Raipur (Rakhial) Com... v. Ahmedabad Electricit...

Gujarat High Court
Aug 31, 2005
Important Paras
Please sign up to view Important Paras.
Smart Summary (Beta)

Summary of Opinion

Factual and Procedural Background

Three Special Civil Applications (S.C.A. Nos. 15737 of 2004, 15545 of 2004 and 13216 of 2004) were heard together as they raised the common question of whether Ahmedabad Electricity Company Limited (the Company) could insist that auction-purchasers/new owners pay arrears of electricity dues incurred by previous owners as a condition precedent to restoring or granting electric connections to premises sold in liquidation proceedings.

S.C.A. No. 15737 of 2004: The petitioner was a co-operative society which purchased assets of Raipur Manufacturing Company Limited pursuant to winding-up proceedings (Company Petition No. 114 of 2001, disposed of on 15.10.2001). Sale deeds and rectification deeds were executed in August/October 2004. After taking possession the petitioner applied for electricity connection; the Company, by letter dated 07.01.2004, refused supply unless arrears of approximately Rs. 12.3 crores (claimed to be due prior to 15.07.1999) were paid. The petitioner cited the Apex Court decision in Isha Marbles v. Bihar State Electricity Board and other authorities; the Company did not reply and the petitioner filed this writ petition.

S.C.A. No. 15545 of 2004: The petitioner was purchaser No. 2 of premises of Raipur Manufacturing Company Limited (wound up in the same Company Petition No.114 of 2001). The petitioner applied for supply on 13.08.2004 but was denied connection on the same grounds as in S.C.A. No. 15737/2004.

S.C.A. No. 13216 of 2004: The petitioner purchased property of M/s. Ajit Mills Company Limited pursuant to liquidation (Company Petition No. 197 of 1987 disposed of on 08.02.1994). The petitioner applied for power on 28.05.2004 but was refused connection on similar grounds.

The petitions were heard with learned advocates appearing for petitioners and for the respondent Company. The Court disposed of the petitions together by this common judgment.

Legal Issues Presented

  1. Whether an auction-purchaser/new owner of premises acquired in winding-up/auction proceedings can be required to pay arrears of electricity dues incurred by the previous owner as a condition precedent to grant or restoration of electric connection to those premises.
  2. Whether the distribution licensee (Ahmedabad Electricity Company Limited) may refuse to grant or may keep disconnected supply to premises until outstanding dues relating to that premises (incurred by prior owner/occupier) are cleared, in view of provisions of the Electricity Act (e.g., Section 43, Section 56, and definitions such as Section 2(15)) and the Company’s Conditions of Supply.
  3. Whether contractual or auction conditions (for example clause(s) in sale/auction or Conditions of Supply such as Condition 2(j) or Clause 13) can make the purchaser liable to pay predecessor’s electricity dues, and whether such clauses, if absent, change the legal position.

Arguments of the Parties

Petitioners' Arguments

  • The petitioners, being auction-purchasers under court-ordered liquidation sales, are not liable to pay electricity dues of the previous owners in the absence of a specific statutory provision or an agreement making them liable.
  • Reliance on the Apex Court decision in Isha Marbles v. Bihar State Electricity Board and subsequent decisions (including Ahmedabad Electricity Co. Ltd. v. Gujarat Inns Pvt. Ltd. and Ors) which held auction-purchasers cannot be compelled to clear past arrears as a condition of reconnection.
  • The Company’s refusal to grant fresh connection was unreasonable, and the petitioners have been prevented from using the premises and starting construction activities as a result.
  • The Company had the power to recover dues earlier and did not take timely action, allowing arrears to mount; petitioners should not be made to suffer for the Company’s omission or for any state policy decisions (e.g., to avoid coercive measures against mills' owners to protect workers).
  • There was no agreement, clause or auction condition in the present proceedings that made the purchasers liable for past electricity dues.

Respondent Company's Arguments

  • The Company relied on statutory provisions (notably Section 43 of the Electricity Act, 2003, and Section 56) to argue that duty to supply relates to premises and that dues attach to premises; therefore the licensee can refuse to supply until arrears relating to that premises are discharged.
  • Reliance on the definition of “consumer” (Section 2(15), Electricity Act, 2003) and associated provisions to support the position that outstanding dues are associated with the premises and can be demanded from the owner/occupier seeking supply.
  • Relied on earlier decisions (including Swastic Industries v. Maharashtra State Electricity Board and a Division Bench decision (Letters Patent Appeal No. 691 of 2003 and group matters dated 18.07.2005)) supporting the Board’s right under previous statutes to recover charges and the efficacy of contract or supply conditions (e.g., Clause 2(j) of Conditions of Supply) imposing liability on successors when so agreed or stipulated.
  • The Company pointed to its Conditions of Supply, Clause 17 and Condition No.7 of Form 'D', and to Gujarat Government Gazette provisions (Clause 4.8.3, 31 March 2005) which it said make transferees responsible for unpaid dues where relevant conditions are present.

