P.M Raval And Others v. K.G Ramachandran, Minor And Others.

Madras High Court
Feb 14, 1974
Important Paras
Please sign up to view Important Paras.
Smart Summary (Beta)

Summary of Legal Opinion

Factual and Procedural Background

The opinion concerns three writ petitions challenging ongoing rent control proceedings under Section 4 of the Tamil Nadu Buildings (Lease and Rent Control) Act, 1960 (the Act), seeking writs of prohibition restraining Rent Controllers from proceeding with pending petitions for fixation of fair rent.

Two of the writ petitions involve petitioners who are tenants of premises Nos. 16 and 17, Poonamallee High Road, Madras-3, and respondents 1 to 3 who are the owners of those premises. The other writ petition (W.P. No. 1154 of 1971) involves a petitioner who, together with his brother, owns premises Nos. 40, 41 and 42, Irusappa Maistry Street, Madras, while the first respondent in that petition is the tenant.

The rent control petitions before the Rent Controllers are H.R.C. Nos. 2489 of 1966 and 2942 of 1963 in the first two matters and H.R.C. No. 3885 of 1970 in W.P. No. 1154 of 1971. Each H.R.C. petition was filed under Section 4 of the Act for fixation of fair rent.

Relevant statutory and regulatory context includes Section 4 of the Act (fixation of fair rent), Rules promulgated under the Act (Madras Buildings (Lease and Rent Control) Rules, 1961), in particular Rules 8–14 and Schedule II (depreciation). The opinion also references a sequence of judicial decisions in this Court and the Supreme Court interpreting the meaning of "cost of construction" in Section 4 and the validity of Rule 12 of the Rules.

The Tamil Nadu Buildings (Lease and Rent Control) Act was later amended by the Tamil Nadu Buildings (Lease and Rent Control) Amendment Act, 1973 (Tamil Nadu Act XXIII of 1973), which completely recast Section 4; however Section 27 of the Amendment Act provided that proceedings pending at the date of its commencement must be decided according to the provisions of the Principal Act (the original Act). The present petitions therefore require interpretation and application of the Principal Act as it stood for proceedings pending before the Rent Controllers.

Legal Issues Presented

  1. Whether, in the light of the Supreme Court's decision holding Rule 12 to be ultra vires and interpreting "cost of construction" in Section 4(3)(b)(i) as meaning the original cost of construction, the Rent Controller can proceed to dispose of petitions for fixation of fair rent under Section 4 of the Act.
  2. Whether the invalidity of Rule 12 (which prescribed rates to calculate the present cost of construction) makes it impossible to ascertain the "cost of construction" required by Section 4(3)(b)(i) and therefore prevents fixation of fair rent under Section 4(3)(a).
  3. Whether Rule 14 (and Schedule II), which prescribes rates and methods for calculating depreciation, remains applicable given the Supreme Court's invalidation of Rule 12, or whether Rule 14 must also be treated as inapplicable because it is integrally linked to Rule 12.
  4. Whether, in the absence of a workable method prescribed by the statute or rules to determine "total cost" under Section 4(3), the Rent Controller has jurisdiction to fix fair rent pursuant to Section 4(1)/(3).

Arguments of the Parties

Petitioners' Arguments

  • First limb: The Supreme Court held Rule 12 to be plainly beyond the terms of the statute (ultra vires). Because Rule 12 prescribed the rates for calculating the cost of construction, the petitioners contend that with Rule 12 invalid there is no statutory prescription of rates and therefore the Rent Controller cannot ascertain the "cost of construction" as required by Section 4(3)(b)(i).
  • Second limb: Even if the "cost of construction" is interpreted as the original cost of construction (as held by the Supreme Court), the petitioners contend that the depreciation to be deducted is prescribed only in Rule 14 and Schedule II. Since Rule 12 has been held invalid, Rule 14 and Schedule II cannot be applied; accordingly the cost as contemplated by Section 4(3)(b)(i) cannot be ascertained because the statute requires deduction of depreciation at prescribed rates.

