Union Of India v. Kishorilal Gupta & Bros.

Calcutta High Court
Feb 11, 1953
Important Paras
Please sign up to view Important Paras.
Smart Summary (Beta)

Factual and Procedural Background

This application seeks an order setting aside an arbitration award on the grounds that the arbitration agreements under which the award was made have ceased to exist, rendering the award null and void. The dispute arises from three contracts between the contractor firm Kishorilal Gupta and Bros. and the Governor-General of India-in-Council through the Director-General of Industries and Supplies, each containing arbitration clauses.

All three contracts were subsequently cancelled and settlement contracts were entered into between the parties on different dates, setting out terms for payment and final determination of the contracts. The contractors made partial payments under these settlements but defaulted on several instalments, leading the Government to refer claims under all three contracts to arbitration.

The contractors challenged the jurisdiction of the arbitrator on the basis that the arbitration clauses had ceased to exist due to the settlement agreements. The arbitrator proceeded, rejected the jurisdictional challenge, and made an award in favor of the Government. The contractors then applied to the Court for a declaration that the arbitration clauses had ceased to exist and that the award was void.

Earlier, the Court dismissed an application for declaration on the ground of non-joinder of parties but expressed views on the existence of arbitration clauses in the contracts. The present application is by one partner of the contractor firm, with all relevant parties before the Court.

Legal Issues Presented

  1. Whether the arbitration clauses contained in the three original contracts have ceased to exist by virtue of the subsequent settlement contracts entered into by the parties.
  2. Whether the arbitration award made under the challenged arbitration clauses is valid or a nullity.
  3. The extent of the arbitrator's jurisdiction to entertain claims under the contracts given the settlement agreements.
  4. The legal effect of accord and satisfaction and rescission on the original contracts and their arbitration clauses.

Arguments of the Parties

Applicant's Arguments

  • All three original contracts and their arbitration clauses have been abrogated by the subsequent settlement contracts and have ceased to exist.
  • Consequently, the arbitration award made under these arbitration clauses is a nullity.

Respondent's Arguments

  • The original contracts could not be rescinded after breach.
  • Liabilities under the original contracts could only be discharged by accord and satisfaction; in the present case, there was accord but no satisfaction regarding two of the contracts, so those contracts were not abrogated.
  • In any event, the arbitration clauses have not been abrogated.
  • The arbitrator has no jurisdiction to decide whether the arbitration clauses have ceased to exist; this is a matter for the Court.

Table of Precedents Cited

Precedent Rule or Principle Cited For Application by the Court
Manohar Koyal v. Thakurdas, 15 Cal 319 Section 62 of the Contract Act does not apply after breach of original contract. Used to establish that rescission under Section 62 is only applicable after breach and not otherwise.
New Standard Bank v. Probodh Chandra, AIR 1942 Cal 87 Contract can be rescinded only after breach; accord and satisfaction discharges liability arising from breach. Supported the view that liabilities under contracts can be discharged by accord and satisfaction after breach.
Morris v. Baron & Co., 1918 AC 1 Rescission under Section 62 may be express or implied; question of construction of new contract. Guided the Court in interpreting whether the new settlement contract rescinded the original contract.
Uttamchand v. Mahmood Jewa, AIR 1920 Cal 143 If original contract is rescinded, arbitration clause is also rescinded. Confirmed that arbitration clause is dependent on existence of original contract.
Jitendra Chandra v. S.N Banerjee, AIR 1943 Cal 181 Section 63 allows promisee to remit performance without consideration; release of liability may be gratuitous. Clarified that release of liability can be gratuitous and does not require new consideration.
British Russian Gazette and Trade Outlook Ltd. v. Associated Newspapers Ltd., (1933) 2 KB 616 Accord without satisfaction does not discharge liability; validity of accord and satisfaction under general contract law. Helped explain the necessity of satisfaction following accord to discharge liability.
Heyman v. Darwins Ltd., 1942 AC 356 Arbitration clause is procedural and ancillary; it depends on existence of dispute under substantive contract. Used to reason that arbitration clause ceases to exist if the original contract is abrogated by settlement.
Elton Cop Dying Co. v. Broadbent & Son Ltd., (1919) 89 LJKB 186 Promise itself may be satisfaction in accord and satisfaction. Illustrated that accord and satisfaction may extinguish prior rights by substituted agreement.
P.R.L Saminathan Chetty v. P.L Palaniappa Chetty, 18 Cal WN 617 (PC) Accord and satisfaction by substituted agreement extinguishes prior rights. Supported the principle that substituted agreements extinguish original contract rights.
Babulal v. Tulsi Singh, AIR 1940 Pat 121 Actual performance of promise is satisfaction. Distinguished between promise and performance as satisfaction in accord and satisfaction.

