Isabhai Musabhai Patel v. Ahmedabad Municipal Corporation

Gujarat High Court
Feb 16, 1970
Important Paras
Please sign up to view Important Paras.
Smart Summary (Beta)

Judgment Summary — Special Civil Application No. 41 of 1967 & Special Civil Application No. 1532 of 1965

Factual and Procedural Background

The two petitions challenge land acquisition proceedings in respect of land under acquisition. In both matters the notifications under Section 4 and Section 6 of the Land Acquisition Act were issued (Section 4 on 15 April 1940; Section 6 on 13 April 1942). The award of compensation was made on 29 February 1960.

Special Civil Application No. 1532 of 1965 was filed in September 1965 (five years after the award, 23 years after the Section 6 notification). Special Civil Application No. 41 of 1967 was filed on 12 January 1967 (seven years after the award, 25 years after the Section 6 notification).

The petitioners in both petitions are tenants who entered into possession of the land after the award (in 1960). The State Government raised preliminary objections of gross delay and laches and that the petitioners lacked locus standi (they were tenants and entered possession after the award). Affidavits-in-reply were filed by the State Government and by the Special Land Acquisition Officer explaining the circumstances that led to protracted proceedings.

The Court dismissed both petitions, discharged the Rule in each with costs, and recorded: "Petitions dismissed."

Legal Issues Presented

  1. Whether the petitions are barred by gross delay and laches such that the petitioners are not entitled to relief.
  2. Whether the petitioners, being tenants who entered possession after the award, are "persons interested" under the Land Acquisition Act and therefore have locus standi to challenge the acquisition.
  3. Whether protracted delay in the exercise of powers under the Land Acquisition Act vitiates the acquisition proceedings and warrants striking them down.

Arguments of the Parties

Petitioners' Arguments (as presented by Mr. Mehta)

  • Delay is not a material question because the petitioners' grievance involves fundamental rights; therefore, delay/laches should not bar relief (relying on several High Court decisions).
  • Physical possession of the property, even if obtained after the award, confers sufficient interest so that the petitioners qualify as "persons interested" under the Land Acquisition Act and have locus standi to challenge the acquisition.
  • The land acquisition proceedings were protracted (took as long as 25 years), and the mode and manner of exercise of power by the authorities is vitiated by gross delay — the petitions seek to strike down the acquisition on that ground.
  • Specific factual explanations for delay in filing included: (a) the Government had not taken possession until 1967; (b) street-line changes by Ahmedabad Municipal Corporation had resulted in inclusion/exclusion of lands at different times; (c) threat of eviction arose only in 1967.

State's Arguments

  • The petitions are barred by gross delay and laches given the long intervals between notifications/award and the filing of the petitions.
  • The petitioners lack locus standi: they are tenants who entered into possession after the award and, therefore, are not "persons interested" within the meaning of the Land Acquisition Act and cannot challenge the notifications or the acquisition.
  • The delay in the acquisition process was satisfactorily explained in affidavits-in-reply filed by the State and by the Special Land Acquisition Officer; the Court should accept those explanations and decline relief.

