Kunhikannan Nambiar v. Government Of Kerala
Factual and Procedural Background
The petitioner was employed as a Village Assistant in 1978 and subsequently promoted to Village Officer. While serving as Village Officer, he was served with a memo of charges dated 13.3.1990 (Ext. P.1) proposing the penalty of stoppage of annual increment for three years with cumulative effect. The memo contained four charges alleging dishonest reporting of land extent, submission of a false report and incorrect sketch/mahazar, suppression/concealment of 70 cents of land in R.S. No. 3/11 of Kotheri desom, Keezhallur Village, and fraudulent assistance to an assignee to collect usufructs from the concealed land.
The petitioner submitted a written explanation dated 30.5.1990 (Ext. P.4) denying allegations, asserting he had acted under supervision of the Village Officer and requesting opportunity to adduce further evidence. The Sub-Collector (3rd respondent) found the petitioner guilty by order Ext. P.5. The petitioner appealed (Ext. P.6) to the 2nd respondent and the appeal was dismissed by Ext. P.7. A petition to the Government (1st respondent) was rejected by Ext. P.8. The petitioner filed the present Original Petition seeking quashing of Exts. P.5, P.7 and P.8.
Legal Issues Presented
The opinion addresses a procedural matter and does not frame distinct legal issues.
Arguments of the Parties
Petitioner's Arguments
- The petitioner stated he acted under the direct supervision and instructions of the Village Officer; he was not the officer who filed the original report.
- He relied on provisions of the Kerala Land Reforms Act and the Land Reforms (Ceiling) Rules to submit that a Village Assistant is not the authority to take possession of excess land; the Village Officer is the minimum authority to do so.
- The petitioner asserted that his role was limited to preparing a sketch under supervision, and that portions of the land were claimed by neighboring owners, so only undisputed extent could be measured at that time.
- He contended that he had been held responsible for transactions occurring after his transfer and for events occurring when he was working elsewhere.
- He argued that although the proposed penalty was a minor penalty under the Kerala Civil Services (C.C & A) Rules, given the complicated facts it was necessary to prove charges by means of oral or documentary evidence in a formal enquiry, so he could adduce evidence in his defence.
- In his appeal (Ext. P.6) he explained the measurement context: inspection with Village Officer and Tahsildar, absence of the owner, absence of distinctive boundaries, oral lease/possession by third parties, and later registered assignments affecting the property's extents.
Respondents' Position (as reflected in the record)
- The Tahsildar (Thalassery) reported (dated 24.9.1991) that the Village Assistant played foul play and concealed 70 cents, that 5 cents were assigned to Thenasseri Madhavi Amma (wife of petitioner’s elder brother) who was collecting usufructs from the whole 75 cents, and that both the Village Officer and Village Assistant were responsible for taking less land than ordered by the Taluk Land Board. This report was relied upon by the Sub-Collector in Ext. P.5.
- The 2nd respondent, in disposing the appeal by Ext. P.7, stated briefly that the written statement filed by the appeal petitioner was not convincing and that he had not given a single ground for setting aside the Sub-Collector's order; hence the appeal was dismissed. The appellate order contains only a short paragraph on merits.
- In the Government order (Ext. P.8) it is revealed that the Addl. Taluk Surveyor, Thalassery, was deputed and his report dated 20.11.1993 (obtained after disciplinary orders) was relied upon by the Government to ascertain correctness of measurements; this report did not exist at the stage of the charge memo or the disciplinary decision.
Table of Precedents Cited
No precedents were cited in the provided opinion.
Court's Reasoning and Analysis
The court undertook a procedural and substantive review of the disciplinary proceedings and recorded the following analytical steps, based strictly on the material in the opinion:
-
Timeline and reliance on after-acquired material:
- The memo of charge (Ext. P.1) is dated 13.3.1990; petitioner’s explanation (Ext. P.4) dated 30.5.1990. The Tahsildar's report dated 24.9.1991 was relied upon in Ext. P.5. Separately, the Addl. Taluk Surveyor's report dated 20.11.1993 was obtained long after the disciplinary authority had passed final orders and was first referenced in Ext. P.8.
