Fair View Co-Operative Housing Society Ltd. v. Savinder S. Rekhi

Bombay High Court
Dec 19, 2007
Important Paras
Please sign up to view Important Paras.
Smart Summary (Beta)

Factual and Procedural Background

The plaintiff is a Co-operative Housing Society registered on 29 May 1964 that holds title to a plot described as CTS 1613 at Chembur (2787 sq. mtrs). The plot originally belonged to Preeti Sahu (allotted in 1942–43). Two buildings existed: Building No. 1 (a bungalow) and Building No. 2 (multi-storeyed). On 24 June 1964 Preeti Sahu executed a registered Deed of Conveyance in favour of the plaintiff and simultaneously executed a registered Deed of Covenant reserving certain rights for the Vendor (Preeti Sahu), including rights to reconstruct Building No. 1, to construct additional floors and to benefit from any future increase in Floor Space Index (FSI) in respect of the land described in the Covenant.

On 22 April 1975 a tripartite agreement was entered into between the plaintiff, Preeti Sahu and defendant Nos. 1–5, under which defendants 1–5 were to receive vacant possession of the bungalow and the Vendor's membership in respect of the bungalow was to be transferred to them; a Deed of Assignment in favour of defendants 1–5 was executed on 30 April 1975, transferring to them the benefits conferred by the 1964 Deed of Conveyance.

Over the years there was correspondence and interaction between the parties regarding redevelopment. Key events include: a letter of 13 January 1990 by the First defendant asserting an entitlement to subdivision (which, the court notes, in fact has not occurred); a request on 2 December 1993 by the First defendant seeking the Society's consent for redevelopment (the Society considered the proposal subject to withdrawal of a co-operative dispute); demolition of the existing bungalow and reconstruction into two bungalows; a 20 January 2000 request by the First defendant to construct a multi-storeyed building in vacant space between the two bungalows; a Special General Body meeting of the Society on 19 March 2000 granting permission subject to safeguards; provisional approval/NOC by the Society on 25 March 2000 subject to compliance with Development Control Rules and submission of plans.

The Municipal Corporation processed a development proposal submitted by defendant Nos. 1–5 and, by communication dated 8 June 2006, indicated that the proposal was being processed under the Development Control Regulations of 1991 for utilizing permissible Transferable Development Rights (TDR) on the entire plot; the Architect for defendants submitted a Development Rights Certificate for 2,080 sq. mtrs and the Municipal Corporation permitted utilization of TDR to the extent of 80% of net plot area or 2,180 sq. mtrs.

The plaintiff filed a Notice of Motion seeking multiple forms of interim relief (injunctions restraining TDR loading/utilization and construction, restraint on sale transactions, challenging the Municipal Corporation's sanction/permission, and appointment of a Receiver). The Motion was heard with arguments and, with the consent of counsel, taken up for final disposal. After considering submissions and law, the court dismissed the Notice of Motion.

Legal Issues Presented

  1. Whether defendant Nos. 1–5 are entitled to utilize Transferable Development Rights (TDR) in carrying out construction on the subject plot (i.e., entitlement to load/use TDR on the plot).
  2. Whether the benefit of TDR/any increase in Floor Space Index (FSI) can be utilized by defendants in the absence of a formal subdivision of the plot.
  3. Whether, until a subdivision occurs, the plaintiff (as registered owner) retains the right to TDR and therefore can prevent defendants from utilising TDR generated from or applicable to the plot.
  4. Whether the Covenant executed on 24 June 1964 and the tripartite agreement of 22 April 1975 restrict or extinguish the Vendor's (and successors') rights to additional FSI/TDR that may accrue in respect of the scheduled land.
  5. Whether interim relief (injunctions and appointment of a Receiver) should be granted to the plaintiff to restrain utilization of TDR, construction, and related transactions.

Arguments of the Parties

Plaintiff's Arguments

  • Defendant Nos. 1–5 are not entitled to utilize TDR while carrying out construction on the plot; the Development Control Regulations of 1991 grant the benefit of TDR to the owner of the land.
  • There has been no subdivision of the land; even if subdivision occurred, defendants would be entitled only to a pro rata share of TDR available for the subdivided plot.
  • Until subdivision, the plaintiff as owner is entitled to TDR and can claim the benefit of any TDR applicable to the entire plot.
  • Utilization of TDR by defendant Nos. 1–5 can only be permitted if the TDR is generated from this plot itself.
  • Alternatively, defendant Nos. 1–5 are not entitled to TDR available on the plaintiff‑Society's plot.

