Kangra Valley State Company Ltd. v. The Union Of India And Others

Delhi High Court
May 30, 1975
Smart Summary (Beta)

Judgment Summary — S.N. Shankar, J.

Factual and Procedural Background

The petitioner-company filed a writ petition under Articles 226 and 227 seeking to quash the Central Government's order dated October 1, 1974 (passed in revision under Rule 54 of the Mineral Concession Rules, 1960) and to direct the State Government not to carry into effect any mining scheme in the area and to grant the mining lease to the petitioner.

The dispute concerns competing applications for mining lease over land in villages Majra and Manethi (Tehsil Rewari, District Gurgaon). The State (then Punjab) notified the area for grant on February 9, 1962. Respondent No. 3 applied on March 12, 1962; the petitioner applied on March 20, 1962. The State did not decide the applications within nine months as required by Rule 24, resulting in deemed refusal under Rule 24(3). Both applicants filed revisions to the Central Government under Section 30 of the Mines and Minerals (Regulation and Development) Act, 1957 read with Rule 54.

The Central Government directed the State (by order dated June 25, 1965) to consider the applications by August 31, 1965; the State did not comply. Litigation ensued, including a writ petition in the High Court of Punjab and Haryana. The Central Government extended time to July 31, 1969. Later, the State of Haryana purported to reject the applications on the ground that the area was being re-notified or that the State decided to exploit the area itself (invoking Article 298). Revisions to the Central Government followed; on February 24, 1970 and April 19, 1972 the Central Government set aside the State's decisions, holding that once a notification making an area available for regrant is issued the State could not thereafter declare the area reserved for itself.

The Central Government's April 19, 1972 order directed grant of lease to respondent No. 3 because his application was earlier; the petitioner challenged that order in Civil Writ 434/72 in this Court. This Court (order dated March 8, 1973) quashed the Central Government's April 19, 1972 order and remanded the matter to the Central Government to determine the petitioner's claimed rights under subsections (1) and (4) of Section 11 of the Act.

On remand the Central Government issued the impugned letter/order dated October 1, 1974, dismissing the revisions on the ground that the State intended to exploit the area itself (directly or through Haryana State Industrial Development Corporation), citing A. Kotaiah Naidu v. State of Andhra Pradesh and Article 298. The Central Government added a proviso that if the State changed policy and invited applications, the petitions would be "resuscitated."

The petitioner challenged the October 1, 1974 order before this Court. Additional procedural events include an application by M/s Haryana Minerals Ltd. to be impleaded (or heard) on the ground it was working the area and had an export agreement; the Court allowed a short affidavit and hearing but rejected that the company's position altered the legal entitlement of the petitioner. Respondent No. 3 later filed a counter-affidavit and raised a new argument about Article 298 agency, which the Court did not permit to be developed because it was not raised in the main petition.

Legal Issues Presented

  1. Whether the Central Government had jurisdiction or power to revisit/alter its prior decision (April 19, 1972) which had held that once an area was notified for grant the State could not reserve it for itself.
  2. Whether the State Government could, after issuing a notification making an area available for regrant, later refuse an application for a mining lease on the ground that it had decided to exploit the area itself (invoking Article 298).
  3. Whether the petitioner-company is entitled to rights or priority in grant of lease under subsections (1) and (4) of Section 11 of the Mines and Minerals (Regulation and Development) Act, 1957 — the remand question directed by this Court's earlier order.
  4. Whether the impugned Central Government order dated October 1, 1974 was legally sustainable in light of the remand and prior findings.

Arguments of the Parties

Petitioner-Company's Arguments

  • The Central Government had no jurisdiction to review or reverse its earlier decision (April 19, 1972) that the State could not reserve the area for itself after a notification had been issued making it available for regrant.
  • The earlier Central Government decision was quasi-judicial (if not wholly judicial) and settled the matter; no rule of law or authority justified the Central Government's reversal in the October 1, 1974 order.
  • No fresh material or case for review had been placed before the Central Government to warrant overturning its prior finding.
  • The doctrine of res judicata / finality of decision should prevent re-agitation of the matter; the Central Government was estopped from adopting the contrary stand after the remand.