- The court found it impermissible to rely upon a report obtained after the disciplinary proceedings (the 20.11.1993 report) to sustain earlier orders, because that report did not exist at the time the charge was framed or when punishment was imposed or the appeal decided.
-
Applicability and interpretation of the Kerala Civil Services (C.C & A.) Rules:
- R.16 (procedure for imposing minor penalties) was quoted and its elements noted: (a) inform the government servant in writing of proposal and allegations and give opportunity to represent, (b) take representation into consideration, and (c) consult Commission where necessary.
- The court recognized that R.16 does not always mandate a formal enquiry, in contrast to R.15 (procedure for major penalties), which contemplates a formal enquiry with witness examination and cross-examination. Nevertheless, the court emphasized that the absence of a requirement for a formal enquiry in minor penalty cases does not mean evidence can be dispensed with in all cases.
- The need to conduct a formal enquiry or permit adducing of evidence depends on the nature and complexity of allegations and the defence raised. Where charges rest on complicated facts or serious allegations, it would be arbitrary to find guilt without enquiry and opportunity to adduce evidence; the principles of natural justice and reasonable opportunity demand this.
-
Evaluation of sufficiency of proceedings in the present case:
- The court observed that the Tahsildar's later report and the subsequent government reliance on post-decisional material were improper. Evidence to substantiate the charges should have been adduced during the proceedings rather than after finding the accused guilty.
- The court noted the disciplinary authority limited itself to minor penalty procedure despite allegations that on their face were grave and might attract major penalties; this raised suspicion that authorities sought to avoid R.15 (formal enquiry) and the attendant requirement to adduce evidence.
- The appellate authority (2nd respondent) failed to address the substantive grounds raised in the appeal memorandum (Ext. P.6) and did not state reasons why the grounds were not accepted; the court held that an appellate authority must indicate reasons for rejecting grounds raised, and that failure vitiates the appellate order (Ext. P.7).
- The petitioner had explicitly requested an opportunity to explain matters better and to adduce evidence in Ext. P.4; the court treated that as an invocation of the right to a reasonable opportunity to be heard and to lead evidence.
-
Identified infirmities and legal consequences:
- The court identified at least two infirmities: (i) charges were not proved by adducing evidence in support of the allegations, and (ii) reasonable opportunity required by law was not afforded to the petitioner before finding him guilty.
- Because of these procedural and evidentiary defects, and because material obtained after final orders was impermissibly relied on, the court concluded that the impugned orders could not be sustained.
Holding and Implications
The Original Petition is allowed and Exts. P.5 (Sub-Collector's order), P.7 (appellate order), and P.8 (Government order) are quashed.
Implications:
- Direct effect: The disciplinary findings and the penalty imposed against the petitioner by the impugned orders have been set aside; the petitioner's challenge succeeds and no costs were awarded.
- Reasoning basis: The orders were quashed because the charges were not proved by evidence and the petitioner was not afforded a reasonable opportunity to adduce evidence; the appellate authority also failed to give adequate reasons for dismissing the appeal; and the Government improperly relied upon a surveyor's report produced after the disciplinary proceedings.
- Broader implications: The opinion emphasizes procedural safeguards in disciplinary proceedings — notably the interplay between R.16 and R.15 of the KCS (C.C & A.) Rules and the requirement that even in minor penalty proceedings, proof by evidence and reasonable opportunity may be necessary when allegations are complicated. The opinion does not announce a novel legal principle beyond its application to the facts and does not cite other case law as precedent in support.
Note: This summary is confined to the content and materials expressly contained in the provided opinion and does not add information beyond the opinion's text.
K.K Denesan, J.:— In 1978, the petitioner was working as Village Assistant, Keezhallur Village. Subsequently he was promoted as Village Officer. While working as Village Officer, Keezhur, he was served with Ext. P.1 memo of charges dated 13.3.1990 directing him to show cause why he should not be awarded with penalty of stoppage of annual increment for 3 years with cumulative effect. The following were the charges framed against him:
“I. That you while working as Village Assistant, Keezhallur have dishonestly reported to the Tahsildar, Tellicherry that there is only an extent of 4.05 acres of land in the possession of Smt. Kariath Kadeesumma W/o. P.A Mammoo in R.S No. 3/11 of Kotheri desom in Keezhallur Village, Tellicherry Taluk though the Land Board in its revised order TLB. 1212/73 (TLY) dated 28.4.78 have ordered to take possession of an extent of 4.75 acres of land in R.S No. 3.II of Kotheri desom Keezhallur Village, Tellicherry Taluk from Smt. Kariath Kadeesumma, W/o. P.A Mammoo.
