Brig. Gurdip Singh Uban & Ors. Petitioners v. Union Of India & Ors. S
Structured Summary of the Opinion (Mahinder Narain, J.)
Factual and Procedural Background
The petitioners — Gurdip Singh, Mrs. Har Sharan Mishra and Mrs. Har Kiran — filed a writ petition under Article 226 of the Constitution on 23-4-1986 seeking quashing of acquisition notifications issued under the Land Acquisition Act (Sections 4 and 6). The Section 4 notification impugned was dated 25-11-1980 and the Section 6 declaration impugned was dated 7-6-1985. The land in question is situated in village Chhatarpur (Union Territory of Delhi) and includes specific khasra numbers identified in the petition.
The petitioners asserted ownership and possession, tracing title back to land allotted to Major General Sujan Singh Uban by Sanad dated 27-9-1963, and that the petitioners derived their title by an arbitration award in favour of Shri Ram Singh Uban. The petitioners did not file objections under Section 5A of the Act. They challenged the validity of the Section 6 declaration as being out of time (issued long after the statutory period), and contended that the Section 4 notification of 25-11-1980 therefore stood released from operation.
Procedurally, the opinion describes related litigation including a Full Bench decision in Balak Ram Gupta v. Union of India (AIR 1987 (1) Delhi 239) and subsequent Division Bench decisions of the Delhi High Court quashing acquisition proceedings with respect to multiple villages. The petition before Mahinder Narain, J. relied on these authorities and on a Supreme Court approval referred to later in the opinion.
Legal Issues Presented
- Whether the notifications under Section 4 (dated 25-11-1980) and Section 6 (dated 7-6-1985) of the Land Acquisition Act, insofar as they relate to the petitioners' land in village Chhatarpur, are invalid and liable to be quashed.
- Whether a declaration under Section 6 issued after the statutory period (as contended by the petitioners) renders the Section 4 notification a nullity and releases the affected land from acquisition.
- Whether the quashing of notifications under Sections 4 and 6 — in cases of large‑scale acquisition — benefits only the parties before the Court or enures for the benefit of all persons affected by the notifications (i.e., whether such quashing is in personam or has wider application).
- What is the legal effect, if any, of the petitioners not having filed objections under Section 5A of the Act on their entitlement to relief when the notification itself is quashed.
Arguments of the Parties
Petitioners' Arguments
- The Section 6 declaration was issued beyond the statutory period (the petitioners rely on a limitation period of three years as stated in the Act prior to subsequent amendment), and specifically was issued after five years and eight months; therefore the Section 4 notification of 25-11-1980 was a nullity and the land stood released from acquisition.
- Although objections under Section 5A had been invited, the petitioners had not filed such objections; they nevertheless sought quashing of the Section 4 and Section 6 notifications on the grounds of invalidity and procedural breach.
- The petitioners relied on the Full Bench decision in Balak Ram Gupta v. Union of India (AIR 1987 (1) Delhi 239) and subsequent Division Bench decisions (and on a subsequent Supreme Court approval in the DDA v. Sudan Singh matter) to contend that quashing of large-scale acquisition notifications enures for the benefit of all affected persons, not merely those who were parties to the earlier litigation.
Respondent's Arguments
- Learned counsel for the Union (Ms. Geeta Luthra) contended that because the petitioners had not filed objections under Section 5A of the Act, they were not entitled to the benefit of quashing of the Section 4 notification in respect of their land.
- The respondents relied on a number of precedents (mentioned in the opinion) said to support a narrower or personal effect of orders — arguing that some authorities show that relief may be confined to parties who participated in the relevant proceedings or who filed objections.
- The respondents also contended that stays obtained in earlier writs (for example, in Munilal & Others v. Lt. Governor of Delhi & Others) entitled the government to treat elapsed time as excused so that the Section 6 declaration was within time.