Defendants' Arguments

  • The plaintiff is bound by the terms of the registered Covenant of 24 June 1964 under which Preeti Sahu (the predecessor in interest of defendant Nos. 1–5) was entitled to demolish or reconstruct the bungalow and to utilize any additional FSI that became available for the land described in the Covenant.
  • TDR is statutorily recognised as a form of FSI under the Maharashtra Regional and Town Planning Act, 1966 and the Development Control Regulations (DCR) of 1991; thus rights to FSI encompass TDR.
  • Although defendant Nos. 1–5 were entitled under the Covenant to the benefit of a subdivision, the Covenant did not state that the right to utilize FSI would be restricted to the subdivided plot.
  • Clause 3 of the tripartite agreement dated 22 April 1975 did not obliterate the rights conferred by the Covenant; defendants as successors in interest inherit those rights.

Table of Precedents Cited

Precedent Rule or Principle Cited For Application by the Court
Janhit Manch v. State of Maharashtra, Writ Petition 637 of 2003 (Division Bench), decided 20 Nov 2006; reported 2006 (2) Mh. L.J. 284 That the form of TDR (the particular “type” or source) is immaterial; what matters is the grant/use of additional FSI by way of TDR. The court relied on the Division Bench's observation to support the proposition that TDR is simply a mechanism to permit additional FSI and that the precise form of TDR does not alter the legal effect that additional FSI may be used/loaded on a receiving plot.

Court's Reasoning and Analysis

The court began by revisiting statutory definitions and the Development Control Regulations:

  • Section 2(9A) of the Maharashtra Regional and Town Planning Act, 1966 defines “development right” to include transferable development rights in the form of the right to utilise the Floor Space Index (FSI) either on the remainder of the land partially reserved for public purposes or elsewhere as the final DCR provide.
  • Development Control Regulation 2(42) defines “Floor Space Index” (FSI) as the ratio of combined gross floor area of all floors to the total plot area.
  • DCR 34 and Appendix VII provide for separation of development potential from the land and the grant and use of TDR in the form of FSI certificates; Appendix VII permits an owner to be awarded TDR (in the form of FSI certificate) which can be used by the owner or transferred to another.

From these provisions the court concluded that:

  • TDR is legally a form of FSI; the statutory definitions constitute a “statutory dictionary” and demonstrate that TDR is the legislative mechanism by which additional FSI may be allocated and transferred.
  • The Division Bench decision in Janhit Manch confirms that the form of TDR is immaterial and the relevant legal effect is the grant/use of additional FSI.

Applying these principles to the facts, the court examined the 1964 Covenant and related instruments:

  • The 1964 Covenant expressly provided that the Vendor (Preeti Sahu) was entitled to additional FSI under the then prevailing municipal rules (about 2,500 sq. ft.) and specifically stipulated that any future increase in FSI in respect of the piece of land described in the Covenant “shall enure to the benefit of the vendor.” The schedule in the Covenant refers to the entire plot described (Plot No. 295).
  • Clause (m) of the Covenant allowed the Vendor to seek subdivision and to take conveyance of the portion pertaining to Building No. 1, but clause (m) did not state that the right to use FSI was confined to the subdivided portion.
  • The tripartite agreement of 22 April 1975 and the subsequent Deed of Assignment in 1975 transferred the benefits of the 1964 Deed of Conveyance/Covenant to defendant Nos. 1–5 as successors in interest.
  • Consequently, the court found it to be a basic fallacy in the plaintiff's submissions to contend that a right to obtain subdivision (clause (m)) necessarily restricted the Vendor's entitlement to future increases in FSI to a later subdivided parcel. The Covenant deliberately conferred the benefit of any future increase in FSI in respect of the scheduled land to the Vendor.

For these reasons the court held that:

  • The plaintiff, although owner of the registered title, is bound by the stipulations of the registered Covenant and cannot thwart the Vendor's (and successors') entitlement to additional FSI/TDR reserved by that Covenant.
  • Defendant Nos. 1–5, as successors in interest to Preeti Sahu, are prima facie entitled to the benefit of the Covenant and therefore to utilize TDR (as TDR is a form of FSI) in the manner permitted by the statutory scheme and the Development Control Regulations.
  • On the material placed before it, the plaintiff failed to make out a prima facie case for interim relief restraining defendants from utilizing TDR, carrying out construction, or dealing in the proposed premises; accordingly, the Notice of Motion lacked sufficient prima facie substance.

