Kanayalal Madhavji Thakkar v. Shree Padmanabh Builders .

Bombay High Court
Nov 23, 2010
Important Paras
Please sign up to view Important Paras.
Smart Summary (Beta)

Factual and Procedural Background

This appeal arises from a judgment of a learned Single Judge dated 24 November 2006, which made absolute a Motion for rejection of a counter-claim under Order 7, Rule 11(d) of the Code of Civil Procedure, 1908, on the ground that the counter-claim was ex facie barred by limitation.

Chronology and key factual points as presented in the opinion:

  • 27 March 2000: Shri Padmanabh Builders (original Plaintiff) instituted a suit against Kanayalal Madhavji Thakkar (original Defendant) seeking declarations and injunctive relief relating to rights in additional F.S.I. beyond 2455 sq.ft and alleging termination of the development agreement by a letter dated 7 February 2000.
  • Letters of 7 February 2000 (annexed as Exhibit 'J' to the original Plaint) and 24 February 2000 indicated termination/cancellation of the agreement and Power of Attorney and asserted that the agreement/Power of Attorney had come to an end on completion of construction quantifiable at 2455 sq.ft.
  • 9 August 2004: The original Defendant lodged a counter-claim (referred to in the opinion as the Plaintiff to the counter-claim) seeking declarations and specific performance to the effect that the development agreement and Power of Attorney continued to subsist.
  • The Defendant to the counter-claim moved under Order 7, Rule 11(d) for rejection of the counter-claim on limitation grounds; the Single Judge made that motion absolute. This appeal challenges that decision.

Legal Issues Presented

  1. Whether the counter-claim filed on 9 August 2004 is barred by limitation having regard to the alleged termination of the agreement (by letter dated 7 February 2000) and the suit instituted on 27 March 2000.
  2. Whether, in deciding an application under Order 7, Rule 11(d), the Court may determine limitation on the face of the plaint/counter-claim when the plaint/counter-claim (and supporting averments) indicate knowledge of termination or refusal to perform.
  3. Whether a plea of limitation can properly operate as a ground for rejection under Order 7, Rule 11(d), and the extent to which authorities permit or limit such rejection without leading evidence or framing specific issues.

Arguments of the Parties

Appellant's Arguments

  • The letter dated 7 February 2000 (annexed as Annexure‑J to the original Plaint) was not referred to within the counter-claim; therefore, it was contended that that letter could not be adverted to for the purpose of rejecting the counter-claim under Order 7, Rule 11(d), relying on the plain language of that provision.
  • The appellant argued that a plea of limitation would not amount to a plea that the suit is barred under any law within the meaning of Order 7, Rule 11(d), i.e., that limitation is not a proper ground for rejection under that rule.

Respondent's Arguments

  • The suit instituted by the Respondent on 27 March 2000 itself constituted repudiation and notice of refusal to perform, and the original Plaint set out termination of the agreement dated 1 October 1989 on 7 February 2000; therefore the counter-claim lodged in 2004 was beyond three years and barred by limitation.
  • It was argued that the Plaintiff to the counter-claim could not escape limitation consequences by clever drafting or by failing to advert specifically to the 7 February 2000 letter, especially given that the counter-claim was lodged with knowledge of the original suit and documents; the institution of that suit amounted to a notice of refusal to perform.
  • The respondent relied on Supreme Court authority that the applicability of Order 7, Rule 11(d) must be decided on the facts of each case and that where a plaint (or counter-claim) is ex facie barred by limitation it is within the Court's jurisdiction to reject it under Order 7, Rule 11(d).