The opinion does not set out detailed or specific counter-arguments advanced by the respondents (owners or Rent Controller) in these petitions within the text provided.

Table of Precedents Cited

Precedent Rule or Principle Cited For Application by the Court
Writ Petitions Nos. 220, 221 and 321 of 1964 (on the file of this Court); judgment by Veeraswami, J. (as he then was) Held that "cost of construction" should be calculated according to rates prescribed by the Government (Rule 12) and that depreciation is to be deducted from that figure backwards (Rule 14 and Schedule II); i.e., treated "cost of construction" as present cost computed by prescribed rates. The opinion recounts this Court's earlier reasoning (Veeraswami, J.) as background, and notes the approach to calculate present cost by applying Rule 12 rates and deducting depreciation under Rule 14 as the scheme earlier adopted by this Court.
Dr. K. C. Nambiar and Ors. v. The Rent Controller, Madras and Ors., I.L.R. (1966) 2 Mad. 334 Bench of this Court confirmed the conclusion that "cost of construction" meant present cost calculated by applying the rates prescribed in Rule 12 and deducting depreciation under Rule 14 backwards. The opinion records that the Bench of this Court confirmed the conclusion reached earlier and that the matter was then taken to the Supreme Court.
K. C. Nambiar v. The IV Judge of Court of Small Causes, Madras and Ors. (Supreme Court) The Supreme Court reversed this Court's conclusion and held that "cost of construction" in Section 4(3)(b)(i) denotes the original cost of construction (not present reproducible cost); held that Rule 12 (which prescribed rates to compute present cost) plainly goes beyond the terms of the section and is therefore invalid. The opinion treats the Supreme Court's decision as controlling: it accepts the Supreme Court's interpretation that "cost of construction" means original cost and that Rule 12 is ultra vires. The Court then examines the consequences of that ruling for Rule 14 and for the Rent Controller's power to fix fair rent under Section 4.

Court's Reasoning and Analysis

The Court's reasoning proceeds in several discrete steps as reflected in the opinion:

  1. The Court first identifies the governing statutory provisions: Section 4 of the Act (fixation of fair rent), with Sub-section (3) providing that fair rent for non-residential buildings shall be nine per cent per annum on the "total cost" of the building, and Sub-section (3)(b) specifying that the "total cost" includes (i) the cost of construction "as calculated according to such rates ... as may be prescribed less the depreciation at such rates as may be prescribed" and (ii) the market value of the portion of the site, with allowances for certain features.
  2. The Court summarizes the history of judicial interpretation: this Court (Veeraswami, J.) and a Bench (Dr. K. C. Nambiar, I.L.R. (1966) 2 Mad. 334) treated "cost of construction" as the present reproducible cost computed by Rule 12 rates, with depreciation deducted backwards under Rule 14 and Schedule II; the Supreme Court reversed and held that "cost of construction" meant the original cost of construction and that Rule 12 was beyond the scope of the statute (ultra vires).
  3. On the first submission (petitioners' argument that invalidation of Rule 12 makes it impossible to compute cost of construction): the Court rejects this submission. The Court reasons that because the Supreme Court held "cost of construction" to mean the original cost of construction, the statutory phrase about being "calculated according to such rates ... as may be prescribed" must be treated as surplus/otiose. In short, if "cost of construction" denotes original cost, there is no need to apply the rates in Rule 12 to arrive at that figure. Therefore the absence of Rule 12 (being void) does not make it impossible to find the "cost of construction" as interpreted by the Supreme Court. The Court accordingly rejects the first limb of the petitioners' contention.
  4. On the second submission (petitioners' contention regarding depreciation): the Court accepts this submission. The Court analyzes Rules 12 and 14 as an integrated scheme: Rule 12 prescribes rates to compute present reproducible cost; Rule 14 (with Schedule II) prescribes the rates and method for calculating depreciation that is to be deducted from the figure arrived at under Rule 12 (backwards). Because the Supreme Court declared Rule 12 void, the Court reasons that Rule 14 cannot stand independently — Rule 14 is inextricably bound up with Rule 12 and is intended to operate on the figure produced by Rule 12. The Court notes that Schedule II's notes and illustrations presuppose the "present capital cost of the building" and that certain formulas in Schedule II are inapplicable if "cost of construction" is treated as original cost. Thus Rule 14 cannot be applied once Rule 12 is struck down.
  5. The Court then turns to the statutory consequence: with both Rules 12 and 14 inapplicable, the statute (Section 4(3)(b)(i)) contains no other prescription or method for arriving at the "cost of construction" required to determine "total cost" and hence the fair rent computation under Section 4(3)(a). Because Sub-section (1) requires the Controller to fix fair rent in accordance with Sub-section (2) or (3) and there is no independent power in the Controller to fix fair rent outside those provisions, the Rent Controller is unable to dispose of the pending petitions for fixation of fair rent in accordance with the requirements of Sub-section (3) of Section 4.
  6. On this factual-legal matrix, the Court concludes that the Rent Controller must be restrained from proceeding with the pending H.R.C. petitions, because the statutory machinery required to compute fair rent (as provided in Sub-section (3)) is not operable in the absence of the Rules previously relied upon and the Supreme Court's ruling.

