Bipinchandra G. Dalal & Another v. State Of Gujarat And Another

Gujarat High Court
Jun 16, 1987
Important Paras
Please sign up to view Important Paras.
Smart Summary (Beta)

Structured Summary of the Opinion

Factual and Procedural Background

Two writ petitions (Special Civil Application No. 4577 of 1984 and Special Civil Application No. 6510 of 1984) challenge orders of the Secretary (Appeals), Revenue Department, State of Gujarat cancelling permissions granted by the Taluka Development Officer (TDO) under Section 65 of the Bombay Land Revenue Code (the Code). In both matters the sequence of events, as recorded by the Court, is broadly similar:

  • Petitioners purchased agricultural land (dates and survey numbers differ by petition) in village Mota Borsava, Mangrol Taluka, prior to applying for permission to make non-agricultural use of the land.
  • Applications under Section 65 were made on 16 August 1982 and, by order dated 6 November 1982, the TDO granted permission for non-agricultural use (for plotting and construction of industrial sheds and residences) in each case.
  • After the TDO's permissions, the petitioners either sold or entered into agreements to sell the lands (and, in at least one case, created and sold sub-plots with transfer of possession to vendees).
  • Long after the grants (approximately 1½ years later), the Secretary (Appeals) issued show-cause notices dated 8/11 May 1984, invoking revisional powers under Section 211 of the Code, and then cancelled the TDO's permissions by orders in June 1984.
  • Petitioners challenged the Secretary's orders before this Court, contending delay, mala fides and abuse of power; they also pointed to inconsistencies in the Secretary's conduct (a contemporaneous proceeding concerning a similar plot resulted in withdrawal of a show-cause notice by the Secretary on 16 October 1984).

Legal Issues Presented

  1. Whether revisional power under Section 211 of the Bombay Land Revenue Code, when exercised in respect of a permission granted under Section 65 of the Code, must be exercised within a "reasonable time" and, if so, how that reasonable time is to be determined.
  2. Whether the Secretary (Appeals) validly exercised the revisional jurisdiction in these cases given the lapse of approximately 1½ years between the TDO's grant of permission (6 November 1982) and the issuance of show-cause notices (8/11 May 1984) and subsequent cancellation orders in June 1984.

Arguments of the Parties

Petitioners' Arguments

  • The Secretary's exercise of revisional power under Section 211 was grossly delayed (approximately 1½ years) and thus unlawful.
  • The cancellation orders were mala fide and amounted to an abuse of power.
  • After receiving TDO's permission, the petitioners sold or agreed to sell parcels or sub-plots and delivered possession to vendees; therefore, a belated cancellation would prejudice third parties and the petitioners' transactions.
  • There was inconsistent administrative treatment: the Secretary withdrew a similar show-cause notice in respect of another plot under substantially identical facts, which undermined the validity of the present cancellations.

Respondent / Secretary (Appeals) and State Arguments

  • The Secretary (Appeals) cancelled the TDO's permissions on grounds that the TDO had not followed Government guidelines (Government Resolution dated 25 March 1981), including failure to consult relevant authorities such as the Industries Department, and had not followed required procedure where a highway passed along the land.
  • The Secretary relied on earlier decisions of this Court (Kamalkhan Ajitkhan v. State of Gujarat and Gulam Yasinmiya Shaikh v. Collector, Surat) to justify exercise of revisional power after a lapse of two or three years; the contention being that revisional jurisdiction could be exercised even after such period where the circumstances did not show prejudice to the affected party.
  • At least one State advocate (Mr. Bukhari) relied on other decisions of this Court (Habib Nasir Khanji and Bhagwanji Bawanji) to argue that the permissible length of reasonable time depends on facts and that exercise after about a year could be proper in appropriate circumstances.