Table of Precedents Cited

Precedent Rule or Principle Cited For Application by the Court
Sopan Sukhdeo Sable v. Assistant Charity Commissioner, 2004 (3) SCC 137 (AIR 2004 SC 1801) The object of Order 7, Rule 11 is to keep out irresponsible lawsuits; for clauses (a) and (d) the averments in the plaint are germane and the defendant's written statement is irrelevant at that stage; courts must read the plaint meaningfully and not be misled by clever drafting creating an illusion of cause of action. The Court relied on this principle to hold that the statements in the counter-claim must be read on their face and that clever drafting cannot defeat a proper application under Order 7, Rule 11(d).
Poput and Kotecha Property v. State Bank of India Staff Association, (2005) 7 SCC 510 Under Order 7, Rule 11 an independent remedy exists to challenge maintainability; the Court has a duty (word "shall") to reject the plaint when it is hit by infirmities under Rule 11; the statement of claim without addition or subtraction must show it is barred. The Court cited this authority to support the proposition that on the face of the counter-claim (without taking evidence) the Court may reject a claim that is ex facie barred by limitation.
Balasaria Construction (P) Ltd. v. Hanuman Seva Trust, (2006) 5 SCC 662 and (2006) 5 SCC 658 The Court discussed whether rejection on the bar of limitation falls within Rule 11(d); earlier reference to a larger Bench and subsequent outcomes showed that question can be fact-specific and may be academic depending on parties' positions. The opinion used this precedent to show the factual sensitivity of Order 7, Rule 11(d) applications and that in some cases limitation cannot be found ex facie; but the present case was distinguished on its facts as ex facie barred.
Hardesh Ores (P) Ltd. v. Hede and Company, (2007) 5 SCC 614 Accepted a plea that a plaint is liable to be rejected where a suit for specific performance is barred by Article 54 of the Limitation Act — suit for specific performance must be filed within three years from date of notice of refusal to perform. The Court relied on this authority to support that a suit for specific performance may be rejected under Order 7, Rule 11(d) where limitation is apparent on the face of the plaint/counter-claim.
Kamala v. K.T. Eswara Sa, AIR 2008 SC 3174 Proposition that on an application under Order 7, Rule 11 the Court would not consider evidence or enter into disputed questions of fact. The Court applied this principle to confirm that its decision had to be made on the face of the counter-claim without admitting extraneous evidence or resolving disputed factual issues.

Court's Reasoning and Analysis

The Court undertook a step-by-step analysis grounded in the pleadings and cited authorities:

  1. Foundational principle: Under Order 7, Rule 11(d) the Court must determine if the plaint/counter-claim, on its face, shows that the claim is barred by any law; this determination is to be made from the averments in the plaint/counter-claim without admitting evidence or resolving disputed factual issues.
  2. Examined the pleadings and documentary material referred to within the counter-claim: the counter-claim itself referred to the institution of the suit (27 March 2000) and relied upon correspondence and documents antecedent to the filing of the counter-claim, including a notice dated 23 June 2004 which itself stated that the power of attorney had been terminated.
  3. Observed that the original Plaint (filed 27 March 2000) contained Exhibit 'J', the letter dated 7 February 2000, which stated plainly that the agreement and Powers of Attorney were cancelled; that letter and the institution of the suit were treated as a notice of refusal to perform.
  4. Applied the Limitation Act: Article 54 requires a suit for specific performance to be filed within three years from the date of notice of refusal to perform; Article 58 requires suits for declaration to be filed within three years from accrual of the right to sue.
  5. Concluded that, on the face of the counter-claim and its own averments (and given knowledge of the suit and of the 7 February 2000 termination), the cause of action for the reliefs claimed in the counter-claim accrued in February 2000; the counter-claim filed on 9 August 2004 therefore lay beyond the three-year period.
  6. Addressed the appellant's objection that the 7 February 2000 letter could not be considered because it was not specifically incorporated into the counter-claim: the Court held that the counter-claim referenced the suit and documents prior to its filing and that the notice of termination was manifest on the face of the pleadings and annexures relied upon by the counter-claim itself.
  7. Surveyed Supreme Court decisions (as cited) to conclude that it is settled that where, on the face of the statement of claim (or counter-claim), limitation is apparent, the plaint/counter-claim can be rejected under Order 7, Rule 11(d) without leading evidence; the present case fell into that category.
  8. Accordingly, the Court found no infirmity in the Single Judge's reasoning that the counter-claim was ex facie barred by limitation and that rejection under Order 7, Rule 11(d) was appropriate.