Holding and Implications

WRITS OF PROHIBITION GRANTED.

Holding: The Court issued writs of prohibition in each of the three matters, restraining the Rent Controller from proceeding with the respective petitions for fixation of fair rent pending before him. Accordingly, the writ petitions are allowed and there is no order as to costs.

Implications: The direct effect of the decision is procedural and specific to the pending proceedings: the Rent Controller is restrained from proceeding with the specified H.R.C. petitions under Section 4 of the Principal Act because the statutory method to compute the "total cost" (and hence fair rent) cannot be applied in the absence of Rules 12 and 14 (the former having been declared ultra vires by the Supreme Court and the latter being inextricably connected to the former). The opinion does not purport to create a new precedent overruling the Supreme Court; rather it applies the Supreme Court's interpretation and draws the consequence that the Controller cannot lawfully proceed under Section 4(3) in these pending matters.

Show all summary ...

1. The petitioners in the former two writ petitions are one and the same and they are the tenants of premises Nos. 16 and 17 Poonamallee High Road, Madras-3 and respondents 1 to 3 therein are the owners of the said premises. The petitioner in W.P. No. 1154 of 1971 along with his brother owns premises Nos. 40 41 and 42, Irusappa Maistry Street, Madras, while the first respondent in that writ petition is the tenant of the said premises. The prayer in the former two writ petitions is for the issue of a writ of prohibition restraining the fourth respondent in the writ petitions, who is functioning as the Rent Controller, not to proceed with H.R.C. Nos. 2489 of 1966 and 2942 of 1963 respectively, pending on his file. Those rent control petitions were filed under Section 4 of the Tamil Nadu Buildings (Lease and Rent Control) Act, 1960, (Tamil Nadu Act XIX of 1960), hereinafter referred to as the Act, for fixation of fair rent in respect of the buildings in question. Similarly, W.P. No. 1154 of 1971 prays for the issue of a writ of prohibition restraining the second respondent therein, namely, the Rent Controller, from proceeding with the Rent Control proceedings H.R.C-No. 3885 of 1970, which was a petition filed under Section 4 of the Act for fixation of fair rent.

2. For the purpose of understanding the arguments advanced before me, it is necessary to refer to the relevant provisions of the Act. Section 4 (1) of the Act states that the Controller shall, on application by the tenant or the landlord of a building and after holding such inquiry as the Controller thinks fit fix the fair rent for such building in accordance with the principles set out in Sub-section (2) or in Sub-section (3) as the case may be, and such other principles as may be prescribed. Sub-section (2) deals with the principles applicable to a residential building, while Sub-section (4) deals with the principles applicable to a non-residential building. We are concerned in the writ petitions only with a non-residential building and as there is no substantial difference between the two sub-sections, I reproduce sub-section (3) of section 4 below:

3(a) The fair rent for any non-residential building shall be at nine per cent. gross return per annum on the total cost of such building.

