B.R Baliga And Others v. Town Municipal Council, Udupi And Another
Structured Summary of the Opinion
Factual and Procedural Background
The petitioners, residents of Udupi Town, filed a writ petition by way of public interest litigation seeking directions to prohibit the first respondent (the Town Municipal Council of Udupi / Municipality) from constructing any commercial building in Survey No. 115/1A and 115/1B, Moodanidambur, Udupi Town, and for removal of the construction already made. The land (approximately 1 Acre 79 Cents) is shown in the approved Outline Development Plan (ODP) and Comprehensive Development Plan (CDP) as reserved for Transport and Communication uses. According to the petitioners, K.M. Marg must be 80' wide under the ODP/CDP but the existing road is only 20', and no fresh licence for construction could be permitted within 40' from the middle of the road.
The first respondent (Municipality) asserted that the site is owned by the Municipality and intended for a bus stand; a project (bus stand and commercial complex) was sanctioned by the State Government in 1988, tenders invited, funds obtained under the IDSMG scheme (central loan of Rs. 66.65 lakhs), and the first phase (shops in the basement) commenced on 27-12-1993 and was nearly complete except for finishing works. After commencement, the petitioners sought judicial intervention and obtained an order of status quo (issued on 14-7-1994).
The second respondent, Udupi and Malpe Town Planning Authority, objected that the land is within Traffic and Transportation Zone in the CDP, that K.M. Marg width should be 80' and no licence could be granted within 40' of the road centre line, that the Municipality did not apply for a commencement certificate under Section 14 of the Town Planning Act, and that the building under construction would hinder required road widening.
Legal Issues Presented
- Whether the writ petition is maintainable.
- Whether the first respondent (Municipality) is required to obtain permission for construction under the Maharashtra/Karnataka Municipalities Act (specifically S.187) and the Karnataka Town and Country Planning Act (specifically S.14 and related provisions).
- Whether the writ petition is liable to be dismissed on the ground of laches (delay) or because the petitioners acted with oblique motive, negating public interest standing.
Arguments of the Parties
Petitioners' Arguments
- The petitioners are taxpayers and citizens entitled to enforce statutory regulations and to ensure conformity with the CDP/ODP; they filed the petition in public interest to protect the required 80' width of K.M. Marg and related public rights.
- The land in question is reserved for a bus stand (Transport and Communication Zone) and is being improperly utilised for a commercial complex in violation of zoning regulations under the Town Planning Act.
- The Municipality did not obtain any permission or licence required under Section 187 of the Karnataka Municipalities Act before commencing construction, nor did it obtain a commencement certificate under the Town Planning Act; government administrative sanction does not substitute for statutory approvals by the Planning Authority.
- If the commercial construction is permitted, the road cannot be widened to 80' as required by the CDP and public convenience would be adversely affected.
First Respondent (Municipality) / Counsel's Arguments
- The petitioners acted with mala fide intent and personal motive; the petition amounts to private grievance, not genuine public interest litigation.
- The petitioners delayed for years (knowledge of proposed construction since 1988 but suit in 1994) so the writ is barred by laches and delay.
- The project was sanctioned by the State Government in 1988; plans and estimates were prepared/approved by the Chief Architect and the Chief Engineer and technical sanction obtained; works commenced after wide publication and completion of first phase is near.
- The commercial complex area is within prescribed norms (about 5.2% or thereabouts) and is intended to provide amenities to travelling public (canteen, medical shops, parking etc.).
- There is no requirement for the Commissioner to apply to himself for a grant of permission/licence; Section 14 of the Town Planning Act applies only if there is deviation from the CDP.
- Physically, the site is at a higher level and it is impractical to widen the road to 80'; the shops serve as a practical retaining wall and do not prevent road widening in any feasible way.
- Delay in completion would cause financial hardship to the Municipality because of loan interest (9.75%) and public inconvenience due to inadequate existing bus stand.
Second Respondent (Town Planning Authority) — Objections
- The land is specified for Traffic and Transportation in the CDP; K.M. Marg width should be 80' and no construction can be licensed within 40' of the road centre line.