Central Government and State of Haryana's Arguments

  • The Central Government and State argued that after the Central Government's earlier order had been quashed, the matter on remand allowed consideration of the State's plea that it would itself work the area; reliance was placed on authorities (Perumal Pillai v. Pandaram; Bachcha Lal v. Lachman) concerning remands under Order 41, Rule 23, C.P.C.
  • They contended that when an order is set aside and a case remanded, the revising/adjudicating authority can re-open issues and consider pleas not previously upheld.

M/s Haryana Minerals Ltd.'s Contentions (Applicant to be impleaded / heard)

  • The company asserted it was actually working the area pursuant to the State's decision to exploit, had an agreement with a foreign company for export sales, and had already exported material; it sought to be impleaded or at least heard.
  • It argued that given its activities and commercial commitments, the Court should not exercise its discretionary jurisdiction under Article 226 to quash the Central Government's order.
  • The Court recorded that the applicant company was entirely owned by the State Government, and that its contractual/export activity did not improve its legal position vis-à-vis the petitioner's statutory claims.

Respondent No. 3's Arguments

  • Respondent No. 3 initially was the successful applicant in the Central Government's April 19, 1972 order (as his application was earlier in time); after intervention he filed a counter-affidavit and ultimately supported the petitioner's contention that the impugned order was vitiated.
  • In later submissions, respondent No. 3's counsel raised a new ground: that under Article 298 the State had no power to exploit the land through the agency of a limited company (i.e., that a limited company was not the applicant and no lease had been granted to it). The Court did not permit development of this new point since it was not part of the main petition.

Table of Precedents Cited

Precedent Rule or Principle Cited For Application by the Court
A. Kotaiah Naidu v. State of Andhra Pradesh, AIR 1959 Andh Pra 485 Illustration of State power under Article 298 to carry on trade or business (as amended) and to deal with mineral resources in the public interest. The Central Government relied on this authority in its October 1, 1974 letter to justify the State's power to exploit the area itself. The Court recorded the reliance but found the Central Government's re-adoption of the State's plea impermissible in light of prior findings and remand directions.
Burn and Co., Calcutta v. Their Employees, 1956 SCR 781 : AIR 1957 SC 38 Application of the principle of finality / res judicata beyond suits — that a decision after full hearing should not be re-agitated; principle underlying Section 11 CPC. The Court relied on this case to support the proposition that there must be an end to litigation and that a competent authority's earlier decision on a controversy should not be reopened without justification. It informed the Court's view that the Central Government could not lightly revisit its prior rejection of the State's plea.
Sheoparsan Singh v. Ramnandan Prasad Singh, (1916) ILR 43 Cal 694 : AIR 1916 PC 78 Historical authority affirming the rule of res judicata as founded on ancient precedent and dictated by enduring wisdom. The Court cited this supporting authority to reinforce the universal application and importance of finality in litigation.
Perumal Pillai v. Pandaram, AIR 1951 Trav-Co 26 Authority involving remand under Order 41, Rule 23 (reopening matters when decree is set aside and remanded); supports that issues can be re-agitated on remand under that provision. The Central Government/State relied on this case to argue that on remand the revising authority could consider the State's plea. The Court held this authority inapplicable because the remand in the present matter was by writ mandamus with specific directions and not a general remand under Order 41, Rule 23.
Bachcha Lal v. Lachman, AIR 1938 All 388 Another authority on remand under Order 41, Rule 23 permitting re-agitation in light of fresh evidence. The Court observed that this authority did not assist the Central Government because the present remand differed in character — it was specific to determination of rights under Section 11(1) & (4), not a general reopening under Order 41, Rule 23.
J.K. Cotton Spinning & Weaving Mills Co. Ltd. v. Commissioner of Income-tax, U.P., (1963) 47 ITR 906 (All.) Principle that on remand/fresh assessment the assessing officer is bound by directions of appellate authority but retains powers "subject to those directions." The Court noted this authority to show that a fresh decision must still be made subject to binding directions; it remarked that the authority does not permit derogation from directions. The case was used to counter the idea that the Central Government could ignore its prior directions.
State of Orissa v. Union of India, AIR 1972 Orissa 68 Principle that a subordinate/statutory State authority is bound by the order of the Central Government. The Court referred to this to emphasize that State Governments, as statutory authorities under the Act and Rules, are bound by Central Government orders and cannot reassert a right previously negatived by the Central Government.