Holding and Implications

Holding:

NOTICE OF MOTION DISMISSED.

Implications:

  • Direct effect: The plaintiff's application for interim relief (including injunctions restraining loading/utilization of TDR, restraint on development/construction and sale transactions, challenge to Municipal Corporation's permission, and appointment of a Receiver) was dismissed. As a result, on the prima facie record, defendant Nos. 1–5 are entitled to proceed with utilization of TDR in exercise of rights that flow from the 1964 Covenant and their succession to the Vendor's interest.
  • Legal significance: The court applied statutory definitions and the Development Control Regulations and relied on the Division Bench authority in Janhit Manch to treat TDR as a form of additional FSI; the decision resolves the interlocutory application on those legal foundations but does not purport to lay down novel legal precedent beyond applying the cited authorities and the clear wording of the registered Covenant.
Notice of Motion dismissed.
Show all summary ...

The relief which has been sought by the plaintiff in the Notice of Motion which falls for consideration is to the following effect:

(i) Injunctive relief is sought against the defendants from loading or utilizing TDR on the plot of land forming the subject-matter of the suit;

(ii) Injunctive relief is sought against defendant Nos. 1 to 5 and 8 from carrying out development or construction on the plot in question;

(iii) Injunctive relief is sought restraining defendant Nos. 1 to 5 and 8 from entering into transactions for the sale of premises in the proposed building which is to be constructed on the plot;

(iv) Implementation of the sanction and permission granted by the Municipal Corporation for development is impugned; and

(v) The appointment of a Receiver is sought in respect of the work of construction that is being carried out by defendant Nos. 1 to 5 and 8. Arguments have been heard on the Notice of Motion and with the consent of all the learned Counsel, the Motion has been taken up for hearing and final disposal.

2. The plot of land to which the proceedings relate, comprises of CTS 1613 at Chembur and admeasures 2787 sq. mtrs. The land was allotted to Preeti Sahu when a Town Planning Scheme was prepared in 1942-1943 by the Additional Collector. Two buildings were constructed on the plot. The first which is described as Building No. 1 was a bungalow. The second being Building No. 2 consisted of a structure with a ground floor and three upper floors. The plaintiff is a Co-operative Housing Society which was registered on 29th May, 1964. On 24th June, 1964, a Deed of Conveyance was executed between the owner and the plaintiff by which the owner transferred and assigned the plot to the plaintiff. Contemporaneously, a Deed of Covenant also dated 24th June, 1964 was entered into between the plaintiff and the owner. The covenant provided that the Society had enrolled the Vendor as its member; the Vendor as a member of the Society would have a permanent right of residence in Building No. 1 and to let out the aforesaid building and to assign her right of membership. Clause (1-g) of the Covenant provided as follows:

“(g) The Society shall also give the necessary permission to the Vendor and/or her assigns, whenever requested to construct at their own cost an additional floor or floors on the said Building No. 1 in accordance with law the Municipal Rules and Building Bye-Laws and if required the Society shall carry out such additional construction at the cost of the Vendor and/or her assigns through the Architect and contractors to be approved or by the vendor and/or her assigns.”

3. Under clause (i), the Vendor was entitled to demolish and reconstruct Building No. 1 and the Society undertook to give permission to the Vendor:

“(i) The Vendor and her assigns as such members of the Society shall have the right to renovate at their own cost the said Building No. 1 and at like cost, to demolish and/or re-construct the Building No. 1 and the Society doth hereby agree and undertake to give to the Vendor and/or her assigns the requisite permission for the said purpose and the Society shall, if required, carry out the said work at the cost of the Vendor and/or her assigns through the Architect and Contractors approved of by the Vendor and/or her assigns.”

4. Under clauses (1) and (m), the Covenant provided as follows:

“(1) Under the present Rules of the Bombay Municipal Corporation regarding building construction in Chembur the Vendor is entitled to additional floor area of about 2500 square feet in respect of Building No. 1 and the Vendor shall be entitled to utilize the same. If at any time hereafter the Floor Space Index (FSI) in respect of the said piece or parcel of land more particularly described in the Schedule hereunder written is increased the same shall enure to the benefit of the vendor to the intent and effect that the vendor shall be entitled to construct additional floor on Building No. 1 to the extent permitted by the increase in FSI and the Society shall not make any alteration and/or addition to the Building No. 2 in any manner that may affect the said right of the Vendor.

