had occurred while the goods were in the custody of that railway system.

13. section 80 of the Indian Railways Act lays down how compensation is to be levied when goods are booked over the line of more than one railway administration by through booking over several independent railways. The aggrieved party may sue either the railway administration with which the contract of carriage was entered into and/or the administration on whose line the injury had occurred: G.I.P Railway v. Jugol Kishore (1) (I.L.R 52 Allahabad 238).

14. The Courts in England had held that where a contract was made with one railway company for the delivery of goods at a station on some other line it must be regarded as an entire contract made with the first company alone and not with that company as the agent of the other concerns to whose station the goods are to be sent [Bristol & Exter Railway Company Ltd. v. Collin, (2) (1879) 7 H.???, 194]. This view however was not fully countenanced by Rankin, J., Dekhori Tea Co., Ltd. v. A.B Railway Co., Ltd., (3) (I.L.R 47 Cal. 6, 17.)

15. section 80 of the Indian Railways Act creates a statutory liability on the part of the Railways. It makes the railway administration to which the goods are consigned and/or the railway administration on whose lines the loss occurred, liable to be sued at the option of the plaintiff.

16. The relationship of principal and Agent was attempted to be introduced for considering the question as to which of the railways is liable when goods are delivered to one railway for carriage over other railways to a destination of such other railway; the railway with which the contract is entered into is considered to be the principal and the other railway administrations including the one at the destination as the Agent.

17. But as observed in Governor-General in Council v. Sukdeoram Marwari, (4) (A.I.R 1949 Patna 329), this section lays down a specific rule of law governing the liabilities of different railways over which goods may be carried and those specific rules must be given effect to irrespective of any other consideration based on agencies or partnership.

18. It was held by this Court in E.I Railway Company v. Nopechand Magniram (5) (19 C.L.J 434), that when goods are carried by different railways and are lost in the course of transit, for fastening liability on any particular railway system it was necessary to prove that the loss occurred on the line of that railway. Damage while on transit over a particular railway system was required to be proved by the plaintiff in Sri Gangajee Cotton Mills Co., Ltd. v. E.I Railway Company, (6) (I.L.R 44 Allahabad 763); Darbarimal v. Secretary of State (7) (I.L.R 6 Lahore 499); Madras and Southern Marhatta Railway v. Chinna Nagiah, (8) (A.I.R 1946 Mad. 227). In G.I.P Railway v. Sham Monohar (9) (I.L.R 34 Allahabad 422) no evidence was led to prove that the goods had come into possession of the particular railway and the loss had occurred while on that railway. The Court held that in view of the provisions of section 80 of the Indian Railways Act no decree could be passed against that railway without a finding that the loss had occurred on that railway.

19. The onus is on the Plaintiff to prove that the loss has occurred while on the railway over which the goods have passed which is attempted to be made liable.

20. In our view the decree as passed against the Darjeeling Himalayan Railway Company Ltd., cannot be sustained as there is no evidence to show that the goods were damaged while the same were in transit over this railway system. 90 bales had been mis-directed to Gadkhali. For such mis-direction the Darjeeling Himalayan Railway Company Ltd., could not and was not attempted to be made liable. Whether this was due to some mistake or latches on the part of the Bengal & Assam Railway or of the G.I.P Railway need not be considered at this stage.

21. From Ex. 1 (f) a communication addressed to the Chief Transportation Manager, Bengal & Assam Railway from one of the Railway Officers dated 12th October, 1946 it appears that the 90 bales had been detained at Gad khali under instruction of the Chief Transportation Officer of B & A Railway.

22. On the 8th January, 1947 the Traffic Superintendent, B. & A. Railway, is intimating by Ex. IZ(5) that the goods have been received from the B. & A. Railway in a damaged condition when the consignment was opened and open delivery was given the extent of the damage done was noted. The Commercial Inspector, Darjeeling Himalayan Railway Company Ltd., who had represented that railway at the time of the open delivery in February, 1947, was examined as D.W.I in this case. He had no knowledge of the circumstances under which and at what place the damage had occurred. None of the witnesses examined on behalf of the Plaintiff could either speak about the time or the circumstances under which the damage had been done. There is thus no escape from the conclusion that the Plaintiff has failed to prove that the loss had occurred owing to the negligence or latches of the Darjeeling Himalayan Railway Company Ltd., or even during the period that the consignment was in charge of that railway. We must accordingly hold that apart from any other consideration the decree passed against Defendant No. 2 cannot be sustained on this ground.

23. As indicated already, the Plaintiff's claim has been dismissed as against the Union of India representing the State Railway. The Bengal and Assam Railway system has fallen within the Indian Union and has subsequently been merged with E.I Railway and later on a new nomenclature has been given.