Holding and Implications

Holding: APPEAL DISMISSED. The Court upheld the Single Judge's order making absolute the Motion under Order 7, Rule 11(d) and held that the counter-claim filed on 9 August 2004 was barred by limitation.

Implications:

  • Direct effect: The counter-claim was rejected as being ex facie barred by limitation; the Single Judge's order was affirmed and the appeal dismissed.
  • Scope of precedent: The Court applied existing Supreme Court principles concerning Order 7, Rule 11(d) and the Limitation Act. The opinion does not purport to lay down a new principle of law beyond applying those authorities to the facts of this case.

Appeal dismissed.
Show all summary ...

Dr. D.Y Chandrachud, J.:— This appeal arises out of an order of a learned Single Judge dated 24 November, 2006 by which a Motion for the rejection of a plaint under Order 7, Rule 11(d) of the Code of Civil Procedure, 1908 was made absolute. The motion proceeded on the foundation that the claim of the Plaintiff to the counter-claim (the original Defendant to the Suit) was ex facie barred by limitation.

2. On 27 March, 2000, Shri Padmanabh Builders (the original Plaintiff) instituted a suit against Kanayalal Madhavji Thakkar (the original Defendant) inter alia seeking a declaration that the Defendant does not have any right, title or interest in respect of the additional F.S.I that may be available in respect of the suit properties in excess of 2455 sq.ft already consumed by the Defendant under an agreement dated 1 October, 1989 and that the Defendant does not have any right to sell or enter into any agreement for sale of units beyond 2455 sq.ft granted under the aforesaid agreement. Injunctive relief was sought against the Defendant from carrying out any further construction and from entering into agreements for sale. The case of the Plaintiff was that the agreement dated 1 October, 1989 was terminated by a letter dated 7 February, 2000. By a further letter dated 24 February, 2000, the Defendant was informed that in view of the circumstance that the Defendant had unauthorisedly consumed F.S.I in excess of what was authorised under the agreement, the Plaintiff was entitled to terminate the agreement and that in any event, both the agreement and the Power of Attorney granted to the Defendant had automatically come to an end upon the completion of the construction by consuming a quantified F.S.I of 2455 sq.ft

3. A counter-claim was lodged by the Defendant to the suit on 9 August, 2004. The Motion which has been made absolute by the learned Single Judge is for the rejection of the counter-claim on the ground that it is barred by limitation. Hence, for convenience of reference, it would be appropriate to refer to the parties to the counter-claim as the Plaintiff to the counter-claim and the Defendant to the counter-claim. The relief that has been sought by the Plaintiff to the counter-claim is (i)A declaration that the Plaintiff is entitled to all rights, title and interest emanating from the development agreement dated 1 October, 1989 and that the Power of Attorney executed by the Defendant to the counter-claim continued to be subsisting and binding; (ii) A decree for specific performance to transfer all rights, title and interest in the suit property; and (iii) A declaration that the Defendant to the counter-claim has no right or interest in the suit property. In paragraph 17 of the counter-claim, the Plaintiff stated that in 1998- 99 when he was in the process of carrying out further development in the suit property, one of the newly inducted partners of the Defendant tried to cause obstruction, taking advantage of the fact that the conveyance and Power of Attorney were unsigned documents. The counter-claim adverts to the suit instituted in this Court and to the circumstance that an application for interim relief has been made in the suit. The counter-claim contained a statement that by a notice dated 23 June 2004, the Defendant in collusion with the Co-operative Society tried to terminate the Power of Attorney and wanted to further develop the property with the balance loadable FSI. According to the Plaintiff, it appears that Defendants are trying to take control of the property by giving a notice dated 23 June, 2004. In paragraph 26 of the counter-claim, it has been averred that the cause of action for filing a counter-claim is not barred by the law of limitation and it was lodged along with the Written Statement and after issuing a legal notice dated 27 July, 2004.

