R. Natarajan v. Union Of India

Madras High Court
Nov 9, 2010
Important Paras
Please sign up to view Important Paras.
Smart Summary (Beta)

Structured Summary of the Provided Opinion

Factual and Procedural Background

These are Writ Appeals arising out of a common judgment and order dated 3rd February 2010 passed by a Single Judge in W.P. Nos. 19946 to 19954 of 2008. The appeals were heard together by M.Y. Eqbal, C.J. and T.S. Sivagnanam, J.

The Petitioners (now Appellants) are owners of land in Alagumalai Revenue Village, Tirupur Taluk, Coimbatore District, contiguous to National Highway NH-67. The Central Government/ National Highways authorities issued notifications for acquisition (references include a Gazette Notification dated 26th October 2007 and a notification dated 21st November 2007 reported in newspapers). The Petitioners submitted objections (dates in the record include 23.08.2007, 18.12.2007 and a detailed objection dated 8th December 2007).

The Competent Authority conducted an enquiry on 8th January 2008 and by order dated 29th January 2008 disallowed the Petitioners' objections under Section 3-C(2) of the National Highways Act, 1956. Thereafter a declaration/notification under Section 3-D(1) was published (the opinion records a notification under Section 3-D(1) dated 23rd May 2008), and subsequent steps followed.

The Petitioners filed writ petitions seeking certiorari to quash the notification and consequential proceedings, contending inter alia that the order under Section 3-C(2) was not served or communicated to them and that objections were not properly considered, resulting in violation of principles of natural justice. The Single Judge dismissed the writ petitions on the ground that the Petitioners had not challenged the Section 3-C order and that after vesting under Section 3-D their remedy lay in claiming compensation under Section 3-G, but observed that Petitioners could request the Respondents to consider surrender of lands.

Legal Issues Presented

  1. Whether the Competent Authority complied with the mandatory requirements of Section 3-C(2) of the National Highways Act, 1956 in relation to the Petitioners' objections (i.e., whether objections were considered, parties heard and reasons given).
  2. Whether the order dated 29th January 2008 under Section 3-C(2) was served or communicated to the Petitioners and, if not served, whether that affects the validity of subsequent steps (including the declaration under Section 3-D).
  3. Whether, once land is said to have vested in the Central Government under Section 3-D, the Petitioners are restricted to compensation remedies under Section 3-G, or whether challenge to the lawfulness of prior steps (e.g., defective Section 3-C(2) proceedings) can be entertained and can invalidate subsequent actions.

Arguments of the Parties

Appellants' Arguments

  • The order under Section 3-C(2) was never served or communicated to the Petitioners; therefore it was not open to the Single Judge to treat that order as having been validly passed and immune from challenge in the writ petitions.
  • The Section 3-C(2) order dated 29th January 2008 is violative of principles of natural justice because the objections were not considered on merits, no reasons were assigned, and there was total non-application of mind by the Competent Authority.
  • Because the Section 3-C(2) order is allegedly erroneous and devoid of proper consideration, the subsequent orders and notifications under Section 3-D cannot be sustained.

Respondents' Arguments

  • The Appellants participated in the enquiry held on 8th January 2008, and therefore cannot contend that they were unaware of the order made under Section 3-C(2).
  • Once notification under Section 3-D(1) was issued and the lands are said to have vested with the Government, the sole remedy available to the Petitioners is to claim compensation as provided under Section 3-G of the Act.
  • The Competent Authority and district revenue officer conducted necessary enquiries and concluded acquisition was inevitable for the highway project; hence the objections were properly dealt with and rejected.

Table of Precedents Cited

Precedent Rule or Principle Cited For Application by the Court
Munshi Singh v. Union of India, 1973 (2) SCC 337 That a person whose property is being or is intended to be acquired should have a proper and reasonable opportunity of persuading the authorities that acquisition should not be made; Section 5-A embodies that principle (right of representation and hearing is valuable). The court invoked the principle to emphasize that the statutory right of objection/hearing under the National Highways Act (Section 3-C) is substantive and not a mere formality, reinforcing the need for a proper hearing and consideration.
Union of India v. Mukesh Hans, 2004 (8) SCC 14 Reiterates that right of representation and hearing is valuable and that any decision dispensing with that minimal right must be based on materials on record. The court relied on this authority to stress that if the appropriate government or authority decides to take away the right of hearing/representation, that decision must be supported by record materials and cannot be arbitrary.
Competent Authority v. Barangore Jute Factory, 2005 (13) SCC 477 That an initial Notification under the acquisition provision is foundational: if the initial Notification is bad, all subsequent steps (including vesting under Section 3-D and taking possession) fall with it. The court applied this principle to hold that defective disposal of objections under Section 3-C can invalidate the subsequent declaration and vesting — hence, if 3-C disposal is invalid, subsequent steps cannot be sustained.