24. The learned Subordinate Judge has dismissed the Plaintiff's suit against the Union of India as it was found that no notice had been served on the E.I Railway Administration and the G.I.P Railway. This finding has not been and cannot be seriously assailed. It is, however, contended that so far as B and A. Railway is concerned correspondence was going on with the administration of this railway and from such correspondence it is reasonable to hold that there was a sufficient compliance with the condition imposed under section 77 of the Railways Act.

25. Section 77 provides that a person shall not be entitled to compensation for the loss, destruction or deterioration of goods delivered and so carried—”unless his claim to the refund or compensation has been preferred in writing by him or on his behalf to the Railway Administration within six months from the date of the delivery of the animals or goods for carriage by railway.”

26. On behalf of the plaintiff this objection was attempted to be met by the argument that in the special facts of this case no notice under Section 77 was required to be given or in the alternative even if such a notice was necessary the correspondence between, the plaintiff and the Sikkim Durbar on the one hand and the different railway administrations on the other were sufficient to satisfy the condition.

27. We do not think that the plaintiff has been able to satisfy us that the claim for compensation was not for “loss, destruction or deterioration” of the goods.

28. It is not necessary for us to enter into a discussion as to what is the implication of the word “loss” in section 77, whether it has a wider meaning attached to it in this country than is the case under the English Authorities. As observed in Nursingdas v. G.I.P Railway (10) (I.L.R 7 Lahore 319) loss includes loss by the carrier as also to the owner whether for mis-delivery or for their non-delivery. As the compensation claimed is for the deterioration of the goods which had been delivered for carriage, the claim in the) present case is for compensation for goods having been deteriorated. Notice under section 77 of the Act must be served within six months from the date of the delivery of the goods for carriage by railway. Time is to be calculated as from the date of the delivery of the goods for carriage and not from the date of delivery as had been held in certain decisions (East Indian Railway v. Jogpat Singh, A.I.R 1924 Cal. 725; Governor-General in Council v. Sarbeswar Das, 88 C.L.J 165).

29. So far as the G.I.P Railway or E.I Railway Administrations are concerned no such notice either directly or indirectly had been served. It is however contended as there is no form of notice fixed under the statute there will be sufficient compliance if the railway administration is intimated of a claim for compensation. In the correspondence which was carried on for months together there is no indication of any claim for compensation. Requests for enquiry and for early delivery of the goods which could not be traced at that time cannot be taken as notice of a claim for compensation. The correspondence therefore in the present case cannot assist the plaintiff in maintaining the present claim against railway administration as a substitute for service of notice under Sec. 77 of the Railways Act.

30. The claim by the plaintiff therefore is barred under section 77 of the Indian Railways Act.

31. The proposition that the contracting railway is liable to pay compensation to the consignor and to the consignee in any event is not always correct.

32. Reference need be made to Section 72(1) of the Railways Act which lays down that the responsibilities of the railway is that of bailees under the Indian Contract Act. If there is no negligence or mis-conduct on the part of the contracting railway it having duly discharged its duties and responsibilities under Section 72(1) of the Railways Act that railway also will have to be absolved from all responsibilities for the loss of the goods.

33. The decision of the Patna High Court in Jankidas Marwari v. Governor-General in Council, (11) [A.I.R 1946 Pat. 336] on which strong reliance was placed on behalf of the Plaintiff must be held to be a wrong decision. The Court overlooked in that case the principle that even a contracting railway cannot be held liable if it is not guilty of any negligence or default.

34. We may also deal shortly with the defence that the claim is barred under Articles 30 & 31 of the Indian Limitation Act. The present claim is for compensation for injuring the goods and it may be taken that it is also for compensation! for delay in delivering the goods, though the former appears: to be the correct reading of the nature of the claim.

35. Under Article 30 a suit for compensation for injuring goods has to be brought within one year from when the loss or injury occurred. In the present case there is no proof or evidence as to whether and when the injury occurred; when there is no evidence there are difficulties in determining the starting point of limitation. If we had not found that the claim of the plaintiff was otherwise barred it would have been necessary for us to consider this aspect in greater detail.

36. If the claim falls under Article 31 of the Limitation Act it is clearly barred as one year had expired from the date when the goods ought to have been delivered. A substantial portion of the consignment was delivered on the 7th June, 1946 and that would be the date when the remaining portion of the consignment ought to have been delivered. The suit having been filed on the 9th April, 1948 it was barred by limitation. In view of our decision on the other points it is not necessary to consider this defence at greater length.

37. The result therefore is that the appeal is allowed, the cross-objection is dismissed and the plaintiff's suit is dismissed. Considering the special circumstances of this case we direct that the parties would bear their respective costs in both the Courts.

Mitter, J.:— I agree.

A.K.D.G