Table of Precedents Cited
| Precedent | Rule or Principle Cited For | Application by the Court |
|---|---|---|
| Balak Ram Gupta v. Union of India, Full Bench, AIR 1987 (1) Delhi 239 | Where large scale acquisition is undertaken as an integrated scheme, quashing of Section 4 notifications can enure for the benefit of all affected persons; litigation of this nature is public interest in character and not merely inter-partes. | The Court relied on and applied the Full Bench's reasoning as directly applicable to the instant case; the Full Bench decision was a central authority supporting petitioners' entitlement to relief despite non-filing of Section 5A objections. |
| DDA v. Sudan Singh & others (referred as 45 (1991) DLT 602 (SC) in the opinion) | Supreme Court approval (seal of approval) of the High Court Full Bench approach (reference in para 4 of that Supreme Court judgment) including quashing of notifications for multiple villages. | The Court treated the Supreme Court's approval as reinforcing applicability of the Full Bench decision to the instant case. |
| Sheonov v. Commercial Tax Officer, AIR 1985 SC 621 | Example cited to show that quashing part of an integrated scheme may vitiate the whole scheme. | Cited by the Full Bench (repeated in this opinion) as supporting the proposition that partial stays/quashings can frustrate an integrated acquisition scheme. |
| Gauraya v. Thakur, AIR 1986 SC 1440 | Another authority illustrating the consequences of quashing parts of an integrated acquisition scheme. | Referred to by the Full Bench and in this opinion to support the public‑interest and scheme‑wide effect of quashing notifications. |
| C.L. Goel v. Union of India (CWP No. 2838 of 1985) (Division Bench) | A Division Bench quashed acquisition proceedings in respect of the same notifications as in the instant writ petitions. | The Division Bench's decision (relying on the Full Bench) was followed and the Court noted that similar petitions had been allowed despite the petitioners not having filed Section 5A objections. |
| Deepak Vaid v. Union of India (CWP No. 2781 of 1985) (Division Bench) | Division Bench decision allowing challenge to same acquisition notifications. | Noted as another writ allowed by a Division Bench on similar grounds; used to show consistent application of Full Bench view. |
| Shyam Nandan Prasad and Others v. State of Bihar and Others, (1993) 4 SCC 255 | Case remanded for fresh hearing regarding Section 5A objections (High Court had directed remand); related to procedural requirement of hearing under Section 5A. | The Court distinguished this case, noting it did not involve quashing of Section 4 notifications and therefore was not applicable to the instant facts. |
| Ashwani Kumar Dhingra v. State of Punjab, AIR 1992 SC 974 | Denial of benefits to a non-party where the High Court's decision had been based on a concession made in Court in favour of co-owners. | The Court distinguished the case on its facts — emphasising that in Ashwani Kumar Dhingra a specific concession confined relief, whereas no such concession existed in Balak Ram Gupta's case. |
| Chhota & Ors. v. Union of India, 48 (1992) DLT 98 (DB) | Division Bench observations contrary to the Full Bench regarding the public nature of challenges to Section 4 notifications; the opinion suggests those observations did not notice the Full Bench. | The Court considered that the later Division Bench judgment had not noticed the Full Bench decision and treated such contrary observations as possibly per incuriam and not applicable over the Full Bench authority. |
| Abdul Samad & another v. The Municipal Corporation of the City of Ahmedabad and another (Farid Ahmed), AIR 1976 SC 2095 | Observation that hearing of objections under Section 5A is a personal hearing in isolation (as cited by respondents). | The Court held that the observation was taken out of context and did not undermine the Full Bench's broader view regarding large-scale acquisitions. |
| State of Tamil Nadu v. I. Krishnan, AIR 1996 SC 497 | Authority discussing laches/delay where petitioners failed to act soon after Section 6 declaration; the Supreme Court held delay could be fatal. | The Court distinguished this authority: it involved delay (laches) rather than a contention that non-filing of Section 5A objections alone was fatal; thus it did not help the respondents. |
| State of Haryana & others v. Sukhdev & others, 1995 (8) Supp (1) SCC 34 | Decision cited by respondents; the opinion states it does not lay down that quashing of Section 4/6 notifications must be personal. | The Court held this case did not support the respondent's proposition and was not helpful to them. |
| Munshi Singh and others v. Union of India, AIR 1973 SC 1150 | Respondents relied on wording that could be read to confine quashed acquisition proceedings to parties before the Court. | The Court rejected the proposition that Munshi Singh laid down a general rule that quashing notifications in large-scale acquisitions would remain operative against non-parties. |
| Rambhai Lakhabai Bhakt v. State of Gujarat and others, (1995) 3 SCC 752 | Where a person chose not to appear in person (or through counsel) and sent objections by post, the Court declined to find fault with the Land Acquisition Officer for not giving personal hearing. | The Court noted the case did not assist the respondent because its facts and ratio were not analogous to the present controversy. |