(b) The total cost referred to in Clause (a) shall consist of

(i) the cost of construction as calculated according to such rates for such classes of non-residential buildings as may be prescribed less the depreciation at such rates as may be prescribed ;

(ii) the market value of that portion of the site on which the non-residential building is constructed ; and shall include such allowances as may be made for consideration? of locality in which the non-residential building is situated, features of architectural interest, accessibility to market, nearness to the railway station and such other amenities as may be prescribed and of the purpose for which the non-residential building is used:

Provided that such allowances shall not exceed twenty-five per cent of the cost of construction as calculated in the manner specified in Sub-clause (i).

Pursuant to the provisions contained in the Act, the Government of Tamil Nadu had framed rules called the Madras Buildings (Lease and Rent Control) Rules, 1961. As far as the fixation of fair rent is concerned, the same is dealt with in Rules 8 to 14 of those Rules. Rule 8 stated that the residential building shall be classified into four different classes, depending upon the specifications and the materials used in the construction thereof as specified in Schedule I. Rule 9 provided for the calculation of cost of construction of residential buildings. Rule 10 enumerated the amenities in respect of which allowances should be made. Rule 11 classified the non-residential buildings into : (i) factories and godowns; and (ii) other non-residential buildings. Rule 12 dealt with the calculation of cost of construction of non-residential buildings. Rule 13 dealt with allowances to be made for amenities in respect of non-residential buildings. Rule 14 is as follows:

The depreciation of buildings shall be calculated at the rates specified in Schedule II.

Schedule II to the Rules is as follows:

SCHEDULE II STANDARD RATES OF DEPRECIATION.
"The meaning of the expression " cost of construction" occurring in Sub-section (3) (b) (1) of Section 4 was the subject-matter of the decision in W. P. Nos. 220, 221 and 321 of 1964 on the file of this Court and the appeals arising therefrom. In that case, it was contended on behalf of the petitioners-tenants that the expression, "cost of construction" occurring in Sub-section (3) (b) (i) of Section 4 meant only the actual cost of construction of a particular building at the time when the building was put up, while on behalf of the Government and the landlords it was contended that the expression "cost of construction" meant only the present cost of reproducing the building and it did not mean the original cost of construction of the building in question. The argument advanced on behalf of the Government as well as the landlords in those cases was that the section contemplated ascertainment of the present cost of putting up the building by application of the rates prescribed by the Government under Rule 12, and deducting depreciation at the rates prescribed by Rule 14, read with Schedule II, backwards for the purpose of arriving at the figure contemplated by Sub-section (3) (b) (i) of Section 4 of the Act. Veeraswami, J., (as he then was), who disposed of the writ petitions observed:"

'Total cost' in Section 4 (2), (Section 4 (3) for the purposes of the present writ petitions) is a composite concept consisting of three components mentioned and out of which the cost of construction for the purpose of arriving at the total cost is to be calculated according to the rates prescribed for each class of building prescribed and not the initial expenditure incurred in the construction.

Normally, the notion of depreciation is a subsequent fall in value or reduction of worth due to deterioration arising from age, use and other causes and it is deducted from the last value of the building as reduced by previous, depreciation. But the depreciation calculated at the prescribed rates is under Section 4 (2) (b) (Section 4 (3) (b) for the purposes of the present cases) to be deducted from the cost of the construction as calculated according to the rates prescribed. When the cost of construction is arrived at on such basis, the depreciation at the prescribed rate is to be deducted therefrom backwards. This mode of deduction of depreciation is no doubt a reverse process.