Court's Reasoning and Analysis

The Court examined the nature of the original contracts, the arbitration clauses contained therein, and the subsequent settlement contracts executed by the parties. It applied the provisions of Sections 62 and 63 of the Contract Act, which govern rescission and remission of contractual obligations, respectively. The Court emphasized that rescission under Section 62 is only effective after breach of contract and is a question of construction of the new contract.

The Court distinguished between accord (an agreement to accept something different) and satisfaction (performance of that agreement), noting that mere accord without satisfaction does not discharge liability arising from breach. The Court relied on established case law to affirm that an arbitration clause is collateral and procedural, dependent on the existence of the substantive contract and disputes arising thereunder.

Applying these principles, the Court found that the settlement contract dated 22-2-1949, relating to the contract for Kettles Camp, was a substituted agreement that finally settled and extinguished the original contract and its arbitration clause. Persistent breaches of this settlement did not revive the original contract or arbitration clause.

Conversely, the settlement contract dated 6-9-1948, relating to the contract for Laddies Cook, did not discharge the original contract because the agreed payment was not made, so the arbitration clause in that contract continued to exist and the arbitrator had jurisdiction to make an award.

The Court noted that the arbitration award was a lump sum award covering multiple contracts without clear apportionment, rendering it impossible to determine the award relating to each contract. Since the arbitration clause for the Kettles Camp contract had ceased to exist, the portion of the award relating to it was a nullity, which tainted the entire award.

Holding and Implications

The Court held that:

  • The arbitration clause contained in the contract dated 22-9-1944 for Kettles Camp ceased to exist as of the settlement contract dated 22-2-1949.
  • The arbitration award, insofar as it relates to that contract, is a nullity and is set aside.
  • The arbitration clause in the contract dated 2-4-1943 for Laddies Cook remains valid, as the settlement contract did not discharge the original contract.
  • The lump sum nature of the award without clear apportionment renders the entire award bad and invalid.

Implications: The decision directly affects the parties by invalidating the arbitration award in respect of the Kettles Camp contract and setting aside the entire award due to its inseparability. No new precedent beyond the application of established contract and arbitration principles was set. The ruling clarifies the effect of settlement agreements on arbitration clauses and the necessity for clear apportionment in arbitration awards involving multiple contracts.

Show all summary ...

1. This is an application asking for an order setting aside an award for a declaration that the arbitration agreements under which the award was made have ceased to exist and for an adjudication that the award is a nullity and is void and without any effect.

2. There were three contracts between the contractor firm Kishorilal Gupta and Bros, and Governor-General of India-in-Council through the Director-General of Industries and Supplies. Each of these contracts contains an arbitration clause. The material part of the arbitration clause is as follows:

“In the event of any question or dispute arising under these conditions or any special conditions of contract or in connection with this contract except as to any matters the decision of which is specially provided for by these conditions the same shall be referred to the award of an arbitrator to be nominated by the purchaser and an arbitrator to be nominated by the contractor……….”