| Munilal & Others v. Lt. Governor of Delhi & Others (CWP No. 426 of 1981) | Referenced for the fact that a Division Bench had issued a stay restraining respondents from issuing any declaration under Section 6, and respondents relied on such stay to argue time taken could be allowed. | The opinion records the respondents' contention based on this stay but treats it as background to the petitioners' challenge; the Court did not accept the respondents' broader submission based on non-filing of Section 5A. |
| Indian Express Newspapers (Bombay) Pvt. Ltd. & others v. Union of India & others, (1985) I SCC 641 | Authority cited to the proposition that notifications are to be treated as "law" under Article 13(3)(a) of the Constitution. | The Court relied on this principle to support the view that quashing of a notification (which is treated as law) enures for the benefit of all persons likely to be affected by that notification. |
Court's Reasoning and Analysis
The Court's reasoning proceeds by reference to precedent and by distinguishing authorities relied upon by the respondents. The essential analytical steps set out in the opinion are:
- The Court accepted the Full Bench's analysis in Balak Ram Gupta v. Union of India (AIR 1987 (1) Delhi 239). The Full Bench's reasoning — reproduced in the opinion — emphasises two connected considerations: (a) the practical nature of large-scale, integrated acquisition schemes which makes partial implementation impracticable and (b) the public-interest character of writ petitions challenging Section 4 notifications, such that locus standi is diluted and the litigation often raises grounds common to many landowners. The Full Bench concluded that quashing parts of an integrated notification is generally effective for the whole scheme.
- The Court applied the Full Bench's reasoning to the present facts: the acquisition at issue formed part of a large-scale, integrated acquisition scheme and therefore the quashing of the impugned notifications could not be confined only to parties who filed Section 5A objections or who were before an earlier Court.
- The Court reviewed and addressed authorities cited by the respondents. For each cited precedent the court either distinguished the facts or explained why the precedent did not support the narrow rule for which respondents contended:
- Shyam Nandan Prasad was distinguished because it involved remand for Section 5A hearings rather than quashing of Section 4 notifications.
- Ashwani Kumar Dhingra was distinguished on the basis that the High Court decision there rested on a concession made in court, which is absent in Balak Ram Gupta's case.
- Some Division Bench decisions (e.g., Chhota & Ors.) were noted as not having considered the Full Bench and thus could not override the Full Bench's reasoning.
- Farid Ahmed/Abdul Samad's observation about the personal nature of a Section 5A hearing was said to be taken out of context and not relevant to the Full Bench principle in large-scale acquisitions.
- State of Tamil Nadu v. I. Krishnan was recognised as dealing with delay/laches; the Court observed that the Supreme Court there condemned delay, but that the case did not stand for the proposition that non-filing of Section 5A per se is fatal.
- Other cited cases (State of Haryana v. Sukhdev; Munshi Singh; Rambhai Lakhabai Bhakt) were similarly considered and found not to support the respondents' contention that quashing of large-scale acquisition notifications must be limited to the parties who litigated earlier.
- The Court also placed weight on the fact that the Supreme Court had, in the cited DDA v. Sudan Singh matter, given approval to the Full Bench's approach. Further, the opinion relied on Indian Express (1985 I SCC 641) for the proposition that notifications are "law" within the meaning of Article 13(3)(a), so that when such a notification (i.e., law) is quashed it enures for the benefit of all persons likely to be affected.
- Having considered the authorities and the factual matrix (including the timing of the Section 6 declaration and the nature of the acquisition scheme), the Court concluded that the petitioners were entitled to relief despite their not having filed Section 5A objections, and that the precedent and principles relied upon by petitioners applied to their case.
Holding and Implications
Holding: Writ petition allowed; rule made absolute. The Court allowed the petition and awarded costs to the petitioners. The short concluding statement in the opinion reads: "For the aforesaid reasons, the writ petition succeeds, and rule is made absolute."
Implications: The direct effect of the Court's decision in this matter is that the petitioners obtain the relief they sought (quashing of the challenged acquisition notifications as they apply to the petitioners' land) and are awarded their costs. The opinion applies and relies upon existing High Court Full Bench authority (Balak Ram Gupta) — which the Court notes has received approbation in subsequent higher authority — and distinguishes other cases cited by the respondents. The opinion does not purport to announce a novel legal principle beyond applying the Full Bench and related authorities; rather it enforces the existing line of authority that, in cases of large-scale integrated acquisitions, quashing of notifications may enure for the benefit of all persons affected by those notifications.
