A.M. Mariappa Mudaliar v. Governor General In Council
Judgment Summary
Factual and Procedural Background
The plaintiff, a piece-goods merchant of Coimbatore with an office in Madras, sued the South Indian Railway for Rs. 6,981-10-0 as the value of three bales of sarees and cloths stolen from the Madras Beach Station goods shed. On 29 May 1946 the plaintiff's clerk Rajagopalan (P.W.1) consigned six bales through a cartman, Pullayya (P.W.2), to be booked to Tuticorin. The bales were placed near the weighing machine in the goods shed without completing formal booking procedures.
One bale was discovered missing the following morning; forwarding and risk notes (Exs. P-1 to P-3) were numbered and entered in the gate book (Ex. D-2) on the morning after the deposit. A belated complaint was made, and subsequent inquiries, police involvement and search produced recovered sarees; two accused non-railway persons were convicted and some sarees returned to the plaintiff. Further losses were discovered on 1 June and 3 June 1946. Evidence showed a persistent defect — a depression under the main corrugated iron gate — enabling entry to the shed, and the railway had been informed of that depression as early as July 1945.
The railway repudiated liability mainly on two grounds: (1) the bales had not been delivered to them for carriage within the meaning of Section 72 of the Railways Act; and (2) liability was excluded under the risk notes (Exs. P-1 and P-2) for want of misconduct by railway servants. The Master formulated eight issues (set out below). The trial judge analyzed the factual deposit, the conduct of the cartman Pullayya, the state of knowledge of railway servants, prior notice of gate defect, and authorities on when delivery to a railway occurs and on the scope of “misconduct” under risk notes.
The suit was ultimately decreed. The plaintiff was awarded two-thirds of the plaint claim less Rs. 280 (value of sarees returned by the police) with proportionate costs against the railway administration.
Legal Issues Presented
- Were the plaintiff's goods placed in the sole custody and possession of the defendant railway as alleged in paragraph 3 of the plaint and did the defendant accept the same for transport on 29th May 1946?
- Did the defendant railway become liable either as bailees or otherwise for the safe custody of the goods left in their possession?
- Was the loss in the goods shed occasioned by the negligence or any other defect in maintaining the goods shed and is the defendant liable for the loss caused to the plaintiff?
- Was not the defendant in any event liable to protect the plaintiff's interest after the first theft at the shed?
- To what damages is the plaintiff entitled?
- Is the defendant liable to pay plaintiff the damage suffered by him under the circumstances set out in the plaint?
- Is the defendant absolved under the Risk Notes A and B in the case?
- To what reliefs is plaintiff entitled?
Arguments of the Parties
Plaintiff's Arguments
- The plaintiff asserted that six bales were consigned and placed in the goods shed for despatch to Tuticorin, and that the railway should be held responsible for the stolen bales.
- Evidence included forwarding and risk notes (Exs. P-1 to P-3), complaints to railway officials (Ex. P-4, P-5) and correspondence/telegrams informing the plaintiff and railway of the losses.
- The plaintiff relied on recovery of some sarees by police and on the contention that certain bales were in railway custody when thefts occurred.
Defendant (Railway) Arguments
- The railway's written statement denied liability on two main grounds: that the bales were not delivered to the railway within the meaning of Section 72 of the Railways Act, and that the risk notes (Exs. P-1 and P-2) absolved them because there was no misconduct by their servants.
- Counsel for the railway contended that even if the bales were in the goods shed, liability did not vest until the goods were “marked” or actually loaded in the wagon (i.e., until booking was completed), and that under Sections 54 and 47 the railway could impose rules postponing the vesting of liability.
- The railway relied on the clause in the forwarding note that the railway shall not be accountable unless goods are booked and receipt is given, arguing that booking completion (loading) was essential to liability.