- The first respondent did not apply for a commencement certificate under Section 14 of the Town Planning Act and did not submit any plan before starting construction.
- The building under construction will hinder required road widening and left an average width of 27½' from the centre line of K.M. Marg, which would contravene the CDP.
Table of Precedents Cited
| Precedent | Rule or Principle Cited For | Application by the Court |
|---|---|---|
| Durga Prasad v. Chief Controller of Imports and Exports, (1969) 1 SCC 185 : AIR 1970 SC 769 | Authority cited for the proposition that public interest litigation cannot be pursued by persons with oblique motive; supporting dismissal where motive is improper. | The court acknowledged the principle but observed that because serious questions of statutory authority (Municipality acting without required permissions) arose, it would not reject the petition solely on the ground of maintainability or alleged oblique motive. |
| Tilokchand Motichand v. H.B. Munshi, (1969) 1 SCC 110 : AIR 1970 SC 898 | Also cited to support the proposition that PIL cannot be used by persons with oblique or private motives. | Referenced with Durga Prasad; the court noted the principle but declined to dismiss the writ petition on that ground given the statutory questions requiring adjudication. |
| Ramana Dayaram Shetty v. International Airport Authority of India, (1979) 3 SCC 489 : AIR 1979 SC 1628 | Cited for the principle that a writ petition may be dismissed on the ground of laches where petitioners fail to act with due diligence. | The court accepted the general principle but held that, despite the delay, the petition could not be dismissed because serious statutory questions about compliance with municipal and town planning laws required consideration. |
| Ashok Kumar Mishra v. Collector, Raipur, (1980) 1 SCC 180 : AIR 1980 SC 112 | Cited in support of laches/delay as a bar to relief. | Used to illustrate that delay can bar relief; the court nonetheless proceeded to examine the merits due to the importance of the statutory issues before it. |
| M.B. Sadashiviah v. City Improvement Trust Board, Mysore, (1988) 3 Kant LJ 91 | Authoritative support cited for the proposition regarding laches (state/local jurisprudence). | Relied upon by respondent's counsel for delay argument; court noted the reliance but did not dismiss the petition on that basis. |
| Unreported decision: Writ Petition No. 24620/1991 dated 4-2-1993 | Cited by respondent in support of laches/delay argument. | Considered by the court as part of the corpus of authorities on laches, but the court nonetheless continued to decide on the statutory issues raised. |
| S.K. Sharma v. Corporation of the City of Bangalore, ILR 1986 KAR 2536 | Held that residents are entitled to question unlawful construction in violation of zoning regulations which are hazardous; supports public interest scrutiny by residents. | The court relied on this decision to support the proposition that residents may challenge unlawful construction affecting public safety and zoning, reinforcing the court's decision not to refuse relief on maintainability/laches grounds. |
| Shivajirao Nilangekar Patil v. Dr. Mahesh Madhav Gosavi, (1987) 1 SCC 227 : AIR 1987 SC 294 | Authority that private litigation may assume the character of public interest litigation if it furthers public interest. | The court cited this to show that even litigation that started privately may be treated as public interest litigation if it furthers the public interest; used to support allowing the petition to be considered on merits. |
| K.K. Govindaraju v. Commissioner, Corporation of City of Bangalore; Vinayaka Investments v. Commissioner, ILR 1987 KAR 1570 | Dealt with S.505 of Municipal Corporations Act and Ss.14 & 76M of the Town Planning Act—held no departure from ODP/CDP or Zoning Regulations without written permission from Planning Authority. | The court cited this Division Bench view in considering whether Municipalities can deviate from ODP/CDP without written permission; it supported the proposition that written permission of the Planning Authority is necessary for departures. |
| Superintendent & Remembrancer of Legal Affairs, West Bengal v. Corporation of Calcutta, AIR 1967 SC 997 | Authority relied on for the proposition that the State or Crown is not immune from statutory provisions and must comply with law. | Cited by petitioners' counsel to support contention that municipal/state bodies must comply with statutory licensing requirements; the court considered this in its analysis of applicability of S.187 to the Municipality. |
| Union of India v. Jubbi, AIR 1968 SC 360 | Also cited for the proposition that the State is not exempt from statutory provisions. | Used to reinforce the petitioners' contention that public authorities are bound by statutory requirements; considered in the court's discussion of whether the Municipality needed to comply with S.187 procedures. |
| MFA No. 1067/92 (decision dated 29-7-92) | Previous decision of the court stating that where work is started by the Commissioner it can be presumed to have been started with the Commissioner’s permission. | The court relied on this decision to conclude that the Municipality need not issue notice to itself under S.187(1) nor grant permission to itself under S.187(2); that provision therefore did not apply to the present municipal construction. |
Court's Reasoning and Analysis
The court proceeded through a multi-step analysis, addressing maintainability/laches, statutory obligations under the Municipalities Act (S.187), and obligations under the Town and Country Planning Act (S.14 and related provisions).