II. That you have misled the higher authorities by submitting false report and preparing incorrect sketch and mahazar in respect of land taken possession from Kariath Kadeesumma W/o. P.S Mammoo on 18.7.78 by the Tahsildar, Tellicherry.
III. That while taking possession of the land in R.S No. 3.II of Kotheri desom, Keezhallur Village you have suppressed facts, mis-used your official position and played foul play and concealed 70 cents of land with ill-motive.
IV. That you have fraudulently helped Smt. Thenasseri Madhavi Amma the assignee of 5 cents of land adjacent to 70 cents of land concealed for collecting usufructs from the entire 75 cents and thereby sustained heavy loss to Government.”
2. Petitioner submitted Ext. P.4 explanation to the memo of charges, denying the allegations made against him. He submitted that he was not the Officer who filed the report, but it was done by his superior. He emphatically denied the allegation that he had acted dishonestly, fraudulently etc. His case is that the true facts have not been taken into consideration by the disciplinary authority. In the penultimate paragraph of Ext P.4 he submitted as follows:
“In the circumstances I submit that I am innocent of the charge alleged against me and I may be exonerated.
If however, the Sub Collector is not satisfied with my explanation I pray that I may be given a chance to explain things better and by adducing further evidence.”
3. The 3rd respondent Sub Collector passed Ext. P.5 finding the petitioner guilty of the charges. After going through the explanation of the petitioner and the Village Officer and the report of the Tahsildar it was found that the petitioner acted malafide in measuring the land as 4.05 acres, as against the required extent of 4.75 acres.
4. Against Ext. P.5 petitioner preferred Ext. P.6 appeal before the 2nd respondent. But it was dismissed by Ext. P.7 Finally he filed a petition before the 1st respondent-Government. That petition was rejected as per Ext. P.8 Petitioner has prayed for quashing Exts. P.5, P.7 and P.8
5. I have heard Sri. E.V Nayanar, learned counsel for the petitioner and the learned. Govt. Pleader for the respondents.
6. The main contention of the petitioner is that he had performed the duties entrusted to him under the direct supervision and instructions of the Village Officer. He submits, after referring to the relevant provisions of the Kerala Land Reforms Act, that the Village Assistant is not the officer authorised to take possession of the property declared as excess land. The lowest authority to take such possession is the Village Officer as can be seen from the Land Reforms (Ceiling) Rules. In fact, the report was submitted by the Village Officer. The work assigned to the petitioner was to prepare a sketch of the property and that work he did in the presence and under the direct supervision of the Village Officer. According to him, the neighbouring owners claimed possession of a portion of the property and therefore the Village Officer could take possession of only the undisputed extent of land. According to the petitioner he has been found guilty even for transactions that had taken place subsequent to his transfer from the Village Office and for things that had happened when he was working elsewhere. It is further contended that though the penalty proposed against him and inflicted on him is a minor penalty under the KCS (CC & A) Rules, considering the complicated nature of the facts, it was necessary to prove the charges by means of oral evidence or documentary evidence in a formal enquiry so that the petitioner also would have got the opportunity to establish that the facts alleged against him were not true.
7. In Ext. P.5 order it is stated that the remarks of the Tahsildar, Thalassery, was called for on the explanation of the delinquent officers, and the Tahsildar reported that the Village Assistant had played some foul play and concealed 70 cents of land in R.S No. 3/11 of Kotheri Desom of Keezhallur Village, that an extent of 5 cents of land was assigned to one Thenasseri Madhavi Amma adjacent to the 70 cents of land thus concealed and the said Madhavi Amma who is the wife of the elder brother of the Village Assistant was collecting usufructs from the entire area of 75 cents of land. Ext. P.5 proceeds to say that the Tahsildar further remarked that the Village Officer and Village Assistant were fully responsible for the lapses in taking over a lesser extent of land as against the order of the Taluk Land Board. It is evident from the next paragraph contained in Ext. PS that the finding was reached based on the Tahsildar's report dated 24.9.1991 It is pertinent to note in this connection that the memo of charge (Ext P.1) is dated 13.3.1990 and the explanation of the petitioner to that memo is dated 30.5.1990 (Ext. P.4).
