Mmtc Limited (India) v. Alcari, Sa (Switzerland)

Delhi High Court
Jul 31, 2013
Smart Summary (Beta)

Factual and Procedural Background

The appellant MMTC Ltd., a public sector undertaking involved in the import of urea, entered into a contract with the respondent, Alcari, SA (Switzerland) (now Hinduja Bank (Switzerland) Ltd.), for the supply of 15,000 MT of urea as part of a larger tender for 400,000 MT. The contract included a clause (Clause 26) restricting the use of vessels older than 15 years without prior approval from MMTC. The claimant selected an overaged vessel and sought MMTC's approval, which was complicated by the involvement of the Department of Fertilizers (DoF), the consignee, who had not approved the vessel. The claimant provided guarantees regarding discharge rates to secure conditional acceptance. The vessel sailed despite MMTC's objections, leading to a dispute over demurrage charges due to differing interpretations of the agreed discharge rate.

The dispute was referred to arbitration under Clause 23 of the contract. The arbitrator ruled in favor of the claimant, awarding the balance demurrage amount with interest and dismissing MMTC's counterclaim. MMTC challenged the award's maintainability and validity before the Single Judge, who upheld the arbitral award and directed it to be made a rule of the Court. MMTC appealed this decision.

Legal Issues Presented

  1. Whether the Single Judge had jurisdiction and maintainability to entertain the application to make the arbitral award a rule of Court under Section 17 of the Arbitration Act, 1940, in the absence of original arbitral records.
  2. Whether the use of a vessel older than 15 years without prior approval constituted a breach of contract absolving MMTC of demurrage liability.
  3. Whether the condition regarding minimum discharge rate of 600 MT/WWD was valid and binding, and whether the arbitrator correctly applied the doctrine of severability to the award.
  4. Whether the interest rate of 18% per annum awarded by the arbitrator was reasonable under the Arbitration Act, 1940.

Arguments of the Parties

Appellant's Arguments (MMTC)

  • The proceedings under Section 17 of the Arbitration Act, 1940, were not maintainable as the original arbitral award and records were not filed by the arbitrator or authorized persons.
  • The arbitration and award were governed by the Arbitration Act, 1940, not the Arbitration and Conciliation Act, 1996, and the claimant's attempt to proceed under the latter was improper.
  • There was no prior approval by MMTC for the use of the overaged vessel; any approval was only by the Department of Fertilizers, which was not a party to the contract or suit, thus invalidating the approval.
  • The claimant breached Clause 26 by proceeding without MMTC's valid approval, relieving MMTC of demurrage liability.
  • The discharge rate condition was material to the contract, and the claimant's failure to adhere to the contractual tonnage and discharge terms negated liability.
  • The Single Judge erred in upholding the award despite these breaches and in accepting the claimant's version over contradictory evidence.

Respondent's Arguments (Claimant)

  • The issue of maintainability was conclusively decided against MMTC in a prior appeal (FAO (OS) 261/2009), and the claimant could not be prejudiced by the absence of original arbitral records due to their unavailability from the arbitral institution (ICC).
  • The claimant had sought MMTC's approval and was informed that the Department of Fertilizers had the final say, so the claimant proceeded based on that conditional approval.
  • The claimant provided guarantees regarding discharge rates, which were accepted, and MMTC's objections were inconsistent.
  • The arbitrator's findings on factual issues, including the approval and discharge rate, were supported by consistent evidence and should not be re-examined by the Court.
  • The doctrine of severability was correctly applied to uphold the valid parts of the award even if one part was erroneous.
  • The interest rate awarded should be adjusted to reflect reasonable market rates, but the power of the arbitrator to award interest under the 1940 Act was valid.