3. Under each of these contracts the Governor-General in Council now represented by the respondent supplied raw materials and the contractor made part supplies. All these three contracts were later cancelled. By the contract dated 2-4-1943, the contractors agreed to supply to the Government 43,000 laddies cook. This contract was cancelled on 21-5-1945 and a claim by the Government for price of raw materials supplied remained outstanding. On the 6-9-1948 the parties entered into a settlement contract which is as follows:

“(1) The contractor expressly agrees to pay the Government the sum of Rs. 3,164-8-0 only on this contract.

(2) The contract on payment of the amount mentioned in Cl. (i) shall stand finally determined.”

4. By the contract dated 15-9-1944 the contractors agreed to supply to the Government 15,500 bath ovals. This contract was cancelled on 21-5-1945 and there remained outstanding claims by the contractors for compensation and claims by the Government for price of raw materials supplied. On 6-9-1948 the parties entered into a settlement contract which is as follows:

“(1) The contractor expressly agrees to pay to the Government the sum of Rs. 36,276. If, D.G.I and S. has recovered any amount under the contract out of the sum due credit will be given to the contractor.

(2) The contract stands finally determined and no party will have any further claim against the other.”

5. By the contract dated 22-9-1944 the contractors agreed to supply to the Government 100,000 Kettles Camp. This contract was cancelled on 9-3-1946 and claims by the Government for raw materials supplied under this contract and by the contractor for compensation for breach of contract remained outstanding. On 22-2-1949 the parties entered into a settlement contract which is as follows:

“The firm will pay a sum of Rs. 45,000/- in full and final settlement of the amount due to the Government in respect of raw materials received against the contract and their claims for compensation for cancellation for the same contract.

2. The firm will retain all surplus partly fabricated and fully fabricated stores lying with them.

3. The firm agree to pay the above mentioned sum of Rs. 45,000/- only together with the sums owing by them to the Government under the settlements reached in two other cases A/T Nos. MP/75762.R-61/78 dt. 15-9-44 and MP 50730 8.R-1/90 dated 2-4-43, in monthly instalments for Rs. 5,000/- only for the first three months, first instalment being payable on 10-3-1949 and further instalment of Rs. 9000/- per month till the entire dues payable to Government are paid.

4. In the event of default of any monthly instalments interest will be charged by Government on the amount as defaulted at the rate of 6 per cent per annum from the first day of the month in which the instalment shall be due. If the instalments defaulted exceed two in number the Government will have the right to demand the entire balance of the money payable by the firm together with interest thereon at the rate above mentioned on that balance and take such steps to recover from them from the security to be offered by the firm in terms of the settlement or otherwise.

5. In order to prove cover for the moneys payable to the Government the firm undertakes to hypothecate their moveable and immovable property in Bamangachi Engineering works together with all machinery sheds and leasehold interest in land measuring about 5.75 acres at mouja Bamangachi in Howrah. The firm further undertakes to execute the necessary stamped documents for the purpose as drafted by the Govt. Solicitor at Calcutta.

6. The contract stands finally concluded in terms of the settlement and no party will have further or other claim against the other.”

6. Between 28-10-1948 and 17-1-1949 the contractors had in all paid a sum of Rs. 9,000/- to the Government under the first two settlement contracts. Since the 3rd settlement contract the contractor paid in all a sum of Rs. 11,000/- i.e Rs. 3,000/- on 10-3-1949, Rs. 3,000/- on 26-4-1949, Rs. 1,000/- on 12-8-1949, Rs. 3,000/- on 3-9-1949 and Rs. 1,000/- on 31-10-1949. The contractor defaulted in payment of all the instalments payable under the third settlement contract. By letters dated 28-3-1949, 1-4-1949 and 4-5-1949, the Government requested the contractors to pay the instalments in arrears and the instalments to fall due. By letter dated 17-5-1949 the Government requested the contractors to execute the hypothecation bond and also reminded them that in default of payment of instalments the Government had the right to obtain payment of the entire balance remaining unpaid under the settlement contracts. The contractors did not execute the hypothecation bond.