Court's Reasoning and Analysis

The court proceeded in a statutory and textual manner: it first reviewed the relevant provisions of the National Highways Act, 1956, including Sections 3-A, 3-B, 3-C, 3-D, 3-F and 3-G. The court reproduced Section 3-C and highlighted sub-section (2) which mandates that objections be made in writing, that the Competent Authority shall give the objector an opportunity of being heard (in person or by a legal practitioner), and that the Competent Authority shall, after hearing and any further enquiry, by order either allow or disallow the objections.

The court emphasized that compliance with Section 3-C(2) is not a mere formality; the Competent Authority has a duty to hear, consider and then allow or disallow objections with reasons. The court observed prima facie that the provision creates a substantive right.

Turning to the record, the court examined the Competent Authority's order dated 29th January 2008 which purported to disallow the Petitioners' objections. The order recorded that an enquiry was held on 8th January 2008 and that the landowners/objectors appeared and gave statements. However, the operative reasoning recorded in that order was that technical experts/consultants (NHAI) had already prepared a detailed project report, land acquisition work was started and the project was under progress, and that because the land was for public interest and compensation would be paid under Section 3-G the objection was rejected.

The court found the 29.01.2008 order deficient in two principal respects (as stated in the opinion): (1) the Competent Authority did not assign reasons reflecting consideration of the substance of the objections — the order relied on the NHAI technical opinion and project status rather than addressing the merits of the Petitioners' specific objections; and (2) there was a "total non-application of mind" by the authority when rejecting the objections. The court also noted that a copy of the Section 3-C(2) order was neither served nor communicated to the Petitioners.

The court rejected the Respondents' submission (and the Single Judge's reasoning) that the Petitioners' challenge to the Section 3-D notification could not entertain a collateral challenge to the Section 3-C order merely because the Petitioners had not separately filed a challenge to the Section 3-C order. The court relied on precedent (Competent Authority v. Barangore Jute Factory) that if the earlier step (the disposal of objections) is invalid, the subsequent declaration/vesting cannot be sustained.

Applying these principles, and after considering the authorities cited, the court concluded that the objections filed by the Petitioners had not been considered in their right perspective, no reasons had been assigned, and the order was not communicated — cumulatively rendering the Section 3-C(2) order invalid for the purposes of sustaining subsequent actions.

Holding and Implications

Core Ruling: The Appeals and the Writ Petition were allowed. The impugned order of the learned Single Judge was set aside. The order passed by the Competent Authority under Section 3-C(2) of the National Highways Act, 1956 and the consequential orders were quashed, and the matter was remitted to the Competent Authority.

The court directed the Competent Authority of the Respondents to reconsider the objections filed by the Appellants under Section 3-C(2) and to dispose of them in accordance with law by passing a reasoned order. The opinion further stated that after complying with the statutory requirements, the Respondents may proceed in the matter.

Implications: The direct consequence is that the Competent Authority must re-hear/reconsider the objections and pass a reasoned order; the prior Section 3-C(2) and consequential steps were quashed for inadequate disposal. The opinion does not purport to lay down a new legal precedent beyond applying existing Supreme Court authorities to the facts of this case.

Show all summary ...

Prayer: Writ Appeals filed against the order dated 3rd Feb., 2010 passed by learned Single Judge in W.P Nos. 19946 to 19954 of 2008.

Prayer: W.P No. 17991 of 2010 filed for the issuance of a Writ of Certiorari to call for the records on the file of the 1st Respondent in Na.Ka No. 125695/2010(2)/U4 dated 15.06.2010 and quash the proceedings therein as illegal, incompetent, regular and without jurisdiction.

JUDGMENT

M.Y Eqbal, C.J and T.S Sivagnanam, J.