Table of Precedents Cited
| Precedent | Rule or Principle Cited For | Application by the Court |
|---|---|---|
| Secretary of State v. Sheo Bhagwan Chiranjilal, 68 All. 576 : (A.I.R. 1936 All. 69) | Held that consignment deposited in a railway goods shed with permission of an authorised servant was delivery within the meaning of the Railways Act, even without forwarding note tendered or receipt granted. | Used as leading authority to support the proposition that goods in a goods shed with knowledge/permission of railway servants may constitute delivery under Section 72. |
| Jalim Singh v. Secretary of State, 31 Cal. 951 : (8 C.W.N. 725) | Decision laying down the same principle that deposit with railway permission amounted to delivery. | Cited as part of a line of authority affirming that deposit with knowledge/permission of railway servants can be delivery under the Act. |
| Ramachandranath v. G.I.P. Ry., 39 Bom. 485 : (A.I.R. 1915 Bom. 24) | Another decision supporting the same principle regarding delivery by deposit in goods shed. | Relied upon to show established authority that goods in the shed with railway knowledge or permission can create bailee liability. |
| Narsinggirji Mfg. Co v. G.I.P. Ry., 21 Bom. L.R. 406 : (A.I.R. 1918 Bom. 26) | Same principle as above: deposit in shed with knowledge/permission may be delivery. | Counted among authorities reinforcing the court's view on when delivery occurs under the Act. |
| Roshan Umar Karim & Co. v. M. & S.M. Ry. Co. Ltd., 59 Mad. 789 : (A.I.R. 1936 Mad. 508) | Considered the meaning of the word “misconduct” in risk notes; provided a definition distinguishing omission (misconduct) from intentional mischief (wilful misconduct). | The court adopted and agreed with the definition of “misconduct” (an omission to do what is expected) in determining whether the railway servants' conduct amounted to misconduct under the risk note. |
| B.N. Ry. Co v. Moolji Stkka & Co., 58 Cal. 585 : (A.I.R. 1930 Cal. 815) | Held that the present form of risk note was wider in scope and enlarged railway liability (view attributed to Suhrawardy, J.). | Used to support the proposition that risk notes may be construed to enlarge rather than restrict liability, and thus the railway could be held where misconduct proved. |
| Norris v. Great Central Ry. Co., (1915) 114 L.T. 183 : (85 L.J.K.B. 285) | Considered the distinction between “misconduct” and “wilful misconduct”; Lush, J. held mere carelessness did not amount to wilful misconduct. | Cited in discussing the appropriate test for misconduct under risk notes and to explain that the court must distinguish ordinary negligence from misconduct/wilful misconduct. |
| Brabant & Co. v. King, 1895 A.C. 632 : (64 L.J.P.C. 161) | House of Lords view that the obligation of a bailee includes taking all reasonable precautions and all proper measures for protection when risks are imminent or have occurred. | Invoked to support the proposition that once risks were evident (theft had occurred), the railway had a duty to take protective steps (e.g., special watchmen or contacting police). |
| Khairati-Lal-Baboo Lal v. B.B. & C.I. Ry., A.I.R. 1928 All. 230 : (113 I.C. 743) | Held that an inference of active connivance by railway servants was a legitimate inference in circumstances where repeated thefts from certain goods occurred. | Relied upon to justify the court's inference that the concentration of thefts from the plaintiff's unbooked bales could point to connivance or active participation by some railway servants. |
Court's Reasoning and Analysis
The court proceeded by separating the facts relating to (a) the first alleged loss (night of 29 May 1946) and (b) the subsequent losses (nights of 31 May and 2 June 1946).
1) Initial deposit and the first bale: The court found the plaintiff's account of the initial deposit of six bales unsatisfactory. The cartman Pullayya's evidence was disbelieved as embellished and unreliable. Material facts supporting disbelief included: (i) the gate clerk (D.W.1) who kept the gate book had no recollection of receiving the forwarding notes on 27 May; (ii) the numbering/registration in the gate book took place only on the morning of 30th (after one bale was already missing); and (iii) there was no evidence that any goods clerk authorised Pullayya to leave the bales near the weighing machine overnight. The court held that a consignor who places goods in a goods shed without taking booking steps or apprising officials leaves the goods at his own risk; therefore the railway could not be held liable for the first bale lost on 29 May.
2) The remaining bales and acceptance of custody: As to the other five bales, the court found that the forwarding and risk notes had been numbered and the goods were to the full knowledge of railway servants in the goods shed. The court concluded that, on the facts, the railway administration must be deemed to have accepted delivery of those five bales and hence stood as bailees under Section 72 of the Railways Act. The court rejected the railway's contention that liability was postponed until goods were actually marked or loaded; it held that delivery is a question of fact dependent on surrounding circumstances and that goods deposited with the knowledge or permission of railway servants before the shed is locked can constitute delivery.