(m) Whenever required by the Vendor the Society shall make an application for the sub-division of the said piece or parcel of land more particularly described in the Schedule hereunder written as indicated by the dotted line on the said plan and in the event of such sub-division being approved and/or sanctioned by the Bombay Municipal Corporation it shall be at the option of the Vendor to have the said piece or parcel of land sub-divided and to take a Conveyance from the Society in respect of Building No. 1, and the land appertaining thereto and the land enclosed by the said dotted lines falling on the side of Building No. 1 by payment of the society of a nominal consideration of Re1/- and the Society shall execute such conveyance in favour of the Vendor and/or her assigns or the person or persons nominated by them and the Society shall bear all the out of pocket costs charges expenses in respect of such conveyance.”

5. The Deed of Conveyance as well as the Covenant were registered. The FSI consumed in the bungalow (Building No. 1) was 5900 sq. ft., while FSI consumed in the second building was 24,500 sq. ft.

6. On 22nd April, 1975, a tripartite agreement was entered into between the plaintiff, Preeti Sahu and defendant Nos. 1 to 5. The agreement provided that Preeti Sahu as transferor and defendant Nos. 1 to 5 as transferees had agreed that the transferees should get vacant possession of the bungalow and that the membership of transferor in respect of the bungalow be transferred to them. Clause 3 entitled defendant Nos. 1 to 5 to obtain a sub-division of the plot so as to bifurcate the portion of the plot on which the bungalow was constructed from the plot on which the multi storeyed building of the Society was constructed. Upon the sub-division, the Society was to have no right, title or interest in the portion of the plot on which the bungalow stands. On 30th April, 1975, a Deed of Assignment was executed by Preeti Sahu in favour of defendant Nos. 1 to 5. By and as a result of the assignment, defendant Nos. 1 to 5 became entitled to all the benefits conferred by the Deed of Conveyance dated 24th June, 1964.

7. Initially by a letter dated 13th January, 1990, the First defendant recorded that he was entitled to get the property subdivided so as to bifurcate the plot with the bungalow from the land on which the Society's building was constructed. The First defendant stated that it appeared that the plot had been lawfully sub-divided. As a matter of fact, it has not been disputed before this Court during the hearing of the motion that there is no sub-division of the plot. Defendant Nos. 1 to 5 had instituted certain proceedings before the Co-operative Court seeking a conveyance in respect of the plot of land together with the bungalow, but the dispute was withdrawn. On 2nd December, 1993, the First defendant sought the consent of the plaintiff for the redevelopment of the property subject to the condition that the defendants intended to do so to the extent of the existing constructed area. At a meeting of the General Body, the plaintiff agreed to consider the proposal subject to the withdrawal of the Co-operative case by defendant Nos. 1 to 5 and it would appear that the withdrawal of the co-operative dispute was in pursuance of the condition imposed by the Co-operative Society. This was made clear in the letter dated 13th April, 1994 of defendant Nos. 1 to 5. The existing bungalow was thereupon demolished and two bungalows came to be constructed.

8. On 20th January, 2000, the First defendant addressed a letter to the plaintiff seeking the permission of the plaintiff for the construction of a multi storeyed building in the area which was lying vacant between the two bungalows. At a Meeting of the Special General Body of the plaintiff held on 19th March, 2000, the members of the society agreed to grant permission for development subject to the condition that the development should be in accordance with the Development Control Rules and should not jeopardise the rights of the Society. The relevant part of the resolution reads as follows:

“After some discussion, it was decided to grant necessary permission to Rekhi for development subject to conditions which will safeguard our interest. It will be made clear to Rekhi that the development will be strictly in accordance with Development Control Rules of Municipal Corporation and will in no way jeopardise the rights of the Society and that liabilities arising out of the development will be borne by Rekhi and the Society shall be indemnified by Rekhis.”