1. Since these Appeals arise out of common judgment and order passed in batch of Writ Petitions, the same were heard together and are disposed of by this common judgment.

2. The Petitioners are the Appellants. They filed Writ Petitions seeking issuance of Writ of Certiorari for quashing the order dated 9the July, 2008, in Na.Ka No. 28943/06.Vu7 published in the “Daily Tanthi” dated 16th July, 2008, so far as it relates to the Petitioners/Appellants.

3. The facts of the case lie in a narrow compass.

4. The Petitioners/Appellants are the owners of the land in Alagumalai Revenue Village, Tirupur Taluk, Coimbatore District. There is a National Highway going from Karur to Coimbatore and the highway is abutting their lands. It is said that the officials of the National Highways Department inspected the lands of the Appellants and took measurement. On enquiry, the Appellants came to know that the Respondents are going to lay bye-pass road connecting NH 67 from Avinashipalayam Sungam to Ramaswamy Koil Pirivu instead of widening the existing NH-67. The Appellants' case is that, they came to know about the Notification dated 21st November, 2007 in the newspapers. Immediately, the Appellants submitted detailed objections to the Respondents on 8th December, 2007. The 1st Respondent did not pass orders under Section 3-C(2) of the National Highways Act, 1956. The Appellants case was that the impugned order came to be passed without passing order under Section 3-C(2) of the said Act, which is violative of Principles of Natural Justice.

5. The authority of the Respondents, National Highways, in their Counter Affidavit, have stated that the Gazette Notification dated 26th October, 2007, for acquisition of land of the Appellants was notified and the same was published in two daily newspapers. A public notice was also issued calling for objections from interested persons. Necessary enquiry was made under Section 3-C(2) of the Act on 8th January, 2008, and after perusing the representation, the 2nd Respondent came to the conclusion that the acquisition of land is inevitable for widening the road and, accordingly, the objections/claim of the Appellants was disallowed on 29th January, 2008. The further case of the Respondents is that after the aforesaid order under Section 3-C(2) of the Act was passed, necessary Notification under Section 3-D(1) of the Act was notified in the Gazette on 23rd May, 2008 and the substance of the Gazette Notification was published in the newspapers as required under Section 3-G(3) of the Act.

6. The main contention of the Petitioners/Appellants in the Writ Petition was that they were not aware about the order made under Section 3-C of the Act. It was contended that the order under Section 3-C was passed behind the back of the Appellants and they were not given opportunity of hearing. Even the copy of this order was not served or communicated to the Appellants.

7. Learned Single Judge is of the view that since the order made under Section 3-C of the Act was not challenged by the Appellants and the only challenge was about the Notification dated 9th July, 2008, the question of accepting the submission of the Appellants with regard to the validity of the order made under Section 3-C cannot be gone into. Learned Single Judge is also of the view that once the lands vested with the Government as required under Section 3-D of the Act, the Petitioners/Appellants remedy lie only in claiming compensation as provided under Section 3-G of the Act. Accordingly, all the Writ Petitions have been dismissed. However, while dismissing the Writ Petition, learned Judge, in the last paragraph of the order observed as under:

“10. At this juncture, learned Counsel appearing for the Petitioners states that if there is any possibility to give up the lands of the Petitioners, the Respondents could be directed to consider the same. It is always open to the Petitioners to approach the Respondents with such request and as and when such request is made by the Petitioners, it is open to the Respondents to decide the same on merits and in accordance with law.”

8. Mr. V. Raghavachari, learned Counsel appearing for the Appellants assailed the impugned judgment and order passed by learned Single Judge as being contrary to law, and facts and evidence on record. Learned Counsel submitted that learned Single Judge gravely erred in law in dismissing the Writ Petitions on the ground that the Appellants had not challenged the order of the 2nd Respondent made under Section 3-C of the Act without considering the Appellants specific case that no order under Section 3-C of the Act was ever served or communicated to the Petitioners/Appellants. Learned Counsel further submitted that in absence of any proof or evidence to establish that the order of the 2nd Respondent under Section 3-C of the Act was served on the Appellants, the finding of the learned Judge that the Appellants could not challenge the order under Section 3-D of the Act is totally erroneous and against the provisions of the Act. Learned Counsel vehemently assailed the order dated 29th January, 2008 on the ground that it is violative of Principles of Natural Justice and further on the ground that there is total non-application of mind on the part of the Respondents while passing the said order and also the same has been passed without giving any reasons. According to the learned Counsel, in view of the fact that the aforesaid order passed under Section 3-C is absolutely erroneous and violative of Principles of Natural Justice, the subsequent orders and Notifications issued under Section 3-D cannot be sustained in law.