3) Railway's rule-making argument (Sections 54 and 47): The court addressed the railway’s submission that it could postpone liability by framing rules under S.54 and S.47. The court observed that any rule inconsistent with statutory liability under Section 72 would be ultra vires; the liability of the railway as bailee under Section 72 could not be avoided by contractual terms or rules that sought to evade the statutory duty.
4) Misconduct and scope of liability under the risk note: The court recognized that liability under the risk note (Ex. P-2) is limited to losses caused by misconduct of railway servants and that the consignor must strictly prove such misconduct. The court adopted the definition of “misconduct” set out in Roshan Umar Karim (an omission to do what is expected) and accepted the distinction between mere negligence and wilful misconduct discussed in Norris. Applying these principles, the court found multiple grounds of misconduct:
- Prior notice of a defect in the gate since July 1945, which the railway had neglected to rectify.
- The apathy of the goods shed staff and station master in failing to take prompt protective steps (for example putting special watchmen on duty or telephoning the police) after thefts had occurred.
- The suspicious concentration of thefts on unbooked bales to the apparent exclusion of other booked articles, together with the practical improbability of repeated removal of heavy bales without some active connivance; the court considered an inference of connivance legitimate in these circumstances.
5) Result on liability: On these findings the court concluded there was misconduct by railway servants in respect of the second and third bales lost; therefore the railway was liable for those losses as bailees. The first bale, where delivery to the railway had not been established, did not attract railway liability.
6) Remedies and quantification: The court quantified relief by decreeing two-thirds of the plaint claim less Rs. 280 (the value of sarees returned by the police), with proportionate costs against the railway administration.
Holding and Implications
Holding: The court entered judgment for the plaintiff. In substance the court held that the railway was liable as bailees under Section 72 of the Railways Act for two of the stolen bales and the plaintiff was awarded two-thirds of the plaint claim less Rs. 280, together with proportionate costs.
DISPOSITION: Suit decreed; decree for two-thirds of the plaint claim less Rs. 280 and costs against the railway administration.
Implications:
- The court affirmed that delivery to a railway (and consequent bailee liability under Section 72) can arise from the deposit of goods in a goods shed with the knowledge or permission of railway servants even if the formal booking process has not been fully completed; the question is one of inference from facts.
- The court held that railway rules or forwarding-note clauses which seek to postpone or avoid statutory liability under Section 72 are ineffective to the extent they are inconsistent with the statute (i.e., such rules would be ultra vires).
- The liability under the risk note is confined to losses due to misconduct of railway servants; the consignor must prove misconduct, but misconduct may include omissions to take steps reasonably expected (as explained by the authorities cited). On the facts the court found such misconduct proved in respect of the second and third bales.
- The judgment applied existing precedents and legal principles to the facts but did not purport to announce a novel rule of law beyond those authorities; its immediate consequence was the monetary decree and costs in favour of the plaintiff and a statement of how Section 72, risk notes and rule-making powers interrelate in this factual context.
Note: The summary above reproduces only the factual findings, legal issues, arguments, authorities and reasoning expressly contained in the provided opinion. No information has been added that is not found in the opinion text.
JUDGMENT
1. The plaintiff, piece goods merchant of Coimbatore with an office in Madras, sues the South Indian Railway for the recovery of Rs. 6981-10-0 as the value of three bales of sarees and cloths which were stolen from the Madras Beach Station goods shed.