On the above reasoning, this Court dismissed those writ petitions holding that the meaning of the expression 'cost of construction' was not the original cost of the building, but the present cost of reproducing the building and the actual amount referred to by Sub-section (3) (b) (1) of Section 4 has to be arrived at by ascertaining the present cost at the rates prescribed by the Government in Rule 12 and allowing for depreciation from that amount backwards at the rates prescribed in Rule 14, read with Schedule II. The above decision was taken up in appeal to a Bench of this Court and the Bench confirmed that conclusion in Dr. K.C. Nambiar and Ors. v. The Rent Controller, Madras and Ors. I.L.R. (1966) 2 Mad. 334. The matter was taken up further in appeal to the Supreme Court and the Supreme Court in K.C Nambiar v. The IV Judge of Court of Small Causes Madras and Ors. , reversed the conclusion of this Court and held that the expression, "cost of construction" in Sub-section (3) (b) (i) of Section 4 for determining the first component, when used in juxtaposition with the expression "market value" in Sub-section (3) (b) (ii) is used to denote not the market value, but the cost of original construction. In this view, the Supreme Court has held that Rule 12, which prescribed the rates at which the cost of construction is to be computed plainly goes beyond the terms of the section.

3. Thereafter, the Tamil Nadu Buildings (Lease and Rent Control), Act was amended by the Tamil Nadu Buildings (Lease and Rent Control ) Amendment Act, 1973, that is, Tamil Nadu Act XXIII of 1973. By this amendment, section 4 of the principal act dealing with the fixation of fair rent was completely recast. Notwithstanding this, Section 27 of the Amendment Act provided that every proceeding relating to the fixation of fair rent pending before the Controller or any authority on the date of the coming into force of that Act, shall be decided in accordance with the provisions of the Principal Act, that is, the Act. Thus, with regard to the proceedings pending before the Rent Controller which are the subject-matter of the present writ petitions, by virtue of Section 27 of the Tamil Nadu Act XXIII of 1973, they have to be disposed of only in accordance with the provisions contained in the Principal Act, that is, the Act, and without reference to the Amendment Act, namely, Tamil Nadu Act XXIII of 1973. Consequently, the question for consideration in these writ petitions is, whether in the light of the Judgment of the Supreme Court referred to above, the Rent Controller can proceed to dispose of the petitions before him and fix the fair rent in accordance with Section 4 of the Act.

4. The contention of the learned Counsel for the petitioners is this. The Supreme Court in the decision referred to above has held that Rule 12 is plainly beyond the scope of the statute and therefore is not valid. Consequently once Rule 12 is out of the picture, the cost of construction cannot be arrived at by the Rent Controller. The basis of this argument is that the statutory provision contemplates the cost of construction being ascertained only by applying the rates for such classes of non-residential buildings as may be prescribed and once such provision has been held to be ultra vires, there is no prescription of rates and consequently the cost of construction cannot be calculated, as provided for in the statute. The second limb of the argument is that even assuming that the cost of construction can be ascertained, in view of the decision of the Supreme Court, it means only the original cost of construction, still the cost as contemplated by Sub-section (3) (b) (i) cannot be ascertained, because the cost of construction must be reduced by the depreciation at such rates as may be prescribed and the depreciation to be deducted has been prescribed only in Rule 14 and Schedule II and those rates of depreciation cannot be applied. I shall now consider the validity of these submissions.

5. As far as the first submission is concerned, in my opinion, the same is without force. Since the Supreme Court has held that the expression, "cost of construction" occurring in Sub-section 3 (b) (i) of Section 4 means only the original cost of construction, the question of arriving at the said cost of construction by applying any rate prescribed by the Government cannot possibly arise. Therefore, the expression, "as calculated according to such rates for such classes of non-residential buildings as may be prescribed" occurring in Sub-section 3 (b) (i) of Section 4 must be deemed to be surplus or otiose having no meaning whatever. The expression, "cost of construction" itself means only the original cost of construction. Consequently, I am unable to accept the argument that, by virtue of the decision of the Supreme Court, it has-become impossible to find out the "cost of construction" as interpreted by the Supreme Court. As a matter of fact, from what I have pointed out already, it will be clear that once the expression, "cost of construction" denotes the original "cost of construction", the expression following that expression occurring in Sub-section 3 (6) (i), as extracted by me above, will be meaningless and therefore it cannot be contended that there being no prescription of the rates, the cost of construction cannot be arrived at. Hence, I reject the first submission.