9. On the other hand, Mr. P. Wilson, learned Additional Advocate General, appearing for the Respondents strenuously contended that the Appellants participated in the enquiry on 8th Jan., 2008 and, therefore, they cannot be allowed to say that they are not aware of the order made under Section 3-C of the Act. According to the learned Counsel, after the Notification was issued under Section 3-D(1) of the Act and once the lands stood vested with the Government, the only remedy available to the Appellants is to claim compensation as required under Section 3-G of the Act.

10. Before considering the merit in the submission made by the learned Counsel appearing for the respective parties, we would first like to go through the relevant provisions of the National Highways Act, 1956. The Act was enacted to provide for the declaration of certain Highways to be National Highways and for matters connected therewith. Section 3 was substituted by the National Highways Law (Amendment), 1997 (Central Act 16 of 1997). Section 3 defines the word ‘Competent Authority’ and the word ‘land’. Section 3-A empowers the Central Government to declare its intention to acquire such lands if it is satisfied that the said land is required for the purpose of operation of National Highway or for the building, maintenance and management of the National Highways. Such Notification shall give brief description of the lands and the Notification shall be published in two local newspapers one of which will be in a vernacular language. After the said declaration made by Notification, the authorities of the Central Government have been empowered under Section 3-B of the Act to make inspection, survey, measurement, valuation or enquiry, to set out boundaries, mark such levels, dig or bore into sub-soil or do such other acts or things as laid down by Rules made in this behalf by the Government.

11. Section 3-C is the important and relevant Section for the purpose of the instant case. Sub-section (1) to Section 3-C gives right to a person interested in the land to file objections within twenty-one days and object to the use of the land for the purposes mentioned under Section 3-A of the Act. Sub-section (2) provides that such objection shall be made to the Competent Authority in writing and shall set out the grounds thereon and the Competent Authority shall allow or disallow the said objections. Sub-section (3) of Section 3-C provides that orders made by the Competent Authority under sub-section (2) shall be final. For better appreciation, Section 3-C of the Act is reproduced hereinbelow:

“3-C. Hearing of objections.— (1) Any person interested in the land may, within twenty-one days from the date of publication of the Notification under sub-section (1) of Section 3-A, object to the use of the land for the purpose or purposes mentioned in that sub-section.

(2) Every objection under sub-section (1) shall be made to the Competent Authority in writing and shall set out the grounds thereof and the Competent Authority shall give the objector an opportunity of being heard, either in person or by a legal practitioner, and may, after hearing all such objections and after making such further enquiry, if any, as the Competent Authority thinks necessary, by order, either allow or disallow the objections.

Explanation—- For the purposes of this sub-section, “legal practitioner” has the same meaning as in clause (i) of sub-section (1) of Section 2 of the Advocates Act, 1961 (25 of 1961).

(3) Any order made by the Competent Authority under sub-section (2) shall be final.”

12. It further reveals that after the objection is finally disposed of in the manner required under sub-section (2) of Section 3-C of the Act, the authority shall proceed under Section 3-D, which provides, inter alia, that after the objection having been disallowed, the Competent Authority shall submit a report to the Central Government and the Central Government, on receipt of the report so declare by Notification in the Official Gazette that the land has been acquired for the purpose mentioned under sub-section (1) of Section 3-A. Section 3-D reads as under:

“3-D. Declaration of acquisition.— (1) Where no objection under sub-section (1) of Section 3-C has been made to the Competent Authority within the period specified therein or where the Competent Authority has disallowed the objection under sub-section (2) of that Section, the Competent Authority shall, as soon as may be, submit a report accordingly to the Central Government and on receipt of such report, the Central Government shall declare, by Notification in the Official Gazette, that the land should be acquired for the purpose or purposes mentioned in sub-section (1) of Section 3-A.

(2) On the publication of the declaration under sub-section (1), the land shall vest absolutely in the Central Government free from all encumbrances.