4. The Defendant to the counter-claim moved a Motion under Order 7, Rule 11(d) which was made absolute by a learned Single Judge. The learned Single Judge noted that the counter-claim would according to Counsel for the Plaintiff thereto, be governed by Articles 54 and 58 of the Limitation Act. Under Article 54, a suit for specific performance of a contract has to be instituted within three years of the date fixed for the performance of the contract and if no such date is fixed, within three years from the date of notice that performance was refused. Under Article 58, a right to institute a suit for a declaration arises when the right to sue first accrues and the suit has to be instituted within a period of three years from the accrual of the cause of action. The learned Single Judge noted that the notice dated 23 June, 2004 which is annexed to the counter-claim contained a categoric averment that the Defendants to the counter-claim had on account of the illegal acts of the plaintiff terminated the Power of Attorney and called upon the Plaintiff to return the same. As a matter of fact, the agreement and the Power of Attorney were terminated by a letter dated 7 February, 2000 which is annexed at Exhibit J' to the original Plaint. Consequently, if the cancellation of the Power of Attorney gives the cause of action for the counterclaim, the learned Single Judge was of the view that the cause of action would accrue in February, 2000 and not in 2004 as claimed by the Plaintiff to the counter-claim. On these grounds, the learned Single Judge held that accepting the statements of the Plaintiff in the counter-claim on their face, the termination of the Power of Attorney on 7 February, 2000 furnished a cause of action to the Plaintiff to file a counter-claim. Hence, the counter-claim which was filed on 18 August, 2004 was held to be barred by limitation.

5. On behalf of the Appellant, the judgment of the learned Single Judge is called into question on the following submissions:

(i) The letter dated 7 February, 2000 addressed by the Defendant to the counter-claim to the Plaintiff has not been referred to in the counter-claim. The letter, it is urged, has been annexed as Annexure-J to the original Plaint instituted before this Court by the Defendant to the counter-claim. Hence, it was urged that the letter dated 7 February, 2000, insofar as it does not form part of the counter-claim, cannot be adverted to, having regard to the plain language of Order 7, Rule 11(d);

(ii) It was urged that a plea of limitation would not amount to a plea that the suit is barred under any law within the meaning of Order 7, Rule 11(d).

6. On the other hand, it was urged on behalf of the Respondent that:

(i) The suit which the Respondent has instituted in this Court on 27 March, 2000 was itself a repudiation of the right of the Plaintiff to the counter-claim to avail of any right over and above the FSI of 2455 sq.ft that has already been consumed under the agreement dated 27 October, 1989. In the original Plaint in the suit, it is the case of the Plaintiff (the Defendant to the counter-claim) that the agreement dated 1 October, 1989 had been terminated on 7 February, 2000. The counter-claim which has been instituted on 9 August, 2004 would, therefore, clearly be beyond the period of three years of the accrual of the right to sue:

(ii) The Plaintiff to the counter-claim by a process of clever drafting cannot avoid the plain consequence of the circumstance that the agreement was terminated on 7 February, 2000 by failing to advert to that letter specifically in the counter-claim. The Plaintiff to the counter-claim is aware of the suit instituted by the Defendant thereto in this Court which sets.out the case of the Defendant that the agreement has been terminated on 7 February, 2000 and the institution of the suit would itself amount to a notice of refusal to perform;

(iii) The Supreme Court has held in several cases that the question as to whether a plaint is liable to be rejected under Order 7, Rule 11(d). is a decision which has to be arrived at on the facts of each case. When, on the face of the averments they stand in the counter-claim, it is evident that the claim is barred by limitation, the Court was within its jurisdiction to exercise its power to reject the Plaint.

