Union Of India, Owni... v. Khandelwal Bros (P.)...

Madras High Court
Dec 3, 1974
Smart Summary (Beta)

Factual and Procedural Background

The appellants are the defendants in O.S. 3931 of 1967 on the file of the City Civil Court, Madras. The first plaintiff (first respondent) was consignee of two consignments entrusted to the appellants for carriage by rail from Sealdah to Royapuram under two railway receipts (Nos. 322997 and 322998 dated 24 April 1964). The consignments contained various iron pipes (details given in the opinion).

On delivery at Royapuram there was a shortage: 26 black pipes (4" diameter) missing from the first consignment and 12 G.I. pipes (4" diameter) missing from the second consignment, evidenced by a shortage certificate (Ex. A.5 dated 10 July 1964). The plaintiffs issued notice and instituted suit seeking recovery: Rs. 3,329.18 for the first consignment and Rs. 1,855.39 for the second consignment, together with interest at 6% per annum from 10 July 1964.

The appellants repudiated liability, relying principally on S. 77-C of the Indian Railways Act (alleging defective packing and no negligence), denying entitlement to interest, and initially raising a limitation objection (which they later conceded was based on an erroneous assumption about the suit's institution date).

The trial court (VIII Assistant Judge, City Civil Court, Madras) framed seven issues (see below). The trial judge found for the plaintiffs on maintainability, on the question of negligence/exoneration, on conformity with packing conditions (in absence of proof to contrary), and held plaintiffs entitled to interest from 1 November 1966 (date of acknowledgment of notice). The trial court decreed Rs. 5,184-57 with interest at 6% p.a. from 1 November 1966. The defendants appealed.

Legal Issues Presented

  1. Whether the plaintiffs have the right, title and interest in the suit consignment.
  2. Whether there was any negligence or misconduct on the part of the defendants (railway administration).
  3. Whether the plaintiffs conformed with the packing conditions prescribed under the Railways Act.
  4. Whether the defendants are exonerated from liability under S. 77-C of the Indian Railways Act due to the defective packing.
  5. Whether the plaintiffs are entitled to claim any interest over the claim.
  6. Whether the suit is barred by limitation.
  7. To what reliefs are the parties entitled.

Arguments of the Parties

Appellants' Arguments

  • They pleaded they were not liable because there was no negligence or misconduct by the railway administration.
  • They contended consignors had not conformed to prescribed packing conditions and had not taken required care in dispatching goods, invoking S. 77-C of the Indian Railways Act to be absolved of liability.
  • They argued that the suit-claimants were not entitled to interest prior to the suit.
  • They initially argued the suit was barred by limitation but later conceded this was based on an erroneous assumption about the institution date and did not press this point further.

Respondents' Arguments

  • The respondents (plaintiffs) sought recovery for the shortage of goods as evidenced by the shortage certificate and invoked liability of the railway administration for the missing portions of the consignments.
  • They claimed interest at 6% per annum from 10 July 1964 (as pleaded in the suit).
  • The opinion records that, in the course of the appeal, the respondents' counsel conceded that the respondents could not sustain the trial court's direction to pay interest from 1 November 1966 in light of Supreme Court authority, and accepted that interest should run only from the date of the suit (8 September 1967).

Table of Precedents Cited

Precedent Rule or Principle Cited For Application by the Court
Shiv Saran Dass v. The Union of India (High Court of Delhi) Support for the view that S. 77-C does not apply to loss/short delivery (i.e., the section addresses damage, deterioration, leakage or wastage, not loss/non-delivery). The court noted that the High Court of Delhi had taken the same view, and relied on this to reinforce its interpretation that S. 77-C does not cover the present shortage/loss of goods.
Union of India v. West Punjab Factories, Ltd. (Supreme Court) Principle that, in the absence of usage or contract, express or implied, or statutory provision, interest by way of damages cannot be awarded. The court applied this principle to modify the trial court's interest award: respondents conceded that interest should only run from the date of the suit (8 September 1967), and the appellate court ordered interest at 6% p.a. only from that date on the specified sum.

Court's Reasoning and Analysis

The court's analysis centered on statutory interpretation of S. 77-C of the Indian Railways Act and application of the section's requirements to the facts of shortage/short delivery.