(3) Where in respect of any land, a Notification has been published under sub-section (1) of Section 3-A for its acquisition but no declaration under sub-section (1) has been published within a period of one year from the date of publication of that Notification, the said Notification shall cease to have any effect:

Provided that in computing the said period of one year, the period or periods during which any action or proceedings to be taken in pursuance of the Notification issued under sub-section (1) of Section 3-A is stayed by an order of a Court shall be excluded.

(4) A declaration made by the Central Government under sub-section (1) shall not be called in question in any Court or by any other authority.”

13. After the aforesaid requirement of law, as contemplated under Section 3-D, is complied with by the Competent Authority of the Central Government, the Competent Authority shall direct the land owner or the person in possession to surrender or deliver possession of the land under Section 3-A of the Act. If any person refuses or fails to comply with the direction, then the Commissioner or the Collector shall enforce the surrender of the land to the Competent Authority or the person duly authorised by it. Section 3-F of the Act further provides that after the land stood vested with the Central Government under Section 3-D, it shall be lawful for any person authorised by the Central Government to enter and do other acts necessary upon the land related to or in connection with the National Highway. Section 3-G prescribes the mode of determination of amount of compensation payable to the land owners.

14. In the light of the aforesaid provisions of the Act, the only question that falls for consideration is whether the authorities of the Respondents have complied with the mandatory requirements of law quoted hereinabove before acquiring the Appellants' lands for the purpose of National Highway or for the purposes connected therewith.

15. As noticed above, after the Central Government declared its intention by issuing a Notification in the Official Gazette to acquire the lands for the building, maintenance, management or operation of the National Highway, the land owners or person interested have the right to file their objections within twenty one days from the date of publication of the Notification, and can object to the use of the land for the purpose or purposes mentioned in sub-section (1) of Section 3-A of the Act. sub-section (2) of Section 3-C of the Act very specifically provides that the Competent Authority before whom such objection is made, shall give the objector an opportunity of being heard either in person or by a legal practitioner, and may, after hearing such objections, and after making further enquiry, if necessary, either allow or disallow the objections. At this juncture, again we take the opportunity to reproduce sub-section (2) of Section 3-C of the Act.

“Every objection under sub-section (1) shall be made to the Competent Authority in writing and shall set out the grounds thereof and the Competent Authority shall give the objector an opportunity of being heard, either in person or by a legal practitioner, and may, after hearing all such objections and after making such further enquiry, if any, as the Competent Authority thinks necessary, by order, either allow or disallow the objections.”

Prima facie, therefore, it is manifestly clear that the compliance of the aforesaid provision is not a mere formality. Sub-section (2) cast a duty upon the Competent Authority to consider the objections, and after hearing such objections, and after making such further enquiry, if any, shall allow or disallow the objections.

16. The Respondents in their Counter Affidavit filed in the Writ Petitions, has stated that the Appellants have raised their objections in the Petition dated 23.08.2007 and 18.12.2007 It is further stated that under Section 3-C(2) of the Act necessary enquiries have been conducted by the Competent Authority (LA) and the District Revenue Officer, Coimbatore on 08.01.2008 and after perusing the documents and examining the case, the Competent Authority and the District Revenue Officer, Coimbatore came to the conclusion that the acquisition of lands are inevitable for the widening of the National Highways project and has disallowed the petition. From the objections raised by the Appellants, the copies of which are available on record, it is evidently clear that several objections had been raised by the Appellants including that the Notification issued for acquiring the lands for the expansion of the National Highways on the lands in question are proposed to be used to lay new roads instead of expansion project of the National Highways. Due to this many farmers like the Appellants, who hold small piece of agricultural lands, would be led to irreparable loss. For better appreciation, the grounds taken by the Appellants in the Objection Petition are reproduced herein below:

“4. At present, the National Highways is running near the Survey Numbers 316 and 317. If the available national highways is developed and regulated, the national highways would be constructed in a proper manner. I being the farmer and the other farmers would not be affected.

5. I am ready to offer the lands which would be required to develop and expand the national highways which is running near my lands at present, without raising any objection, whatsoever. In the same fashion, the other farmers near my lands are read to offer the lands for the expansion of the roads.