Table of Precedents Cited

Precedent Rule or Principle Cited For Application by the Court
Arosan Enterprises Ltd. v. Union of India, (1999) 9 SCC 449 Limits on court interference with arbitral awards under Section 30 of the Arbitration Act; no reappraisal of evidence unless total perversity or wrong law. The Court relied on this precedent to affirm that the arbitrator is the sole judge of evidence quality and quantity and that the Court should not reappraise evidence absent manifest error.
R.S Jiwani v. Ircon International Ltd, 2010 (1) Bom CR 529 Doctrine of severability in arbitral awards; valid parts of an award can be upheld separately from invalid parts if severable. The Court applied this principle to uphold the valid parts of the award despite erroneous application of Article 14 to a condition, finding severability appropriate.
J.C Budhraja v. Chairman, Orissa Mining Corporation Ltd, (2008) 2 SCC 444 Partial setting aside of arbitral awards; valid and separable parts can be upheld. The Court cited this to support the doctrine of severability and to reject setting aside the entire award where only part is vitiated.
Hindustan Construction Co. Ltd. v. State Of Jammu & Kashmir, AIR 1992 SC 2192 Power of arbitrators under the Arbitration Act, 1940 to award interest at reasonable rates. The Court recognized the arbitrator's power to award future interest but reduced the rate to a reasonable market-based rate.

Court's Reasoning and Analysis

The Court first addressed the maintainability of the application under Section 17 of the Arbitration Act, 1940, rejecting MMTC's objection regarding the absence of original arbitral records. It noted that the claimant had mistakenly filed under the 1996 Act but later corrected the procedure, and the original records were unavailable due to the arbitral institution's retention policy. No dispute existed over the award's contents or outcome.

On the merits, the Court accepted the arbitrator's findings that MMTC did not validly withhold approval but rather indicated that the Department of Fertilizers had the final say. The Court noted that MMTC could not deny giving approval by proxy through DoF and then avoid liability. It also found no breach by the claimant in using the overaged vessel given the conditional approval and guarantees provided.

Regarding discharge rates, the Court found the arbitrator's and Single Judge's conclusions reasonable and supported by evidence, with the actual discharge rate exceeding contractual minimums. Demurrage liability arose from port congestion, not vessel capacity or discharge rate breaches.

The Court upheld the application of the doctrine of severability, finding that the arbitrator's erroneous application of Article 14 to the discharge rate condition was severable and did not vitiate the entire award.

Finally, the Court reduced the interest rate awarded from 18% to 6% per annum simple interest, aligning with prevailing international market rates and judicial precedents, while affirming the arbitrator's power to award interest under the 1940 Act.

Overall, the Court found no fundamental or manifest error warranting interference and affirmed the Single Judge's judgment and the arbitral award.

Holding and Implications

The appeal is dismissed and the impugned judgment and order upholding the arbitral award are affirmed.

The direct effect of this decision is that the claimant's entitlement to the balance demurrage amount with interest is confirmed, and MMTC's objections and counterclaims are rejected. No new precedent is established; the Court reaffirmed established principles limiting judicial interference in arbitral awards, the applicability of the doctrine of severability, and the reasonableness requirement for interest awards under the Arbitration Act, 1940.

Show all summary ...

MR. JUSTICE S. RAVINDRA BHAT (OPEN COURT)

1. This is an appeal against the order of the learned Single Judge in CS(OS) No. 379A/2002 upholding the arbitral award dated 17.02.2000 and directing it to be made as rule of the Court.

2. The Appellant MMTC Ltd., (hereafter “MMTC”) is a public sector undertaking engaged, inter alia, in the import of urea. It entered into a contract with the Respondent (Alcari, SA (Switzerland), now Hinduja Bank (Switzerland) Ltd., hereafter “the Claimant”) for the supply of 15,000 MT of urea pursuant to a tender issued by it for the import of 4,00,000 MT.

3. MMTC formally accepted the Claimant's offer on 7th July, 1992, with the date of shipment under the contract being 10 July, 1992. Clause 26 of the contract provided as under:

“26, Sellers are to ensure that liberties, victories and other war built vessels are avoided for the shipment of the cargo. They should also not book vessels of more than 15 years age. In case of necessity of booking vessels older than 15 years the Sellers shall take the prior approval of the Buyers.”

4. Stating that it was pressed for time, the Claimant selected a vessel aged more than 15 years and approached MMTC for its approval on 10 July, 1992. On the same date, MMTC informed the Claimant that the Department of Fertilizers (“DoF”, the consignee) had not agreed to the nomination of the vessel. Claimant responded on the same date that since Mr. Jaiswal of MMTC “had expressed some difficulties in giving approval as the decision in such matters essentially lies with the Deptt. of Fertilizers”, the matter had been discussed with Mr. K. Parthsarathy, Deputy Commissioner of the DoF, who had indicated that the vessel would be acceptable if the Claimant could “give a letter undertaking responsibility for shortfall in discharge rate below 1250 MT per day” and that “in any case discharge rate should not fall below 500 MT per day.” The Claimant accordingly gave a written guarantee by a letter dated 10 July, 1992 that it would “assume any incidental costs that may arise as per our contract and tender conditions if the said discharge rate fell below 1250 MT/WWD” It also furnished a guarantee on 21st July, 1992 stating that the discharge rate would not fall below 600 MT/WWD per day. MMTC did not respond to either of these communications.