-
Maintainability / Laches:
Court's approach:
The court recognized established principles that public interest litigation cannot be pursued by persons with oblique motives and that delay/laches can bar relief. The respondents had relied on multiple authorities to urge dismissal on these grounds. However, the court determined that serious questions remained regarding whether the Municipality had authority to proceed without statutory permissions. Because these statutory questions required adjudication, the court refused to dismiss the petition solely on grounds of maintainability or laches.
-
Municipalities Act — Section 187:
Issue:
Whether S.187(1) (notice) and S.187(2) (no construction without permission) applied to the Municipality when it itself undertakes construction.
Analysis and conclusion:
The court examined S.187 and its sub-sections (including sub-sections dealing with inspection and stopping of works by the Municipal Commissioner). The court observed that sub-sections relating to inspection and stopping presume inspection of buildings constructed by persons other than the Municipality. Relying on a prior decision (MFA No.1067/92), the court held that where work is started by the Commissioner it can be presumed to have been started with his permission. Given that the plans were prepared by the Chief Architect and approved by the Government, the court concluded the Municipality was not obliged to issue notice to itself under S.187(1) nor to grant permission to itself under S.187(2). Thus the construction was not hit by S.187(2) in the present facts; the petitioners' contention on this point was rejected.
-
Town Planning Act — Section 14 and Zoning / CDP conformity:
Issue:
Whether the Municipality needed written permission/commencement certificate under S.14(2) to undertake the development and whether the construction contravened the CDP (particularly road widening requirements for K.M. Marg to 80').
Analysis and conclusion:
The court noted the CDP placed the site within Traffic and Transportation Zone, where bus stand construction is a permissible use. Under the CDP/Zoning Regulations, ancillary uses (canteen, banking counters, indoor recreational uses, etc.) are permissible up to 5% of the total area. The court found that the ancillary/commercial portion was about 5.05% by the respondents' calculation (petitioners contested the calculation). The court treated the marginal excess of 0.05% as negligible and concluded the ancillary/commercial construction for public amenities fell within permissible uses.
However, the court emphasized that the CDP requires K.M. Marg to be 80' wide and that no construction may be permitted within 40' of the centre line. The Town Planning Act (Ss.14–16, made applicable to CDPs by S.24) requires conformity with plans and provides that changes to land use or development require permission of the Planning Authority; changes contrary to the ODP/CDP may be permitted only under S.14A with prior State Government approval. The second respondent submitted the building left on average only 27½' from the centre line, implying a shortfall of about 12½' in road width if the construction continued. The court held that, because the construction would reduce the road width contrary to CDP, the Municipality must seek modification of the CDP in accordance with law (including obtaining prior State Government approval if required). The court rejected the submission that State Government administrative sanction replaced the Planning Authority's statutory functions: government expenditure sanction did not substitute for statutory approval under S.14.
-
Directions and practical disposition:
Orders based on analysis:
The court directed that the Municipality was at liberty to apply for modification of the CDP, and if it did so the Town Planning Authority and the State Government must process and consider the application on merits within 3 months from communication of the order. Because construction was almost complete, the court ordered the Municipality not to proceed further without lawful modification of the CDP (i.e., without reducing the required 80' width in accordance with statutory procedure). The court thus partly allowed the writ petition and issued other directions (no order as to costs; communication to the Chief Secretary for compliance).