6. It could not be accepted that as lot of accidents are caused in Avinasipalaym junction of this highways, the new National Highways is being constructed. Because, in the junction which separates from Avinasipalayam-Customs Division and Tarapuram Road to Road leading to Coimbatore, which comes under the jurisdiction of Avinasipalayam Police Station, in the year 2006, only three accident cases have been registered (Crime Nos. 11/2006, 143/2006 and 193/2006). Further in the year 2007, only 2 cases have been registered (Crime Numbers 57/2007 & 168/2007). All not been caused due to the above mentioned curves. The accidents had occurred due to the dashing of vehicles directly with each other. It could not be said that if the National Highways are made straight, the accidents would not occur. If in the two junctions near the Avinasipalayam junction, are provided with roundtana and the bulbs are installed, it would reduce the causes for accident.

7. If we go from the Avinasipalayam junction of the present National Highways, it will lead to loss of time also could not be accepted. The distance in the present national highway from the Avinasipalayam junction, the new highways which is going to connect the old road, is about 1450 metres. The distance or which the new road had been planned is 1300 metres. In order to reduce 150 metres highways, the proposal to destroy the agricultural lands, and to construct the new road and to spend several crores for such road construction could not be accepted.”

17. The Appellants in support of the grounds taken in the Petition submitted the map and other documents. However, the said objection was disallowed by the authority vide order dated 29.01.2008 It would be relevant and important to quote the order dated 29.01.2008 whereby the objections of the Appellants were rejected under Section 3-C(2) of the Act.

“PROCEEDINGS OF THE

COMPETENT AUTHORITY (NH 67) AND COIMBATORE

DISTRICT REVENUE OFFICER

Present: Dr. S. Prabhakaran, M.B.S.C, M.B.A,

Na.Ka 58775/2007.VU 7(1) 29.1.2008

Sub: Land Acquisition - National Highways 67 (Karur to Kovai) - Kovai District - Tirupur Taluk - Alakumalai Village - Survey No. 316 - Section 3-A(1) - The objection received - Enquiry completed and order passed.

Ref: 1. The objection of Marathal dated 23.8.2007 & 18.12.2007

2. The proceedings of the Competent Authority dated 28.12.2007 Na.Ka 58775/07.Vu 7(1). The letter of the Project Director, National Highways, Trichy dated 7.1.2008

Pursuant to the objection submitted against the land acquisition in Survey No. 316, Alagumalai Village, Tirupur Taluk, Coimbatore District for the purpose of 4 lane N.H 67 from Karur to Coimbatore, notice of enquiry was issued for the enquiry on 8.1.2008 by the Competent Authority. The land owners/objectors appeared in person and gave statement.

2. The objection of the Petitioner was perused. The Project Director of NHAI has informed that with the help of technical experts/consultant NHAI has already prepared detailed project report, land acquisition work was started and the project work is under progress. Therefore, the acquisition of the lands could not be dropped/alignment could not be changed. Since the land is acquired for public interest and compensation is paid under Section 3(G), the objection of the Petitioner is rejected under Section 3-C(2) of the National Higways Act, 1956.

Competent Authority (NH 67) and District Revenue Officer, Coimbatore.

Tmt. Marathal, W/o Ramasamy Gounder, Sundakadu

18. A perusal of the order shows that the Competent Authority disallowed the objection not on the ground that there was no substance in the objection, rather on the ground that the technical expert/consultant (NHAI) has already prepared detailed project report, land acquisition work was started and the project work is under progress. The objection was also disallowed on the ground that since the land is acquired for public interest, and compensation is paid under Section 3-G of the Act, the objection so raised is bound to be rejected. We are really shocked and surprised to see the order and the manner of exercising power under Section 3(2) of the Act. The order clearly shows that the authority passed the order purely on the basis that the technical experts have already given their opinion. Nothing is reflected from the order that the objection raised by the Appellants were even considered or dealt with by the authority. Moreover no reasons have been assigned while rejecting the objection. In our opinion, there is total non-application of mind on the part of the authority while passing the order rejecting the objection under Section 3(2) of the Act.