Table of Precedents Cited

Precedent Rule or Principle Cited For Application by the Court
Dalpatbhai Hemchand v. Municipality of Chansma, 8 Guj LR 225 = AIR 1968 Guj 38 Consideration of the effect of delay on enforcement of fundamental rights. The Court held this decision has no relevance to the present cases because the petitioners here do not have fundamental rights to enforce in these facts; therefore the authority could not be used to explain the petitioners' delay.
Kamalabai Harjivandas v. T. B. Desai, AIR 1966 Bom 36 Examination of delay in enforcement of petitioner's fundamental rights (in context of constitutional validity of an Act). The Court determined the decision is inapplicable because petitioners do not possess enforceable fundamental rights in the present circumstances.
Lal Chand Jagan Nath v. District Food & Supplies Controller, AIR 1965 Punj 410 Considered the effect of delay on enforcement of petitioner's fundamental rights. The Court found it not relevant to the present facts where petitioners lack the asserted fundamental right.
Abdul Majeed Qureshi v. Corporation of Calcutta, AIR 1967 Cal 174 Consideration of delay in respect of an action challenging municipal action (effect of delay on enforcement). The Court regarded this decision as not applicable to the present matters for the same reason: lack of fundamental-rights character in petitioners' claim.
Maharashtra State Road Transport Corporation v. Shri Balwant Regular Motor Service, Amravati, 71 Bom LR 438 = AIR 1969 SC 329 Reproduced and approved a passage from Lindsay Petroleum v. Hurd regarding the doctrine of laches and two important circumstances for assessment: length of delay and acts during the interval. The Court applied the equitable principles of laches (length of delay; nature of acts during the interval) as articulated in that decision to conclude the petitioners' delays (seven and five years) were inordinate and that petitioners remained inactive during the interval.
Lindsay Petroleum Co. v. Hurd, (1874) 5 PC 221 Statement on laches: doctrine is equitable, not arbitrary; two key circumstances are the length of delay and the nature of acts during the interval affecting justice between parties. The Court used these factors (length of delay; nature of acts during the interval) as the governing test for laches and concluded the petitioners had inordinate delay and remained passive, warranting dismissal.
Ambalal Purshottam v. Ahmedabad Municipal Corporation, (1968) 9 Guj LR 809 = AIR 1968 SC 1223 Considered a similar question of delay; observed that delays may be explainable where authorities attempted purchase by private treaty and that aggrieved parties could seek writs to compel completion of award/possession. The Court quoted this decision and applied its reasoning to accept the affidavits explaining the delay here and to hold that petitioners could have sought earlier relief but did not; thus the delay did not vitiate acquisition in the circumstances.
Dinshaw Italia v. State of Hyderabad, AIR 1955 Hyd 203 Referenced by petitioners (precise principle not elaborated in the text). The Court examined the decision and found the principles laid down in it had no application to the facts of the present cases; therefore detailed examination was unnecessary.
Jia Lal v. Om Prakash, AIR 1960 J&K 128 Referenced by petitioners (precise principle not elaborated in the text). The Court concluded the principle in that decision did not apply to the present facts and did not require detailed consideration.
Boregowda v. Subbaramiah, AIR 1959 Mys 265 Referenced by petitioners (precise principle not elaborated in the text). The Court held the principle laid down in that decision had no application to the present facts and did not examine it in detail.

Court's Reasoning and Analysis

The Court proceeded by first addressing the preliminary objection of delay and laches. It relied on the undisputed chronology (notifications in 1940 and 1942; award 29 February 1960; petitions filed in 1965 and 1967) and noted the petitioners filed their petitions five and seven years after the award and many years after the Section 6 notification.

The petitioners attempted to justify delay by asserting (a) Government had not taken possession until 1967; (b) municipal street-line changes led to shifting inclusion/exclusion of parts of the land; and (c) threat of eviction arose only in 1967. The Court found these explanations insufficient in light of the petitioners' long inaction.

On the argument that delay is irrelevant because fundamental rights are involved, the Court reviewed authorities cited by petitioners concerning the effect of delay on enforcement of fundamental rights. The Court concluded those authorities were inapplicable because, on the facts of these petitions, the petitioners did not possess a fundamental right to enforce.

The Court applied the equitable doctrine of laches as articulated in Lindsay Petroleum (and reproduced with approval by the Supreme Court in Maharashtra State Road Transport Corporation v. Balwant). The two central considerations were (i) the length of delay, and (ii) the nature of acts during the interval that might affect either party. The Court found the delays (seven and five years) to be inordinate and that the petitioners remained "absolutely quiet" and did not take steps to vindicate any rights during the interval. Accordingly, the petitions suffered from gross delay and laches.

On locus standi, the Court examined the status of the petitioners as tenants who entered possession after the award (post-29 February 1960). The Court held that tenants who enter into possession after the award are not "persons interested" within the meaning of the Land Acquisition Act and therefore lack locus standi to challenge the acquisition notifications. The Court emphasized the practical consequences of allowing successive tenants inducted by an owner after notification to continually challenge acquisitions, which would frustrate the object of the Act.

Because of the conclusions on delay/laches and locus standi, the Court considered it unnecessary to delve fully into the merits. Nevertheless, the Court briefly addressed the contention that the protracted conduct of the acquisition process vitiated the exercise of power. The affidavits-in-reply filed by government officials and the Special Land Acquisition Officer provided detailed explanations for the delay in making the award and in taking possession. The Court found these explanations satisfactory and relied on the Supreme Court decision in Ambalal Purshottam (quoted in the opinion) to support the view that delay, when explained, does not necessarily indicate bad faith or the exercise of powers for an improper purpose.