Disposition: Petition Allowed. Petitioners awarded costs.
This summary is restricted to and derived exclusively from the content of the provided opinion. No information has been added beyond what is contained in the opinion.
Mahinder Narain, J.:— The petitioners Gurdip Singh, Mrs. Har Sharan Mishra and Mrs. Har Kiran have filed this writ petition under Article 226 of the Constitution on 23-4-1986, praying that the notifications for acquisition issued for planned development of Delhi under Sections 4 and 6 of the Land Acquisition Act (hereinafter called as “the Act”), being dated 25-11-1980 and 7-6-1985 respectively, in relation to the land of the petitioners in village Chhatarpur in the Union Territory of Delhi, be quashed.
2. The petitioners asserted that they are the owners and in possession of land in khasra No. 704/1, 706/2, 706/1, 706/3, 707/2, 714, 715/2, 909/2, 10/2 and 693, all situated in the revenge estate of village, Chhatarpur in the Union Territory of Delhi. It was also asserted that the aforesaid lands are allotted to Major General Sujan Singh Uban in lieu of agriculture lands left behind in West Pakistan. It was further asserted that this land was allotted to Major General Sujan Singh Uban by Sanad dated 27-9-1963. The petitioners became owners of the land as a result of an arbitration award of Shri Ram Singh Uban.
3. The aforesaid notification, under Section 4 of the Act, dated 25-11-1980 purported to exclude certain categories of land from acquisition although they were within the villages land whereof was acquired. These were: (a) Government lands; (b) Land already notified either under Section 4 or under Section 6 of the Land Acquisition Act, 1894; and (c) the land in respect of which layout plans building plans had been sanctioned by the M.C.D before 5-11-1980.
4. The petitioners also stated that although objections under Section 5A of the Act were invited, but they had not filed any objections under Section 5A of the Act.
5. It was also contended that in view of the provisions of Section 6 of the Act, no declaration could be made after expiry of three years from the date of publication of the notification under Section 4 of the Act, (this period has since been reduced to one year by subsequent amendments).
6. The petitioners further contended that in view of the fact that the declaration under Section 6 of the Act was issued after five years and eight months, the issuance of the notification under Section 4 of the Act on 25-11-1980 was nullity in the eyes of law in view of the aforesaid amended Section 6 of the Act, and as a consequence of Section 6 notification being a nullity, and as the declaration under Section 6 of the Act was not issued within a period stipulated by that Section, the land of the petitioners covered by the Section 4(1) Notification, dated 25-11-1980, stood automatically released from the operation of Section 4 Notification.
7. The petitioners also contended that they were filing this petition on becoming aware that the respondents were contending that the notification under Section 6 of the Act was valid, inasmuch as a stay order had been issued by a Division Bench of the Delhi High Court, restraining the respondents from issuing any declaration under Section 6 of the Act, in Civil Writ Petition No. 426 of 1981 Munilal & Others v. Lt. Governor of Delhi & Others, allowing time taken to get it vacated, the Section 6 Notification was within time.
8. The petitioners further stated that they became aware of difference of opinion between Division Benches of the High Court in Civil Writ Petition No. 2850 of 1985, filed by Hemant Sharma and others, and in Civil Writ Petition. No. 1639 of 1985—Balak Ram Gupta… v. Union Of India….., which difference of opinion led to directions by the Court that Balak Ram Gupta's case be heard by a larger Bench, which larger bench was yet to hear the said reference.
9. In the aforesaid circumstances, it is clear that the petitioners in, their own right, had questioned the Sections 4 and 6 Notifications during the pendency of Civil Writ Petition No. 1639 of 1985 (Balak Ram Gupta… v. Union Of India…..).
10. The Full Bench of the Delhi High Court decided the Civil Writ Petition No. 1639 of 1985 by its judgment and order dated 25-7-1987. This was reported as AIR 1987(1) Delhi 239. Ranganathan, J. speaking for the Full Bench, observed as follows as regards the meaning of Section 6 of the Act.