19. It is true that a limited right has been given to the land owner or person interested under Section 3(2) of the Act to file objection to the Acquisition proceedings. But such a right given to the person is not an empty formality, rather it is a substantive right. It has been consistently held by the Supreme Court that the person whose property is being or is intended to be acquired should have a proper and reasonable opportunity of persuading the authorities that the acquisition of property can be avoided. In Munshi Singh v. Union of India, 1973 (2) SCC 337, their Lordships taking notice of the object and importance of Section 5-A of the Act observed as under:

“7. Section 5-A embodies a very just and wholesome principle that a person whose property is being or is intended to be acquired should have a proper and reasonable opportunity of persuading the authorities concerned that acquisition of the property belonging to that person should not be made. … The legislature has, therefore, made complete provisions for the persons interested to file objections against the proposed acquisition and for the disposal of their objections. It is only in cases of urgency that special powers have been conferred on the appropriate Government to dispense with the provisions of Section 5-A:”

The aforesaid view has been subscribed by the Supreme Court in the later decision in the case of Union of India v. Mukesh Hans, 2004 (8) SCC 14, wherein their Lordships held as under: (Para. 36, page 28)

“It is clear from the above observation of this Court that right of representation and hearing contemplated under Section 5-A of the Act is a very valuable right of a person whose property is sought to be acquired and he should have appropriate and reasonable opportunity of persuading the authorities concerned that the acquisition of the property belonging to that person should not be made. Therefore, in our opinion, if the appropriate Government decides to take away this minimal right then its decision to do so must be based on materials on record to support the same and bearing in mind the object of Section 5-A.”

20. Coming back to the order again, by which objection was disallowed, admittedly no reasons had been assigned. Although the authority was exercising the statutory duty to invite objection, hear the parties, and take a decision either allowing or disallowing the objection, the authority was bound to assign valid reasons. As per the 14th Report relating to Judicial Administration in India, the Law Commission recommended that even in administrative decision, provisions should be made that it should be accompanied by reasons.

21. The contention of Mr. P. Wilson, learned Additional Advocate General that since the Appellants are challenging only the Notification issued under Section 3-D of the Act and not the order passed under Section 3-C(2) of the Act, the validity of the order need not be gone into in the Writ Petition. We do not find any force in the said submission of the learned Additional Advocate General. The Appellants challenged the Notification of the Central Government under Section 3-D of the Act mainly on the ground that the objection under Section 3-C(2) of the Act was not considered, or if considered, the order disallowing the objection was not served upon the Petitioners. While deciding a similar question, the Supreme Court in the case of Competent Authority v. Barangore Jute Factory, 2005 (13) SCC 477, held as under: (para 11, pages 486-487)

“About the argument based on vesting of the land in the Central Government, it is to be seen that if the initial Notification is bad, all steps taken in pursuance thereof will fall with it. Vesting under Section 3-D(2) arises on a declaration by the Central Government under Section 3-D(1). The declaration is the result of disposal of objections under Section 3-C. Each step is a consequence of earlier step and in that sense all the steps are linked to the initial Notification for acquisition under Section 3-A(1) and (2). This initial Notification has been held to be not in accordance with law. When the foundation goes, rest of the edifice falls. The invalid Notification under Section 3-A renders all subsequent steps invalid. Therefore, vesting of land in the Central Government in the present case cannot be said to be lawful and it does not advance the case of the Competent Authority or NHAI. Taking possession of the land is yet another step in the same sequence and is again subject to the initial Notification being held valid. The initial Notification having been invalidated, there can be no legal or valid vesting of land in favour of the Central Government.”

22. After having gone through the entire facts of the case and giving our anxious consideration in the matter, we are of the considered view that the objections filed by the Appellants have not been considered in its right perspective and has not been disposed of by giving reasons as contemplated under Section 3-C(2) of the Act. Moreover, admittedly, the copy of the order was neither served nor was communicated to the Appellants. The learned Single Judge, therefore, failed to consider this aspect of the matter.

23. For the reasons aforesaid, these Appeals and the Writ Petition are allowed. The impugned order passed by the learned Single Judge is set aside. Consequently, the order passed by the Competent Authority under Section 3-C(2) of the Act and the consequential orders are quashed. The matter is remitted back to the Competent Authority of the Respondent to consider the objections filed by the Appellants under Section 3-C(2) of the Act, and the Competent Authority is directed to dispose of the same in accordance with law by passing a reasoned order. Needless to say that after complying with the requirements of law, the Respondents shall proceed in the matter.