Table of Precedents Cited

Precedent Rule or Principle Cited For Application by the Court
Isha Marbles v. Bihar State Electricity Board (Apex Court) Held that an auction-purchaser seeking reconnection cannot be made to clear past arrears as a condition precedent; what matters is the contract entered into by erstwhile consumer and the Board and contractual liabilities cannot be enforced against a third party (auction purchaser). The Court interpreted Section 24 of the old Electricity Act in conjunction with other provisions to reach this result (paras 55–56 quoted). The Court applied the ratio from Isha Marbles as a primary authority to hold that auction-purchasers here cannot be required to clear past arrears as a condition for connection in the absence of a statutory provision or an agreement making them liable.
Ahmedabad Electricity Co. Ltd. v. Gujarat Inns Pvt. Ltd. and Ors Affirmed that in case of fresh connection the auction-purchasers cannot be held liable to clear arrears of previous owners in absence of specific statutory provision; indicated some doubt about the broad proposition in Isha Marbles but did not overrule it (left that for appropriate case). The Court treated this decision as applicable and binding on facts similar to present petitions and relied on it to reinforce the view that auction-purchasers are not liable to pay previous owners' arrears where no statutory or contractual basis exists.
Swastic Industries v. Maharashtra State Electricity Board (Apex Court) Held that the Board's right under Section 24 of the (old) Act to recover charges and discontinue supply is not taken away by Section 60-A of the Electricity Supply Act, 1948; Board retained option to sue within limitation period and also exercise power to discontinue supply. Relied upon by the respondent to support its right to refuse connection and to seek recovery; the Court considered this authority but did not allow it to justify imposing past arrears on auction-purchasers in the absence of statutory/contractual basis applicable on the facts before it.
Sun Chem v. G.E.B. Chairman and Ors. (2004) 6 G.H.J. 251 Held that where there is an agreement (Clause 13 in that auction) by which the purchaser agrees to pay predecessor's dues, the purchaser is liable to pay unpaid electricity dues of predecessor-in-title. The Court distinguished Sun Chem because in the present cases there was no auction clause, condition or agreement (such as Clause 13) making the purchaser liable; therefore Sun Chem did not apply.
Division Bench decisions of this Court (L.P.A. No. 1027 of 1998; S.C.A. No. 2162 of 2003; Letters Patent Appeal No. 691 of 2003 and group matters dated 18.07.2005) Earlier decisions of this Court held that the auction-purchaser cannot be made liable to pay electricity dues of previous consumer unless there is an agreement to that effect, and have upheld the applicability of relevant Conditions of Supply when parties were bound by them (e.g., Clause 2(j) where accepted). The Court considered these Division Bench decisions as binding and observed the Company had earlier been unsuccessful on similar facts; the Court therefore followed the line of authority that auction-purchasers without a contractual stipulation cannot be compelled to pay predecessor’s arrears.

Court's Reasoning and Analysis

The Court proceeded in a stepwise manner, applying precedent and the factual record before it:

  1. Determination of factual status: it was uncontested that the petitioners acquired properties pursuant to winding-up proceedings and that sale-deeds were executed by the Official Liquidator in favour of the petitioners; the petitioners therefore were auction-purchasers under court orders.
  2. Precedential framework: the Court examined the binding pronouncements of the Apex Court in Isha Marbles and the subsequent decision in Ahmedabad Electricity Co. Ltd. v. Gujarat Inns, which directly addressed whether auction-purchasers can be required to pay previous owners' electricity arrears as condition of reconnection. Those authorities held they cannot, absent a specific statutory provision or contractual acceptance of such liability.
  3. Application of precedent to present facts: the Court found the facts here to be similar to the cited authorities — there was no statutory provision making auction-purchasers liable, and critically there was no agreement, auction condition or contractual stipulation (such as Clause 2(j) or Clause 13 in other matters) in the present sales making the petitioners responsible for prior arrears.
  4. Evaluation of the respondent's statutory arguments: although the respondent relied on provisions of the Electricity Act, 2003 (Sections 2(15), 43 and 56) and on previous law (Section 24 of the old Act), the Court concluded that those provisions did not displace the binding precedent that contractual liabilities of the erstwhile consumer cannot be enforced against a third party (the auction-purchaser) in the absence of statutory mandate or agreement. The Court noted the respondent’s reliance on Swastic Industries and other decisions but distinguished cases where a purchaser had expressly accepted liability.
  5. Consideration of the respondent's conduct: the Court noted that the respondent had not filed suits or raised objections at the time of the public auction conducted by the Official Liquidator, and had not taken timely coercive action to recover the dues. The Court regarded that omission as a factor that militated against allowing the respondent to saddle the petitioners with the arrears now; the power to recover should be exercised against the original consumer.
  6. Binding nature of local precedent: the Court emphasised prior Division Bench decisions of the same Court that had ruled against the respondent on similar facts and therefore treated those decisions as binding and directly applicable.
  7. Conclusion on remedies: applying the above analysis and precedents, the Court concluded the respondent was not justified in withholding or refusing fresh electric connections to the petitioners’ premises on the ground of unpaid arrears of previous owners, and therefore directed restoration/grant of supply subject to usual legal procedures.

