V. Alagar Thevar v. Madurai Municipality
Case Summary — Judgment by Ramaprasada Rao, J.
Factual and Procedural Background
The Madurai Municipality auctioned the right to collect fees in respect of weekly shandies and the annual cattle fair for the financial year 1962–1963. An auction was held on 6 March 1962; by a resolution dated 16 March 1962 the Council accepted the defendant's bid of Rs. 70,000. The defendant was put in possession from 1 April 1962. The contract period was one year, 1 April 1962 to 31 March 1963.
The contract (Ex. A.1) contained a covenant permitting the Municipal Council to determine the agreement by written notice if the contractor failed to perform covenants, and to resell or manage the market departmentally; the licensee would be liable to compensate losses and damages as per municipal accounts. The Municipality alleged the defendant collected fees in excess of prescribed rates; the Commissioner cancelled the contract by proceedings dated 25 April 1962, effective 26 April 1962, and forfeited the caution deposit of Rs. 500. The Council approved the cancellation on 3 May 1962. The defendant appealed unsuccessfully against the cancellation and also filed a writ petition (under Article 226) that prevented a re-auction purchaser from effectively running the market.
The Municipality ran the market departmentally for the unexpired portion of the contract and, after the contract period ended, assessed damages in its municipal accounts. The Municipality sued to recover damages of Rs. 20,420-53 together with interest at 12% (a calculated interest amount of Rs. 5,377-53 is shown), making a total claimed of Rs. 25,798-06. The defendant filed a written statement raising several defenses and a counterclaim; the trial court framed issues (the detailed statement of issues was omitted in the text). The trial Judge found in favour of the plaintiff on issues 2–6, held the cancellation and forfeiture valid, allowed the plaintiff's claim (including interest and collection charges as those items were not pressed by the defendant in the trial court), and decreed the suit with costs. The defendant appealed.
Legal Issues Presented
- Whether the cancellation of the contract by the Commissioner (later ratified by the Council) was valid and enforceable.
- Whether the suit for recovery of damages was barred by limitation (the suit was filed on 10 June 1965; cancellation effective 26 April 1962 and the contract period ended 31 March 1963).
- Whether the Municipality was entitled to recover interest at 12% per annum on the reckoned damages (i.e., whether interest on such damages could be claimed in law or equity in the absence of contractual provision).
Arguments of the Parties
Appellant (Defendant) — Principal Arguments
- The Commissioner had no authority to cancel the lease; the contract was void because it was not signed by the Commissioner (challenge to validity of cancellation).
- The cancellation of the agreement was illegal, void and inoperative.
- The suit is barred by limitation — filed on 10 June 1965, more than three years after the cancellation dated 26 April 1962.
- The claim for interest (described as "damages over damages") is not maintainable.
- The defendant claimed he was entitled to a refund of Rs. 17,505 and made a counterclaim for that sum.
- The deduction of 10% as departmental collection charges was said to be without legal basis.
Respondent (Madurai Municipality) — Principal Arguments
- The defendant cannot now challenge the validity of the Commissioner’s proceedings and the Council’s ratification because he did not take independent proceedings at the appropriate time and, in fact, sought a writ to prevent re-auction (which estops him).
- The suit is not barred by limitation because damages were to be reckoned only at the end of the contract period (31 March 1963) when municipal accounts could be settled; the cause of action thus accrued at the end of the financial year.
- The Municipality contended it was entitled to interest on the damages because it had been deprived of the sums during the contract period (though the respondent’s counsel hesitantly advanced this point and did not point to a contractual provision or authority in support).
Table of Precedents Cited
No precedents were cited in the provided opinion.
Court's Reasoning and Analysis
The court examined the factual matrix and the parties' conduct, then addressed each principal contention:
- On the validity of cancellation: The court noted that when the Commissioner cancelled the contract (proceedings dated 25 April 1962, effective 26 April 1962) and the Council approved that action, the defendant had an opportunity to challenge those proceedings by taking independent proceedings. Instead, the defendant accepted the cancellation without objection and actively sought a writ to restrain the Municipality from re-auctioning the right. The court held that this conduct estopped the defendant from asserting in the present recovery suit that the cancellation was beyond the Commissioner’s or Council’s statutory power. The court therefore refused to permit the defendant to litigate a matter he had the opportunity to raise earlier and had not pursued.