We, therefore, think that, in proceeding to interpret the scope of the explanation, we should keep in mind the nature of the proceedings under the Land Acquisition Act and the nature of the proceedings in which stay orders are obtained. So far as the first of these expects is concerned, while it is possible for the Government to issue notifications under S. 4 in respect of each plot of land sought to be acquired. It is not feasible or practicable to do so, particularly in the context of the purpose of many of the acquisitions at the present day. It is common knowledge that in Delhi, as well as many other capital cities, vast extents are being acquired for planned development or public projects. The acquisition as generally part of an integrated scheme, or plan and though, technically speaking, there can be no objection to individual plots being processed under Ss. 5A. 6, 9, 12, etc., particularly after the amendment of 1967, the purpose of acquisition demands that at least substantial blocks of land should be dealt with together at least up to the stage of the declaration under S.6 To give an example, if a large extent of land is to be acquired for the excavation of a canal, the scheme itself cannot be put into operation unless the whole land can be eventually made available. If even one of the land owners anywhere along the line applies to Court and gets a stay of the operation of the notification under S.4, in practical terms, the whole scheme of acquisition will fall through, it is of no consolation to say that there was no stay regarding other lands covered by the scheme. To compel the Government to proceed against the other lands (by refusing the benefit of the explanation in such a case on the ground that there is no stay order in respect thereof) would only result in waste of public expenditure and energy. If, ultimately, the single owner succeeds in establishing a vitiating element in the S.4 notification and in getting it quashed by the Supreme Court, the whole proceeding of acquisition will fail and the Government will have to retrace the steps they may have taken in respect of other lands (see Sheonov v. Commercial Tax Officer, AIR 1985 SC 621, and Gauraya v. Thakur. AIR 1986 SC 1440). Assuming that where such final order is by a High Court the position is not free from difficulty, the debate as to whether, in law, the quashing of the order enures only to the benefit of the party who filed the writ petition and obtained the order is futile, for the moment the Government seeks to enforce the acquisition against the others, they would come up with similar petitions which cannot but be allowed. In other words, in many of the present day notifications, the acquisition scheme is an integral one and the stay or quashing of any part thereof is a stay or quashing of the whole. This aspect should not be lost sight of.
Secondly, the nature of proceedings in which stay orders are obtained are also very different from the old pattern of suits confined to parties in their scope and effect. Section 4 notifications are challenged in writ petitions and it is now settled law that in this type of proceeding the principle of locus standi stands considerably diluted. Any public spirited person can challenge the validity of proceeding of acquisition on general grounds and when he does this the litigation is not inter parties simpliciter it is a public interest litigation which affects wider interests. The grounds of challenge to the notification may be nothing personal to the particular landholder but are, more often than not, grounds, common to all or substantial blocks of the land owners. In fact, this group, of petitions now listed before us raise practically the same contentions just as the previous batch of writ petitions challenging the notifications under S.4 raised certain common contentions. To accept the contention that the challenges and interim orders in such petitions should be confined to the particular petitioners and their lands would virtually provide persons with common interests with a second innings. If the initial challenge succeeds, all of them benefit; and, for some reason that falls and the second challenge succeeds on a ground like the one presently raised, the first batch of petitioners also get indirectly benefited because of the impossibility of partial implementation of the scheme for which the acquisition is intended.
(Emphasis added)
11. From what is stated in para 27, it is clear that the Full Bench has held that the contention that an order quashing Sections 4 and 6 notifications shall ensure only for the benefit of the person who had filed the writ petition, is futile contention, and that litigation of this nature is not inter-party simpliciter it is a public interest litigation which affects wider interest. Thereafter the Full Bench directed that the matter be laid before the appropriate Division Bench for disposal.
12. The Division Bench of this Court by its order dated 18-11-1988 observed. “A careless and mindless exercise of powers by Land Acquisition Collectors and the Administrator in these cases had left us with no option, but to quash all land acquisition proceedings in regard to eleven villages. It is to be noted that the proceedings of acquisition of land in 11 villages, land of which villages was sought to be acquired by the notifications in question in the instant writ, as also the notification which was in question in Balak Ram Gupta's case, were the same.
13. The Division Bench in Civil Writ Petition No. 2838 of 1985 (C.L Goel v. Union of India), Civil Writ Petition No. 2781 of 1985 (Deepak Vaid v. Union of India), and Civil Writ Petition No. 1444 of 1986, allowed the aforesaid three writ petitions, questioning the acquisition of land under the notifications for acquisition of land which were the same notifications as the notification in this case, despite the fact that in those two petitions Section 5A objections had not been filed by the petitioners. The Division Bench while disposing of the aforesaid writ petitions, relied upon its own judgment in Civil Writ Petition No. 1639 of 1985, decided on 18-11-1988. Counsel for the petitioners, therefore, contends that in view of the judgment of this Court (Full Bench in Balak Ram Gupta v. Union of India, the judgment of Division Bench in Balak Ram Gupta v. Union of India, reported as 37(2), (1989) DLT 150, and the judgments of this Court in Civil Writ Petitions No. 2838 of 1985, 2781 of 1985 and 1444 of 1986 this petition questioning the notifications under Sections 4 and 6 of the Act which was questioned in Balak Ram Gupta's case and the other three cases, mentioned above, be also allowed.