Key steps in the reasoning:

  1. Interpretation of S. 77-C: The court observed that the section expressly refers to four contingencies—damage, deterioration, leakage or wastage—and does not mention loss, destruction or non-delivery. The court therefore held that S. 77-C is confined to those four situations and has no application to loss or non-delivery of goods.
  2. Rejection of appellants' "leakage" argument: The appellants argued that the word "leakage" in S. 77-C could be broadly read to cover the present shortages. The court rejected this construction as frivolous and untenable. The court considered the dictionary meanings cited by the appellants but explained the relevant meaning of "leakage" (in commerce, an allowance for partial loss by leaking as of liquid in shipment) does not cover the loss of pipes from wagons or other such missing items. The court concluded that the present shortages cannot reasonably be described as "leakage" under S. 77-C.
  3. Even if S. 77-C were applicable, the statutory prerequisites in sub-section (2) were not satisfied: The court identified the three requirements the railway must prove under S. 77-C(2) to escape liability: (a) that goods were delivered in a defective condition or were defectively/ improperly packed; (b) that as a consequence they were liable to damage/deterioration/leakage/wastage; and (c) that such defective condition or packing was not brought to the notice of the railway administration or its servants at the time of delivery.
  4. Application of the facts to the statutory requirements: The appellants did not contest that the goods were in a defective condition at delivery; their case was limited to non-compliance with packing conditions. Critically, forwarding notes (Ex. B2) signed by the consignors expressly recorded that "P. 38F and P. 41 are not complied" in the column relating to consignment condition. Thus, the alleged defective or improper packing had been brought to the notice of the railway administration. Because the third requirement (non-notification to the railway) was not satisfied, the railway could not rely on S. 77-C(2) to escape liability.
  5. Evaluation of the appellants' evidence: The sole witness produced by the appellants (an unloading clerk, D.W.1) was not competent to rebut the forwarding-note statement that the relevant packing requirements were not complied with, and could not establish that the defective packing had not been brought to the railway's notice.
  6. Interest issue: In light of the Supreme Court authority (Union of India v. West Punjab Factories, Ltd.), the court held that interest as damages cannot be awarded in the absence of usage, contract or statutory provision. The respondents' counsel conceded the trial court's award of interest from 1 November 1966 could not be sustained; the parties accepted interest only from the date of suit (8 September 1967).
  7. Resulting disposition: Given the foregoing, the appellate court concluded that S. 77-C did not apply to absolve the appellants of liability, and even if it could apply, the statutory conditions for escape were not met. The court therefore confirmed the trial court's decree subject to the limited modification on the interest award.

Holding and Implications

Holding: The appeal was dismissed and the trial court's judgment and decree were confirmed subject to one modification. The court's core ruling may be stated as: APPEAL DISMISSED.

Concrete orders and immediate consequences:

  • The trial court's decree for recovery (originally Rs. 5,184-57) is confirmed.
  • Interest: The respondents are entitled to interest at 6% per annum only from the date of the suit—namely, 8 September 1967—on the sum stated in the opinion as "Rs. 3184—57" (the opinion expressly so modifies the trial court's earlier direction that interest run from 1 November 1966).
  • Costs: The appellants (who failed substantially) were ordered to pay the costs of the respondents.

Broader implications: The opinion interprets S. 77-C narrowly, holding it applies to damage, deterioration, leakage or wastage and not to loss/non-delivery; however, the opinion does not purport to lay down a novel principle beyond this statutory construction. No broader precedent beyond application to the facts was announced by the court in this opinion.

Show all summary ...

JUDGMENT

1. The defendants in O.S 3931 of 1967 on the file of the City Civil Court, Madras, are the appellants herein. The first plaintiff-first respondent was a consignee of two consignments-one consisting of 175 pieces of M.S black pipes 4″ diameter and 88 pieces of G.I pipes 3″ diameter and the other consisting of 143 pieces of G.I pipes 4″ diameter and 148 pieces of G.I pipes 2″ diameter, which were entrusted to the appellants herein for transportation from Sealdah to Royapuam under two railway receipts Nos. 322997 and 322998 dated 24th April 1964, one of which has been marked as Ex. B.2 When the goods were taken delivery of at Royapuram, there was a shortage of 26 Nos, of black pipes in the first consignment and 12 pieces of G.I pipes 4″ diameter in the second consignment, as evidenced by the shortgage certificate, Ex. A.5 dated 10th July 1964. It is with reference to this shortage, after issuing notice, the respondents instituted the suit for recovery of a sum of Rs. 3329.18 in respect of the first consignment and a sum of Rs. 1855.39 in respect of the second consignment. They also claimed interest at 6 percent per annum from 10th July 1964.