8. Ext. P.6 is the appeal memorandum submitted by the petitioner against Ext. PS. In Ext. P.6 the petitioner has stated that pursuant to the order issued by the Taluk Land Board, the Village Officer himself inspected the property along with the Taluk Tahsildar and during inspection the declarant/owner of the property was not present there. No distinctive boundaries were available to separate the extent of land to be taken possession of from the adjacent stranger's properties. Morever, a dispute was pending with regard to the boundary between the declarant and those in possession of the neighbouring properties. Accordingly, as instructed by the Tahsildar and the Village Officer, the petitioner measured me property on 18.7.1998 and a sketch was prepared for an extent of 4.05 acres only, since the balance extent of property was said to be in the possession and enjoyment of one Chambil Makunnath Abdulla and another Kunhikannan as per oral lease. Subsequently it was learnt that the above named persons got assignment of the properties by executing separate registered assignment deeds for 25 cents and 31 cents respectively from the declarant
9. The appeal memorandum raising various grounds is seen disposed of by the 2nd respondent by passing Ext. P.7 order. The 2nd respondent has allotted just one short paragraph to deal with the merits of the case. All other paragraphs speak about the history of the disciplinary proceedings. The relevant paragraph is extracted below:
“The case has been examined in detail with reference to the records of enquiry and the contentions raised by the appeal petitioner. The written statement filed by the appeal petitioner is not convincing. He has not been able to give one single ground for setting aside the order of the Sub-Collector. Hence the appeal petition is dismissed.”
10. A perusal of Ext. P.6 memorandum of appeal and the order extracted above clearly shows that the Appellate Authority has disposed of the appeal by avoiding a proper discussion about the grounds raised therein. The appellate authority has got the duty to say for what reason he felt that the grounds raised in the appeal were not ‘grounds’ in his opinion. The appellate authority cannot escape judicial scrutiny by not stating the reasons in support of his conclusion. The facts and reasons mentioned in the appeal memorandum have not been adverted to, at least briefly, by the 2nd respondent while issuing Ext. P.7 order. I have no hesitation to hold that Ext. P.7 is vitiated for the aforesaid legal infirmities and is liable to be set aside on that ground alone.
11. The review petition submitted by the petitioner was disposed of by the 1st respondent by Ext. P.8 order. Ext. P.8, for the first time, reveals the fact that, in order to ascertain the truth of the allegations in the charge memo, some other competent person was deputed to re-measure the property. Ext. P.8 says that the Addl. Taluk Surveyor, Thalassery was deputed for the purpose of ascertaining the correctness of the measurement and a report was obtained from him on 20.11.1993, that is long after the disciplinary authority passed final orders in the disciplinary proceedings. There is no reference to the above report dated 20.11.1993 in the memo of charge dated 13.3.1990 or the statement of allegations appended thereto. There cannot be any reference to the said report upto the stage of the disposal of the appeal memorandum, because at the time when the charge was framed and the order imposing punishment was passed, the report of the Taluk Surveyor obtained on 20.11.1993 was not in existence. Undoubtedly, the said report obtained much later and behind the back of the petitioner cannot be made use of by the Government to sustain the original or the appellate order. This is a glaring illegality which vitiates Ext. P.8
12. As per R. 16 read with R. 11 of the Kerala Civil Services (C.C & A.) Rules, 1960, punishment of barring of increments with cumulative effect is a minor penalty. To impose a minor penalty, the procedure prescribed under R. 16 alone need be followed. R. 16(1) of the said Rules reads:
“16. Procedure for imposing minor penalties.