14. Ms. Geeta Luthra, learned counsel for Union, of India, despite the Full Bench judgment of this Court in AIR 1987 Delhi 239, to the effect that when large scale of acquisition of land is undertaken, it cannot be said that the quashing of the notification under Section 4 of the Act which initiates the process of acquisition of a large scale of land, shall ensure for the benefit of a particular case in which that notification is quashed, and despite the three writ petitions decided by the Division Bench of this Court, being Civil Writ Petitions No. 2838 of 1985, 2781 of 1985 and 1444 of 1986, has asserted that inasmuch as Section 5A objections had not been filed by the petitioners, they are not entitled to the benefit of quashing of Section 4 notification with respect to their land.
15. We are not at all able to appreciate such a contention in face of the aforesaid authorities.
16. Learned counsel asserts that she is supported by some judgments of Courts. We have examined the judgments which she has referred to.
17. The case reported as (1993) 4 SCC 255(3), (Shyam Nandan Prasad and Others v. State of Bihar and Others), was a case which did not quash Section 4 proceedings under the Act. The High Court had directed remand of the case for a fresh hearing regarding Section 5A objections. The judgment of the Supreme Court was also to the same effect. Being a case of remand for hearing under Section 5A, such a case has no application, to a case where notification under Section 4 of the Act has been quashed, and we do not think it helps the counsel for the respondent at all.
18. Another case which has been relied upon by counsel for the respondent is AIR 1992 SC 974(4) (Ashwani Kumar Dhingra v. State Of Punjab)(4). The learned counsel for the respondent has built up her arguments on the basis of the observations made in this judgment, which have no application to the facts and circumstances of the instant case. In that case one of the persons who was not party to an action, sought the same benefits regarding compensation which had been allowed to his co-owners. The Supreme Court had denied that on the basis of the facts of that case. The important fact in that case was that in the High Court itself the Senior Advocates of the co-owners had made a concession that the orders regarding the case be specifically confined only to the co-owners before the Court. In view, of the fact that the High Court decided the case of the co-owners on the basis of the concession of their counsel, such a case based upon concession, cannot be a precedent for the proposition which is sought to be advanced in the case before us. There is no such concession by any counsel in the Balak Ram Gupta's case.
19. The concession which was made in Balak Ram Gupta's case by the counsel for the respondent, was to the effect that after perusal of the entire record of the case regarding the hearing of Section 5A objections, he was not in a position to support the proposition that a hearing had been granted to each of the petitioners as required by law, contained in Section 5A of the Act. A concession such as the one which was made in Balak Ram Gupta's case, made on the basis of official record, cannot be regarded as a concession, which would not create a precedent inasmuch as in Balak Ram Gupta's case hundreds of files of acquisition, and hundreds of objections were required to be dealt with, could not possibly have been dealt with in the manner the respondent alleged that they had dealt with. The whole acquisition, proceedings had to be quashed because of breach of statutory provisions regarding acquisition of land. That acquisition could not have been according to the authority of law, as contemplated by Article 300A of the Constitution.
20. The next case relied upon by the counsel for the respondent is a judgment of this Court (DB), reported as 48 (1992). The Delhi Law Times 98 (DB) (Chhota & Ors. v. Union of India) (5). We have perused this judgment, and we find that this judgment is dated 28-5-1992, whereas the judgment of the Full Bench in Balak Ram Gupta's case AIR 1987 Delhi 239 (FB) is dated 27-5-1987. The later judgment reported in the Delhi Law Times has not noticed the judgment by the Full Bench in Balak Ram Gupta's case, and has made some observations contrary thereto, relating to the public nature of the exercise in the matter of considering the validity of notifications under Sections 4 and 6 of the Act. In connection with large scale acquisition of land, and to the extent of inconsistently “per incuriam”. Also the Division Bench of this Court did not notice that the judgment of the Supreme Court in the case Ashwani Kumar Dhingra v. State Of Punjab alone and could not have laid down the proposition of general and universal application..