The Court further noted that if the petitioners had an interest in the property they could have earlier sought writs to compel the Land Acquisition Officer to expedite the proceedings and make an award; having failed to do so, they could not complain later of the delay.

Holding and Implications

Holding: Both petitions were dismissed. The Rule in each petition was discharged with costs. (Petitions dismissed.)

Implications:

  • Direct effect: The petitioners obtain no relief; the acquisition proceedings stand and the petitions are dismissed with costs.
  • The Court found the petitioners' delay and laches, and their lack of locus standi (being tenants who entered possession after the award), to be decisive. The Court accepted the State's explanations for the delay in making the award and taking possession.
  • The opinion does not purport to establish a new legal precedent beyond applying established laches principles and existing interpretations of "persons interested" under the Land Acquisition Act; no broader novel rule is set out in the text.

Disposition recorded in the opinion: "Both the petitions, therefore, fail. Rule in each of the two petitions is discharged with costs. Petitions dismissed."

Show all summary ...

1. The petitioners in Special Civil Application No. 41 of 1967 are tenants in respect of the land under acquisition. The petitioners in Special Civil Application No. 1532 of 1965 are also tenants in respect of the land under acquisition. In both the cases the notifications issued under Section 4 and under Section 6 of the Land Acquisition Act are the same. The notification under Section 4 was issued on 15th April 1940. The notification under Section 6 was issued on 13th April 1942. The award of compensation was made on 29th February 1960. Special Civil Application No. 41 of 1967, was filed on 12th January 1967. Special Civil Application No. 1532 of 1965 was filed in September 1965. So far as Special Civil Application No. 41 of 1967 is concerned, it was filed seven years after the award was made and 25 years after the notification under Section 6 was issued. So far as Special Civil Application No. 1532 of 1965 is concerned it was filed five years after the award was made and 23 years after the notification under Section 6 was issued.

2. On these facts the first preliminary objection which has been raised on behalf of the State Government is that both the petitions are barred by gross delay and laches. It is contended that even a civil suit was grossly time-barred when these two petitions were filed. The petitioners have tried to explain this delay in paragraph 15 in Special Civil Application No. 41 of 1967. They have tried to justify this gross delay by stating that the Government had not taken possession of the property in question until 1967 when the said petition was filed. Therefore, their attempt is to justify the delay on their part by referring to the alleged gross delay on the part of the Government. The second ground which they have stated is that the Ahmedabad Municipal Corporation had been changing the street line from time to time and that therefore, certain lands were excluded from the acquisition proceedings and certain lands were included therein. The third ground is that they were faced with the threat of eviction only in 1967. Similar grounds have been stated by the petitioners in the other Special Civil Applications explaining the delay in filing it. In the affidavits - in- reply the State Government has tried to meet the allegations made against them on this count. In our opinion, both these petitions suffer from gross delay.

3. Mr. Mehta who appears for the petitioners in both the petitions has tried to argue that the question of delay is not a material question in these two petitions because what is involved is a fundamental right of the petitioners. He has invited our attention to the decision of this High Court in Dalpatbhai Hemchand v. Municipality of Chansma reported in 8 Guj LR 225 = (AIR 1968 Guj 38) wherein the question which this High Court considered was the question relating to the effect of delay on the enforcement of fundamental rights. He has then invited our attention to the decision of the High Court of Bombay in the case of Kamalabai Harjivandas v. T. B. Desai reported in AIR 1966 Bom 36. In that case the constitutional validity of the Requisitioning and Acquisition of Immovable Property Act, 1952 was challenged and it was in that connection that the learned Judges were examining the question of delay on the enforcement of the petitioner's fundamental rights.