Holding and Implications
Holding: Petition partly allowed.
Core rulings and direct effects on the parties:
- The court held that the Municipality was not required to issue notice to itself under S.187(1) nor obliged to grant permission to itself under S.187(2) of the Municipalities Act in the circumstances of this case (plans prepared/approved by State authorities and work started by the Commissioner).
- The court held that ancillary commercial uses incidental to a bus stand are permissible under the CDP subject to the 5% limit; the marginal excess claimed (5.05%) was treated as negligible by the court for present purposes.
- Because the proposed construction would reduce K.M. Marg's width below the CDP-prescribed 80' (leaving on average about 27½' and a shortfall of about 12½' from the centre line), the Municipality cannot proceed further with construction unless and until the CDP is lawfully modified. The Municipality was directed to apply for modification of the CDP and the Planning Authority and State Government were directed to decide the application on merit within three months of communication of the order.
- No order as to costs was made.
- The court directed communication of the order to the Chief Secretary, Government of Karnataka, for compliance.
Broader implications:
The opinion focuses on application of existing statutory controls (Municipalities Act and Town Planning Act / CDP) to the facts and on ensuring required statutory procedures are followed for any change in land use or road-width reduction. The court did not purport to lay down any sweeping new legal principle; its directions were addressed to the parties and to the statutory authorities to follow the statutory modification process set out in the Town Planning Act before proceeding further.
Final disposition (as recorded in the opinion): Petition partly allowed. The first respondent is restrained from proceeding further with the construction unless the CDP is lawfully modified; the first respondent is directed to apply for such modification and the 2nd respondent and State Government shall consider the application within three months. No order as to costs. Copy of the order to be communicated to the Chief Secretary, Government of Karnataka.
1. The petitioners residents of Udupi Town have filed this writ petition by way of public interest litigation, seeking directions of this Court prohibiting the first respondent from constructing of any commercial building in Survey No. 115/1A, 2A1 of Moodanidambur, Udupi Town and for the removal of the construction already made.
2. According to the petitioners, the land measuring 1 Acre 79 Cents is reserved under the Transport and Communication Zone and is situated in the heart of Udupi Town, adjacent to the K.M Marg leading to the State Highway. As per the approved Outline Development Plan (‘ODP’ for short) and the Comprehensive Development Plan (‘CDP’ for short) published by the 2nd respondent Udupi and Malpe Town Planning Authority, the width of K.M Marg is required to be 80′ and the existing road available at present is only 20′ and hence no fresh licence for construction could be permitted within 40′ from the middle of the road. It is further stated that in fact the first respondent rejected the application of the owner of an adjoining site for construction of such a building and no exception could be made in the case of the first respondent who is putting up building in violation of ODP and CDP. It is their further contention that inasmuch as the land is meant for providing a regular bus stand, no commercial building can be constructed. If the building is permitted to be constructed, it will leave only 20′ of space between the building and the middle of the road which would cause inconvenience to the travelling public. Repeated representations to the Chief Minister and the representatives of people met with no response. Therefore the petitioners have approached this Court for redress. In the objection statement filed by the first respondent-Municipality, the locus standi of the petitioners is questioned. It is further stated that the site in question is owned by the Municipality and is meant for the construction of a bus stand as the existing bus stand is inadequate. A comprehensive plan for the construction of a bus stand and the commercial complex for the purpose of locating shops, canteen etc., was sanctioned and approved by the State Government in the year 1988 and tenders were invited from contractors for executing the work by wide publication. Thereafter funds were raised under the Integrated Development of Small and Medium Town (IDSMG) which is a Central Government sponsored scheme, under which, an amount of Rs. 66.65 lakhs was sanctioned by way of loan and the State Government approved change of land use and permission was granted for taking up construction of the first phase of the project, namely construction of shops in the basement. The work was commenced on 27-12-93 which was widely published and thereafter the first phase of the work costing Rs. 19 lakhs is almost nearing completion and the shops are ready for occupation, except for the fixation of rolling shutters and electrification. At this stage, the petitioners have obtained an order of status