Holding and Implications

Holding: The Court's final decision was as follows:

Directed Relief: The respondent, Ahmedabad Electricity Company Limited, is directed to grant power supply to the petitioners' premises without insisting upon payment of the arrears of electricity dues in respect of the power supplied to the previous owners.

Specific orders given in the judgment:

  • The petitioners must approach the respondent Company within one week from receipt of a copy of the order and comply with all legal procedures necessary to obtain electric connection.
  • The respondent Company is expected to grant the electric connection as expeditiously as possible and preferably within four weeks from when the petitioners approach it.
  • The petitions were disposed of accordingly, Rule made absolute to the stated extent, with no order as to costs. The Civil Application was also disposed of accordingly.
  • The respondent's request for a stay of the order for four weeks was rejected as unreasonable by the Court.

Implications:

  • Direct effect: The petitioners (auction-purchasers) are entitled to fresh electric connections without being required to pay arrears of previous owners, where there is no statutory provision or contractual/agreed clause making them liable.
  • No broader change in law was declared by this judgment; rather, the Court applied and followed existing higher and co-ordinate court authorities (including the Apex Court decision in Isha Marbles and Division Bench decisions of this Court). The decision enforces the application of those precedents on the facts before the Court rather than creating a new principle.

Note: This summary strictly reflects the facts, arguments, authorities and reasoning contained in the provided opinion and does not introduce information beyond that text.

Show all summary ...

1. These three petitions raise a common question and are directed against the action of respondent " Ahmedabad Electricity Company Limited (for short, the Company) of insisting upon the payment of the arrears of electricity dues in respect of the power supplied to the previous owners as a condition precedent for the restoration of electric connection in the premises of the new owners. Hence, they are disposed of by this common judgment.

2.0 The facts leading to the filing of Special Civil Application No. 15737 of 2004 are as under;

2.1 The petitioner in this petition is a Co-operative Society registered under the provisions of the Gujarat Co-operative Societies Act, 1961, engaged in commercial activities and in the construction of houses for its members. Respondent No. 2 herein, M/s. Ajar Enterprises Pvt. Ltd., had purchased the assets of one Raipur Manufacturing Company Limited for Rs. 13.30 crores, pursuant to the winding-up proceedings in Company Petition No. 114 of 2001 held before this Court. The said petition was filed on 14.06.2001 and it came to be disposed of on 15.10.2001.

2.2 As per the conditions of the said auction, the assets of the Company were conveyed to the petitioner Society by the Official Liquidator as per the Deed of Conveyance executed on 02.08.2004 read with the Deed of Rectification dated 01.10.2004 executed between the Official Liquidator of the Company i.e. of Raipur Manufacturing Company Limited, ICICI Bank Ltd., respondent No. 2 herein " M/s. Ajar Enterprises Pvt. Ltd and the petitioner herein, and, one Shreeji (Rakhial) Commercial Co-operative Housing Society Ltd. (i.e. petitioner in S.C.A. No. 15545 of 2004) by which the entire property purchased by respondent No. 2 vide order dated 02.12.2004 was transferred to the petitioner - Society and Shreeji (Rakhial) Commercial Co-operative Housing Society Ltd. (i.e. petitioner in S.C.A. No. 15545 of 2004).

2.3 After taking possession of the said Company, the petitioner applied to respondent No. 1 - Company for the grant of electric connection for the said premises. However, respondent No. 1, vide letter dated 07.01.2004, declined to grant power supply to the petitioner, unless the petitioner pays the demand in the sum of approximately Rs. 12.3 crores claiming to be the outstanding dues in connection with the power supplied to the previous owner, i.e. Raipur Manufacturing Company Limited (in liquidation) prior to 15.07.1999.

2.4 In response to the above, the petitioner addressed letter dated 25.11.2004 to respondent No. 1 claiming that in view of the judgment of the Apex Court in the case of Isha Marbles v. Bihar State Electricity Board, and some other judgments, the respondent Company could not insist upon the petitioner to pay up the demands due from the previous owner as a condition precedent for the release of fresh connection in view of the auction purchase.

2.5 No reply was given by respondent No. 1 to the said letter of the petitioner. The petitioner was not extended with the power supply, thereby preventing it from starting its construction activity. Since electricity connection was not released by the respondent - Company, the petitioner has approached this Court by way of this writ petition.