9. On 25th March, 2000, the plaintiff granted its provisional approval subject to compliance of the Development Control Rules and submission of the Plan of the proposed building for the approval of the Society. On 4th July, 2000, the plaintiff informed the First defendant that the Managing Committee of the Society had not accepted the proposal for the utilization of TDR as a result of which, the plans could not be approved. There was thereupon an exchange of correspondence. On 8th June, 2006, the Municipal Corporation informed the plaintiff that the proposal for development submitted by defendant Nos. 1 to 5 was being processed under the Development Control Regulations of 1991 for utilizing the permissible TDR on the entire plot, based on the resolution passed by the General Body on 19th March, 2000 and the NOC of 25th March, 2000. The Architect of defendant Nos. 1 to 5 submitted plans for loading TDR and submitted a Development Rights Certificate for 2080 sq. mtrs. The Municipal Corporation has permitted utilization of TDR to the extent of 80% of the net plot area or 2180 sq. mtrs.

10. The decision of the Municipal Corporation to allow the utilization of TDR has been impugned on behalf of the plaintiff. At the hearing of the Notice of Motion, it has been urged on behalf of the plaintiff that (i) defendant Nos. 1 to 5 are not entitled to utilize TDR while carrying out construction on the plot of land and the Development Control Regulations of 1991 stipulate that the benefit of TDR is to be given to the owner of the land; (ii) There has been no subdivision of the land and even if the land were to be subdivided defendant Nos. 1 to 5 would be entitled only to the benefit pro rata of the TDR available for the bifurcated plot; (iii) Until a sub-division takes place, the plaintiff is the owner of the land and would be entitled to TDR; (iv) The utilization of TDR by defendant Nos. 1 to 5 can only be permitted when the TDR is generated from this plot only; and (v) In the alternative defendant Nos. 1 to 5 would not be entitled to TDR available on the plaintiff-Society's plot.

11. On the other hand, on behalf of the defendants, it has been urged that the plaintiff is bound by the terms of the Covenant dated 24th June, 1964 under which the predecessor in interest of defendant Nos. 1 to 5 was entitled to demolish or reconstruct the existing bungalow and to utilize any additional FSI that became available on the plot of land more particularly described in the schedule thereto. TDR, it was urged, is statutorily recognised as a form of FSI under the Maharashtra Regional and Town Planning Act, 1966 and the Development Control Regulations of 1991. While defendant Nos. 1 to 5 were entitled under the Covenant to the benefit of a sub-division, the Covenant did not provide that the right to utilize FSI would be restricted to the subdivided plot. Clause 3 of the tripartite agreement dated 22nd April, 1975 would continue to survive and did not obliterate the rights which enured under the Covenant.

12. In considering the merits of the rival submissions for the purposes of deciding the application for interim relief, it would be necessary conceptually to revisit the meaning of TDR. TDR is an acronym for Transferable Development Rights. Section 2(9A) of the Maharashtra Regional and Town Planning Act, 1966 defines the expression “development right” as follows:

“(9A) “development right” means right to carry out development or to develop the land or building or both and shall include the transferable development right in the form of right to utilise the Floor Space Index of land utilisable either on the remainder of the land partially reserved for a public purpose or elsewhere, as the final Development Control Regulations in this behalf provide.”

(emphasis supplied)

13. The expression “Floor Space Index” is defined by Development Control Regulation 2(42) to mean the quotient of the ratio of the combined gross floor area of all floors to the total plot area. The definition of the expression “development right” therefore, includes transferable development rights in the form of the right to utilize the floor space index of land. This floor space index in the form of TDR is utilizable either on the remainder of the land partially reserved for public purposes or elsewhere as may be provided in the Development Control Regulations. The definitions contained in an Act passed by the legislature, it is trite law, provide a statutory dictionary. TDR is a form of FSI. The Development Control Regulations for Greater Bombay of 1991 elucidate the concept of Transferable Development Rights in Regulation 34. DCR 34 provides as follows:

“34. Transfer of Development Rights. — In certain circumstances, the development potential of a plot of land may be separated from the land itself and may be made available to the owner of the land in the form of Transferable Development Rights (TDR). These Rights may be made available and be subject to the Regulations in Appendix VII hereto.”