- On the effect of the Municipality running the market: The Municipality had two alternatives upon cancellation — re-auction the right or run the market departmentally. The Municipality attempted to re-auction on 16 May 1962, but that attempt was thwarted by the defendant's writ petition, and the record shows the Municipality ran the market departmentally for the unexpired portion of the contract. Because the re-auction did not result in a third party actually conducting the market, the court found it unnecessary (and inappropriate) to compute damages on the hypothetical assumption that the second auction's bid (Rs. 30,500) should be treated as income for purposes of damage calculation.
- On limitation: The court drew a distinction between a single, immediately actionable wrong (e.g., trespass) and a wrong that produces continuing damage over a contractual period. The court reasoned that contracts which allocate performance over a period (here, a municipal financial year) often give rise to continuing injury and the total injury can only be accurately ascertained at the end of that period when accounts are settled. Applying that principle, the court held that the Municipality's right to sue for damages (if any) accrued at the end of the contract period (31 March 1963), not on the date of cancellation (26 April 1962). Calculating limitation from 31 March 1963, the suit filed on 10 June 1965 fell within the permissible period and the limitation plea failed.
- On interest claimed at 12%: The court examined the Municipality's claim for 12% interest on the reckoned damages. It emphasised that awarding interest on such damages requires either an express contractual provision or a sound equitable basis or authority. The Municipality’s counsel had not pointed to any clause in Ex. A.1 or to any authority that would justify this interest claim. The court held that there was no contractual or equitable justification for awarding interest at 12% on the damages as claimed and therefore the item of interest was not maintainable. The trial Judge had allowed interest because the defendant had not argued against it below, but on appeal the court considered the matter afresh and disallowed the interest.
Holding and Implications
Core Ruling: The appeal was partly allowed.
Direct consequences and implications for the parties (as stated in the opinion):
- The appellate court upheld the validity of the Municipality's cancellation of the contract and the forfeiture of the caution deposit insofar as the defendant is estopped from challenging the cancellation in this suit (the defendant had not taken earlier independent proceedings and had sought a writ to prevent re-auction).
- The court held that the suit was not barred by limitation because the cause of action to quantify damages accrued at the end of the contract period (31 March 1963); the suit filed on 10 June 1965 was within time.
- The court disallowed the Municipality's claim for interest at 12% on the reckoned damages (Rs. 5,377-53 as calculated in municipal accounts), concluding there was no contractual provision or equitable basis or authority to support such interest.
- The practical effect is that the Municipality's recovery for actual damages (as reckoned in the municipal accounts — the primary damage figure set out in the record is Rs. 20,420-53) was sustained by the trial court findings which the appellate court did not overturn; however, the appellate court removed the interest component. (The opinion states the appeal is "partly allowed" and orders costs accordingly.)
- The court ordered that "each party will pay and receive costs according to their success in the appeal." The opinion does not purport to establish a new broader precedent beyond the reasoning applied to limitation and interest in the particular contractual and factual matrix of this case.
Note: This summary is limited to and faithfully reflects only the matters expressly contained in the provided opinion. Where the original text omitted lists (for example, the specific statement of issues), that omission has been noted rather than supplemented.