7. On 10-8-1949 the Government referred its claim of Rs. 1,52,723 under all the three contracts to arbitration. By its letter of that date the Government appointed Bakshi Shib Charan Singh as its arbitrator and called upon the contractors to nominate their arbitrator. The contractor replied on 18-8-1949 stating that the matter had already been settled by arbitration. The contractors did not nominate their arbitrator and by its letter dated 29-8-1949, the Government appointed Bakshi Shib Charan Singh as sole arbitrator.

8. By letter dated 3-9-1949 the contractors alleged that a new arrangement had been arrived at between them and the Government and stated that in view of that settlement they had not appointed their arbitrator. This new arrangement was denied by the Government in the subsequent correspondence.

9. One of the partners of the contractor firm applied to this Court for a declaration that the arbitration clauses had ceased to exist. That application was dismissed by Banerjee J. on 15-6-1950 on the preliminary ground that all persons interested had not been joined as parties. While dismissing the application Banerjee J. also held that the arbitration clause contained in the contract dated 2-4-1943 for laddies cook had not ceased to exist. It was conceded before Banerjee J. that the arbitration clause contained in the contract dated 15-9-1944 for bath ovals had ceased to exist. With regard to the arbitration clause contained in the contract dated 22-9-1944 for kettles camp, Banerjee J. declined to express a final opinion but he was doubtful whether the settled contract had discharged the original contract.

10. The Government filed its state of facts before the arbitrator on or about 12-9-1950. In that state of facts the Government claimed to appropriate the sum of Rs. 20,000/- paid since 6-9-1948 towards the contract dated 15-9-1944 for bath ovals. Upon such appropriation the Government claimed

“(a) the sum of Rs. 3,164-8-0 under the contract dated 2-4-1943 for laddies cook,

(b) the sum of Rs. 16,276/- under the contract dated 15-9-1944 for bath ovals,

(c) the sum of Rs. 1,13,282-4-5 on account of price of raw materials supplied under the contract dated 22-9-1944 for kettles camp after appropriating another sum of Rs. 20,000/- which had been paid sometime in June 1948.

11. The Government also stated that it did not claim relief in respect of the contract for bath ovals having regard to the concession before Banerjee J. that the arbitration clause in respect of that contract has ceased to exist. The contractors filed their counter-state of facts on or about 29-9-1950 challenging the jurisdiction of the arbitrator to arbitrate in the matter and alleging that the arbitration clauses in the several contracts had ceased to exist. The contractors also challenged the claim of the Government and the appropriation of payments made in the state of facts.

12. On 31-7-1951, the arbitrator made an award for the sum of Rs. 1,16,446-11-5 interest at 6 per cent per annum from 10-8-1949 and Rs. 1,000/- for cost in favour of the Government and against the contractors. The arbitrator repelled the contention that the arbitration clauses had ceased to exist.

13. This application is made by one Kishorilal Gupta. He admittedly was a partner of the contractor firm Kishorilal Gupta & Co. Originally, there were two other partners in that firm, viz., Banarashidas Gupta and Hanuman Prosad Boid. Benarashidas Gupta is now dead and Lilabati Devi is his only heir and legal representative. Both Hanumanprasad and Lilabati are respondents to this application. Mr. A.K Sen, counsel for the Union of India at first contended that Lilabati Devi was not the only heir and a legal representative of Benarashidas Gupta, and on that ground this application was bad for non-joinder of parties. Eventually Mr. Sen abandoned this contention.

14. Mr. I.P Mukherjee, learned counsel on behalf of the petitioner contends that all the three contracts and arbitration clauses contained therein have been abrogated by the subsequent settlement contracts and have now ceased to exist, and consequently the award is a nullity.

15. Mr. A.K Sen, learned counsel on behalf of the Union of India contends that:

“(a) the original contracts could not be rescinded after breach.

(b) after breach the liabilities under the original contract can be discharged only by accord and satisfaction. In this case there was an accord but no satisfaction with regard to the contracts dated 22-9-1944 and 2-4-1943 and consequently those contracts were not abrogated.”