quo. It is the further case of the first respondent that in the circumstances, the petitioners should be taken to have waived their objections if any and have acquiesced with the action taken by the respondent. The width of the road of K.M Marg is hardly 20′ and at the spot where the construction is being put up, the road width would be more than 30′. The land in question is at a highest level than the road and with road on four sides and instead of building a retaining wall on the side of the K.M Marg, the first respondent put up shops which substitute for a retaining wall. The area occupied by the shops will not exceed 5% of the total area to be constructed, which is within the norms. Public amenities for travelling public, like canteen, medical shops, space for parking of vehicles etc., is provided. The construction is being made strictly in accordance with the plan sanctioned by the Government. It is not possible or feasible to widen the road to the extent of 80′. The question of first respondent obtaining commencement certificate and the 2nd respondent considering it does not arise as it is not required under law. If the construction is not permitted, it would result in greater hardship to the travelling public as the existing bus stand is totally inadequate as over 350 buses come to the bus stand daily and over 800 trips are undertaken. The loan obtained by the Municipality carries an interest of 9.75% and the delay in completing the construction would result in heavy loss to the Municipality.
3. The second respondent-Town Planning Authority filed statement of objections stating that the land in question is specified for Traffic and Transportation purpose in CDP and the width of K.M Marg is required to be 80′ and the existing bus stand leading to the State Highway is about 20′ in width and no fresh licence for construction of building could be granted within 40′ from the middle of the road to any of the owners of the vacant land available on the either side of this road. Out of the total extent of land 5% of the area can be utilised for canteen, banking counters, clubs, indoor recreational uses and other ancillary uses as per Zoning Regulation of the CDP. The first respondent has not applied for commencement certificate under Section 14 of the Karnataka Town and Country Planning Act, 1961 (‘Planning Act’ for short). The distance of the building under construction left an average width of 27½ from the centre line of K.M Marg Road. The first respondent did not submit any plan to the second respondent before starting of the construction. The building under construction is a hindrance for widening the road as required by CDP.
4. Sri Vijaya Shankar, learned counsel appearing for the petitioners contended that the petitioners are tax payers and are citizens of Udupi Town and are virtually interested in the observance of the Statutory Regulations and Rules of the public body such as the Municipality and the writ petition is filed in public interest to safeguard the rights of the citizens to have the road of 80′ in width in accordance with the CDP. He contends that the site which is meant for providing a bus stand is being utilised for the construction of a commercial complex, thereby violating the Zonal Regulations under the Town Planning Act and that the first respondent did not obtain any permission or licence as required under S. 187 of the Karnataka Municipalities Act, 1964 (‘Municipalities Act’ for short). Commencement certificate under the Town Planning Act was not obtained. The alleged approval by the Government did not amount to approval of the plans and in fact, the Government merely accorded sanction for incurring the expenditure. The Municipality is not exempted from the provisions of the Municipalities Act, so also the Government. He further contends that if the construction is put up, the road cannot be widened to the requisite width of 80′ as required by the CDP. He contends that the land use cannot be changed except with the permission of the authority under the Town Planning Act.
5. In reply Sri Udaya Holla, learned counsel for the first respondent contended that the petitioners have filed the writ petition with mala fide intention with personal motive and have no public interest in mind. He contends that the writ petition has to be dismissed on grounds of delay and laches as the petitioners are aware of the proposed construction right from the year 1988 and did not approach the Court till September, 1994. The plans and estimates for the construction were approved by the State Government and they are drawn strictly in accordance with the rules after obtaining technical sanction and the plans are drawn by the Chief Architect of the State. The commercial complex does not exceed 5.2% of the total area and it is well within the norms. He argued that there is no requirement of the Commissioner applying to himself for grant of permission and licence for construction. Section 14 of the Town Planning Act is applicable only if there is deviation from the CDP. He further contends that it is impossible to keep the width of the road at 80′ as the site on which the construction is being made is at a higher level than the road and there is no scope for widening the road.