V.C.S
JUDGMENT
Ramaprasada Rao, J.:
The Madurai Municipality formed out its right to collect fees in connection with the weekly shandies and annual cattle fair held within its jurisdiction for the year 1962—1963. The auction was held on 6th March 1962 and the Council of the Madurai Municipality accepted the defendant's bid of Rs. 70,000 as it was the highest, by its resolution dated 16th March 1962. Admittedly the defendant was put in possession of the market from 1st April 1962. The period during which the defendant could remain in the market for purposes of collecting the fees therefrom is admittedly one year commencing from 1st April 1962 and ending with 31st March 1963. For purposes of this case one or two salient clauses of the contract may be referred to. In particular, if the contractor fails to perform or observe any of the covenants in the said agreement it shall be lawful for the Municipal Council in addition to and without prejudice to its other rights and remedies, by notice in writing, to determine the agreement or the contract and on such determination the licence granted to the defendant shall cease. It is also provided that it is open to the Executive authority of the Municipality or the council of its own volition, on such cancellation, to resell or manage the market departmentally. At the risk and cost of the licensee, and the licensee (defendant) shall be liable to compensate all losses and damages arising therefrom as per Municipal accounts. It is the common case that the defendant in violation of the terms of Ex. A.1 collected a fee far in excess of the schedule of rates prescribed by the plaintiff and this gave a cause of action to the plaintiff to determine the licence and cancel the contract. Accordingly, the Commissioner, by his proceedings dated 25th April 1962, cancelled the contract with effect from 26th April 1962, and gave notice to the defendant that caution deposit of Rs. 500 was being forfeited. Subsequently, the action of the Commissioner was approved by the council in its resolution dated 3rd May 1962. An appeal by the defendant as provided for against such cancellation to the Council of the Madurai Municipality was unsuccessful. Thereafter, the defendant did not question the right of the Council to so cancel the contract as above. An attempt was made by the Madurai Municipality to reauction the right to collect fees in the Same market by conducting an auction on 16th May 1962, but this proved abortive in the sense that the defendant caused a writ petition to be filed in this court and thwarted the subsequent auction-purchaser from effectively conducting the weekly shandy and annual cattle fair. The fact, however, remains that notwithstanding the so called reauction on 16th May 1962, the auction purchaser, one Karuppanna Thevar, did not run the market which was run departmentally by the Municipality itself. In those circumstances the Municipality had to run the market till the period of the contract was over and at the end of the contract period the damages were reckoned as per the Municipal accounts in the following manner:
Particulars of claim
Lease amount due from the defendant Rs. 70,000-00 Lew:
1. Amount remitted by the defendant as per M.R No. 36653/3-3-62 1,000-00 do as per M.R No. 26655/3-3-62 1,000-00 do as per M.R No. 40607/28-3-62 16,003-00 2. Amount collected departmentally 35,640-52 Less: 10% departmental collection charges 3,563-05 Balance. Rs. 32,073-05 Net total of items I and 2 Rs. 50,079.47 Less caution deposit forfeited 500-00 49,579-47 Balance 20,420-53 Interest for the same from 1-4 63 to 10-6-65 for 2 months and ten days at 12 per cent per annum 5.377-53 Total Rs. 25,798-06
The Municipality after apprising the defendant of such damages sustained by it as a result of the wrong committed by the defendant claimed a sum of Rs. 20,420-53 as and towards actual damages and also interest thereon at the rate of 12 percent per annum for a period of 2 years, 2 months and 10 days amounting to Rs. 5,377-53. The suit is for the recovery of the said amount with interest.
2. The defendant in his written statement raised various contentions. He would state that the Commissioner had no right to cancel the lease and the contract itself was void, because it was not signed by the Commissioner and that in any event, the cancellaton of the agreement was illegal, void and inoperative. The defendant's case is that far from he being liable to pay any amount by way of damages he is entitled to a refund of the sum of Rs. 17,505 which he paid in the course of his obtaining the contract as above. He has also made a counter claim for this and has paid the necessary court fee thereon. In any event, the deduction of 10 percent as collection charges is said to be a claim without legal basis. The defendant also resisted the claim for interest. On all these grounds the suit was resisted.
3. The plaintiff filed a reply statement denying once again the contentions of the defendant, and in particular, the right to counter claim in the sum of Rs. 17,505 and maintaining that the account was proper.
4. On the above pleadings the following issues were framed:
[The statement of issues omitted as not necessary;— Ed.]
Issue No. 1 was not pressed. On issues 2 to 6 the trial Judge held that the contract is valid and enforceable and found all the issues in favour of the plaintiff. On the question whether the cancellation of the contract was legal and whether the Municipality could forfeit the caution deposit, the learned Judge was of the view that the Municipality was in order in having cancelled the contract and forfeited the caution deposit. The 7th issue as regards the maintainability of the suit was not pressed. On the question whether the Municipality was entitled to interest, the learned Judge observed that as the learned counsel for the defendant did not argue that the plaintiff was not entitled to interest or collection charges, he was decreeing the suit for the amounts claimed under such heads as well. In the end, therefore, he decreed the suit with costs. As against this, the defendant has come up to this court in appeal.