5. Further, on 21 July, the Claimant informed MMTC that the vessel had sailed from the load port with cargo on 18 July, 1992. MMTC responded by fax on the same date, reiterating that the vessel, being over 20 years of age, was not acceptable to the DoF in terms of clause 26 of the contract. The Claimant, by telex message on 21 July, 1992 informed MMTC that the vessel had already sailed on 17 July and it had proceeded in the belief that the vessel would be “accepted by the Department of Fertilizers if discharge rate guaranteed the cd\basis of minimum 600 MT/WWD” and that it accepted this condition despite its conviction that the vessel was capable of handling the contractual discharge rate.

6. An inter-departmental telex message dated 24 July, 1992 sent by Mr. Parthasarathy of DoF to Mr. N.K Kala of MMTC said, on the other hand, that “as per the guaranteed discharge rate of 600 MT/WWD agreed to by the suppliers”, the DoF “has no objection in fixation of this Vessel” subject to conditions, of which clause (d) said “the discharge rate should be 600 MT per day as agreed to by the suppliers” This message was not communicated to the Claimant.

7. The vessel achieved a discharge rate of 1168 MT/WWD, which was more than the contractual rate of 1000 MT/WWD, but incurred demurrage on account of rain and congestion at the port. The Claimant consequently made a demurrage claim of US$ 142,447.90, having calculated the discharge rate at the contractual rate of 1000 MT per day. MMTC disputed this, calculating demurrage at the rate of 600 MT per day, and paid US$ 75,625 accordingly. This led to a dispute over the balance amount of US$ 66,822.90.

8. The parties referred the dispute to arbitration under Clause 23 of the contract. The arbitrator decided in favour of the Claimant, holding that it was entitled to the balance demurrage amount of US$ 66,822.90 with interest at 18% per annum from one month after the date of receipt of the award till the date of payment. MMTC's counter claim of US $75,625 with interest, made on the ground that it had paid the amount “by mistake” and did not owe the Claimant demurrage in view of alleged breach of clause 26 of the contract made in the use of an overage vessel was dismissed.

9. The arbitrator found that use of the overaged vessel had been approved, subject to a condition, the exact term of which was at the centre of the controversy. The evidence put forth by the Claimant was both consistent and compelling, whereas MMTC's was riddled with internal contradictions. Thus the arbitrator ruled in favour of the Claimant's version that the acceptance was conditional on the guarantee of a minimum discharge rate of 600 MT/day. He found that MMTC, being an instrumentality of the state, was bound under Article 14 to impose a condition that was reasonable. Reducing the discharge rate to 600 MT/day could not be considered reasonable, but the condition was severable from approval granted, thus having no effect on its validity. Reduction of the rate for calculation of demurrage would have required an amendment in the contract with the written consent of both the Claimant and MMTC. There had been no such attempt.

10. The Claimant initially moved for execution under the new Arbitration and Conciliation Act, 1996. After notice was issued, the MMTC objected to maintainability of those proceedings, stating that the arbitration proceedings and award were not subject to the new Act, but were conducted and culminated under the Arbitration Act, 1940. The Claimant, therefore, filed an application before the learned Single Judge under Section 17 of the Arbitration Act, 1940 to treat the arbitral award as rule of the Court. MMTC challenged the maintainability of the suit under the Arbitration Act and also filed objections against the award in LA. 353/2003 in the same suit.

11. The learned Single Judge, by an order dated 16.03.2009, ruled on objections to the maintainability of the application by the claimant, against MMTC. In the impugned order, the learned Single Judge had noticed that an appeal (FAO (OS) 261/2009) was pending on the file of this Court, which had questioned the maintainability of proceedings preferred by the claimant to make the award a rule of Court, and held that the ruling on merits was without prejudice to MMTC's contentions in that appeal.