6. Apart from filing objections, no contentions were put forward on behalf of the second respondent.
7. In view of the rival contentions of the parties the questions for consideration are whether the writ petition is maintainable and whether the first respondent is required to obtain permission for construction under the Municipalities Act and the Town Planning Act and whether the writ petition is liable to be dismissed on the ground of laches.
8. The Town Municipal Council of Udupi resolved to construct the bus stand building, shopping complex at a cost of Rs. 83.24 lakhs in Survey No. 115/1A and 115/1B within Udupi Municipal area. The Government of Karnataka sanctioned the project by an order dated 13-4-1988 to be executed through the Public Works Department. The new sketch of the project was prepared by Government Chief Architect which was approved by the Chief Engineer (Communication & Building) by administrative sanction was accorded to the Municipality. The work was commenced on 27-12-93 after vide publication and when the work was under progress, the petitioners had approached this court for directions prohibiting the first respondent from putting up a commercial building in the site reserved for Transport and Communication Zone. By an order dated 14-7-94, a direction to maintain status quo in respect of the construction was issued.
9. Sri Udaya Holla, learned counsel appearing for the first respondent opposed the writ petition on the grounds of maintainability and laches. He contended that the petitioners have come with an oblique motive and that they are motivated by personal grievance against the Municipality and that public interest is not involved. In support of his contention he relied on the decisions in Durga Prasad v. Chief Controller of Imports and Exports, (1969) 1 SCC 185 : AIR 1970 SC 769 and Tilokchand Motichand v. H.B Munshi, (1969) 1 SCC 110 : AIR 1970 SC 898.
10. Sri Holla contends that the petitioners having slept over the matter for a long period, cannot be permitted to question the action of the Municipality, after long lapse of nearly six years and that the writ petition is barred by laches. In support of his contention he relies on Ramana Dayaram Shetty v. International Airport Authority of India, (1979) 3 SCC 489 : AIR 1979 SC 1628; Ashok Kumar Mishra v. Collector, Raipur, (1980) 1 SCC 180 : AIR 1980 SC 112; M.B Sadashiviah v. City Improvement Trust Board, Mysore, (1988) 3 Kant LJ 91 and an unreported decision in Writ Petition No. 24620/1991 dated 4-2-1993.
11. It is well settled law that public interest litigation cannot be pursued by persons with an oblique motive to promote their personal grievance. It is well established principle that a writ petition may be dismissed on the ground of laches, if the petitioner does not act with due diligence in questioning the impugned action of the respondent. The decisions relied on by the learned counsel fully support his contentions. But it is to be noted that serious questions relating to the authority of the Municipality to proceed with the constructions without obtaining the permission and licence under the Municipalities Act and under the Town and Country Planning Act are involved in this writ petition, requiring consideration of this court. In that view of the matter, I do not propose to reject this writ petition, merely on the grounds of maintainability and laches. Reference may usefully be made to the decision of the Division Bench of this Court in S.K Sharma v. Corporation of the City of Bangalore, ILR 1986 KAR 2536, where it is held that “every resident of the city is entitled to question unlawful construction in any locality in violation of Zoning Regulations which are hazardous”. In Shivajirao Nilangekar Patil v. Dr. Mahesh Madhav Gosavi, (1987) 1 SCC 227 : AIR 1987 SC 294, the Supreme Court was of the view that the private litigation resumes character of public interest litigation if it was in furtherance of public interest.
12. The first contention of Sri Vijaya Shankar is that the construction has started without obtaining permission and licence as required under S. 187(2) of the Municipalities Act and that even Municipality is not exempted from the provisions of the Act and is bound to obtain the permission before commencing the construction. In support of his contention he relies on K.K Govindaraju v. Commissioner, Corporation of City of Bangalore, Vinayaka Investments v. Commissioner, Corporation of City of Bangalore, ILR 1987 KAR 1570. Dealing with S. 505 of the Karnataka Municipal Corporations Act, 1976 and Ss. 14 and 76M of the Town Planning Act, a Division Bench of this court held that there can be no departure from the provisions of ODP, CDP or Zoning Regulations, unless written permission is secured from the Planning Authority. It was further held that if there is a plain contravention of the provisions of ODP/CDP, the Commissioner will alter the plan to bring it within the conformity of law.