(c) In any event the arbitration clauses have not been abrogated.”

16. Mr. A.K Sen concedes that in the present case the arbitrator has no jurisdiction, to decide the question whether the arbitration clauses have ceased to exist and his finding is not binding upon this Court and it is for the Court to determine whether or not the arbitration clauses have ceased to exist.

17. It is at first necessary to advert to the provisions of Sections 62 and 63 of the Contract Act which are as follows:

“S. 62: If the parties to a contract agree to substitute a new contract for them or to rescind or to alter it the original contract need not be performed.

S. 63: Every promisee may dispense with or remit whole or any part of the performance of the promise made to him or may extend the time for such performance or may accept, instead of it, any satisfaction which he thinks fit.”

18. In — ‘Manohar Koyal v. Thakurdas’, 15 Cal 319 at pp. 325-26 (A), this Court held that:

“We are of opinion that the Judge has erred in applying provisions of Section 62 of the Contract Act to this case at all. Section 62 is but a legislative expression of the common law and its provisions do not apply after there has been a breach of the original contract.”

19. The view of this Court, therefore, is that under Section 62 of the Contract Act the contract can be rescinded only after breach; — ‘New Standard Bank v. Probodh Chandra’, AIR 1942 Cal 87 at p. 90 (B). I notice that Panckridge J. found some difficulty in applying this principle to all cases — ‘Brijmohon v. Mahabir’, 40 Cal WN 808 (C).

20. The rescission under S. 62 may be express or implied. It is a question of construction of the new contract whether or not it rescinds the original contract. — ‘Morris v. Baron & Co.’, 1918 AC 1 at pp. 35, 38 and 26 (D).

21. If the contract is rescinded wholly, the arbitration clause which forms part of that contract is also rescinded. If the original contract is not rescinded by the new contract the arbitration clause contained in the original contract is also not rescinded. — ‘Uttamchand v. Mahmood Jewa’, AIR 1920 Cal 143 (E).

22. Section 62 requires an agreement which necessarily implies consideration.

23. Section 63 of the Contract Act does not require an agreement with or without consideration. Under that section the promisee may before breach gratuitously release the promisor from the obligation to perform the promise. — ‘Jitendra Chandra v. S.N Banerjee’, AIR 1943 Cal 181 at pp. 184 and 187 (P). The promisee may after breach gratuitously release the promisor from his liability arising on such breach. The promisee may also accept instead of performance of the promise such satisfaction as he thinks fit. — ‘15 Cal 319 at pp. 325-7 (A)’.

24. It is also beyond controversy that the liability arising out of breach of contract may be discharged by accord and satisfaction — ‘AIR 1942 Cal 87 at p. 90 (B); that is to say, “by an agreement after breach whereby some consideration other than his legal remedy is to be accepted by the party not in fault, followed by performance of the substituted consideration” — see ‘Chitty on Contracts, 20th Edition at p. 286’.

25. I venture to think that the validity and effect of the accord and satisfaction must be judged by the general law of contract quite apart from the provisions of Sections 62 and 63 of the Contract Act.

26. The accord is an agreement for good consideration and is valid and enforceable under the general law of contract — ‘40 Cal WN 808 at p. 812 (C); — ‘British Russian Gazette and Trade Outlook Ltd. v. Associated Newspapers Ltd.’, (1933) 2 KB 616 at pp. 650, 651, 653, 654 and 644-5 (G), commenting on — ‘(1918) AC 1 at p. 35 (D).

27. Mere accord without satisfaction does not discharge the liability arising on breach of contract. This rule had its origin in early days when the binding character of executory agreements was not recognised, see — ‘(1933) 2 KB 616 at pp. 650 and 643-4 (G).

28. Equitable considerations may arise if there is part performance of the accord and the parties cannot be restored to the position they occupied before such performance; — ‘(1918) AC 1 at p. 36 (D).