7. While dealing with the rival contentions, it is of some significance in the facts of this case that the counter-claim was lodged by the Plaintiff on 9 August, 2004 with clear notice and knowledge of the case which has been set out by the Defendant to the counter-claim in the suit instituted before this Court. As a matter of fact, the counter-claim contains in paragraph 1, a reference at the outset to the institution of the suit. The documents which are relied upon in the counter-claim include all correspondence prior to the date of the filing of the counter-claim. In the suit which was original instituted before this Court on 27 March, 2000, the case of. the original Plaintiff was that the agreement dated 1 October, 1989 stood terminated on 7 February, 2000. The letter dated 7 February, 2000, which is annexed at Exhibit ‘J’ to the Plaint states in plain and unmistakable terms that the agreement as well as all Powers of Attorney stand cancelled. On 24 February, 2000, the original Plaintiff addressed a further letter calling upon the original Defendant not to act on the basis. of the Power, of Attorney. The Defendant was intimated that the. Plaintiff is entitled to terminate the agreement dated 1 October, 1989 as well as Power of Attorney in view of the unauthorized consumption of FSI by the Defendant and that in any event the agreement as well as the Power of Attorney have automatically come to an end upon the completion of the construction by consuming FSI quantified at 2455 sq.ft under the agreement. It was in this background that the relief that is sought in the Plaint is a declaration that the original Defendant does not have any right, title or interest in respect of FSI in excess of 2455 sq.ft consumed under the agreement dated 1 October, 1989 and that the Defendant would have no right to sell any units beyond the aforesaid extent under the agreement. Injunctive and other reliefs were also sought. The Defendant to the suit has, in the counter-claim, in this background and with the knowledge of the termination and of the refusal to perform sought a decree for specific performance of the development agreement dated 1 October, 1989 and a declaration that the agreement entered into between the parties continues to subsist. The Plaintiff to the suit has founded the suit on the termination of the original agreement dated 1 October, 1989. Faced with the claim of the Plaintiff in the suit, the Defendant to the suit has filed his counterclaim seeking a declaration that the agreement continues to subsist and for a decree for specific performance. The counter-claim contains an averment in paragraph 17 that in 1998–99, an obstruction was caused by a newly inducted partner of the Defendant to the counter-claim during the course of development. The Plaintiff to the counter-claim relies upon the notice dated 23 June, 2004. The notice dated 23 June, 2004 refers to the prior termination of the agreement. As a matter of fact, the notice upon which reliance has been placed in the counterclaim, states as follows :

“You are further aware that on account of various illegal acts done by you pursuant to the said power of attorney, our clients have terninated the power of attorney and called upon you to return the same.

It appears that in spite of the termination of the said power of attorney you are representing before the Society and other people as constituted attorney of our clients.”

(Emphasis supplied).

8. The issue before the Court is as to whether the Plaintiff to the counter-claim can by a clever act of draftsmanship escape from the consequence of the counter-claim being barred by limitation by omitting to refer to the termination dated 27 February, 2000. The answer to this is in the negative. Order 7, Rule 11(d) of the Code of Civil Procedure, 1908 provides for the rejection of the Plaint inter alia whether the suit appears from the statements in the Plaint to be barred by any law. Now, it is a well settled position in law that it is the statements in the Plaint which have to be accepted on their face in arriving at a determination as to whether the suit is barred by any law, No amount of evidence can be let in for the purpose of making that determination. In this case, the Plaintiff to the counter-claim has instituted the counter-claim cognizant of the case of the Defendant who was the Plaintiff in the original suit and to the circumstance that it is the contention of the Defendant to the counter-claim that the agreement of 1 October, 1989 has been terminated on 7 February, 2000. Both the letter dated 7 February, 2000 as well as the very institution of the suit in this Court on 27 March, 2000 constitute a notice of refusal to perform to the Defendant to the suit. A suit for a declaration had to be filed within a period of three years of the accrual of a right to sue while a suit for specific performance had to be filed within a period of three years of a notice of the refusal to perform. The suit has been filed beyond a period of three years. Hence, on the basis of the counter-claim as it stands, and without adding or detracting anything from it, it is ex facie clear that the claim is barred by limitation.

9. Counsel appearing on behalf of the Appellant, however, sought to urge that the issue as to whether limitation can be a ground for rejecting a plaint under Order 7. Rule 11(d) is not by settled.