13. The learned counsel contends that the Municipalities are under an obligation to obtain a licence as required by law and even a State has no exemption from the provisions of the law and the Crown has no immunity. He relies on Superintendent and Remembrancer of Legal Affairs, West Bengal v. Corporation of Calcutta, AIR 1967 SC 997 and Union of India v. Jubbi, AIR 1968 SC 360.
Section 187 of the Municipalities Act enjoins a duty on the person intending to construct, alter or reconstruct a building to give a notice to the Municipal Council. Sub-section (2) lays down that no construction or reconstruction shall begin, unless and until permission for the execution of the work is granted under Sec. 377. The Central Government or the State Government are exempted from the provisions of the Act in respect of any property belonging to them. There is no such specific Rule in so far as a Municipality is concerned and therefore Sri Vijaya Shankar contends that the Municipality was bound to issue a notice under sub-sec. (1) of Sec. 187 and to obtain permission under sub-sec. (2). Sri Holla contends that there is no question of the Municipality applying to itself for grant of permission in its own favour. He submits that the provisions in Sec. 187 are applicable to persons other than the Municipality.
14. Sub-section (1) of S. 187 requires all persons to issue notice to the Municipality before proceeding to construct or reconstruct or alter or add to a building and no construction or reconstruction can be commenced without obtaining permission under sub-sec. (2). It has to be seen whether these provisions are applicable to Municipalities. Under sub-sec. (7), the Municipal Commissioner may inspect the building under construction or reconstruction and may stop the construction or reconstruction under sub-sec. (8), if it is commenced without permission, or is not in conformity with the permission granted. These sub-sections would make it clear that the inspection by the Commissioner will be on buildings which are constructed or reconstructed by persons other than the Municipality. In MFA No. 1067/92 dated 29-7-92 this court has held as follows:
“In this case the work itself is started by the Commissioner, so it can be presumed that the work is started with the permission of the Commissioner”.
15. It is also to be noticed that the plans were prepared by the Chief Architect of the State and were approved by the Government. In the said circumstances it has to be held that the first respondent-Municipality was not obliged to issue notice to itself under sub-sec. (1) of S. 187 and to grant permission to itself for proceeding with the construction. The construction of the building is not hit by sub-sec. (2) of S. 187. The contention of the learned counsel for the petitioners on this aspect is rejected.
16. The next submission of Sri Vijayashankar is that the Municipality was under an obligation to obtain written permission of the Planning Authority under Section 14(2) of the Town Planning Act and without the grant of a commencement certificate in the prescribed form by the Planning Authority, the first respondent cannot proceed with the construction.
17. The admitted facts are the 2nd respondent-Udupi Malpe Town Planning Authority prepared a Comprehensive Development Plan according to which, the bus stand in question is situated within the Traffic and Transportation Zone in which it is permissible to construct railway yard, railway station, bus stand, bus shelters, roads etc. Admittedly, the construction is undertaken by the first respondent is a bus stand, which falls within the permissible use of the land. Sri Vijaya Shankar contends that the construction of a commercial complex in the site contravenes the Zoning Regulations.
18. Under the Zoning Regulations prepared under the CDP, under special circumstances, it is permissible to use the land for locating canteen, banking counters, clubs, indoor recreational uses and other ancillary uses, not exceeding 5% of the total area. The construction of the commercial complex for the purpose of providing amenities to the public making use of the bus stand, will fall within the meaning of “ancillary uses” which are permissible. As seen from the objections, the total percentage of the built up area works out to hardly 5.05% of the total land area and the same is within the norms prescribed under the CDP and it is controverted in the rejoinder filed by the petitioners. The only contention is that even the said 5% of the construction is not meant for commercial purposes. It is common knowledge that the public make use of the bus stand which requires canteen, shops etc. which are meant for their benefit. Inasmuch as the total area covered by the ancillary uses being only 5.05% it has to be held to be within the limit, as the excess is only 0.05% which is negligible.