4. The next decision to which he has invited our attention is the decision of the Punjab High Court in the case of Lal Chand Jagan Nath v. District Food & Supplies Controller reported in AIR 1965 Punj 410. The learned Judge in that case was considering the effect of delay on enforcement of the petitioner's fundamental rights. Mr. Mehta has then invited our attention to the decision of the Calcutta High Court in the case of Abdul Majeed Qureshi v. Corporation of Calcutta, reported in AIR 1967 Cal 174. In that case a learned Judge of the Calcutta High Court was considering the effect of delay in respect of an action which was instituted by the petitioner challenging the imposition of the licence fee which was ultra vires the powers and authority of the Municipal Corporation of Calcutta.

5. In the present cases the tenants in both the petitions entered into the possession of the land in question after the award was made. Assuming that they have some right to possession, the right which they have is subject to the land acquisition proceedings. The decisions cited before us by Mr. Mehta wherein the effect of delay on the enforcement of the petitioner's fundamental rights was considered have no relevance and have no application to the present case. The petitioners, in the facts and circumstances of these two cases, have no fundamental right to enforce and, therefore, they cannot take recourse to them and explain away the gross delay from which the petitions suffer.

6. Mr. Mehta has then invited our attention to the decision of the Supreme Court in the case of Maharashtra State Road Transport Corporation v. Shri Balwant Regular Motor Service, Amravati reported in 71 Bom LR 438 = (AIR 1969 SC 329). In that decision the Supreme Court has reproduced with approval a passage from the case of Lindsay Petroleum Collector. v. Hurd, (1874), 5 PC 221 where in Sir Barnes Peacock dealt with the question of laches. It has been laid down therein that the doctrine of laches in Courts of Equity was not an arbitrary or technical doctrine. The validity of the defence of delay and laches must be tried upon principles, it is laid down in that case, substantially equitable. Two circumstances, always important in such cases, are the length of delay and the nature of acts done during the interval, which might affect either party and cause a balance of justice or injustice in taking the one course or the other, so far as it relates to the remedy. Applying these two circumstances to the two petitions before us we find that in one case the length of delay is seven years and in another case the length of delay is five years. In both the cases, it is inordinate. Next, during the period commencing from the date when the award was made until the petitions were filed the petitioners remained absolutely quiet and did not take any steps to vindicate their rights, if they had any. We are, therefore, of the opinion that the present petitions suffer from gross delay and laches and that the petitioners are not entitled to any relief from this Court. They were thoroughly indifferent to their rights, if they had any. We cannot encourage indolence and permit them to agitate stale matters.

7. Another preliminary objection which has been raised by the State is that the present petitioners have no locus standi to file these petitions. The petitioners in both the petitions are tenants and not the owners of the property under acquisition. They entered into possession of the land in 1960, that is to say, 20 years after the notification under Section 4 of the Land Acquisition Act was issued and 18 years after the notification under Section 6 of the said Act was issued. Next, they entered into possession after the award of compensation was made. Mr. Mehta, appearing for the petitioners in both the petitions, has contended before us that the petitioners are 'the persons interested' within the meaning of the Land Acquisition Act. According to him, on account of the physical possession of the property which they have, even though they might have obtained it after the award was made, they have sufficient interest to challenge the validity of the acquisition. According to him, the physical possession confers upon them sufficient interest. It is beyond dispute that the petitioners in both the petitions entered into possession of the land after the award for compensation was made on 29th February 1960. In our opinion, tenants who enter into possession of the land under compulsory acquisition after the award of compensation is made are not 'the persons interested' within the meaning of the Land Acquisition Act. They do not have locus standi to challenge the land acquisition notifications. To hold otherwise is to defeat the object of the Land Acquisition Act. An owner of a property may go on inducting tenants after tenants into the land under acquisition in anticipation of successive attempts to take its possession. If such tenants one after another go on challenging the acquisition, there will be no end to litigation and no acquisition of property can be made. The petitions, therefore, must fail on that ground also.

8. Mr. Mehta, appearing for the petitioners, has invited our attention to certain sections of the Land Acquisition Act in order to show that the petitioners, in the facts and circumstances of the present case, are the persons interested and he has also invited our attention to certain decisions. We mention them out of fairness to him.

9. The first decision is in the case of Dinshaw Italia v. State of Hyderabad, reported in AIR 1955 Hyd 203. The second is in the case of Jia Lal v. Om Prakash reported in AIR 1960 J and K 128 and the third is in the case of Boregowda v. Subbaramiah reported in AIR 1959 Mys 265. We have looked into these decisions and we find that the principle laid down in those decisions has no application to the facts and circumstances of the present case. It is, therefore, not necessary for us to examine those decisions in details.