Table of Precedents Cited

Precedent Rule or Principle Cited For Application by the Court in This Opinion
State of Gujarat v. Raghav Natha, 1969 GLR 992 (Supreme Court) The revisional power under Section 211 must be exercised within a reasonable time; where the order sought to be revised is one under Section 65, the revisional jurisdiction should be exercised within a few months because Section 65 itself gives urgency (permission deemed granted after three months). The Court relied on this Supreme Court pronouncement as the decisive legal principle: because the TDO's permissions were under Section 65, revisional action by the Secretary (Appeals) after about 1½ years was not within the "few months" window and therefore contrary to the standard set in Raghav Natha.
Kamalkhan Ajitkhan v. State of Gujarat, Special Civil Application No. 395 of 1978 (this Court) Accepted that reasonable time depends on facts; revisional power exercised after two years was held permissible where petitioner had not acted on the land and no prejudice would be caused. The Secretary relied on this decision to justify delayed revision. The Court in the present opinion distinguished it: it does not concern orders under Section 65, and its rationale (absence of prejudice where no development occurred) did not apply here where petitioners had sold or agreed to sell and transferred possession.
Gulam Yasinmiya Shaikh v. Collector, Surat, Special Civil Application No. 2022 of 1974 (this Court) Revisional action after almost three years was upheld where facts showed no investment or development by the petitioner and thus no prejudice would result. The Court treated this decision as of limited relevance for the same reasons as Kamalkhan Ajitkhan: it is not a case dealing with revision of an order under Section 65 and therefore cannot override the special time-sensitivity identified by the Supreme Court in Raghav Natha.
Habib Nasir Khanji v. State, 1970 GLR 307 Supports the proposition that the length of reasonable time for exercise of revisional jurisdiction depends on facts and circumstances; exercise after about a year can be permissible depending on the case. Relied upon by the State's counsel to argue that revision after a year may be acceptable in some cases. The Court noted the decision does not concern Section 65 permissions and therefore is not dispositive of the issue here.
Bhagwanji Bawanji v. State of Gujarat, 1971 GLR 156 Similar to Habib Nasir Khanji: the permissible delay for exercising revisional power is fact-dependent and may extend to about a year in suitable cases. Also relied upon by the State. The Court observed likewise that it does not deal with Section 65 and so cannot govern cases where Section 65's time-sensitivity determines the permissible period for revision.

Court's Reasoning and Analysis

The Court's analysis proceeded by identifying the legal rule governing revisional power in the specific context of permissions under Section 65 and then comparing the facts of these petitions against that rule:

  1. Identify the controlling precedent: The Court treated the Supreme Court's decision in State of Gujarat v. Raghav Natha as the controlling legal principle for cases where Section 211 is invoked to revise orders passed under Section 65. The Supreme Court held that, although Section 211 contains no explicit limitation, revisional power must be exercised within a reasonable time and, for Section 65 permissions, that reasonable time is "within a few months" because Section 65 itself accords urgency (permission is deemed granted if the authority does not decide within three months).
  2. Apply the rule to the facts: The TDO's permissions in both matters were dated 6 November 1982. Show-cause notices were issued only on 8/11 May 1984 (approximately 1½ years later) and cancellation orders were passed in June 1984. The Court therefore asked whether the revisional power had been exercised within the "few months" timeframe required by Raghav Natha.
  3. Examine State's contrary authorities and factual distinctions: The Secretary relied on earlier decisions of this Court where revisional power had been upheld after longer delays (two to three years). The Court accepted that those decisions stand for the proposition that the permissible delay is fact-dependent, but distinguished them because they did not relate to Section 65 permissions and typically involved situations where the affected party had taken no development steps and therefore no prejudice would result.
  4. Consideration of delay and prejudice: The Court emphasized that where a Section 65 permission is involved, the statutory mechanism itself signals that revision must occur promptly. Here, petitioners alleged (and the record showed) that they had sold or entered into sale agreements and transferred possession or created sub-plots and sold them — facts that indicate potential prejudice from a belated cancellation.
  5. Absence of satisfactory explanation: The Court found no satisfactory explanation in the Secretary's orders for delaying the exercise of revisional power for about 1½ years. There was no suggestion of any preliminary inquiry that would justify the delay in these cases, unlike another batch of petitions referenced by the Court. The Court also noted administrative inconsistency: the Secretary had withdrawn a show-cause notice in a materially similar case while he proceeded to cancel permissions in these cases.
  6. Conclusion from combined legal and factual analysis: Given the Supreme Court's time-sensitive rule for Section 65-related revisions, the absence of explanation for the delay, and the presence of facts indicating potential prejudice to petitioners and third-party vendees, the Court concluded that the Secretary exercised revisional power after the expiry of the reasonable period required by Raghav Natha and therefore the cancellations were invalid.