3. The short facts in Special Civil Application No. 15545 of 2004 are that the petitioner in this petition is one of the two purchasers, being purchaser No. 2, of the premises of the said Raipur Manufacturing Company Limited, which went into liquidation and was wound up in Company Petition No. 114 of 2001 disposed of on 15.10.2001. On 13.08.2004, the petitioner made an application to respondent Company for the supply of power. But, the petitioner was denied electricity connection on the same grounds as stated in the aforesaid Special Civil Application.

4. The facts in Special Civil Application No. 13216 of 2004 are that the petitioner in this petition had purchased property belonging to one M/s. Ajit Mills Company Limited pursuant to the liquidation proceedings held before this Court in Company Petition No. 197 of 1987. The said petition was filed on 28.12.1987 and it came to be disposed of on 08.02.1994 pursuant to the winding up order passed as back as on 28.04.1989. On 28.05.2004, in order to restart the activities in the premises, the petitioner made an application to the respondent Company for release of power supply to the premises. However, the petitioner was denied electricity connection on the same grounds as stated in the aforesaid petitions. Hence, these petitions.

5. Heard Mr. S.N. Soparkar with Mr. Amar N. Bhatt, Mr. P.K. Jani with Mr. Mayur Rajguru and Mr. Shaikh with Ms. Ratna Vora learned Advocates appearing for the petitioners and Mr. K.B. Pujara with Mr. P.N. Thakkar learned Advocates appearing for the respondent Company.

6. Mr. S.N. Soparkar learned advocate for the petitioner has contended that the petitioner Society, being the auction-purchaser of the assets of the Company in question, is not liable to pay the electricity dues of the previous owner, in the absence of their being a statutory provision in that behalf. He has submitted that the respondent Company could not have and ought not to have denied the petitioner fresh electricity connection on the ground that the dues of M/s. Raipur Mills Pvt. Ltd are not paid by the petitioner Company, in view of the law laid down by the Apex Court in the case of Isha Marbles v. Bihar State Electricity Board , and, more particularly, in view of the observations made in Paras 55 & 56 of the said decision, which read as under;

55. In all the present cases the supply of electricity to a particular premises which had the benefit of enjoying electricity had been disconnected under Section 24 of the Electricity Act. The auction-purchasers want reconnection. The Board says no; unless and until the consumption charges in relation to that property which came to be incurred during the ownership of the previous incumbent are cleared off. Is that stand of the Board correct? The High Court, in the main judgment in Suman Packaging (CWJC No. 5358 of 1992) given the following reasons for answering the question against the Board;

1. Section 24 stipulates discontinuance of supply of electrical energy to the consumer in respect of a sum due from him. We are afraid the High Court had not read Section 24 in conjunction with other statutory provisions though they had been noted, namely, Section 26 of the Supply Act; Section 22 of the Electricity Act and clause VI of Schedule to the Electricity Act. They clearly postulate the obligation to supply energy for such premises. At the risk of repetition we hold that the premises had enjoyed the benefit of electricity. The owner of the premises or even the occupier of the premises, as stated under Rule 2(af) of the Indian Electricity Rules, becomes liable to pay the consumption charges together with other dues. In other words, the liability is in respect of the dues of electricity which came to be supplied pursuant to the contract with the former owner. The discharge of such liability will be on such owner or occupier.

56. From the above it is clear that the High Court has chosen to construe Section 24 of the Electricity Act correctly. There is no charge over the property. Where that premises comes to be owned or occupied by the auction-purchaser, when such purchaser seeks supply of electric energy he cannot be called upon to clear the past arrears as a condition precedent to supply. What matter is the contract entered into by the erstwhile consumer with the Board. The Board cannot seek the enforcement of contractual liability against the third party. Of course, the bona fides of the sale may not be relevant.

6.1 Mr. Soparkar has further contended that it is well settled law that where there is power there is duty. He has submitted that in the present case no doubt the respondent Company has the power to recover the outstanding dues, but, the said power is to be exercised with responsibility. Learned counsel has submitted that the respondent Company has not exercised its power in a prudent manner at the relevant point of time, by waiting for such a long period in recovering the dues of the past owners without initiating any action, thereby resulting in the mounting of the dues, which in some cases, may even be more than the value of the property in question. Apart from the above, the debts of the Company that has gone into liquidation might in some cases would even be time-barred.

6.2 Learned counsel has submitted that before the dues had assumed huge figures, the respondent Company ought to have disconnected the power supply at the relevant point of time and initiated necessary proceedings against the defaulter. Therefore, it is now not open to the respondent Company to claim the dues from the auction-purchasers, i.e the petitioners herein, for the negligence committed by the respondent authorities in performing its duties responsibly at the relevant point time of time.