2. The admitted facts are these. On 29th May 1946 the plaintiff's clerk Rajagopalan (p. W. 1) consigned six bales through cartman maistry one Pullayya P. w. 2 to be booked to Tuticorin. He placed these bales near the weighing machine in the goods shed without any formalities of booking being complied with. The next morning the forwarding note, Ex. P-1, and the risk notes Exs. P-2 and P-3 were numbered and entered by the railway gate clerk D.W 1 in the gate book Ex. D-2 in which the forwarding note ex. P-1 was assigned number 294. In the meantime one of the bales kept in the goods shed was stolen the previous night. Rather belated complaint was made about this disappearance by Pullayya. Rajagopalan made complaint (Ex. P-4) to the Chief Commercial Superintendent with copy to the Goods Station Master, Sankaranarayana Ayyar, (D.W 3) who has since retired, and sent telegram to the plaintiff in Coimbatore District. The remaining five bales continued to remain in the goods shed without apparently anything being done till 1st June when Rajagopalan went with the plaintiff's son (P.W 4) who had come from Coimbatore and discovered another bale missing. On the advice of the goods station staff who appeared to have assumed no responsibility for unbooked goods lying in the goods shed P.W 4 sent letter Ex. P. 5 to Trichinopoly bringing to notice the loss of the second bale and asking for open delivery of the remaining bales lying at the Beach station. The goods station master also on 1st June 1946 sent complaint Ex. P. 12 to the Madras Police enclosing copy of this letter and asking for investigation. There was, however, neither development nor police investigation until the morning of 3rd June the four bales still lying in the goods shed. The senior assistant goods clerk D.W 6 on coming to duty at about 7 A.M found some coloured thread scattered outside the main goods shed gate way. He immediately sent word to the station master D.W 3 who arrived and telephoned to the police. After head constable arrived the goods shed gate, the seals of which were in tact, was opened. It was subsequently discovered that third bale belonging to the plaintiff had been stolen obviously by thieves during the night. The Inspector of Railway Police, Egmore, A.W Fernandez who has since retired arrived at that morning and found underneath the main corrugated iron gate which closes the railway line which admits the wagons into the goods shed space about foot wide which had been formed an the masonry of the floor, through which on experimentation he found that medium-sized man could squeeze without scratch. It is not disputed that this was the modus operandi by which thieves entered the goods shed and made way with these bales. These investigations (resulted in case against two accused woman (A-1) and man (A-2) not employees of the railway who were convicted the former under S. 411, Penal Code, and sentenced to rigorous imprisonment for four months and the latter under S. 414, Penal Code, to rigorous imprisonment for only one month. They produced sarees from hiding places on confessions they made. 28 sarees were returned by the police to the plaintiff who has in his claim given credit for their value.
3. A very significant piece of evidence is furnished by the Railway Police Inspector, P.W 3 who deposed that the goods station master (D.W 3) who worked in this capacity from 1941 to October 1916 told him that he had sent up report about this depression under the main trailway gate to his superiors in July 1945 and that no action had been taken. (After discussing the evidence, the judgment proceeded:) I must find, therefore, at the commencement that there was this defect in the gate brought to the notice of the railway authorities which they unfortunately neglected to rectify. It may be that by the use of crowbar this depression was enlarged for purposes of these thefts and camouflaged by being filled with earth and debris to escape notice. The railway company repudiated liability for the loss of these bales in prolix written statement mainly on two grounds: (1) that the bales had not been delivered to them to be carried by rail within the meaning of Section 72 of the Railways Act, and (2) that they were absolved from liability under the notes Exs. P-1 and P-2 as there to no misconduct on the part of any of their servants. These are the two main points which arise for determination though the Master framed the following issues:
1. Were the plaintiff's goods placed in the sole custody and possession of the defendant railway as alleged in para. 3 of the plaint and did the defendant accept the same for transport on 29th May 1946?
2. Did the defendant railway become liable either as bailees or otherwise for the safe custody of the goods left in their possession?
3. Was the then in the goods shed occasioned by the negligence or any other defect in maintaining the goods shed and is the defendant liable for the loss caused to the plaintiff?