Court's Reasoning and Analysis

The Court's reasoning followed a structured legal analysis based on the facts and prior orders placed before it:

  1. The Court observed that the Central Government's earlier order (April 19, 1972) had held that once the Punjab Government issued a notification making the area available for regrant the State could not subsequently declare the area reserved for itself; that order was quashed by this Court in Civil Writ 434/72 because the Central Government had not considered all relevant facts under subsections (1) and (4) of Section 11 of the Act, and the matter was remanded for determination of those rights.
  2. On remand the Central Government reversed position in the October 1, 1974 letter by accepting the State's assertion that it intended to exploit the area itself under Article 298. The Court found that reversal objectionable because no fresh material or proper basis for review was shown to have been placed before the Central Government.
  3. The Court applied the doctrine of res judicata / finality to administrative decisions and statutory adjudications. It relied on authorities (Burn and Co.; Sheoparsan Singh) to hold that a competent authority's decision on a matter after full inquiry should not be re-agitated without proper justification. The Court considered this principle as a bar to the Central Government's volte-face.
  4. The Court further held that litigation on the earlier order (Civil Writ 434/72) operated as an estoppel against the Central Government subsequently taking a contrary stand on remand. The Central Government had defended its April 19, 1972 order in the earlier proceedings and had not advanced the plea later relied upon; it was therefore precluded from now adopting that plea after the remand.
  5. The Court examined authorities cited by the Central Government and State (Perumal Pillai; Bachcha Lal) and distinguished them. Those authorities involved remands under Order 41, Rule 23, C.P.C. (a general remand where the case had been decided on a preliminary point and re-opened). The Court explained that the present remand was by mandamus with specific directions to determine rights under Section 11(1) and (4), and was not equivalent to an Order 41, Rule 23 remand that permits general re-opening of all issues.
  6. The Court noted J.K. Cotton shows a fresh decision must be made "subject to" binding directions; it used this to underscore that the Central Government could not disregard its previous determination/directions regarding the State's power after notification.
  7. On the issue of Haryana Minerals Ltd.'s assertion of actual exploitation and export agreements, the Court found that (a) the remand was limited to determining the petitioner's rights vis-à-vis respondent No. 3 under Section 11 and (b) the applicant company was state-owned and its contractual activities could not improve its legal standing against the petitioner's statutory claim. The Court rejected the contention that the commercial arrangements justified denying relief to the petitioner.
  8. The Court did not permit respondent No. 3 to develop a new point (that the State could not exploit through a limited company under Article 298) because it had not been raised in the main petition; accordingly the new argument was not considered substantively.
  9. On these bases the Court concluded the impugned October 1, 1974 order of the Central Government was manifestly erroneous, not supported by fresh material, and contrary to the mandate of the remand; accordingly it could not be sustained.

Holding and Implications

Holding: The Court quashed the Central Government's order dated October 1, 1974 (Annexure N) and issued a mandamus directing the Central Government to rehear the matter and determine the inter se rights of the petitioner and respondent No. 3 with reference to the petitioner's claim under subsections (1) and (4) of Section 11 of the Mines and Minerals (Regulation and Development) Act, 1957.

Implications and immediate consequences:

  • The Central Government must reconsider the matter on remand in the terms specified by this Court's prior order — i.e., determine whether the petitioner-company is justified in claiming rights under Section 11(1) and (4).
  • The State Government cannot successfully rely on the plea that it reserved the area for itself after a prior notification and after the Central Government earlier negatived that plea, unless proper new material or justification is placed before the Central Government on remand.
  • M/s Haryana Minerals Ltd.'s commercial arrangements and asserted exploitation do not, as recorded by the Court, improve its legal entitlement against the petitioner's statutory claim; the arrangement cannot circumvent the statutory and supervisory remedies and directions already ordered.
  • The Court directed that parties bear their own costs.

The opinion does not purport to lay down a new general principle of law beyond applying established doctrines (finality/res judicata, limits of remand and the binding nature of prior administrative determinations) to the facts before it; the direct and operative effect is the quashing of the October 1, 1974 order and a mandate to the Central Government to re-determine rights under Section 11 as directed.

Order accordingly.
Show all summary ...

S.N SHANKAR, J.:— The petitioner-Company by this writ petition under Articles 226 and 227 of the Constitution has prayed that the order dated October 1, 1974 passed by the Central Government in revision under Rule 54 of the Mineral Concession Rules, 1960 be quashed and directions be issued to the State Government to desist from carrying into effect, itself or through any of its agencies, any scheme or operation in the mining area referred to in the petition and to grant the mining lease in respect of this area to the petitioner.