6.3 Mr. Soparkar has relied upon a decision in the case of Ahmedabad Electricity Co. Ltd. v. Gujarat Inns Pvt. Ltd and Ors. , and, more particularly, on the following observations made in Paras 1 & 3;

"1. ... It appears that the respondents sought for fresh connections for supply of power to the respective premises. The appellant insisted on the previous arrears being cleared. It also appears that some arrears were paid by respondents No. 1 & 2 in Civil Appeal No. 1691 of 1999. However, the supply of electricity has been resumed. The dispute is whether the respondents should be held liable to pay the arrears which were outstanding against the previous owners.

3. ... We are clearly of the opinion that in case of a fresh connection though the premises are the same, the auction-purchasers cannot be held liable to clear the arrears incurred by the previous owners in respect of power supply to the premises in the absence of there being a specific statutory provision in that regard. Though we find some merit in the submission of the learned counsel for the appellant calling for reconsideration of the wide propositions of law laid down in Isha Marbles case, we think the present one is not a case for such exercise. We leave the plea open for consideration in an appropriate case.

6.4 Learned counsel has submitted that this Court in a similar matter being Special Civil Application No. 3014 of 1998 disposed of on 24.07.1998, while adopting the principle laid down in M/s. Isha Marbles case (supra), had observed that the purchaser of a property at public auction by the State Financial Corporation cannot be made liable to pay the electricity dues of the previous consumer unless there is an agreement to that effect and that there is no allegation of relationship or complicity between the petitioner and the old owner of the premises. Learned counsel has submitted that since in the present case there is no such agreement to the aforesaid effect, the petitioners cannot be held to be liable to pay the electricity dues of the previous consumer.

6.5 The aforesaid decision was carried in Appeal being Letters Patent Appeal No. 1027 of 1998 which came to be disposed of on 04.09.1998. Learned counsel has pointed out to the following observations made in the aforesaid Appeal, which reads as under;

Learned Single Judge, following a decision of the Honourable the Supreme Court in Isha Marbles v. Bihar State Electricity Board and Anr. 1995 (2) GLH 134 (SC), allowed the petition filed by the petitioners. We do not see any infirmity in the order passed by learned Single Judge. No doubt, Mr. H.B. Shah for the appellant submitted that various points were not placed before the Honourable the Supreme Court when M/s. Isha Marbles (supra) came to be decided by the Honourable the Supreme Court.

In our opinion, so far as this Court is concerned, this Court is bound by the law laid down by the Honourable the Supreme Court and the learned Single Judge has correctly observed that the point is squarely covered by the above decision. We, therefore, do not see any merits in the LPA. LPA stands dismissed.

The aforesaid decision was challenged before the Hon'ble the Apex Court unsuccessfully.

6.6 Mr. Soparkar has next relied upon a decision of a Division Bench of this Court dated 21.10.2004 passed in Special Civil Application No. 2162 of 2003 against the respondent Company, wherein the Bench has made the following observations in its order;

During the course of hearing, two decisions namely Isha Marbles v. Bihar State Electricity Board and Anr. and Ahmedabad Electricity Co. Ltd. v. Gujarat Inns Pvt. Ltd. and Ors. [2004 (2) GLH 691] are brought to the notice of this Court. These decisions clearly hold that the liability cannot be fastened on the auction purchasers/third party. The petitioner is auction purchaser/third party in this case, therefore, Ahmedabad Electricity Co. Ltd cannot seek recovery of electricity dues from the petitioner. The contention that the property has been purchased subject to all risks would not be applicable in this case in view of the legal position discussed above.

6.7 Mr. Soparkar has, therefore, submitted that the action of the respondent Company in withholding of power supply, until the dues of the previous owners are paid, is wholly unreasonable and improper and appropriate directions may be issued to the respondent Company for immediate resumption of power supply to the premises of the petitioners.

6.8 Mr. P.K. Jani appearing with Mr. Mayur Rajguru and Mr. Shaikh appearing with Ms. Ratna Vora learned Advocates for the petitioners in the respective petitions have adopted the arguments advanced by Mr. S.N. Soparkar. Learned counsel has submitted that the respondent Company's total revenue dues in S.C.A. No. 15737 of 2004 and S.C.A. No. 15545 of 2004 are to the tune of Rs. 12,30,16,068.54 and in S.C.A. No. 13216 of 2004 are to the tune of Rs. 38,58,945.84. Learned counsel has submitted that since the petitioners herein have purchased the property in question from the auction purchasers, there is no liability cast upon the auction purchasers towards the aforesaid dues of the respondent Company. Therefore, while deriving the right title and the interest over the property in question, the petitioners herein cannot be held liable towards the said dues of the respondent Company.