29. It may be shown that the accord itself is also the satisfaction. It is open to the injured party to accept the promise of the party in default in satisfaction of the existing cause of action. The question in modern law is purely one of construction of the accord: — ‘(1918) AC 1 at D. 35 (D) and — ‘(1933) 2 KB 616 at pp. 654-5 (G)’. The cases are illustrative of this question of construction. The promise itself was held to be the satisfaction in — ‘Elton Cop Dying Co. v. Broadbent & Son Ltd.’, (1919) 89 LJKB 186 (H); — ‘40 Cal WN 808 (C) and — ‘P.R.L Saminathan Chetty v. P.L Palaniappa Chetty’, 18 Cal WN 617 (PC) (I). Not the promise but its actual performance was held to be the satisfaction in — ‘15 Cal 319 at p. 327 (A); — ‘Babulal v. Tulsi Singh’, AIR 1940 Pat 121 (J). In — ‘18 Cal WN 617 at pp. 619-20 (PC) (I)’, Lord Moulton observed thus:

“The receipt given by the appellants and accepted by the respondent and acted by both parties proves conclusively that all the parties agreed to a settlement of all their existing disputes by the arrangement formulated in the ‘receipt’. It is a clear example of what used to be well known in Common Law Pleading as ‘accord and satisfaction by a substituted agreement’. No matter what were the respective rights of the parties ‘inter se’. They are abandoned in consideration of the acceptance by all of a new agreement. The consequence is that when such an accord and satisfaction takes place the prior rights of the parties are extinguished. They have, in fact, been extinguished for the new rights; and the new agreement becomes a new departure and the rights of all the parties are fully represented by it.”

30. The accord and satisfaction discharges the causes of action for breaches of contract already committed. Where the accord and satisfaction is by substituted agreement it is a question of construction of that agreement whether it also extinguishes all pre-existing rights and obligations and totally discharges the original contract.

31. Breach of the substituted agreement does not revive what has been discharged. Further complaint must be founded on the substituted agreement and not on the original contract. If the substituted agreement is put an end to under Section 39 of the Contract Act on account of such breaches the original contract is not thereby revived.

32. The arbitration clause is distinct from the I other clauses in the contract.

“It is collateral to the substantive stipulations of the contract. It is merely procedural and ancillary, it is a mode of settling disputes…… It………depends on there being a dispute or difference in respect of the substantive stipulation.”

per Lord Wright in — ‘Heyman v. Darwins Ltd.’, 1942 AC 356 at p. 377 (K). Total breach of the substantive stipulations even when it is accepted by the other party does not abrogate the arbitration clause and even the party in default may involte that clause. — ‘1942 AC 356 at pp. 376-79 and 400 (K)’. But the parties are not bound to have recourse to arbitration. They may settle the disputes directly and agree not to invoke the arbitration clause for that purpose. The arbitration clause ceases to exist with reference to the disputes which are thus settled. They may, also enter into a substituted agreement in complete supersession of the original contract and thereby abrogate the contract and the arbitration clause contained in it.

33. Let us now turn to the document dated 22-2-1949. The parties had arrived at a settlement of their disputes and that settlement is embodied in this document. The words “in full and final settlement of” in Cl. 1 are strong evidence that the parties intended to wipe out the pre-existing claims once and for all in exchange of the contractor's liability for payment of Rs. 45,000/-. By Cl. 3 the performance of the promise to pay that sum is deferred. The settlement is immediate and is not dependent upon performance of the deferred promise. By Cl. 4, on default of performance of the promise the Government has the right to recover the balance of the promised amount remaining unpaid. The default does not revive the old rights and obligations. By cl. 5, the substituted promise is to be secured by hypothecation. Clause 6 clenches the issue. The contract stands finally concluded in terms of the settlement. The conclusion or termination is immediate. It is in terms of the settlement or the bargain which is embodied in the document. No party thenceforth will have further and other claims against the other. There is complete and immediate abrogation of the contract. The parties have settled all their disputes directly. There is accord and satisfaction by substituted agreement. The substituted agreement discharges the existing causes of action. It also totally discharges and extinguishes the original contract. The arbitration clause which is contained in the original contract perishes with it.