2. The petitioner-Company is incorporated under the Companies Act as a public Limited Company with its registered office at New Delhi. It is engaged in the business of quarrying slates and shale (major minerals) and marketing the same. The dispute relates to the right to obtain lease of land situated in villages Majra and Manethi, Tehsil Rewari, District Gurgaon. On February 9, 1962, the then State of Punjab invited applications for grant of mining lease with respect to an area of 671 bighas of land in the aforesaid villages. Respondent No. 3 Diwan Singh Sethi filed his application for the grant of a part of this area on March 12, 1962 while the petitioner-Company filed its application for a similar grant on March 20, 1962. The State Government did not dispose of these applications within the stipulated period of nine months as required by Rule 24 of the Mineral Concession Rules, 1960 which had the effect of a deemed refusal of these applications vide Rule 24 (3) of the said Rules. Both the petitioner and respondent No. 3 consequently filed revisions before the Central Government under Section 30 of the Mines and Minerals (Regulation and Development) Act, 1957 (hereafter called “the Act”) read with Rule 54 of the aforesaid Rules. By its order dated June 25, 1965 the Central Government directed the State Government to consider the applications filed by the petitioner-Company and respondent No. 3 by August 31, 1965. The State of Punjab did not carry out these directions. This led the petitioner-Company to file a writ petition in the High Court of Punjab and Haryana at Chandigarh for orders to the State Government to carry out the directions of the Central Government. In the meantime, at the instance of the State of Haryana which had since come into existence and within whose jurisdiction the lands fell, the Central Government extended the time for consideration of the applications to July 31, 1969. On a statement that the applications will be considered by July 31, 1969, the writ petition was dismissed as infructuous. By order dated July 19, 1969 the State of Haryana informed the petitioner-Company and respondent No, 3 that their applications for grant of mining lease had been rejected because the area in question was being re-notified for the grant of mining lease. This led to a second set of revisions by the petitioner-Company and respondent No. 3 before the Central Government against this decision of the State of Haryana. The Central Government, by order dated February 24, 1970, set aside this decision and directed the State Government to re-consider the applications of the petitioner-Company and respondent No. 3 and decide them on their merits. The State Govt. still did not consider the applications and by letter dated November 4, 1971 the State of Haryana informed the petitioner and respondent No, 3 that in exercise of its executive powers under Article 298 of the Constitution, it had decided to exploit the area itself and on this ground rejected the applications. The petitioner-Company and respondent No. 3 for the third time went in revisions, to the Central Government against this order. The Central Government decided these revisions by order dated April 19, 1972 and set aside the order of the State of Haryana. It held that the State did not lave the power to make a declaration under Article 298 of the Constitution after a notification had been issued throwing open the area for grant or re-grant.

3. A plea was advanced on behalf of the State of Haryana before the Central-Government that the former was not bound by the acts or decisions of the Government of erstwhile State of Punjab but vas rejected. The Central Government observed that “there is no doubt that the State Government of Haryana duly constituted by the Parliament of India after following the appropriate provisions of the Constitution inherits from the erstwhile Government of Punjab such rights and liabilities as were apportioned to it under the Reroganisation order”.

The order further said:

“However, this plea made one thing clear viz. the legal implications of Punjab Government's notification dated 30-1-62 making the area available for regrant once such a notification is issued, any sub-sequent action by the State Government turning down an application for M.L (mining lease) which is otherwise a valid application, on the ground that the State Government has since changed its mind and decided that the area is not available for regrant, is bound to be interpreted as mala fide, In fact, the State Government has no power to make such a declaration once it had issued a notification throwing open an area for grant or regent of mining lease. Therefore, one ground given by the State Government in its letter dated 4-11-71 refusing your application cannot be accepted. That impugned order is accordingly set aside as invalid.”