(1) No order imposing any of the penalties specified in items (i) to (iv) of R. 11(1) shall be passed except after,
(a) the Government servant is informed in writing of the proposal to take action against him and of the allegations on which it is proposed to be taken and given opportunity to make any representation he may wish to make;
(b) such representation, if any, is taken into consideration by the Disciplinary Authority; and
(c) the Commission is consulted in cases where such consultation is necessary”.
13. Under R. 16 of the KCS (CC & A) Rules, a formal enquiry is not a must The procedure prescribed under R. IS for imposing major penalty contemplates a formal enquiry necessitating the examination of witnesses and production of documents with opportunity to the accused employee to cross examine witnesses and adducing his own evidence. But this does not mean that a minor penalty can be inflicted on the accused employee irrespective of the nature of the allegations and the evidence required to prove those allegations. There may arise, in minor penalty proceedings also, the necessity to adduce evidence; without such evidence the charges cannot be held to have been established against the employee. The need to adduce evidence arises in the peculiar facts and circumstances of the case, the nature of the allegations levelled against the delinquent employee and the defence pleaded in his written statement. It cannot be said as an absolute rule in all cases, where a minor penalty alone is proposed to be imposed on the delinquent employee, that the ordeal of an enquiry can be done away with. It is true that the penalty to be imposed is a relevant factor but equally important is the nature of the allegations as also the facts to be established to substantiate the charges. When charges are founded on complicated facts or those involving serious allegations, it will be arbitrary to find the employee guilty, without holding an enquiry. A meaningful application of the principles of natural justice and the doctrine of reasonable opportunity to the accused employee come into play on such occasions.
14. Assuming for a moment that 70 cents of land was fraudulently or dishonestly omitted to be measured from the total extent of land on the false explanation that third persons claimed possession of that portion of the land, one fails to understand as to why the revenue authorities including the Tahsildar and the Sub Collector did not immediately arrange for an inspection of the property, re-measure it without delay and take that extent of land also into possession. What is, however, seen is that the respondents took into possession an equal extent of land belonging to the declarant from another survey number. Whether the petitioner acted bona fide or malafide, honestly or dishonestly and what were the ground realities available on the date of preparation of the sketch, mahazar etc. are matters to be proved by adducing evidence and not by a mere perusal of records prepared by superior officers behind the back of the accused employee. The contention of the petitioner that the decision to impose penalty on him was taken merely on the basis of the allegations which are not based on any evidence or reliable material, cannot be rejected as untenable.
15. The acts of delinquency alleged against the petitioner, prima facie, appear to be grave attracting the infliction of major penalty as well, unless extenuating circumstances are pleaded and established by him. One fails to see why the disciplinary authority limited the scope of the penalty and resorted to the procedure for imposing minor penalty. It may be, that, the authorities wished to close the proceedings without following R. 15 so that the task of adducing evidence is avoided. It is seen from Ext. P.8 that materials in support of the charges collected after finding the accused employee guilty are relied on by the Government to uphold the orders passed by subordinate officers. This is a very strange procedure and has to be deprecated.
16. It is seen from the very first explanation submitted by the petitioner as per Ext. P.4 that he made a request to the disciplinary audiority that he may be given a chance to explain things better and by adducing evidence. Petitioner has stated in ground (b) of the Original Petition that the person who submitted Ext. P.1 report was the Village Officer against whom also charges were framed but action against him was dropped when the Village Officer retired from service.
17. Having regard to the facts and circumstances of the case, I am of the view that the proper procedure that ought to have been followed by the disciplinary authority was to conduct a formal enquiry to establish the charges. It is settled law that the chargesheeted employee shall be given reasonable opportunity to defend his case. What is reasonable opportunity has to be decided in the facts and circumstances of the case and not solely based on the quantum of penalty that might finally be imposed on the employee. The impugned proceedings suffer from, at least, two infirmities (i) Charges have not been proved by adducing evidence in support of the allegations and (ii) Reasonable opportunity as required by law was not afforded to the petitioner before he was found guilty of the charges. The result is that the orders passed against the petitioner cannot be sustained. Exts. P.5, P.7 and P.8 are liable to be quashed and I do so.
18. Original Petition is allowed. No costs.
Alert