7. Mr. K.B. Pujara learned advocate appearing with Mr. P.N. Thakkar for the respondent Company has contended that in view of the provisions of Section 43 of The Electricity Act, 2003 (for short, the Act), dues are attached to the property and not to the consumer. The said Section 43 reads as under;

Section 43 : Duty to supply on request.-(1) Every distribution licensee, shall, on an application by the owner or occupier of any premises, give supply of electricity to such premises, within one month after receipt of the application requiring such supply;

Provided that where such supply requires extension of distribution mains, or commissioning of new sub-stations, the distribution licensee shall supply the electricity to such premises immediately after such extension or commissioning or within such period as may be specified by the Appropriate Commission;

Provided further that in case of a village or hamlet or area wherein no provision for supply of electricity exists, the Appropriate Commission may extend the said period as it may consider necessary for electrification of such village or hamlet or area.

(2) It shall be the duty of every distribution licensee to provide, if required, electric plant or electric line for giving electric supply to the premises specified in sub-section (1):

Provided that no person shall be entitled to demand, or to continue to receive, from a licensee a supply of electricity for any premises having a separate supply unless he has agreed with the licensee to pay to him such price as determined by the Appropriate Commission.

(3) If a distribution licensee fails to supply the electricity within the period specified in sub-section (1), he shall be liable to a penalty which may extend to one thousand rupees for each day of default.

7.1 Learned counsel has submitted that the aforesaid provision casts a duty on the distribution licensee that every distribution licensee shall on an application by the owner or occupier of any premises give supply of electricity to such premises. Therefore, the electricity connection and the outstanding dues in respect of the electricity connection are relatable to the premises and not to the owner or occupier of the premises alone.

7.2 Learned counsel has further submitted that as long as there are any outstanding dues of electricity connection given at particular premises, the licensee is entitled to disconnect the supply and also to keep the supply discontinued, till the entire outstanding dues are paid, as is provided in Section 56 of the Electricity Act, 2003, and therefore, the respondent Company can deny power supply to a consumer unless and until the dues of the earlier occupier are paid up.

8. Mr. Pujara has relied upon the definition of Consumer as provided in Section 2(15) of the Electricity Act, 2003, which reads as under;

2(15) : Consumer means any person who is supplied with electricity for his own use by a licensee or the Government or by any other person engaged in the business of supplying electricity to the public under this Act or any other law for the time being in force and includes any person whose premises are for the time being connected for the purpose of receiving electricity with the works of a licensee, the Government or such other person, as the case may be;

8.1 Learned counsel has submitted that a combined reading of Section 2(15) with Section 43, 50 & 56 of the Act clearly establishes that the connection to be given at any premises need to be considered with regard to the arrears of charges for electricity supplied at the said premises, notwithstanding the change in the ownership and the appropriate authority can direct clearance of such outstanding dues as a condition precedent for reconnection.

9. Mr. Pujara has further contended that in view of the provisions of Section 24 of the old Act, it is open to the respondent Company either to refuse power connection to the consumer or to file a civil suit before the appropriate Court.

9.1 Learned counsel has submitted that the said aspect has been considered by the Apex Court in the case of Swastic Industries v. Maharashtra State Electricity Board. , wherein it has been held that the Board's right under Section 24 of the Act to recover charges for energy and to discontinue supply of energy, if consumer neglects to pay the charges, is not taken away by Section 60-A of the Electricity Supply Act, 1948 which provides an option to the Board to file suit within the period of limitation stipulated therein for recovery of the charges.

9.2 Mr. Pujara has relied upon a Division Bench decision of this Court (Coram : Hon'ble Mr. Justice G. S. Singhvi and Hon'ble Mr. Justice Anant S. Dave) dated 18.07.2005 passed in Letters Patent Appeal No. 691 of 2003 and group matters, and, more particularly, on the following observations made in Page 37 of the said decision;

...... The object of Clause 2(j) is to ensure that the Board is not deprived of the charges of electricity supplied by it. It requires the prospective buyers of electricity to deposit the outstanding dues. Those who purchase the factories and establishments by giving highest bid at the auction or otherwise are deemed to be aware that for the purpose of availing electricity supply they will have to pay the outstanding arrears and, in our opinion, the Court cannot prevent the Board from enforcing Clause 2(j) of the Conditions of Supply, which has been enacted in larger public interest by directing the Board to file Civil Suit or application under the Companies Act. That alternative is always open to the Board and the applicants like the writ petitioners are free to persuade the concerned authorities to adopt that course.

10. Mr. Pujara has further contended that in view of the Conditions of Supply & Miscellaneous Charges of the respondent Company, and, more particularly, the provisions of Clause 17 read with Condition No. 7 of Form 'D', the respondent Company cannot guarantee that the supply of a consumer will not be disconnected for the non-payment of the consumers' energy bill, inclusive of past arrears, even if the consumer may have paid the said bill on the same day prior to the disconnection of supply. Learned counsel has submitted that it is not proper on the part of the petitioners to contend that there was negligence on the part of the Officials of the respondent Company in recovering the arrears of electricity charges of the previous owners. He has submitted that on account of the policy of the State Government of preventing the workers of the textile mills from being unemployed due to the closure of the mills, the respondent Company had not initiated any coercive measures against the mills owners.