The claims of the petitioner-Company and respondent No. 3 were then considered and the Central Government held that because the application of respondent No. 3 earlier in time he was entitled to the grant of the lease in preference to the petitioner-Company and the State Government was directed to grant mining lease to respondent No. 3 in respect of an area of 129.88 acres of land in the aforesaid villages. This led the petitioner-Company to file a Civil Writ in the High Court of Delhi (C.W 434/72) which was accepted by this Court on March 8, 1973. Copy of this order is Annexure ‘A’ filed with the petition. This Court held that which considering the rival claims of the petitioner-Company and respondent No. 3, the Central Government failed to take into account all the facts relevant for this purpose as per sub-sections (1) and (4) of section 11 of the Act and its decision, therefore, could not be sustained. The order of the Central Government was quashed and the matter was remanded to the Central Government in the following terms:

“The Central Government had, therefore, a duty to determine the rights of the petitioner-Company claimed under subsections (1) and (4) of Section 11 of the said Act. It failed to do so. The impugned order, therefore, has to be set aside and the rights of the petitioner-Company under sub-sections (1) and (4) of Sec. 11 of the said Act have to be determined by the Central Government.

We, therefore, order the issue of a writ of certiorari to quash the impugned order dated April 19, 1972 of the Central Government and further order the issue of a mandamus to the Central Government to hear the matter again and determine whether the petitioner-Company is justified in claiming rights under subsections (1) and (4) of Section 11 of the said Act .........”

4. The Central Government reconsidered the matter and communicated its decision to the petitioner-Company by letter dated October 1, 1974 Annexure ‘N’ to the petition. After setting out the previous history of the case and noticing the remand made by this Court in paragraph 11, the letter said:

“The question of determination of inter se claims of the two petitioners can only arise if the area in respect of which the applications have been made is available for grant. Now the State Government had made it clear that they are interested in exploiting the area themselves either directly or on agency basis through the Haryana State Industrial Development Corporation. We are not concerned at this stage as to whether the modalities of the proposed exploitation in the public sector are complete but as laid down in A. Kotaiah Naidu v. State of Andhra Pradesh (AIR 1959 Andh Pra 485) the State Government has power to carry on trade or business as prescribed by Article 298 of the Constitution as amended in its parent form by the Seventh Amendment Act, 1956 and, a private individual cannot question the right of Government to deal with mineral resources in the State in the manner they deem fit in the public interest.”

5. In this view, the Central Government dismissed the revisions of both the petitioners but in para. 12 added:

“...... However, should there be a change in the policy of the State Government and they abandon their plan of exploitation of the minerals in public sector or by themselves and decide to invite applications for mining lease, it would be deemed that both these petitions are resuscitated and their claims will have to be considered on merits. This safeguard is being put only to make sure that the petitioners do not lose on any make-believe pleas of a policy of State exploitation of mineral resources which can immediately be changed in the near future to their detriment.”

6. Shri M.C Bhandare, appearing for the petitioner, vehemently argued that the Central Government had no jurisdiction to review its own previous decision in the order dated April 19, 1972 where it held that once a notification making the area available for regrant was issued by the Punjab Government the State Government could not turn down the application on the ground that it had changed its mind and had decided to work the area itself. The learned counsel said that the Central Government in that order had explicitly held that the State Government had no powers to take such a decision. This decision of the Central Government, he maintained, was not an administrative decision but a quasi-judicial, if not wholly judicial decision given by the Tribunal exercise of statutory powers and operated to set at rest the question decided. We find substance in the argument of the learned counsel. No rule of law or authority has been cited before us to justify the somersault taken by the Central Government in the instant case. No material has been placed on record to show that any case for review of the previous decision had been made out or any fresh material whatsoever was placed before the Central Government.

7. The doctrine of res judicata is not a technical doctrine applicable only to records. It is a fundamental doctrine of all courts that there must be an end to litigation (see pares 357 of Halsbury's Laws of England. Third Edition, Volume 15, page 185). This doctrine is not confined to suits alone. In Burn and Co., Calcutta v. Their Employees, 1956 SCR 781 : (AIR 1957 SC 38), this doctrine was applied in case of an award by the Industrial Tribunal. In this case a previous award ignored. The Labour Appellate Tribunal subscribed to the view that it was a rule of prudence and not of law. It was further observed that the relevant statute prescribed no limitation as to when and under what circumstances an award could be re-opened. On page 789 (of SCR) : (at p. 43 of AIR) of the report, Venkatarama Ayyar, J., speaking for the Court said:

“But we propose to consider the question on the footing that there is nothing in the statute to indicate the grounds on which an award could be reopened. What then is the position? Are we to hold that an award given on a matter in controversy between the parties after full hearing ceases to have any force if either of them repudiates it under Section 19 (6), and that the Tribunal has no option, when the matter is again referred to it for adjudication, but to proceed to try it de novo, traverse the entire ground once again, and come to afresh decision. That would be contrary to the well recognised principle that a decision once rendered by a competent authority on a matter in issue between the parties after a full enquiry should not be permitted to be re-agitated. It is on this principle that the rule of res judicata enacted in Section 11 of the Civil Procedure Code is based. That Section is, no doubt, in terms inapplicable to the present matter, but the principle underlying it, expressed in the maxim “interest rei publicae ut sit finis litium,” is founded on sound public policy and is of universal application.”

The Court approved the observations of Sir Lawrence Jenkins, Chief Justice in Sheoparsan Singh v. Ramnandan Prasad Singh, (1916) ILR 43 Cal 694 : (AIR 1916 PC 78) where though the question arose in relation to a suit, it was observed that the rule of res judicata was founded on ancient precedent and was dictated by a wisdom which is for all time.

8. It would also be seen that in the previous Writ Petition No. 434 of 1972 as we have already said the order of the Central Government in which it was held by the Central Govt. that the State Government had no right to reject the applications for mining lease, after making the area available for grant and directing that lease be granted to respondent No. 3, was challenged by the present petitioner. With the leave of the Court, copy of that writ petition along with the counter-affidavit filed by the Central Government in answer thereto was placed on record. The Central Government in that petition defended its order and nowhere took the plea that as the State Government had reserved the area to itself for exploitation, the writ petition could not succeed. That litigation, having been fought on this basis, to our mind, also operates as an estoppel to preclude the Central Government after the matter was remanded to it to take up the plea which it had already rejected and which was never advanced by it in those proceedings to defeat the petitioner's claim. In our view, it was not open to the Central Government to adopt the stand taken in the impugned order after the matter was remanded to it in terms of the mandamus to “determine whether the petitioner-Company is justified in claiming rights under sub-sections (1) and (4) of Section 11 of the said Act”. The impugned order of the Central Government, therefore, is manifestly erroneous and cannot be sustained.

9. Shri Harish Chander, learned counsel for the Central Government, and Shri N.N Goswami appearing for the state of Haryana, argued that the order of the Central Government having been quashed by the Court in Civil Writ 434 of 1972, it was non-existent and there was no bar to the Central Government acceding to the plea of the State Government that it would itself work the area. Reliance in support of this submission was placed on Perumal Pillai v. Pandaram, AIR 1951 Trav-Co 26. This case was a case of remand by the court under the provisions of Order 41, Rule 23 which envisages “remand” where the court from whose decree an appeal is preferred has disposed of the suit upon a preliminary point and the decree is reversed in appeal. It was in this context that it was held that where a decree was set aside and the case was remanded to the lower court, all the contentions between the parties were before the court, and it was open for the court to go into all the issues arising out of such contentions. In the present case, there was no such remand. The mandamus issued was in specific terms and entitled the Central Government to determine the rights of the petitioner-Company vis-a-vis the respondent in terms of the mandamus.

10. The learned counsel next referred to Bachcha Lal v. Lachman, AIR 1938 All 388. This was also a case of remand under Order 41, Rule 23. C.P.C and the court held that the case having been decided on a preliminary point and in view of the court's order under Order 41, Rule 23 which re-opened the case, it was open to the defendant to re-agitate the same question in the light of the fresh evidence produced by him. This authority thus is also of no assistance to the learned counsel.

11. Reference was next made to J.K Cotton Spinning and Weaving Mills Co. Ltd. v. Commissioner of Income-tax, U.P, (1963) 47 ITR 906 (All.). This was a case where on appeal from assessment the Appellate Assistant Commissioner set aside the assessment and directed the Income-tax Officer to make a fresh assessment. It was held that the Income-tax Officer was bound by the directions of the Appellate Assistant Commissioner in making fresh assessment but “subject to those directions” he had the same powers in a fresh assessment as he had originally when making an assessment under Section 23 of the Indian Income-tax Act, 1922. What had happened in this case was that the Income-tax Officer assessed, the asessee in the original assessments on the basis of dividends declared by the Company in which it held shares. The appellate Assistant Commissioner set aside the assessments but pending the appeals an order was passed under Section 23-A of the Indian Income-tax Act, 1922 in, regard to that Company and dividends were allowed to be distributed rut of its undistributed profits, the Income-tax Officer in the fresh assessment in this situation included the dividends which the assesses was deemed to have received under section 23-A. This authority nowhere says that the fresh assessment could be in derogation or in disregard of the directions of the Appellate Assistant Commissioner.