Holding and Implications

Holding: The Court set aside the impugned orders of the Secretary (Appeals) cancelling the permissions granted under Section 65 of the Bombay Land Revenue Code in both Special Civil Applications. The rule is made absolute with no order as to costs.

Implications:

  • Immediate consequence: The cancellations of the TDO's permissions in both petitions were quashed — the petitioners' permissions (granted 6 November 1982) stand restored by the Court's order.
  • Grounding principle reaffirmed: The opinion applies and reaffirms the Supreme Court's guidance in State of Gujarat v. Raghav Natha that, in matters where Section 211 is invoked to revise orders under Section 65, revisional jurisdiction must be exercised within a few months of the permission being granted; delay of about 1½ years without satisfactory explanation is unreasonable.
  • Broader precedent: The opinion does not purport to create a novel precedent beyond applying Raghav Natha. The Court distinguished other decisions relied upon by the State on the particular ground that those cases did not involve Section 65 permissions and turned on different factual circumstances (notably, absence of development or investment by the affected party). The opinion therefore limits the application of those contrary precedents in Section 65 contexts.

No other remedies, conditions or further directions were specified in the opinion beyond setting aside the Secretary's cancellation orders and directing that there be no order as to costs.

Show all summary ...

1. These two petitions are directed against the order passed by the Secretary (Appeals), Revenue Department of the State of Gujarat, in exercise of power conferred by Section 211 of the Bombay Land Revenue Code (hereinafter called 'the Code') whereby he cancelled the permission granted by the Taluka Development Officer, Mangrol, (hereinafter called 'TDO') under section 65 of the code. The facts giving rise to these petitions, briefly stated, are as under.

2. The first petition, Special Civil Application No. 4577 of 1984, has been filed by two petitioners who had applied under section 65 of the code for permission to make non-agricultural use of the land bearing Survey No. 152/1 in Block No. 120 admeasuring about 4 acres 3 gunthas which they had purchased under a registered sale deed dated 20th July 1981 for Rs. 40,401/-. The case of the petitioners is that they were entitled to purchase the land in question since they themselves were agriculturists. The lands in question are situate in village Mota Borsava in Mangrol Taluka which falls in Zone III of the Industrial Zones created under the incentive scheme floated by the State Government under Government Resolution dated 22nd December 1977. As the land was situate in Zone 111 comprising Mangrol Taluka, the petitioners were entitled to certain incentives for setting up small, medium or large scale industries in the said zone. The petitioners made an application dated 16th August 1982 for permission to use the land in question for non-agricultural purposes, namely, plotting the same for construction of industrial sheds and residences. The TDO granted permission by his order dated 6th November 1982, Annexure 'A'. It is the say of the petitioners that after the permission was granted under section 65 of the code, the lay-out plans were prepared and 45 sub-plots created thereunder were sold to different persons by registered sale deeds as detailed in Annexure 'C'. It appears from the said Annexure that the lands were sold on 7th/8th July 1983 to different persons. The actual possession of the lands sold to these persons was also transferred.