10. In this context, it would be necessary to advert to some of the well settled principles underlying the interpretation of Order 7, Rule 11 of the Code. In Sopan Sukhdeo Sable v. Assistant Charity Commissioner, 2004(5) Mh.L.J (SC) 129 : (2004) 3 SCC 137 : AIR 2004 SC 1801 the Supreme Court held that the real object of Order 7. Rule 11 is to keep out of Courts iiresponsible law suits. For the purpose of deciding an application under clauses (a) and (d) of Order 7, Rule 11, the averments in the Plaint are germane. The plea taken by the Defendant in the Written Statement would be wholly irrelevant at that stage. In exercise of its jurisdiction under Order 7, Rule 11 what is required is a meaningful and not a formal reading of the Plaint and clever drafting which creates an illusion of a cause of action ought not to detract from the jurisdiction of the Court on an application for rejection. In Poput and Kotecha Property v. State Bank of India Staff Association, (2005) 7 SCC 510 the earlier judgments on the subject were revisited and the Supreme Court held that under Order 7. Rule 11 an independent remedy is made available to the Defendant to challenge the maintainability of the suit irrespective of his right to contest it on merits. The use of the word “.shall” casts a duty on the Court to perform its obligations in rejecting the plaint when it is hit by any of the infirmities provided in the four clauses of Rule 11. For that purpose, the statement of claim without addition or subtraction must show that it is barred by any law to attract the application of Order 7, Rule 11. A Bench of two learned Judges of the Supreme Court in Balasaria Construction (P) Ltd. v. Hanuman Seva Trust, (2006) 5 SCC 662 referred the question as to whether the rejection of Plaint on the bar of limitation is within the scope of Rule 11(d) to a larger Bench. When the case came up before a Bench of three learned Judges. counsel for both the parties stated that it was not the case of either side that as an absolute proposition under Order 7. Rule 11(d) that an application can never be based on the law of limitation. Both the sides stated before the Court that the impugned judgment was based on the facts of that particular case. In view of the statement. the question which was referred to a larger Bench was rendered academic and the case was sent back to the Bench for disposal on merits. Thereafter in Balasaria Construction (P) Ltd. v. Hanuman Seva Trust, (2006) 5 SCC 658 the Bench of two learned Judges of the Supreme Court held that “the present suit could not be dismissed as barred by limitation without proper pleadings, framing of an issue of limitation and taking of evidence” holding that the question of limitation was a mixed question of law and fact, the Supreme Court held that ex facie in that case on a reading of the plaint, it could not be held that the suit was barred by time. In Hardesh Ores (P) Ltd. v. Hede and Company. 2007(5) Mh.L.J (SC) 577 : (2007) 5 SCC 614 a Bench of two learned Judges of the Supreme Court accepted a plea that the Plaint was liable to be rejected on the ground that the claim was barred by limitation. This was in the context of a suit for specific performance where under Article 54 of the Limitation Act, the suit should have been filed within three years from the date on which the Plaintiff had notice that the renewal of the agreement was refused by the Defendant.

11. In Kamala v. K.T Eswara Sa, AIR 2008 SC 3174 the Supreme Court held that the broad principle which has been laid down by the Court is that the Court would not consider any evidence or enter into a disputed question.

12. In view of the law laid down by the Supreme Court, on an application under Order 7, Rule 11(d), the issue as to whether the claim of the Plaintiff to the counter-claim is barred by limitation must be decided on the face of the counter - claim as it stands. There is no question at this stage of leading or letting in any evidence. This is one of those cases where on the face of the counter-claim it is evident that the Plaintiff to the counter-claim had notice of the termination of the agreement on 7 February, 2000 and of the refusal of the Defendant to the counter-claim to perform the agreement both by the notice of termination and from the reliefs claimed in the suit against him, which was instituted on 27 March, 2000. Hence, the counter-claim which was lodged on 9 August, 2004 was well beyond the period of limitation and was barred by limitation.

13. For the reasons aforesaid, we do not find any infirmity in the judgment of the Learned Single Judge. The appeal shall stand dismissed.

Appeal dismissed.