19. The last submission of Sri Vijaya Shankar is that the permission under S. 14(2) of the Town Planning Act is required inasmuch as the construction which is being made by the first respondent would occupy a portion of the area which falls within the road widening area in accordance with the CDP. The second respondent-Udipi Malpe Town Planning Authority in its objections stated that the width of K.M Marg is 80′ according to the CDP and no fresh licence could be granted within 40′ from the middle of the road. It is further stated that the distance of the building under construction by the first respondent in the site has left an average width of 27′ from the centre line of K.M Marg. From the said submission, it is seen that there will be a shortage of 12½′ from the centre line of the road, if the construction is made by the first respondent. This would contravene the CDP.
20. The provisions of Ss. 14 to 16 of the Development Plan are made applicable, mutatis mutandis to CDP's also, by virtue of S. 24 of the Act. Under sub-sec. (1) of S. 14, every development in the area covered by the plan shall conform to the provisions of the Act and the CDP and the Regulations. Under sub-section (2), no change of land use or development shall be made except with the permission of the planning authority. Section 76M of the Act confers an overriding effect on the provisions of the Town Planning Act over other Acts. Therefore, every change of land use and every development, even if done by a Municipality, should be in conformity with the ODP and CDP, as the case may be. If the development or change of land use is to be made contrary to the ODP or CDP, the Planning Authority may, with the previous approval of the State Government, allow such changes in the land use or development as provided under S. 14A of the Act. It is therefore necessary that the first respondent should approach for necessary changes in the CDP in accordance with law.
21. Sri Holla contended that the land in which the bus stand is being constructed is at a higher level than the road. Therefore it is impossible to widen the road in accordance with the CDP and the construction is being made, which practically amounts to the construction of a retaining wall. It is not disputed that the width of K.M Marg is required to be 80′ according to the CDP and no construction can be permitted, contrary to the CDP. If the contention of Sri Holla is correct, then the change in the land use from the CDP may be sought by the Planning Authority with the previous approval of the State Government, as necessitated by topographical considerations under Sec. 14A. Without such a change in the land use or development it is not permissible for the first respondent to proceed with the construction, thereby reducing the road width from the middle line about 12½′
22. While making the CDP the Statutory Authority has taken into consideration the need to keep the width of K.M Marg as 80′. If the width of the road is to be reduced the 2nd respondent and the State Government will have to consider the merits of the case and take a decision in accordance with law.
23. It was vehemently contended by Sri Holla that in as much as the plans were prepared by the Chief Architect of the State and it was approved and sanctioned by the State Government, there was no necessity to comply with S. 14 of the Town Planning Act. It has to be noted that the Planning Authority is a Statutory Authority under the Town Planning Act with statutory duties to perform under the Act. Even if the Chief Architect of the State is the author of the plans, in case of any violation of the ODP or CDP or Town Planning Act which need change in the land use or development, the written permission of the Planning Authority has to be obtained. The approval given by the State Government is nothing but administrative sanction for incurring the expenditure which cannot be construed as approved in accordance with law, replacing the functions of the Planning Authority under S. 14. Therefore the contention of Sri Holla on this aspect cannot be accepted.
24. It is open to the first respondent to seek modification of the CDP in accordance with the provisions of the Town Planning Act.
25. If the first respondent approaches the 2nd respondent for modification of the CDP, the same shall be processed and considered on merits by the 2nd respondent as well as the State Government in accordance with law within a period of 3 months from the date of communication of this order. In view of the fact that the construction is almost completed, it is not permissible for the first respondent to proceed further, without modification of the CDP by reducing the width of the road suitably from the width of 80′ which is required in accordance with CDP.
26. With the aforementioned directions the writ petition is partly allowed.
27. No order as to costs.
28. Communicate a copy of this order to the Chief Secretary, Government of Karnataka, Vidhana Soudha, Bangalore-560001 for compliance.
29. Petition partly allowed.
Alert