3. The petitioners say that to their utter surprise they received a notice dated 8th/11th May 1984 threatening to cancel the permission granted by the TDO on 6th November 1982 in exercise of revisional powers conferred by Section 211 of the Code. Annexure 'B' to the petition is the show-cause notice issued by the Secretary (Appeals), Objections were filed to the said show-cause notice and oral submissions were made through Advocate at the date of hearing. The Secretary (Appeals) however, by his order dated 26th June 1984 rejected the objections and cancelled the permission granted by the TDO under section 65 of the code. In doing so, he held that the TDO had failed to follow the guidelines laid down by Government Resolution dated 25th March 1981 inasmuch as the permission was granted without consulting the concerned authorities including the Industries Department as required by the said guidelines. He also came to the conclusion that the procedure required to be followed in cases where a highway is passing along the land had not been followed by the TDO. The contention regarding limitation was brushed aside on the ground that in view of two decisions of this Court in Kamalkhan Ajitkhan v. State of Gujarat Special Civil Application No. 395 of 1978 decided on 27th March 1978 and Gulam Yasinmiya Shaikh v. Collector, Surat Special Civil Application No. 2022 of 1974 dated 3rd May 1978 both reported in (1978) 15 GLT at pages 147 and 179 respectively, it was permissible to exercise revisional powers after a lapse of two or three years also and since in the instant case no construction had taken place, the exercise of power was not likely to cause any prejudice to the petitioners.

4. The second petition, Special Civil Application No. 6510 of 1984 concerns land bearing Survey Nos. 134 and 135 of Block No. 104, admeasuring about 48,993-4 sq. metres purchased by the petitioners under a registered sale deed dated 7th July 1981. This land is also situated in village Mota Borsava of Taluka Mangrol. Entrepreneures desirous of setting up small, medium or large scale industries in this area comprising Zone III are entitled to certain incentives e.g., cash subsidy at the rate of 15 per cent of the fixed assets or Rs. 25/- lakhs, whichever is less. The petitioners, therefore, purchased the lands and made an application dated 16th August 1982 under section 65 of the code for permission to make non-agricultural use thereof for the construction of industrial sheds and residences. The TDO by his order dated 6th November 1982 granted permission on the terms and conditions set out in Annexure 'A' to the petition. After the grant of permission the petitioners entered into an agreement for sale of the land to Shrinathji Corporation on 5th October 1982. The petitioners contend that they received the full consideration for the lands and have since delivered actual possession thereof to the organizers of Shrinathji Corporation. The petitioners contend that in view of the decision taken at the level of the Chief Minister they were served with a notice, Annexure 'B' dated 8th/11th May 1984 to show cause why the permission granted by the TDO under section 65 of the code should not be cancelled. The petitioners contend that they filed their written objections to the proposed action and at the hearing made oral submissions through their Advocate but the Secretary (Appeals) cancelled the permission by his impugned order dated 20th June 1984. The petitioners, therefore, contend that the impugned action is mala fide and grossly delayed and smacks of abuse of power. The order of the TDO has been cancelled on the same grounds on which a similar order was cancelled in Special Civil Application No. 4577 of 1984 indicated earlier.

5. From the above facts it clearly emerges that the petitioners had purchased the lands in question before they applied for permission under section 65 of the code. After they purchased the lands, they sought permission to make non-agricultural use thereof which permission was granted by the TDO by his order dated 6th November 1982. It is further case of the petitioners that after the grant of permission they sold or agreed to sell the lands in question to third parties and received consideration for the same. They also parted with the actual possession of the land in favour of the vendees. Long thereafter the Secretary (Appeals) issued show-cause notices dated 8th/11th May 1984 for exercise of revisional power under Section 211 of the Code. In other words, the revisional power was sought to be exercised after a lapse of almost 1 1/2 years. The order cancelling the permission was ultimately passed in June 1984 and it is against that order that the present two petitions are preferred.