2. The appellants herein repudiated the claim of the respondents. They contended that they were not liable for the suit claim as there was no negligence or misconduct; that consignors had not conformed to the packing conditions that they had not bestowed the required care in dispatching the goods; and that therefore under S. 77-C of the Indian Railways Act, the appellants were absolved of their liability. They also contended that the plaintiffs were not entitled to claim any interest and that the suit itself was barred by limitation.

3. On the basis of these pleadings, the following issues were framed by the trial court—

1. Whether the plaintiffs have got the right, title and interest in the suit consignment;

2. Whether there was any negligence or misconduct on the part of the defendants;

3. Whether the plaintiffs conformed with the packing condition prescribed under the Railways Act;

4. Whether the defendants are exonerated from liability under S. 77-C of the Indian Railway Act due to the defective packing;

5. Whether the plaintiffs are entitled to claim any interest over the claim.

6. Whether the suit is barred by limitation;

7. To what reliefs are the parties entitled.

The learned VIII Assistant Judge, City Civil Court, Madras, held on issue 1 that Exs. A.1 and A.2 and B.1 and B.2 clearly proved that the first plaintiff was the consignee and that therefore the suit instituted by the plaintiffs was maintainable; on issues 2 and 4, he found that the appellants were not absolved of their responsibility and that the plaintiffs were entitled to the suit claim; on issue 3, he held that in the absence of evidence, he had to hold that the consignments had conformed to the packing conditions; on issue 5, he held that the respondents-plaintiffs were entitled to interest from 1st November 1966, the date on which the notice issued by the respondents was acknowledged; and on issue 6, 6, his finding was that the suit was not barred by limitation. In view of these findings, he decreed the suit for a sum of Rs. 5184-57 with interest at 6 percent per annum from 1st November 1966. It is against this Judgment and decree that the present appeal has been preferred by the defendants in the suit.

4. Mr. Srisailam, learned counsel for the appellants, advanced two arguments before me. One was that S. 77-C of the Indian Railways Act absolved the appellants of all liability in respect of the suit claim and the other was that the respondents were not entitled to any interest from a date prior to the institution of the suit. On the plea of limitation, the learned counsel for the appellants conceded that the limitation question was raised by the appellants on an erroneous assumption that the suit was instituted only on 23rd September, 1967, and that since it was ascertained that the suit was instituted on 6th September, 1967 itself, the suit was within time and therefore he did not repeat that contention before this court.

5. As far as the first point with regard to S. 77-C of the Indian Railways Act is concerned, the said section is as follows—

“S. 77-C(1)— When any goods tendered to railway administration to be carried by railway—

(a) are in a defective condition as a consequence of which they are liable to damage, deterioration, leakage or wastage, or (b) are either defectively packed or packed in a manner not in accordance with the general or special order, if any, issued under sub-S. (4), and as a result of such defective or improper packing are liable to damage, deterioration, leakage or wastage, and the fact of such condition or defective or improper packing has been recorded by the sender or his agent in the forwarding note, then, notwithstanding anything contained in the foregoing previsions of this Chapter, the railway administration shall not be responsible for any damage, deterioration, leakage or wastage, or for the condition in which such goods are available for delivery at destination, except upon proof of negligence or misconduct on the part of the railway administration or any of its servants.