12. According to the Scheme of Mines and Minerals (Regulation and Development) Act, 1957 and the Rules framed thereunder, the State Government is a statutory authority. It has the power to refuse an application for grant or renewal of mining lease but the Central Government is vested with the revisional powers under Section 30 of the Act and Rule 55. The State Government being a subordinate authority is bound by the order of the Central Government-(see State of Orissa v. Union of India, AIR 1972 Orissa 68) and the Central Government after having once negatived the right of the State Government to reserve the area in question for its own exploitation it was not competent for the Sate Government to raise the same plea again and to claim the same right.

13. During the pendency of this petition on May 12, 1975 M/s. Haryana Minerals Limited Chandigarh filed an application under Order 1, Rule 10 praying that as this Company was actually working the area in pursuance of the decision of the State Government to exploit it and the Company was an independent person end had signed an agreement with a foreign Company for the sale of slates of the mines in foreign market was interested in the decision of this petition and may be directed to be impleaded as a respondent in this case. The application was opposed. The learned counsel for the applicant, however, later stated that the Company does not insist to be impleaded as a party provided it is allowed to file a short affidavit and is given a hearing before the decision of the main petition. To this the petitioner agreed. The Company was accordingly heard and its affidavit dated May 9, 1975 was also taken on record. Along with the affidavit, this Company (M/s. Haryana Minerals Ltd.) filed a copy of an agreement dated November 1, 1974 between the Company and M/s. Toko Granit of West Germany. Shri N.N Goswami argued on behalf of the Company also and urged that according to the agreement the German Company had agreed to buy minimum one thousand sq. metres of multi-coloured slates during the period of the agreement which was for a duration of three years from the date of signing it and that in pursuance of this agreement this Company had already exported ported material worth about 2 lakhs. The learned counsel contended that in these circumstances this Court should not exercise its discretion under Article 226 of the Constitution to quash the order of the Central Government. We do not think that in the facts of the case, a case for exercise of court's discretion under Article 226 is made out. The remand to the Central Government by order of this Court dated 8th March, 1973 was specifically to determine the rights of the petitioner with reference to his contentions under sub-sections (1) and (4) of Sec. 11 of the Act as against respondent No. 3. This having not been done the State Government had no right to deal with the land through the Company and the agreement entered into by it did not improve its position to confer any better rights on the Company. It is clear from the application itself that the applicant Company is not a separate and distinct entity in that sense. In para 3 of the application (C.M 901 of 1975) it is stated that the applicant Company is entirely owned by the State Government. If the order of the Central Government in favour of the State Government is not sustainable for reasons we have already stated, it will be putting a premium on the highhandedness of the State Government to permit it to circumvent the law by adopting a device like the present one.

14. Before parting with the case, we may also record that Shri Hardev Singh appeared for respondent No. 3 after arguments had been partly heard. Respondent No. 3 had not filed any counter-affidavit. On May 22, 1975 he filed an application for permission to grant time to respondent No. 3 to file counter-affidavit and prayed for adjournment. We refused any adjournment but allowed him to file counter-affidavit. Counter-affidavit of resident No. 3 was then filed and taken on record. Shri Hardev Singh, in his arguments, supported the petitioner's contention that the impugned order was vitiated but raised a new ground to attack the order. He contended that under Article 298 of the Constitution the State Government had no power to exploit the land through the agency of a limited company as was sought to be done in this case. He maintained that the Limited Company was never an applicant and no lease to exploit the land had ever been granted to it. As this point was not raised in the main petition, we did not permit the learned counsel to develop this argument.

15. For reasons aforesaid, we quash the order of the Central Government dated October 1, 1974 Annexure ‘N’ to the petition and further order the issue of mandamus to the Central Government to hear the matter again and determine the rights inter se between the petitioner and respondent No. 3 with reference to the claim of the petitioner based on subsections (1) and (4) of Section 11 of the Act.

16. Having regard to all the circumstances of the case, we leave the parties to bear their own costs.

Order accordingly.