6. It may here be mentioned that the petitioners of Special Civil Application No. 6510 of 1984 had also sought permission in respect of another parcel of land situate in village Mota Borsava admeasuring about 2,723 sq. yards which was granted by the TDO on 6th May 1982. In respect of that land also a show-cause notice was issued on 8th May 1984 by the Secretary (Appeals). Insofar as the said proceedings were concerned, the contention urged on behalf of the petitioners that the exercise of power under Section 211 of the Cede was grossly delayed was upheld by the very same officer and the show-cause notice was withdrawn by his order dated 16th October 1984, copy whereof is produced at Annexure 'D' to that petition. A copy of the said order is also produced in Special Civil Application No. 4577 of 1984 for the purpose of pointing out that while in that case the Secretary (Appeals) upheld the contention that the proposed action was grossly delayed, surprisingly he took just a contrary stand while passing the impugned orders which are the subject-matter of the present petitions. On a bare perusal of the order passed by the Secretary (Appeals) in respect of that plot of land in Block No. 80 admeasuring 2,723 sq. yards, it becomes clear that the material facts were more or less identical to the facts in the present two petitions and yet while in the said proceedings he withdrew the show-cause notice by his order dated 16th October 1984, he surprisingly adopted just the contrary course while passing the impugned orders which are the subject-matter of the present two petitions. It is not possible to reconcile the two decisions since the material dates are identical.

7. The Supreme Court in the case of State of Gujarat v. Raghav Natha 1969 GLR 992 was concerned with a case where revisional powers were sought to be exercised under Section 211 of the Code in respect of permission granted under section 65 of the code. In that case one of the questions which came up for consideration was, whether it was open to the concerned authority to exercise revisional jurisdiction at any point of time or whether the same ought to be exercised within a reasonable time. Dealing with this question the Supreme Court observed that while no period of limitation was prescribed under Section 211 of the Code, the power must be exercised within a reasonable time, the length of reasonable time to be determined by the facts of the case and the nature of the order proposed to be revised. The Supreme Court further stated that in cases where revisional power is sought to be exercised with reference to the order made under section 65 of the code, the length of reasonable time must be determined having regard to the time factor provided in section 65 of the code for the grant of permission. Taking note of the fact that under section 65 of the code if the Collector does not inform the applicant of his decision within a period of three months the permission by fiction of law must be taken to have been granted, the Supreme Court observed that the revisional power must be exercised within a few months of the order passed under section 65 of the code having regard to the urgency accorded to such orders by the legislature. The Supreme Court answered the question in paragraph 13 of the judgment as under:

Reading Sections 211 and 65 together it seems to us that Commissioner must exercise his revisional powers within a few months of the order of the Collector. This is reasonable time because after the grant of the permission for building purposes the occupant is likely to spend money on starting building operations at least within a few months from the date of the permission.

It is clear from the above observation that in cases where revisional power is proposed to be exercised under Section 211 of the Code in regard to permission granted under section 65 of the code, the same must be done within a few months keeping in mind the urgency exhibited by the legislature by providing that if the authority does not make up its mind within three months and does not indicate the decision, the permission shall be deemed to have been granted. In the present cases the permission was granted by the TDO on 6th November 1982 and thereafter, after a lapse of almost 1 1/2 years, the Secretary (Appeals) issued show-cause notices dated 8th/11th May 1984 for exercise of power under Section 211 of the Code. The question then is, whether the power can be said to have been exercised within a reasonable time?

8. Mr. Bukhari, the learned Assistant Government Pleader, invited my attention to the decisions of this Court in Habib Nasir Khanji v. State 1970 GLR 307 and Bhagwanji Bawanji v. State of Gujarat 1971 GLR 156 and contended that the length of reasonable time must depend on the facts and circumstances of each case and in the aforesaid decisions the exercise of revisional power after a lapse of a year or so was considered to be in order. He submitted that the basic idea is to see that the sword is not kept hanging on the party granted permission for an unreasonably long period as that would make it difficult for the party to make non-agricultural use of the land. It must be realised that both these decisions on which Mr. Bukhari places reliance are not concerning the grant of permission under section 65 of the code. The power under Section 211 of the Code can be exercised by the State Government and certain high ranking officers in respect of any inquiry or proceedings of any subordinate revenue officer. Such inquiry or proceedings may or may not relate to the question of grant of permission under section 65 of the code. While it is true that the length of reasonable time would depend on the facts and circumstances of each case, it must be realised that insofar as permission under Section 65 is concerned, that provision itself indicates the length of reasonable time within which action must be taken under Section 211 of the Code. Where the order sought to be revised is other than the one made under section 65 of the code, the length of reasonable time may be governed by the facts and circumstances of that case but when an order passed under section 65 of the code is sought to be revised, the time factor set out in that provision itself gives a clear indication of what could be the reasonable time within which the jurisdiction should be exercised. Therefore, exercise of power under Section 211 of the Code in regard to orders made under section 65 of the code stand on a different footing and as observed by the Supreme Court, the revisional jurisdiction must be exercised within a few months. In the present case the order of the Secretary (Appeals) does not indicate why the decision to exercise revisional powers was delayed by Wi years. Unlike in the batch of petitions, Special Civil Application No. 4530 of 1983 and allied matters disposed of today, no preliminary inquiry was made, at least that is nobody's case, before decision to exercise revisional powers was taken. There is no explanation whatsoever why revisional jurisdiction was not exercised soon after the orders granting permission under section 65 of the code were made on 6th November 1982. In the absence of a satisfactory explanation, it is difficult to say that the revisional power was exercised promptly and expeditiously, i.e. within a reasonable time.