5. Mr. R.S Venkatachari, learned counsel for the appellant, raised three contentions. The first one is that the cancellation of the contract was not in order and that in any event, the suit is barred by limitation as it was filed on 10th June 1965, beyond a period of three years from the date of the cancellation of the contract, namely, 26th April 1962 and that in any event, the claim for interest which would tantamount to damages over damages cannot be claimed. Mr. K. Alagiriswami, the learned counsel for the Municipality, contended that it is not open to the defendant now to urge that the proceedings of the Commissioner and later ratified by the Council resulting in the cancellation of the contract, could again be agitated as proceedings resulting in an illegal order as the defendant did not take independent proceedings questioning the right of the Council to cancel the contract or its competency in the matter. Secondly, it was said that the suit is not barred by limitation as the period of the contract ended with 31st March 1963 and that the damages were reckoned as on the last date when the defendants ought to have performed his obligation under the contract, and thus reckoned, the suit filed on 10th June 1965 is well within time. As regards the claim for interest, he hesitantly contended that it was a claim made since the Municipality was deprived of the suit claim during the period of the contract.
6. When the Commissioner of the Municipality, in his proceedings dated 25th April 1962, cancelled the contract with effect from 26th April 1962, and when that was duly approved by a resolution of the Council, an independent cause of action arose for the defendants to agitate for his rights if he was aggrieved. But, the defendant took the cancellation without any objection and hesitation, and on the other hand, he was anxions that the Municipality should not even re-auction the rights to collect the fees from the market as is seen from the fact that he came to court under Art. 226 of the Constitution seeking for an appropriate writ against the Municipality and injunction it from re-auctioning the right to farm out the collections. This specific attitude of the defendant obviously would estop him from contending that the cancellation of the contract was not within the power and the statutory capacity of the executive authority of the Municipality, namely, the Commissioner or the Council of the Madurai Municipality. We are unable, therefore, to accept the first contention of Mr. R.S Venkatachari that it is open to the defendant in this action filed by the Municipality for recovery of damages, to raise a contention which he ought to have raised in another independent action, which he failed to avail of in the appropriate forum and at the appropriate time.
7. If, therefore, the Municipality had the right to cancel, it had two venues of action open to it. Firstly, it could either re-auction the right to collect the fees from the market or conduct the market departmentally itself. It is seen from the record that the Municipality attempted to re-auction the right by conducting such an auction on 16th May 1962. But, as we have already stated, it was at the instance of the defendant the said attempt was thwarted and the defendant is unable to state whether any other person did conduct the weekly shandy under any authority known to law and with the express or implied consent of the Municipality. As a matter of fact, it is not disputed that it was the Municipality which departmentally ran the market for the unexpired portion of the contract; and it is in this sense the contention of Mr. R.S Venkatachari that the offer of Rs. 30,500 made by the second bidder at the auction held on 16th May 1962, should also be taken into consideration for purposes of reckoning the quantum of damages sinks into insignificance. There is, of course, some force in the contention of Mr. R.S Venkatachari that if the Municipality deemed it fit to run the market by itself auctioning the right for a second time, then the amount realised in that second auction should also enter into the computation for purposes of arriving at the quantum of damages which the Municipality could claim ultimately from the defendant. But, such is not the situation in the instant case. It is, therefore, unnecessary for us to go into the contention for hypothetical purposes.