12. In the impugned judgment, before addressing the objections, the learned Single Judge first addressed the scope of interference by this Court with an arbitral award rendered under the Arbitration Act, 1940. The Court cited Arosan Enterprises Ltd. v. Union of India, (1999) 9 SCC 449:

“38. Be it noted that by reason of a long catena of cases, it is now a well-settled principle of law that reappraisal of evidence by the Court is not permissible and as a matter of fact exercise of power by the Court to reappraise the evidence is unknown to proceedings under section 30 of the Arbitration Act In the event of there being no reasons in the award, question of interference of the Court would not arise at all In the event however, there are reasons, the interference would still not be available within the jurisdiction of the Court unless of course, there exist a total perversity in the award or the judgment is based on a wrong proposition of law. In the event however two views are possible on a question of law as well, the Court would not be justified in interfering with the award

39. The common phraseology “error apparent on the face of the record” does not itself, however, mean and imply closer scrutiny of the merits of documents and materials on record The Court as a matter of fact, cannot substitute its evaluation and come to the conclusion that the arbitrator had acted contrary to the bargain between the parties. If the view of the arbitrator is a possible view the award or the reasoning contained therein cannot be examined…………………….”

13. The chief issue was whether MMTC imposed any condition when it was informed that the Claimant was shipping the consignment in a vessel of more than 15 years of age. He found that the only written communication in support of MMTCTs contention that it had granted approval subject to discharge rate being 600 MT per day was the inter-departmental telex message, which had never been communicated to the Claimant. The arbitrator had examined the other available evidence and found favour with the Claimant's assertion that MMTC seemed anxious to ensure the discharge rate did not fall below a minimum of 600 MT/WWD.

14. In view of the established principle that the arbitrator is the sole judge of quality as well as quantity of evidence and reappraisal of evidence is outside the scope of the Court's powers under Section 30 of the Act, the learned Single Judge accepted the arbitrator's finding. He held further that the discharge rate could not have been reduced from 1000 MT to 600 MT/WWD as clause 16 of the contract read “no variation or modification of the contract shall be made except by written amendment signed by parties.” Acceptance of the consignment without demur additionally estopped MMTC from alleging breach of clause 26 of the contract.

15. Lastly, he found that in a commercial contract where the contracting parties are business persons the question of application of Article 14 would not arise. Even so, the award could not be set aside because of erroneous application of the provision as this was one of several reasons given by the arbitrator to decide the matter against MMTC.

16. By the impugned judgment and order, the learned Single Judge allowed the Claimant's application and dismissed objections raised by MMTC. The latter has consequently appealed.

17. It is first contended by MMTC - and urged by its Senior Counsel, Mr. J.P Sengh - that the maintainability of the proceedings under Section 17 of the Act had been ruled against the Claimant in the previous order of the learned Single Judge. Counsel submitted that though FAO (OS) 261/2009 has since been decided and MMTC's appeal against the order on maintainability decided, nevertheless on 15.05.2013, the jurisdiction of the Court to rule upon an application to make the award a rule of Court under Section 17 of the Act, in the absence of the original award and the proceedings conducted by the arbitral body, i.e the International Chamber of Commerce, has not been finally decided. It was submitted that in the absence of the record or the award, which was not filed either by the Arbitrator or anyone authorized by him, the Court could not have proceeded to affirm it and direct a decree to be drawn. Characterizing the impugned judgment as being of questionable legality, since it was premised on a document which could not have been the valid basis for an Indian Court to take cognizance of the award, counsel underlined that the entire proceedings leading to the direction to make the award a rule of Court, was without sanction and jurisdiction. It was repeated here that the judgment of this Court in FAO (OS) 261/2009 did not deal with this aspect at all. Learned senior counsel submitted that even the order impugned in that case had acknowledged that the award had not been filed in accordance with Section 14 of the Act.

18. On the merits, it was argued that there was no prior approval, and if any, it was given by the DoF which was not a party to the suit. Thus the claimant had breached Clause 26, absolving MMTC of the liability to pay demurrage. It was submitted that the MMTC had clearly expressed its reservations and communicated it to the claimant, which nevertheless proceeded to charter an overaged vessel. The consequent demurrage liability, therefore, could not be fastened upon the MMTC. It was emphasized that the DoF could not have any say in the matter and the claimant was not privy to the contract with it in order to claim that its approval or say in the matter had any bearing on the issue. The liability visualized was that of MMTC, and the conditions governing it were clearly spelt-out in the contract, to which the DoF was not a party. Consequently, the claimant could not have relied on the correspondence between MMTC and DoF, and the award, to that extent, was unsustainable. Thus, the learned Single Judge fell into error in rendering the finding that there was nothing wrong in the Claimant proceeding ahead without the approval, despite its being an integral condition of the contract. In so holding, the arbitrator fell into error, and acted contrary to the terms of the contract. Learned senior counsel further argued that the arbitrator failed to see that the question of capacity of the vessel and the tonnage it could discharge had a very material bearing on the terms of the contract, because had the claimant adhered to the quantum, the time for discharge would have been more and consequently there could have been no liability.