14. Appendix VII provides regulations for the grant of transferable development rights to owners/developers and the conditions for the grant of such rights. Under clause (1), the owner or lessee of a plot of land which is reserved for a public purpose in the Development Plan is eligible for the award of transferable development rights in the form of FSI to the extent and on the conditions set out in the appendix. Such an award entitles the owner of the land to FSI in the form of a development rights certificate which the owner may use himself or transfer to any other person. The FSI of the receiving plot is allowed to be exceeded to the extent permissible under the regulation by the use of TDR. Appendix VIIB provides regulations for the grant of TDR in respect of Slum Rehabilitation Schemes to which it may not be necessary to refer for the purposes of this case. The judgment of a Division Bench of this Court in Janhit Manch v. State of Maharashtra, Writ Petition 637 of 2003, decided on 20th November, 2006 [since reported in 2006 (2) Mh. L.J 284] makes it abundantly clear that the form in which TDR is to be used is immaterial and the effect of the concept of TDR is to permit the use of additional FSI. The Division Bench observed thus:

“We may only point out that what form of TDR is to be used is immaterial. The suburbs have a FSI CAP OF 1.00 The additional FSI of 1.00 can only be from heritage TDR, Road TDR, RG TDR and Slum TDR. The form or colour of TDR does not matter. What is relevant is the grant/use of additional FSI by way of TDR.”

15. Conceptually, as a matter of first principle, transferable development rights constitute a legislative recognition of the principle by which the development potential of the land is separated from the land and is made available in the form of a development rights certificate. The genesis of TDR is that lands which were reserved for public purposes including recreation grounds and roads were found to have been encroached upon. The doctrine of TDR was introduced as a matter of legislative policy in order to ensure that upon the public amenities being developed, TDR would be provided in the form of a development rights certificate. This TDR could be utilized in the manner and to the extent contemplated in the Development Control Regulations.

16. In the present case, Preeti Sahu conveyed the land which is more particularly described in Exhibit A to the Plaint to the plaintiff by a registered Deed of Conveyance. Simultaneously, a Covenant was executed between the parties on 24th June, 1964. Under the Covenant which has also been registered, Preeti Sahu reserved the right to complete the construction of Building No. 1, namely, the bungalow. Sahu was entitled under clause (1-g) to construct additional floors and under clause (i) to demolish or reconstruct. Clause (1) specifically provides that under the then prevailing Rules of the Municipal Corporation, Sahu was entitled to additional FSI of 2500 sq. ft. in respect of Building No. 1. Parties stipulated that if and any time thereafter, the FSI “in respect of the said piece or parcel of land, more particularly described in the schedule” was increased, the same shall enure to the benefit of the Vendor, namely, Preeti Sahu. The schedule refers to the entire plot of land, namely Plot No. 295 admeasuring 3522 sq. yds. Under clause (m) the Vendor was entitled to obtain a sub-division and to take a conveyance from the Society. At this stage, it would be material to note that clause (1) entitled the Vendor to the benefit of any future increases of the FSI in respect of the piece of land more particularly described in the Schedule to the Covenant. Preeti Sahu was, therefore, entitled to the benefit of any additional FSI that may be available in respect of the entire land that forms the subject-matter of the Covenant. There is a basic fallacy in the submissions urged on behalf of the plaintiff. Clause (m) of the Covenant provides that the Vendor - Preeti Sahu - was entitled to obtain a sub-division. Clause (m), however, does not provide that right to use FSI would be restricted to the subdivided plot. Similarly, clause (3) of the tripartite agreement that was entered into between the plaintiff, Preeti Sahu, and defendant Nos. 1 to 5 did not bring the right under the Covenant to an end. The plaintiff entered into the Covenant dated 24th June, 1964 conscious of the fact that it was conferring upon Preeti Sahu, the Vendor, the entitlement to the balance FSI and to the benefit of any further increase in FSI. Having agreed to do so by a solemn obligation assumed under the Covenant, the plaintiff cannot complain about the utilization of TDR by defendant Nos. 1 to 5. The benefit of the Covenant enured to defendant Nos. 1 to 5 as successors in interest of Preeti Sahu. The rights of the plaintiff as the owner of the land are subject to the obligations imposed by the Covenant dated 24th June, 1964. Consequently, utilization of TDR which is but a method by which additional construction is permitted on the receiving plot cannot be interdicted by the plaintiff.

17. In these circumstances, the challenge that has been preferred by the plaintiff is prima facie lacking in substance. There can be no dispute prima facie that the plaintiff is the owner of the plot of land. However, the plaintiff as the owner is bound by the stipulation contained in the Deed of Covenant under which the entitlement of the Vendor to utilize any increase in FSI was reserved, defendant Nos. 1 to 5 as successors in interest of the Vendors are entitled to the benefit of the stipulations contained in the Covenant. The plaintiff has, therefore, failed to make out a prima facie case for the grant of interim relief.

18. The Notice of Motion shall accordingly stand dismissed.

Notice of Motion dismissed.