10. In view of our decision on two preliminary points it is not necessary for us to examine the merits of the case. However, since Mr. Mehta has argued them we record a brief opinion thereon. The petitioners according to Mr. Mehta, do not challenge the validity of any of the individual acts. They do not challenge the validity of the notification under Section 4 of the Land Acquisition Act. They also do not challenge the validity of the notification under S. 6 of the Land Acquisition Act. They also do not challenge the validity of the award made under the Land Acquisition Act. What they challenge is the mode and manner of the exercise of power and the contention that he has raised is that the land acquisition proceedings have taken as long as 25 years and that therefore, the exercise of power under the Land Acquisition Act in this case is vitiated by gross delay on the part of the Government. It is, therefore, contended that we must strike down the land acquisition proceedings. On behalf of the State Government an affidavit in reply has been filed. An affidavit in reply has also been filed by the Special Land Acquisition Officer. Detailed facts have been stated in paragraph 3 of the affidavit in reply filed by Mr. K.T. Parmar, Under Secretary to the Government of Gujarat, Revenue Department, explaining the circumstances under which the land acquisition proceedings came to be protracted. Similarly, Mr. Mehta, the Special Land Acquisition Officer, has in paragraph 8 of his affidavit in reply stated in detail the facts which were responsible for the protracted proceedings in these cases. We have taken into account all those facts and, in our opinion, the delay which has been caused in these cases in making the award and taking possession of the land under acquisition has been satisfactorily explained. If the petitioners had any interest in the property they could have instituted the proceedings earlier claiming writ to compel the Land Acquisition Officer to complete the proceedings and to make an early award. They did not do so. Not having done so it is not open to them now to complain of the delay on the part of the Government and to pray for striking down the land acquisition proceedings on the ground of delay in making the award and taking possession of the property under acquisition. Mr. Mehta in this connection has invited our attention to the decision of the Supreme Court in the case of Ambalal Purshottam v. Ahmedabad Municipal Corporation, reported in (1968) 9 Guj LR 809 = (AIR 1968 SC 1223). A similar question was considered by the Supreme Court in that case. It has been observed by their Lordships as follows:

"It is true that no steps were immediately taken by the Land Acquisition Officer or authority to make awards of compensation and to take possession of the lands. But the reason apparently was that the Municipality was still trying to purchase the land by private treaty and when it was found that it could not purchase the lands, the Land Acquisition Officer was requested to expedite the determination of compensation. We are unable to hold that there is any evidence that the Government of Bombay issued the notification under Section 4 of the Land Acquisition Act, not for the bona fide purpose of acquisition, but with the object of pegging down prices so that the lands may when needed be obtained at those rates in future. The land was within the line of the street and could not without the sanction of the municipality be put to any profitable use. If either the land owners or the tenants were aggrieved by the delay, it was open to them to claim writs or orders compelling the State Government to complete the assessment and payment of compensation. We are not hereby to be understood as suggesting that after issue of the notifications under Sections 4 and 6 the appropriate Government would be justified in allowing the matters to drift and to take in hand the proceeding for assessment of compensation whenever they think it proper to do"
.

11. In this case the time taken by the Land Acquisition Officer in making the award has been satisfactorily explained in the two affidavits-in-reply filed in these two petitions. The delay in taking possession after the award was made in 1960 has also been satisfactorily explained. In view of the facts on record, we are unable to find that the Land Acquisition Officer had allowed the matters to drift. Therefore, on one hand the Land Acquisition Officer did not allow in these cases the matters to drift and on the other hand we find that the petitioners did not take any steps, if they had any interest in the property, to have the award made expeditiously and to see that the possession of the land was expeditiously taken. For these reasons, we find no substance in the contention raised by Mr. Mehta.

12. At the close of the hearing Mr. Mehta states to us that, in view of our decision to dismiss the petitions on these three grounds, he does not raise other contentions.

13. The result is that none of the contentions raised by Mr. Mehta succeeds.

14. Both the petitions, therefore, fail. Rule in each of the two petitions is discharged with costs.

15. Petitions dismissed.