21. The next case which is relied upon by Ms. Geeta Luthra, learned counsel for the respondent, is the judgment reported as AIR 1976 SC 2095, (Farid Ahmed (6) Abdul Samad and another v. The Municipal Corporation of the City of Ahmedabad and another), when she has picked up an observation of the Supreme Court to the effect that hearing to the objections under Section 5A of the Act to be granted under the Act, is a personal hearing in isolation. This observation torn out of the context, cannot lead to the inference that the judgment of the Full Bench in Balak Ram Gupta's case, and the judgment of the Division Bench in Balak Ram Gupta's case, was not of universal application to all lands which were covered by the notifications, and large scale acquisition proceedings which were quashed in Balak Ram Gupta cases.
22. Another case which has been cited before us, is AIR 1996 Supreme Court 497 (State of Tamil Nadu and (7) others v. I. Krishnan and others), at page 507, wherein para 40 it is stated by the Supreme Court that, the petitioners in that case, not only did they fail to file objections under Section 5A of the Act, but they also failed to act soon after the declaration under Section 6 was made.
23. As stated above, declaration, under Section 6 was made in 1978, and the present writ petitions were filed sometime in the year 1982-83 when awards were about to be made. The Court held that laches of this kind are fatal. We do not see how this helps the respondents. The Supreme Court did not say that non-filing of Section 5A objections are fatal, but it stated that delay in filing the writ petition is fatal. This case does not help the respondent. We cannot attribute to the Supreme Court something which it did not decide.
24. The next case cited by the respondent is 1995 (8) Supp (1) Supreme Court SCC 34 (State of Haryana & others v. Sukhdev & others). This judgment nowhere states that quashing of notifications under Sections 4 and 6 of the Act are personal. We do not see how this judgment supports the proposition advanced by the respondent.
25. The next case cited by the respondent is AIR (9) 1973 Supreme Court 1150 (Munshi Singh and others v. Union of India), wherein the words used by the Supreme Court regarding quashing of the acquisition proceedings with regard to the land of the “appellant” therein, can be extended to imply that when large scale acquisition notifications under Sections 4 and 6 of the Act, are quashed, the notification survives, and continues to operate against those who were not before the Court. To our mind, no such law can be stated to have been laid by the Supreme Court in AIR 1973 Supreme Court 1150.
26. Ms. Geeta Luthra next cited the case reported as (1995) 3 SCC 752 (Rambhai Lakhabai (10) Bhakt v. State of Gujarat and others). This case does not help the respondent, inasmuch as in para 6 and 7 of the judgement, what the Supreme Court said was that a party who had chosen not to appear in person, or through pleader, but had already chosen to send the objections through post, cannot be heard to protest, if he is not heard in person and “no fault can be laid at the door of the Land Acquisition Officer for not given opportunity of hearing”. The implication to our mind, is that if a person chooses not to do a thing, and he cannot put blame on somebody else. This case does not help the respondent at all.
27. The petitioners have urged before us that the judgement in Balak Ram Gupta's case has received the seal of approval of the Supreme Court in 45 (1991) DLT (11) 602 (SC) (Delhi Development Authority v. Sudan Singh & others) in para 4, wherein the Supreme Court has also said that the notifications with respect not to 11 villages, but 12 villages have been quashed.
28. In the light of the specific seal of approval by the Supreme Court in the aforesaid judgment, it is difficult to see how the Full Bench judgement of the High Court in Balak Ram Gupta's case and Division Bench judgement in Balak Ram Gupta's case is not applicable to the instant case, particularly in view of the fact that “notification”, are specifically treated as “law”, as contemplated by Article 13(3) (a) of the Constitution of India. It has been so held in (1985) I Supreme Court (12) Cases 641. (Indian Express Newspapers (Bombay) Private Ltd. and others v. Union of India & others). The notifications being law, law having been quashed, and made nugatory it enures for the benefit of all persons who are likely to be affected by such law/notification.
Besides this, counsel for the petitioners have also pointed out a short order of this Court, passed in Civil Writ Petition No. 3291 of 1982, wherein a Division Bench (Mahinder Narain and Jaspal Singh, JJ) has held that judgement by which notifications are quashed, are not judgement in personam.
For the aforesaid reasons, the writ petition succeeds, and rule is made absolute.
In the facts and circumstances of the case, the petitioners are entitled to their costs.
A.KPetition Allowed.