4. Was not the defendant in any event liable to protect the plaintiff's interest after the first then at the shed?
5. To what damages is the plaintiff entitled?
6. Is the defendant liable to pay plaintiff the damage Buffered by him under the circumstances set out in the plaint?
7. Is the defendant absolved under the Risk Notes A and B in the case?
8. To what reliefs is plaintiff entitled?
4. The plaintiff has put forward an unacceptable case about the initial deposit of the six bales in the goods shed. The evidence of the cartman maistry Pullayya who was well known to the goads shed staff as regular customer who booked goods for various clients tries to make out that he took these six bales along with the forwarding note and risk notes (Exs. P. 1 to P-3) signed by P.W 1 in his cart to the goods shed on 27th May 1946 and was told that there was no booking of piecegoods that day and very strangely left exs. P. 1 to p. 3 in the goods shed with one of the clerks. He took the 6 bags back. He was later told by P.W 1 that the goods could be booked on 29th on which date he brought these six bales again to the goods shed in his cart. The evidence of Pullayya which is most unsatisfactory is that when he after placing the bales near the weighing machine he asked for the railway receipt the weighing clerk told him that it was not booking day and asked him to come the next day. In cross examination Pullayya said that the “manager” presumably D.W 3 and his clerk told him to take the bales back on 27th although he says that they retained Exs., p. 1 to P. 3. I have no hesitation whatsoever in dis-believing Pullayya's evidence which is obviously embellished and calcuated to prove from the first fact that Exs. P-1 to P-3 were continuously in the possession of the railway company that even from 27th May that the mere placing of these bales in the goods shed on the 29th established delivery to the railway company for despatch.
5. The gate dark, D.W 1 whom I believe, says that he comes on duty at a. M. and that he finds on his table pile of forwarding notes placed there by cartmen which after check he enters in serial order in his gate books Ex. D2. Number 1 to 500 are given and then fresh series is commenced for the forwarding notes. His evidence which is not disputed is that there were certain days nominated for booking piece goods to Tuticorin namely Mondays and Thursdays. He has no recollection of the cartman Pullayya coming to him on the 27th and making any enquiries. Whether Pullayya did actually bring the 6 bales in his cart on the 27th itself along with Exs. P. 1 to P-3 is quite immaterial. As cartman who knew the ins and outs of booking goods, I gravely doubt whether he in fact took the trouble to cart these goods without first ascertaining whether they could be booked that day. What I am convinced about is that he never handed over Exs. P-1 to P-3 to any goods shed railway clerk on 27th May. How then were these six bales registered by the gate clerk on the morning of 30th with descriptions taken from Exs. P. 1 to P. 3 after one of the six bales placed in the goods shed the evening before had disappeared. It is in evidence that there are two goods sbeds, one larger goods shed where these were placed and the other smaller one in which the goods station master or the chief goods clerk has his office. It is admitted on all hands by the goods railway clerk examined and also by the Railway Inspector P.W 3 that in the larger goods shed there were lying both booked and unbooked consignments and also in different portion of this goods shed inward packages received awaiting delivery to consignees.
6. The gate clerk D.W 1 has described the procedure of booking goods in various stages, (1) numbering the forwarding notes and risk notes and entering them in the gate book, (2) their being taken to the weighing clerk, (3) marking of the bales and (4) actual loading into the wagon after which railway receipts are given. D.W 1 asserts that unbooked goods on any day must be taken away and not left at the goods shed during the night and the railway company point to large placard posted that goods kept in the goods shed at consigners' risk unless the forwarding notes are tendered and accepted. It appears to be quite possible in the confusi in which seems to have reigned in this goods shed for cartman known to the goods shed staff as being professional booking agent to have placed these bales near the weighing machine without arousing any suspicion or even apprising them of the fact that he had done so. As I have said the conduct of this cartman Pullnyya quite apart from the unsatisfactory evidence he has given is most suspicious. He has failed to explain the most important piece of evidence in the case that the numbering of the forwarding notes in the gate book was only on 30th June 1946 whereas he says he placed six bales in the goods shed the evening before. Even assuming that he had placed the bales in the goods shed intending to book them he should after having got the forwarding notes numbered have discovered the then of the bale much earlier that morning in the process of booking. The strong probability also is that he knew the day of the week on which the railway booked these goods to Tuticorin and why he brought these bales to the station that day before has not been satisfactorily explained. The position might have? been different if the forwarding notes had been registered in the gate book on 29th May 1948 before he took these bales to the goods shed. In the circumstances there is no satisfactory evidence at all that Pulayya did deposit six and not five bales in the goods shed on 29th or that the railway company were even apprised of the existence of these bales in their goods shes on the night of 29th May 1946 nor is there any evidence except that of the interested and unreliable testimony of Pullayya that any goods clerk gave him permission to keep the bales near the weighing machine for the night. Anyone who places goods in railway goods shed without taking any initial step in the matter of booking or even apprising the goods shed officials that he is doing so clearly leaves the goods there at his own risk and the railway administration cannot be held responsible as there has been no delivery to them of such goods for being railed.