19. On behalf of the claimant, it was argued that the decision in the other appeal concluded the question of maintainability. Stressing that the MMTC could not urge the ground once over, it was argued that the mistake in first filing the petition under the new Act resulted in loss of considerable time. Consequently, when the claimant approached the ICC arbitral chamber, under whose aegis the arbitration proceedings took place, the records were unavailable. It was further argued that there was no dispute with respect to the matters considered by the arbitrator, or the facts and documents. Nor did MMTC demonstrate what prejudice was caused to it, by the claimant relying on the copy of the award and the proceedings. In these circumstances, the justice of the case would suffer, on an over-insistence of the original documents and award.

20. It was argued that the MMTC cannot submit that the permission under clause 26 was not forthcoming. Here, counsel relied on the findings of the arbitrator and submitted that there was no question of approval not having been obtained, in the facts of this case. It was argued that when the claimant approached the MMTC for approval, prior to the sailing of the vessel, the indication given to it was that the DoF had final say in the matter. Now, the MMTC cannot contend that its approval was necessary, regardless of whether DoF approval had been granted. It was also argued that the question of discharge rate of the vessel had to be seen from the perspective of the MMTC's requirement that it should not be below 600 TPD.

21. The first question at the threshold of this dispute, which this Court has to address, is whether the MMTC is correct in contending that the Single Judge should not have entertained the matter, given that the original records were not filed by the arbitrator. As far as the other aspect, i.e the question of limitation goes, this Court finds that the matter stands concluded against the MMTC in FAO (OS) 261/2009 and MMTC's appeal against the order on maintainability decided against it on 15.05.2013

22. MMTC's argument regarding lack of jurisdiction because the Court did not have the benefit of the original arbitral record, in our opinion, is without merit. Whilst ordinarily the objections to awards have to be adjudicated in the context of notices issued under Section 14 in the course of which the Court is expected to receive the original arbitration records, we notice here that there is in fact no dispute about what transpired during the arbitration proceedings or its outcome. As observed in the judgment in FAO(OS) 261/2009, the successful claimant had filed the award mistakenly under the Arbitration and Conciliation Act. Long after it was entertained, MMTC objected, stating that the proceedings ought to be under the old Act, necessitating withdrawal of those proceedings. The Claimant submits that its attempts to secure the original record from the arbitral institution, i.e the ICC were unsuccessful, since records are kept only for a limited period of time. MMTC does not dispute the accuracy of contents of the award, a copy of which was produced by the claimant before the Single Judge. MMTC had been heard on the question of limitation (in approaching the Court, for a rule on the basis of the award) and its contentions overruled, and the matter concluded in FAO(OS) 261/2009. In these circumstances, the attempt at having the issue resuscitated through a ‘side-wind’ as it were, cannot be countenanced. The objection thus articulated is, therefore, rejected.

23. On the merits, the arbitrator found in that there was no question that approval had been granted by the DoF. He did not directly address the issue of approval being invalid because DoF was not a party to the proceedings. As to whether or not approval was granted, and by whom, these are questions of fact that this Court cannot re-examine. We can only note that in terms of the arbitrator's assessment of the facts, MMTC itself indicated inability to grant approval to the overaged vessel, thus necessitating direct interaction between DoF and the Claimant. MMTC could not deny ability to give final approval to the vessel on the one hand, and try to avoid liability to pay demurrage on account of approval having come from DoF on the other.