34. Very soon after the settlement the contractors committed breaches of the several terms of the settlement. Even after such breaches the Government insisted on performance of the substituted agreement and received payment under-it. Persistent breaches of the substituted agreement cannot and does not revive the original contract.

35. In my opinion the arbitration clause contained in the contract for Kettles Camp dated 22-9-1944 has ceased to exist since 22-2-1949. The arbitrator, therefore, had no jurisdiction to entertain any claim with regard to that contract and the award, so far as it relates to it is a nullity. It is, therefore, not necessary to decide if there is any error of law on the face of the award so far as it relates to that contract.

36. It is also clear that the contract dated 2-4-1943, for Laddies Cook and the arbitration clause contained in it have not been abrogated by the settlement contract dated 6-9-1948. By the express words of the settlement contract the original contract is to be determined only on payment in terms of the settlement. Such payment was not made and the original contract and its arbitration clause continued to exist. The arbitrator, therefore, had jurisdiction to make an award with reference to that contract. I am also satisfied that there is no error on the face of the award so far as it relates to that contract.

37. Unfortunately the arbitrator has made an award the operative portion of which is as follows:

“The result is that, on a review of the entire evidence that has been produced before me, I have come to the conclusion that there ought to be an award for Rs. 1,16,446/11/5 in favour of the claimant — the Union of India — and against the respondent Kishorilal Gupta and Bros. The amount awarded shall carry interest at 6 per cent per annum from 10-8-1949 upto the date of payment. I award accordingly.

The stamp duty on this award has been paid by the Government. I direct that respondent firm should pay Rs. 1,000/- as cost of arbitration proceedings in addition to the amount awarded.”

38. The petition assumes that there is a separate award for Rs. 3,164/4/- in respect of the contract dated 2-4-1943 and another award of Rs. 1,13,382/3/5 in respect of the contract dated 22-9-1944. The court however must deal with the award as it stands. The award on the face of it is a lump sum award. On the face of it there is no separate award in respect of the contract dated 2-4-1943. The Court cannot ascertain with certainty the award which the arbitrator would have made if his verdict in respect of the contract dated 22-9-1944 were in favour of the petitioner. The petitioner claimed to appropriate the payment of Rs. 11,000/- made since 22-2-1949, towards all the three settlement contracts. The respondent claimed to appropriate that payment towards the contract dated 15-9-1944, for Bath Ovals but its witness C.C Mookherji (Qq. 13 and 15) admitted before the arbitrator that the payment was appropriated towards the contract dated 2-4-1943 for Laddies Cook and the contract dated 22-9-1944 for Kettles Camp.

39. A separate finding with regard to appropriation may not be necessary for a lump sum award but such finding is clearly necessary if the arbitrator were to make separate awards in respect of the last two contracts. Even if the figure of Rs. 1,16,446/11/- is split up into 2 figures the Court must add further words in the award to indicate in respect of which contract the good part of the award is made. If the Court were to pass judgment on the award for Rs. 3,164/8/- without specifying in the award that it is for the contract dated 2-4-1943 the Union of India may be met by a plea of res judicata when it subsequently enforces its rights in respect of other matters. The award of Rs. 1000/- for costs is clearly effected by the decision of the arbitrator with regard to the contract dated 22-9-1944. The Court is not certain in whose favour and for what sum the award for costs would have been if the arbitrator had decided in favour of the petitioner with regard to the contract dated 22-9-1944. The Court cannot re-write this award. Part of the award is void and the whole award is therefore bad.

40. I pass the following order:

I declare that the arbitration clause contained in the contract dated 22-9-1944, for Kettles Camp has ceased to exist since the settlement contract dated 22-2-1949.

I declare and adjudge the award to be void and invalid and set it aside.

41. The respondent must pay to the petitioner the costs of this application.

A/H.G.P

42. Order accordingly.