8. The second contention of Sri. R.S Venkatachari is that the suit is barred by limitation. This again is an argument which does not see the realities of the jural relationship between the parties before us. The contract in question, is the result of an attempt on the part of the Municipality to farm out the right to collect fees from the weekly shandy and annual cattle fair in the market owned and possessed by the Municipality. Such contract ensures for a period of one financial year. It is not disputed that the financial year during which the defendant could have otherwise gained the right to collect the fees but for his lach and non-observance of the covenants of the contract would be for the year commencing from 1st April 1962 and ending with 31st March 1963. We have already referred to the fact that it was due to an act of omission or commission on the part of the defendant in the matter of working out of the agreement Ex. A.1 that resulted in the cancellation of the contract by the Municipality. Nevertheless, such contracts cannot be understood and interpreted as contracts which automatically give rise to the other party to institute an action for recovery of damages based on that singular act of omission or commission on the part of the wrong doer. There is a marked difference between actions for damages and civil actions for damages for breach of contract which do not range over a particular period during which period certain obligations are on the shoulders of the performing party to do and see that he complies with such obligations till the period of the contract is over. In case where action for damages is laid, the act or omission complained of, no doubt, gives rise to a prima facie cause of action. But in some cases the damage consequent upon the act of omission is actionable forthwith. There is a decipherable difference between the two actionable claims as above. To illustrate, wrongs such as trespass on immovable property, infringement of copyright or trade mark or any other conceivable privilege, etc., are actionable per se and the cause of action for a suit for damages accrues at that time and in that situation. But, when the purpose of a contract is spread over a period and during such a period the injury which is caused is continuing to inflict damages on the party who files the suit ultimately for realisation of damages, then the action is maintainable only in respect of the total damage suffered by that person by reason of the wrong of the wrong doer at the end of the period of the contract. Undoubtedly, an action will lie every time damage accrues from the act. The normal test which courts may adopt to differentiate between an ordinary wrong and a continuous wrong is often attributed to the contractual responsibly of the wrong doer for the state of things from which the damage arises. In the instant case the period of the contract ends with 31st March 1963. One cannot speculate whether the Municipality will sustain damages or not until the Municipal accounts are looked into and settled by the end of the financial year. This is one reason why in cases where continuing injury is perceptible, and if for such injury, a person is responsible as a wrong doer, then the initial wrong committed by him in the matter would not automatically spring a cause of action and compel the other party prejudiced to institute an action straightaway. The other party who expects performance of the contract during the period of the contract suffers the damage during the whole time, reckons it at the end of the period of contract and quantifies it with reference to the relevant data available at the end of such period.
9. If the above principle is borne in mind, then the contention of Mr. R.S Venkatachari that the suit is barred by limitation cannot be countenanced. The period of the contract ends with 31st March 1963. It is only on that date, as is seen even from the covenants in Ex. A.1, the Municipality, with reference to its accounts, can reasonably ascertain the actual damage suffered by it. It is not impossible to imagine that at the end of that period the Municipality might gain as well by collecting more fees than the bid amount of the wrong doer. In such cases the Municipality cannot have the right to sue, since it has not suffered any damage. This also is another feature which aids the principle already referred to by us that it is only on 31st March 1963, which is the ultimate end of the period of performance of the contract, that vests in the Municipality the real and effective cause of action for it to sue for damages if any, suffered by it. Time, therefore, begins to run against the Municipality not on the date when the contract was cancelled, as alleged by the learned counsel for the appellant, but on the date of expiry of the period of contract, namely, the end of the financial year. Thus reckoned, the suit filed on 10th June 1965 is well within time and the plea as to bar of limitation is therefore not sustainable.
10. The last contention of the learned counsel for the appellant has some force. Mr. Alagiriswami is unable to justify the claim of the Municipality to recover interest on damages at the rate of 12 per cent per annum on the reckoned amount, which obviously has reference to the actual damage suffered by the Municipality in relation to its Municipal accounts. The entire principle on which actions for damages could be initiated and ultimately sustained by courts of law is to avoid unjust enrichment of either of the parties to the litigation. Unless there was consensus ad idem between the parties in the matter of payment of such interest over such hypothetical damages which a party might suffer by reason of the breach of the same by one or the other it would not be possible for a court which administers both justice as well as equity to uphold the claim for interest on the damages claimed. Mr. Alagiriswami was unable to point out to us any authority to sustain the claim under this bead. He has not even referred to any express covenant in Ex. A. 1, nor has he referred us to any such agreement by necessary implication which would entitle the Municipality to claim a large sum of Rs. 5377-53 by way of interest. We are satisfied that there is no justification for the claim for interest on damages as it is not supported by contract and as it is not maintainable in equity. The learned Subordinate Judge peripherally considered this item and awarded interest on the ground that the learned counsel for the defendant did not argue that the plaintiff was not entitled to interest or collection charges, But, having regard to the fact that the learned counsel for the appellant argued before us that such interest is not claimable either in law or in equity, we are satisfied that the Municipality is not entitled to such interest. The appeal, is therefore, partly allowed. Each party will pay and receive costs according to their success in the appeal.
V.C.S