(2) When any goods delivered to the railway administration to be carried by railway are found on arrival at destination to have been damaged or to have suffered deterioration, leakage or wastage, then, notwithstanding anything contained in the foregoing provisions of this Chapter, the railway administration shall not be responsible for the damage, deterioration, leakage or wastage of the goods on proof by the railway administration—

(a) that the goods were, at the time of delivery to the railway administration, in a defective condition or were at that time either defectively packed or packed in a manner not in accordance with the general or special order, if any, issued under sub-S. (4) and as a consequence of such defective condition or defective or improper packing were liable to damage, deterioration, leakage or wastage, and (b) that such defective condition or defective or improper packing was not brought to the notice of the railway administration or of any of the servants at the time of delivery of the goods to the railway administration for carriage by railway;

Provided that the railway administration shall be responsible for any such damage, deterioration, leakage or wastage if negligence or misconduct on the part of the railway administration or of any of its servants is proved.

(3) A railway administration shall not be responsible under sub-S. (1) or sub-S. (2) for any damage, deterioration, leakage or wastage occurring after the expiry of the period of seven days after the termination of transit as defined in sub-S. (5) of S. 77.

(4) The Central Government may, by general or special order, prescribe the manner In which the goods delivered to a railway administration to be carried by railway shall be packed.”

It will be seen that the above section refers only to four contingencies, namely, damage, deterioration, leakage or wastage of the goods carried. It does not refer to loss, destruction or non-delivery of the goods. Various provisions of the Indian Railways Act deal with different circumstances under which the railway may be held to be liable, depending upon as to whether the event that occurred was damage to the goods or deterioration of the goods or wastage of the goods or loss of the goods, or destruction of the goods or non-delivery of the goods, as the case may be. However, S. 77-C is confined only to four of the situations, namely, damage, deterioration, destruction, leakage or wastage. It has no application to the loss or non-delivery of the goods. As far as the present case is concerned, as I have already pointed out, there has been a shortage in delivery with regard to 26 Nos. of black pipes in the first consignment and 12 pieces of G.I pipes 4″ diameter in the second consignment. Therefore, that will constitute either a loss of a portion of the goods entrusted for carriage to the railway administration. Notwithstanding this, the learned counsel for the appellants advanced a startling proposition by way of construction of the provision concerned. According to the learned counsel, the word, ‘leakage’ occurring in S. 77-C (1)(a) will cover the present case. The learned counsel also contended that the expression ‘the condition in which such goods are available for delivery’ at destination occurring in S. 77(C)(i)(a) will also apply to the present case. I do not have the slightest hesitation in stating that such a contention is frivolous and utterly untenable. In support of his contention that the word ‘leakage’ occurring in S. 77-C(1) will apply to the present case, the learned counsel wanted to rely upon the meaning given to the word, ‘leak’ used as a noun occurring in Webster's New World Dictionary, 1962 Edn. One of the meanings attributed to the word, ‘leak’ as a noun in the said dictionary is, any means of escape for something that ought not to be let out, lost, etc.” The learned counsel contended that this meaning of the word ‘leak’ will show that leakage' is not confined only to leakage of liquid, that it will include escape of anything else and that in the present case the loss of the pipes in question can be considered to be escape of the pipes occurring as a result of defective package and that therefore the word, ‘leakage’ occurring in S. 77-C(1) will cover the present case. Such a contention has just to be stated to be rejected. I have already pointed out that the said meaning is given to the word, ‘leak’ used as a noun. We are concerned in this case not with the meaning of ‘leak’ used as a noun, but with the meaning of the word, ‘leakage’. One of the meanings which will be relevant in this context which is found in the same dictionary for the word, ‘leakage’ is, ‘in commerce, an allowance for a partial loss by leaking as of liquid in shipment’. Therefore, if any assistance can be derived from the said dictionary, it is this meaning that is relevant and on the face of it that meaning will not cover the facts of the present case. By no stretch of imagination the loss of the pipes from the wagons or from any other place can be said to constitute a leakage of the pipes from the wagons resulting from the defective or improper packing. Therefore, I do not have any hesitation whatever in holding that the loss or short delivery of the pieces in the present case cannot be covered by the expression, ‘leakage’ occurring in S. 77-C(1)(a) of the Indian Railways Act.