7. The position as regards the two remaining bales which were lost during the night of 31st May and 2nd June as it appears to me is quite different. As regards them the entire goods staff were apprised of the existence of these five bales which had been brought to the station for despatch for being railed. The forwarding note and risk notes had also been numbered. I do not believe the evidence of D.W 3 that he not only disclaimed responsibility on 30th May 1936 but asked Pullayya to take the bales away and that he refused. These five bales were therefore to the full knowledge of the railway servants in the goods shed in railway custody under somewhat peculiar circumstances, it is true, with one bale alleged to have been stolen from their goods shed before they can be deemed to have accepted delivery. These goods were allowed to be along, aide other booked articles and the railway administration retained them in their custody clearly as bailees under Section 72 of the Railways Act. The learned advocate for the railway urges that their delivery is not complete unless the goods are either “marked” or loaded in the wagon. There is wealth of authority as regards this contention against the defendant. In Secretary of State v. Sheo Bhagwan Chiranjilal, 68 All. 576 : (A.I.R (23) 1936 All. 69), it was held that consignment of bales of hemp deposited in railway goods shed with the permission of an authorised servant of the railway was delivery within the meaning of the Act, although no forwarding note was even tendered by the consigner and no receipt was granted to him. In that case the goods were destroyed by fire caused by sparks from an engine. The railway company was held to be grossly negligent in failing to make adequate and reasonable provision for the protection of these goods. Other decisions laying down the same principle are Jalim Singh v. Secretary of State, 31 Cal. 951 : (8 C.W.N 725), Ramachandranath v. G.I.P Rly., 39 Bom. 485 : (A.I.R (2) 1915 Bom. 24) and Narsinggirji Mafg. Co v. G.I.P Rly., 21 Bom. L.R 406 : (A.I.R (5) 1918 Bom. 26).
8. Mr. Ramachandra Ayyar has elaborated an argument for the railway administration that although the bales may have been in their goods shed to the knowledge of their servants from the 30th May they only accepted liability after the goods are actually loaded and that under Section 72 of the Railways Act, read with S. 54 and S. 47 they can, as I understand his argument, postpone the vesting of liability by the formulation of certain rules. Under S. 54 railway company may impose conditions not inconsistent with the Act with respect to the receiving, forwarding or deli, very of any animals or goods. Under S. 47(f) the railway company may make rules consistent with the Act for regulating the terms and conditions on which they will ware-house or retain goods at any station on behalf of the consignee or owner. He lays stress on cl. (1) of the forwarding note itself which contains condition accepted by the consignor that the railway shall not be accountable for any articles unless they are booked and receipt for them given by their clerk or agent. He concedes that in the fact of the case law I have referred to supra, this condition, so far as it relates to the actual passage of the receipt is ultra vires but he contends that the goods must be booked before liability of the railway administration commences, and that the vesting of liability in the railway is postponed till the goods are at any rate loaded in the wagon, an act which completes the booking. The liability of the railway company as bailee is governed by Section 72 of the Act and any rule which seeks to evade this liability must be deemed to be inconsistent with the Act and therefore ultra vires.
9. Whether there has or there has not been delivery to the railway administration is an inference of fact from the circumstances of each case. If the consignor was specifically refused permission to keep his goods in the goods shed over night and directed to remove them by the officials responsible it may be possible to hold that the goods would lie there entirely at the consignor's risk without any contract of bailment. But in cases where to the knowledge of the goods shed officials or with their permission specific goods lie in goods shed, deposited there before the shed is locked up for the night, the railway company cannot as it appears to me avoid the responsibilities of bailees under S. 72. It must be remembered that the consignor in such case is afforded no facilities for watching his goods at night. They are taken into the exclusive custody of the railway company and in this case they lay side by side in the goods shed along with booked articles and also articles awaiting delivery to consignees. Delivery in such case cannot be made contingent on the completion of particular stage in the process of booking. It is an inference to be drawn from the circumstances of each case. I have no hesitation in finding that in this particular case the railway administration must be deemed to have accepted delivery of the five bales which to the knowledge of their goods shed officials were in their goods shed, when it was locked up for the night on 80th May. A complaint had been made to them that one of the bales had been stolen from the goods shed the night before. A consignor who sends goods to the goods shed some of which get lost during the day before the goods shed staff accept delivery would be on an entirely different footing and cannot make the railway administration liable as bailees. It is on this principle that no liability for the first bale alleged to have been lost on the night of 29th May can be fastened on the railway; but as regards their liabilities an bailees under S. 72 of the Act as regards the second and third bales lost there can. I think, be no doubt.