6. As far as the second submission is concerned, I am clearly of the opinion that the same is well founded. I have already referred to Rules 12 and 14. Rule 12 deals with the rates for arriving at the present cost of construction, while Rule 14 read with Schedule II deals with the rate of depreciation applicable to-such cost of construction so arrived at. Once the Supreme Court has held that Rule 12 is void as being ultra vires and going beyond the terms of the section, Rule 14 also will have to go, for the simple reason that Rule 12 as well as Rule 14 form an integral part of a single and definite scheme, that scheme being to find out the present cost of reproducing the building and from that value deducting the depreciation backwards for the purpose of arriving at the cost of construction. Once, Rule 12 is held to be void, Rule 14 cannot have an independent existence, because Rule 14 is intended to operate on the figure arrived at by the application of Rule 12. In other words, Rule 14 is inextricably bound up with Rule 12 and once Rule 12 is held to be void, Rule 14 cannot stand independently and cannot be worked. This is apparent from the judgment of Veeraswami, J. (as he then was),, an extract from which I have given in the earlier portion of this judgment. The scheme of Rules 12 and 14 contemplates arriving at the present cost of reproducing a building by applying the rates prescribed in Rule 12 and from the figure so arrived at, deducting depreciation backwards, as provided in Rule 14. If the expression, " cost of construction " occurring in Sub-section (3) (b) (i) of Section 4 denotes the original cost of construction, the question of arriving at the net value after deducting depreciation backwards will not arise and the depreciation will have to be deducted forwards from that figure. Since the scheme of the rules framed by the Government contemplated deducting depreciation backwards on the basis of the validity of Rule 12, and since that rule is held to be void, Rule 14 cannot be applied. This is apparent even from the terms of Schedule II itself, which is referred to in Rule 14. It will be seen that there are three 'Notes' to Schedule II. With reference to the second Note, the Supreme Court in the decision referred to already, has stated that the language used in that Note, even as explained by the illustrations, is obscure. As far as Note 3 is concerned, it deals with finding out the actual depreciation of a building aged in years and the method of calculation, clearly contemplates that the formula will apply only when the cost of construction is held to be, " present capital cost of the building." Once the meaning of the expression, " cost of construction " is held to refer to the original cost of construction, the formula becomes incapable of application for arriving at the depreciation and therefore that itself is an internal evidence to show that Rule 14 read with Schedule II was intended to apply only to the cost of construction arrived at by the application of Rule 12 and not to the original cost of construction. Consequently, in view of the decision of the Supreme Court referred to already holding that Rule 12 is beyond the terms of the statute, I hold that Rule 14 also is incapable of application, since it is dependent upon the application of Rule 12.

7. Once Rules 12 and 14 are out of the way, the statute does not prescribe any other method of arriving at the cost of construction contemplated by Sub-section (3) (b) (i) of Section 4. As I have pointed out already, Sub-section (1) of Section 4 imposes an obligation on the Rent Controller to fix fair rent in accordance with the principles set out in Sub-section (2) or in Sub-section (3). There is no power or jurisdiction in the Rent Controller to fix fair rent independent of the provisions contained in Sub-section (2) or Sub-section (3). Even Sub-section (3) (a) of Section 4 clearly states that the fair rent for any non-residential building shall be at nine per cent, on the total cost of such building. Once the total cost of such a building cannot be arrived at as contemplated by Sub-section (3) (b) (i) of Section 4, Sub-section (3) (a) itself cannot be applied and the fair rent cannot be arrived at as contemplated by the statute. The result is, the Rent Controller will not be in a position to dispose of the petitions pending before him in accordance with the requirements of sub-section (3) of section 4.

8. Consequently, a writ of prohibition will issue in each of these cases restraining the Rent Controller from proceeding with the petitions for fixation of fair rent pending before him and involved in these three writ petitions. Accordingly, these writ petitions are allowed. There will be no order as to costs.