24. The next question relates to the discharge rate. Here, the findings of the arbitrator and the learned Single Judge were that there was no breach of contract by the Claimant in using a vessel with a draft that was more than 600 TPD. Apart from the fact that these findings were within the exclusive domain of the arbitrator and given the limited jurisdiction under Sections 30 and 34 of the Act, the Court is also unable to appreciate how the condition regarding draft was violated. The inter-departmental telex message dated 24 July, 1992 sent by Mr. Parthasarathy of DoF to Mr. N.K Kala of MMTC stated that “as per the guaranteed discharge rate of 600 MT/WWD agreed to by the suppliers”, the DoF “has no objection in fixation of this Vessel” subject to conditions, of which clause (d) said “the discharge rate should be 600 MT per day as agreed to by the suppliers” As a matter of fact, the draft achieved after the vessel berthed at the port was over 1168 TCD. Demurrage became payable, however, on account of port congestion. The liability was thus attributable to other reasons. The findings of the arbitrator cannot be termed as so unreasonable or unsupported by the facts as to warrant interference by the Court under the old Act. The judgment of the Single Judge, therefore, is sound and consequently is affirmed.

25. The third issue concerns the question of severability. The doctrine of severability could not have been applied to save the award, which deserved to be set aside in entirety, because Art. 14 had no application to commercial transactions. In R.S Jiwani v. Ircon International Ltd A Govt, of India, 2010 (1) Bom CR 529, the Division bench found that the doctrine of severability did indeed apply to arbitral awards. The test for its application was, simply enough, whether the relevant part of the award was severable. The Court noted:

“20. The cases would be different where it is not possible or permissible to sever the award In other words, where the bad part of the award was intermingled and interdependent upon the good part of the award there it is practically not possible to sever the award as the illegality may affect the award as a whole. In such cases, it may not be possible to set aside the award partially. However, there appears to be no bar in law in applying the doctrine of severability to the awards which are severable…………………………….”

26. In relation to section 30 of the 1940 act, the law has clearly been stated by the Supreme Court in the case of J.C Budhraja v. Chairman, Orissa Mining Corporation Ltd, (2008) 2 SCC 444, where while dealing with the award, when the Court found that part of the arbitral award was vitiated while the other could be upheld, it held as under:

“26. Does it mean that the entire award should be set aside? The answer is no. That part of the award which is valid and separable can be upheld”

27. Thus, the doctrine of severability is applicable in the case of arbitral awards. The question is whether the part of the award applying the reasonability test under Art. 14 to the condition urged by MMTC is inextricable from the rest of the award or whether it can be separated and set aside. As the learned Single Judge pointed out, this was only one of the reasons given by the arbitrator for deciding in favour of the Claimant's version. The setting aside of this part of the award arguendo would have no effect on the arbitrator's finding that the evidence in favour of the condition being a minimum of 600 MT/day was more compelling. The doctrine of severability was, therefore, correctly applied by the learned Single Judge to the arbitral award.

28. The rate of interest prescribed by the arbitrator was exorbitant. Unlike Section 31(7)(b) of the 1996 Act which prescribes a future interest rate of 18% in the absence of a direction in the award, section 29 of the 1940 act says only that interest prescribed must be at a reasonable rate. The power of the arbitrator to award future interest under the 1940 Act is not in question, as held by the Supreme Court in Hindustan Construction Co. Ltd. v. State Of Jammu & Kashmir., AIR 1992 SC 2192. As to what interest rate is reasonable, a cue can be taken from rates prevalent in the market, as done by the learned Single Judge in State Trading Corporation v. Irano Hind Shipping Company, OMP 396/2003, (decision dated 27.4.2010):

“that the rate of interest awarded by the Arbitral Tribunal is excessive especially keeping in view the fact that the Award is in foreign currency and the rate of interest prevalent in the international markets is extremely low. Even, the Supreme Court in recent judgments has reduced the rate of interest awarded by the Arbitrators on the ground that after economic refomis the interest regime in the country has changed and that rates have substantially reduced

14. Consequently, keeping in view the rates of the interest which have been prevalent in the international market for the last few years, I reduce the rate of interest on the awarded sum to a uniform rate of 6% per annum simple interest from the date of Award i.e 15 January, 2003 till the date of payment”

29. Having addressed the relevant grounds of appeal and thoroughly perused the record, this Court is satisfied that the reasoning and consequent findings of the arbitrator are sound and do not disclose any fundamental or manifest error of the magnitude warranting interference under Section 39 of the Arbitration Act, 1940.

30. For the foregoing reasons, the appeal must fail. The impugned judgment and order of the learned Single Judge is hereby upheld, thus upholding the arbitrator's award. There shall be no order as to costs.