6. There is yet another reason for holding that the said section will have no application to the present case so as to enable the appellants to escape from the liability for the loss in question. The section clearly shows that the damage, deterioration, leakage or wastage must be the result or consequence of defective or improper packing. In this particular case, Ex. B-1 one of the railway receipts, contains an endorsement against the entry, ‘defective condition of the consignment or packing’ as “P/38F and P/41 not complied.” The learned trial Judge pointed out that what P. 38-F and P.41 stood for had not been made known and that in the absence of evidence as to what P.38-F and P.41 stood for, he had to hold that the consignors had conformed to the packing conditions. Apart from this, sub-S. (2) of S 77-C, of the Indian Railways Act, clearly shows that even in such circumstances, the railway administration can escape liability only on proof that the goods were, at the time of delivery to the railway administration, in a defective condition or were at that time either defectively packed or packed in a manner not in accordance with the general or special order, if any, issued under sub-S. (4) and as a consequence of such defective condition or defective or improper packing were liable to damage, deterioration, leakage or wastage and that such defective condition or defective or improper packing was not brought to the notice of the railway administration or any of its servants at the time of delivery of the goods to the railway administration for carriage by railway. In other words, in order to enable the railway administration to escape from its liability for the loss in question, the following requirements must be satisfied by them, namely, (1) that the goods were, at the time of delivery to the railway administration in a defective condition or alternatively the goods were at that time either defectively packed or packed in a manner not in accordance with the general or special order, if any, issued under sub-S (4); (2) that as a consequence of the defective condition or defective or improper packing the goods were liable to damage, deterioration, leakage or wastage; (3) that such defective condition or defective or improper packing was not brought to the notice of the railway administration or of any of its servants at the time of delivery of the goods to the railway administration for carriage by railway. As far as the first of the above three requirements is concerned, it was not the case of the appellants that the goods were, at the time of delivery to the railway administration, in a defective condition. The only case of the appellants was that the packing conditions were not complied with. Therefore, the appellants will have to establish that the packing conditions were not complied with and that as a result of the defective or improper packing, the goods were liable to damages, deterioration, leakage or wastage and that such defective or improper packing was not brought to the notice of the railway administration or of any of its servants. Whatever may be said with regard to the first two requirements, as far as the third requirement is concerned, it is not certainly satisfied in the present case. Ex. B2 contains two forwarding notes signed by Devi Prasad Khandelwal and Co. Pte., Ltd., the consignors, and the two forwarding notes as against the column ‘the consignment is in bad condition as follows’ state that ‘P. 38F and P. 41, are not complied with”. Therefore, once this statement has been made by the consignor in the forwarding notes themselves, it is clear that the defective or improper packing of the consignments in question was brought to the notice of the railway administration or of its servants and therefore the third requirement is not satisfied. The only witness who had been examined on behalf of the appellants was one Nagaraj as D.W 1. He was only an unloading clerk at Royapuram Goods Yard and therefore he was not competent to say anything about the defective or improper packing not being brought to the notice of the railway administration or of any of its servants notwithstanding the statement contained in the forwarding notes, as pointed out already. Consequently, the railway administration cannot escape from its liability to pay for the loss of the goods in question. Hence, my conclusion in this behalf is that S. 77-C of the Indian Railways Act does not apply to the present case and that even if S. 77-C can be said to apply to the present case, the requirements of S. 77-C(2) for enabling the railway Administration to escape from its liability have not been satisfied in the present case.

7. I may also point out that the same view was taken by the High Court of Delhi in Shiv Saran Dass… v. The Union Of India….(1)

8. As far as the second contention with regard to payment of interest is concerned, the decision of the Supreme Court in the Union Of India v. West Punjab Factories, Ltd..(2) makes it clear that in the absence of any usage or contract, express or implied, or of any provision of law to justify award of interest, interest by way of damages cannot be awarded. In view of this decision of the Supreme Court, the learned counsel for the respondents frankly conceded that he could not support the direction of the trial court for payment of interest from 1st November 1966 onwards and that the respondents will be entitled to interest only from 8th September 1967 the date of the suit.

9. Under these circumstances, subject to this minor modification, namely, that the respondents will be entitled to interest on the sum of Rs. 3184—57 at 6 percent per annum only from the date of the suit, namely 8th September 1967, the judgment and decree of the trial court are confirmed and this appeal is dismissed. Since the appellants have failed substantially, they will pay the costs of the respondents herein.

V.C.S