10. The liability of the railway company must of course be restricted to the risk note Ex. P-2 and it is necessary for the consignor strictly to prove misconduct of the railway servants which led to this loss. Prior to 1924 the words in this risk note were “wilful negligence”. In some English decisions the words used and construed in such risk notes were “wilful misconduct”. The meaning of the word “misconduct” has been elaborately considered by Yenkataramana Rao, J. in Roshan Umar Karim & Co. v. M. & S.M Ry. Co. Ltd., 59 Mad. 789 : (A.I.R (23) 1936 Mad. 508). In B.N Ry. Co v. Moolji Stkka & Co., 58 Cal. 585 : (A.I.R (17) 1930 Cal. 815), Suhrawardy, J. took the view that the present risk note was wider and more comprehensive in enlarging the liability of the railway. The distinction between misconduct and ‘wilful misconduct’ was considered in Norris v. Great Central Ry. Co., (1915) 114 L.T 183 : (85 L.J.K.B 285) where Lush, J. held that mere carelessness on the part of the railway servants was not sufficient and did not constitute intentional wrong conduct amounting to wilful misconduct. Venkataramana Rao, J., after comprehensive review of all the available authority defined ‘misconduct’ as follows: “A mere omission to do what is expected of person to do constitutes misconduct” whereas if such failure is directed to intentionally cause mischief or loss to any person then it is called wilful misconduct. With great respect I am in complete agreement with this definition. There is really no difference in substance in the liability of the railway company as bailee under Section 151 of the Contract Act, who is expected to take as much care of the goods bailed to them as man of ordinary prudence would under similar circumstances take and in their liability as restricted in the risk note to cases of misconduct by their servants.
11. The facts of this case present no difficulty or nice distinction, in any event between misconduct and what is not misconduct on the part of the railway servants. In the first place, there was this defect in the railway gate which had not been rectified since 1945. In the second place there was the apathy of the goods shed station master and staff in taking no immediate action to stop recurrence of the astonishing thefts of these large bales. It may be that they laboured under the delusion that as the goods had not been technically booked the railway administration were in no way liable for their loss. The least the Station Mastsr should have done was to have put special watchmen on duty at this gate or to have telephoned immediately to the police at any rate after the disappearance of the second bale. A railway watchman has been examined as D.W 6 who as may be expected, swore to his being in constant state of vigilance all through the night. In Brabant & Co. v. King, 1895 A.C 632 : (64 L.J.P.C 161), the House of Lords expressed the view that the obligation of bailee included not only the duty of taking all reasonable precautions to obviate risks but the duty of taking all proper measures for the protection of the goods when such risk were imminent or had actually occurred. Finally there is the irrestible inference from the facts that the removal of the contents of these bales each weighing 4½ maunds in astonishing succession could not have been achieved without the active connivance of some of the railway servants. In Khairati-Lal-Baboo Lal…Plaintiff Applicant; v. B.B & C.I Ry.…Defendant Opposite Party., A.I.R (15) 1928 All. 230 : (113 I.C 743), Banerji (Walsh?) J. held that such an inference was legitimate one in rather similar circumstances.
12. The concentration of the culprits on this lot of unbooked bales to the exclusion of other booked articles is prima facie very suspicious and permits reasonable inference that this concentration rose from delusion, since the railway servants were under, that unbooked articles in the goods shed were not the subject-matter of responsibility of the railway administration but were fair game to be preyed upon with impunity. I find misconduct on the part of the railway servants clearly proved as regards the second and third bales lost.
13. In the result plaintiff will have decree for two-third of the plaint claim less Rs. 280 the value of some other saris returned to him by the police subsequent to the plaint with proportionate costs against the railway administration.
C.R.K/V.B.B
14. Suit decreed.