8.1. The Secretary (Appeals) has relied on two decisions of this Court, both rendered by S.H. Sheth, J. In the case of Kamalkhan Ajitkhan (supra), the Mamlatdar granted land to the petitioner on 3rd January 1973 and the Assistant Collector issued notice under Section 211 of the Code on 21st January, 1975, that is, after a lapse of two years. Relying on the decision of the Supreme Court that the power must be exercised within a reasonable time, it was observed that reasonable time must depend on the facts and circumstances of each case. Taking note of the fact that the petitioner had not done anything on the Wada land and the land had remained as it was during the said period of two years, this Court held that it was permissible to exercise revisional power as the same was not likely to cause any prejudice to the petitioner. In the case of Gulam Yasinmiya (supra), the order made by the Assistant Collector on 7th August 1967 was sought to be revised after a lapse of almost three years by notice dated 27th October 1970. Taking note of the decision of the Supreme Court as well as this Court in Habib Nasir's case (supra), the learned Judge observed that since the period of reasonable time must depend on the facts and circumstances of each case, it would have been necessary to seriously view the proposed action if the evidence had disclosed that after the land was granted to the petitioner, the petitioner had invested moneys in the land, developed it or had done something to develop it. In the absence of such evidence, this Court held that notwithstanding the lapse of time, since the proposed action was not likely to cause prejudice to the petitioner, the same must be upheld. Both these decisions do not pertain to exercise of revisional powers relating to permission granted under section 65 of the code. As pointed out earlier, cases governed by Section 65 read with Section 211 stand on a different footing and in view of the observations made by the Supreme Court extracted earlier, the power must be exercised within a few months from the date of permission. Besides, in the present case the petitioners have averred that after the grant of permission, they have sold or entered into an agreement to sell the plot for the purpose of development and if the permission granted is belatedly cancelled, it would have a direct impact on the transaction entered into by the petitioners. Miss Shah was, therefore, right in contending that so far as the present two petitions are concerned since the first respondent has not given any satisfactory explanation for the delay, this Court must hold that the power was not exercised within reasonable time. She submitted that in the present case it is not the contention of the first respondent that any preliminary inquiry was made to determine whether these were fit cases for exercise of revisional powers as in the batch of petitions. Special Civil Application No. 4530 of 1983 and allied matters disposed of today and, therefore, there is no explanation whatsoever why the power was not exercised promptly within a few months from 6th November 1982. This is all the more so because in similar circumstances the Secretary (Appeals) had while dealing with land in Block No. 18 admeasuring 2723 sq. yards, withdrawn the show-cause notice on the ground that the proposed action was delayed. I am inclined to agree with the submissions made by Miss Shah in this behalf.

9. In view of the above, I hold that in the facts and circumstances of the cases on hand, the exercise of revisional power by the Secretary (Appeals) was after the expiry of reasonable period as replaced by the Supreme Court in Raghav Natha's case (supra). I am, therefore, of the opinion that the impugned orders passed by the Secretary (Appeals) cancelling the permission granted under section 65 of the code must be set aside in both the cases. The rule is made absolute accordingly with no order as to costs.