10.1 Mr. Pujara has relied upon a decision of this Court in the case of Sun Chem v. G.E.B. Chairman and Ors. reported in (2004) 6 G.H.J. pg. 251, wherein it has been held that when there was an agreement between respondent No. 3 and the petitioner with respect to Clause 13, the petitioner is liable to pay the dues of electricity consumption remained unpaid by the predecessor-in-title.

10.2 Mr. Pujara has next relied upon a Division Bench decision of this Court (Coram : Hon'ble Mr. Justice G. S. Singhvi and Hon'ble Mr. Justice Anant S. Dave) dated 18.07.2005 passed in Letters Patent Appeal No. 691 of 2003 and group matters, wherein the Bench has upheld the provision of clause 2(j) of the Conditions of Supply, while recovering the dues of the consumer. The said Clause 2(j) reads as under;

2(j) : Recovery of old dues :- Recovery or new connection for any premises, where there are arrears of the Board pending from the consumer/occupier, shall not be entertained. The new successor/occupier has to clear these dues of the previous consumer before the application of successor/occupier is processed for supply of electricity. If the Board at a later date, gets the full or part of these dues from the previous consumer, the amount shall be refunded to the successor/occupier after adjusting the costs including legal expenses to recover arrears and the refund shall bear no interest.

10.3 Mr. P.N. Thakkar learned advocate for the respondent has adopted the arguments of Mr. K.B. Pujara and has relied on Clause 4.8.3 of the Gujarat Government Gazette published on 31st March, 2005, which provides that where premises to which electricity is supplied by Licensee is transferred to transferee and the transferee does not get service connection in the Premises transferred to his name, and continues to use the service connection in previous name, the transferee shall be responsible for payment of running energy bills as well as unpaid dues of energy bills and other amounts relating to the service connection. Learned counsel has submitted that the dues of the Distribution Licensee shall be payable on demand, in default of which the supply to the Premises may be disconnected, subject to the provisions of the Acts, rules and regulations for the time being in force.

10.4 Learned counsel has, therefore, submitted that the respondent Company has all rights to decline power supply to the petitioners, unless the arrears are fully paid up.

11. No other contentions have been raised by the learned advocates for the parties.

11.1 It is not in dispute that the properties in question were purchased by the petitioners pursuant to the winding-up proceedings held before this Court. Thereafter, as per the orders of this Court, the Official Liquidator had executed the Sale-deeds in favour of the petitioners herein, and therefore, the petitioners are the auction-purchasers under the orders of this Court. Being the auction-purchasers, the petitioners cannot be called upon to clear the past arrears of the previous owners as a condition precedent for supplying power to their premises. Apart from the above, no suit/s were filed by the respondent Company and no objections were raised before this Court when Advertisement was given by the Official Liquidator for public auction of the properties in question.

11.2 Similar issue arose before the Apex Court in Ahmedabad Electricity Co. Ltd. v. Gujarat Inns Pvt. Ltd and Ors. (supra), wherein the Court held that where the premises comes to be owned or occupied by the auction-purchaser and when such purchaser seeks supply of electric energy, he cannot be called upon to clear the past arrears as a condition precedent to supply power. In the case of Isha Marbles (supra), the Apex Court has observed that what matters is the contract entered into by the erstwhile consumer with the Board. The Board cannot seek the enforcement of contractual liability against the third party. Whatever the amount mentioned to have been due and recoverable, the same is due and recoverable from the erstwhile owner and the user of electricity and not from the present owner who is an auction-purchaser.

11.3 The aforesaid view has been reaffirmed in a decision in the case of Ahmedabad Electricity Company Ltd. v. Gujarat Inns Pvt. Ltd. and Ors. (supra). In my opinion, the ratio laid down in the said decision shall squarely apply on the facts of the case on hand. In that case, the respondents had sought for fresh connections for supply of power to their respective premises. The appellant-A.E.C insisted on the previous arrears being cleared. The question before the Apex Court was that whether the respondents should be held liable to pay the arrears which were outstanding against the previous owners.

11.4 The facts of the above referred case and the facts of the cases on hand are similar. In the present case, the respondent Company has insisted upon the payment of the arrears of electricity dues in respect of the power supplied to the previous owners as a condition precedent for the restoration of electric connection in the premises of the new owners. Considering the principle laid down by the Apex Court in the aforesaid decisions, the petitioners herein, being the auction-purchasers, cannot be held liable to clear the arrears incurred by the previous owners in respect of the power supplied to the premises, in the absence of there being a specific statutory provision in that regard. There was no condition in any of the proceedings that the purchaser is liable to pay any outstanding dues of the respondent Company, if any, owed by the Company under liquidation. Hence, the ratio down in the aforesaid decision shall squarely apply to the facts of the case on hand.

11.5 The decision relied upon by the learned advocate for the respondent in Letters Patent Appeal No. 691 of 2003 and group matters shall not apply to the case on hand, since in the present case there is no condition/agreement between the parties to the effect that the purchaser is liable to pay the outstanding dues of the respondent Company if any owed by the Company under liquidation. In the aforesaid decision of the Division Bench, the parties were bound by the condition, namely Condition No. 2(j), formulated by the Board. Hence, I am afraid that the said decision also cannot come to the rescue of the respondent on account of the absence of such a condition. Such a condition would have been applicable provided that the same was accepted by the previous owners of the premises in question. In the present case, no such condition was accepted by the previous owners of the said premises.

12. The next decision relied upon by Mr. Pujara in the case of Sun Chem v. G.E.B. Chairman (supra) shall also not apply to the case on hand, inasmuch as in that case, the parties were bound by Clause 13 of the auction which provided that the petitioner was liable to make payment of the due electricity consumption charges of its predecessor-in-title.

12.1 In the present case, there is no such condition between the parties by which the petitioners were made liable to pay the arrears of electricity dues in respect of the power supplied to the previous owners. Hence, the said decision also shall not apply to the case on hand.

12.2 Now, assuming even if the respondent Company has the power to recover the arrears of electricity charges of the previous owner from the new incumbent, it has to be concluded that by not recovering the amount at the relevant point of item, mistake / omission has occurred on the part of the respondent Company in not taking necessary steps at the appropriate time. On account of the said act of omission / mistake on the part of the respondent, the petitioners cannot be held to be liable to pay the said amount of arrears. Hence, the power to recover the arrears of electricity charges has to be exercised against the original consumer and not on the new incumbent, i.e a third party. It may not be out of place to state that when this Court had advertised for the auction of the properties in question prior to the winding-up proceedings, the respondent Company could have objected to the said auction of the properties in view of the huge revenue dues of the erstwhile owners of the said properties. Having not done so, the respondent Company, cannot take advantage of their mistake / omission at this stage.

12.3 Further, even if it is presumed that the respondent Company had not initiated coercive measures for the benefit of the workers of the textile mills, the respondent Company cannot thrust upon the burden of the arrears of electricity charges on the petitioners. The petitioners cannot be made victims of such huge recovery of arrears, on account of the liberal stand taken by the State Government in that regard. Apart from the above, the arrears in question are very old and by now they have become time-barred, and therefore, the petitioners cannot be permitted to recover the said amount of arrears by exercising powers which were not exercised at the relevant point of time.

12.4 Moreover, it is required to be noted that there is no such condition, such as Condition 2(j), in respect of the respondent Company. The State Government has not incorporated any such condition in respect of the respondent Company. In the case on hand, in the absence of such a condition, the respondent Company cannot take shelter of the provisions of its Conditions of Supply & Miscellaneous Charges in order to transfer the burden of arrears of the previous owner on the new owners i.e the petitioners herein.

13. Even otherwise, two Division Bench's of this Court, one in L.P.A. No. 1027 of 1998 and thereafter, in S.C.A. No. 2162 of 2003 have taken similar view in the case of the respondent Company itself, and therefore, this Court is also bound by the said decisions. Hence, I am of the opinion that the action of the respondent Company is wholly uncalled for and the respondent is required to grant fresh connection to the petitioner without insisting for the arrears of the previous owners.

14. In above view of the matter, respondent " Ahmedabad Electricity Company Limited, is directed to grant power supply to the premises of the petitioners without insisting upon the payment of the arrears of electricity dues in respect of the power supplied to the previous owners. The petitioners are directed to approach the respondent Company within a period of one week from the receipt of copy of this order for getting electric connection for their premises and shall also comply with all the legal procedures necessary for getting electric connection for its premises. It is expected that the respondent Company shall grant electric connection to the premises of the petitioners, as expeditiously as possible, and preferably within a period of four weeks from the date when the petitioners had approached them. The petitions stand disposed of accordingly. Rule is made absolute to the aforesaid extent with no order as to costs. The Civil Application also stands disposed of accordingly.

15. At this stage, Mr. Pujara learned advocate for the respondent Company has requested for the stay of this order for a period of four weeks from today.

16. It be noted that the petitioners have invested huge amounts in these properties and that to in liquidation proceedings which were approved by this Court. Considering the fact that the law is well settled in the case of the respondent Company, when as back as in the year 1998, the Division Bench of this Court in L.P.A. No. 1027 of 1998 had rejected the Appeal preferred by the respondent Company on similar set of facts, and thereafter, in the year 2003, another petition being S.C.A No. 2162 of 2003 on similar facts was dismissed by the Division Bench of this Court, the respondent Company ought to have accepted the law declared by this Court as well as by the Apex Court, more particularly, when they are on similar counts, as in the case on hand. The respondent Company ought to have accepted the decision in its true spirit. Hence, the request made by the learned advocate for the respondent is unreasonable and the same is rejected.