Trackparts Of India Ltd. v. Cosmos Co-Operative Bank Ltd. And Others

Bombay High Court
Feb 25, 2004
Important Paras
Please sign up to view Important Paras.
Smart Summary (Beta)

Summary of Opinion Concerning Section 22(1) of SICA

Factual and Procedural Background

The respondents filed a dispute under section 9 of the Maharashtra Co-operative Societies Act, 1960 seeking recovery of an alleged debt from the petitioner-company. An ex parte award dated 20-2-1999 was passed against the petitioner by the Co-operative Court. The petitioner challenged that award by an appeal filed in May 1999. By order dated 18-5-1999 the Co-operative Appellate Court admitted the appeal for final hearing and directed the parties to maintain status quo concerning the petitioner-company's alleged properties.

Alleging erosion of net worth, the petitioner made a reference under SICA which was registered as Reference No. 152 of 2001; that Reference was dismissed on 24-1-2003. The petitioner then filed an appeal under section 25 of SICA (Appeal No. 89 of 2003) before the Appellate Authority, which remained pending. Meanwhile, the earlier appeal (Appeal No. 30 of 1999) before the Co-operative Appellate Court came up for hearing on 9-7-2003; applying section 22(1) of SICA, the Co-operative Appellate Court suspended the proceedings until further orders. The petitioner challenged that suspension by the present petition.

Legal Issues Presented

  1. Whether the restrictions imposed under section 22(1) of the Sick Industrial Companies (Special Provisions) Act, 1985 (SICA) — i.e., the bar on proceeding with proceedings for winding up, execution, distress, appointment of a receiver, or suits for recovery/enforcement of security or guarantees — apply to appeals filed by an industrial company (including a sick industrial company) against orders of lower courts/authorities that pertain to monetary claims against that industry.

Arguments of the Parties

Petitioner's Arguments

  • Section 22 of SICA applies to proceedings initiated against a sick company and does not apply to proceedings initiated by the sick company or a company claiming to be sick.
  • Reliance was placed on several authorities and on statements of objects and reasons of SICA; specific cases relied upon included Nirfabrics Ltd. v. Nirlon Ltd., Duke Offshore Ltd. v. Burns Standard Co. Ltd., Reserve Bank of India v. Peerless General Finance & Investment Co. Ltd., and R (Quintavalle) v. Secretary of State.

Respondents' Arguments

  • The restriction under section 22 of SICA applies to all proceedings that relate to monetary claims against a sick company irrespective of whether they were initiated by the company or by others.
  • Reliance was placed on the decisions in Patheja Bros. Forgings & Stamping v. ICICI Ltd. and Maharashtra Tubes Ltd. v. State Industrial and Investment Corporation of Maharashtra Ltd.

Table of Precedents Cited

Precedent Rule or Principle Cited For Application by the Court in this Opinion
Nirfabrics Limited v. Nirlon Limited (1999 (1) Mh. L.J 512) Decision under the Bombay Relief Undertakings (Special Provisions) Act, 1958 — cited by petitioner to support limited application of suspension provisions. Court held the Nirfabrics decision concerns a different statute (Bombay Relief Undertakings Act, 1958) and is not pari materia with SICA; therefore it was of no help to the present case.
Duke Offshore Limited v. Burns Standard Company Limited (1999 (1) Mh. L.J 428) Single Judge decision referenced by petitioner; contained observation about Real Value Appliances Ltd. v. Canara Bank but did not lay down law on the present point. Court observed Duke Offshore did not establish a proposition on the issue and was factually different (concerned original-stage proceedings and enforcement of a bank guarantee by the industrial company). Also noted it pre-dated Patheja Bros.
Reserve Bank of India v. Peerless General Finance & Investment Co. Ltd. (AIR 1987 SC 1023) Principle that interpretation must depend on text and context; both text and context are important for statutory interpretation. Cited for the settled position that textual interpretation should align with contextual understanding; court applied this to read section 22(1) in context of Chapter III of SICA and its objects.
R (Quintavalle) v. Secretary of State ((2003) 2 All E.R 113) House of Lords' guidance that controversial provisions should be read in the context of the statute as a whole and in its historical context. Invoked by the petitioner for contextual interpretation; court acknowledged the value of context but relied primarily on textual reading and relevant Indian precedents.
Patheja Bros. Forgings & Stamping v. ICICI Ltd. (AIR 2000 SC 2553) Apex Court held section 22 cannot be read to mean only suits against the industrial company are barred; words are clear and unambiguous and cover enforcement of guarantees even if not strictly 'against' the industrial company. Court treated Patheja as authoritative support for a wide reading of section 22(1) to include proceedings at the appellate stage and proceedings affecting monetary claims or guarantees related to the industrial company.
Maharashtra Tubes Ltd. v. State Industrial & Investment Corporation of Maharashtra Ltd. ((1993) 2 SCC 144) Apex Court's exposition that section 22(1) freezes actions in relation to the properties of the concern during specified pendency unless BIFR/Appellate Authority consents — the underlying idea is that every such action should be frozen. Cited to support the proposition that "every such action should be frozen" and to justify a broad application of section 22(1) (including appeals and further proceedings).
Madalsa International Ltd. v. Central Bank of India (1998 (1) Mh. L.J 666 : AIR 1998 Bom. 247) Decision of a Division Bench of the High Court which was later disapproved by the Apex Court in Patheja Bros. Court noted Patheja disapproved Madalsa International's view and therefore Madalsa's contrary interpretation was not followed.
Real Value Appliances Ltd. v. Canara Bank (AIR 1998 SC 2064) Held that once a reference under section 15 is registered and directions for information/documents are given, for purposes of section 22 an inquiry under section 16 may be deemed to have commenced and the prohibitions in section 22 come into play immediately. Cited to reject inferences from Duke Offshore and to reinforce that section 22's prohibitions operate once the statutory conditions (e.g., registration and directions) are fulfilled; used to distinguish decisions that did not address the precise statutory sequence.
State of West Bengal v. Subodh Gopal Bose (AIR 1954 SC 92) Principle that statements of objects and reasons can be used to understand background or mischief but not to ascertain the plain meaning of statutory words. Invoked to caution against relying on the statement of objects as a primary aid to construe section 22(1) when the statutory text is clear.

Court's Reasoning and Analysis

The court's analysis proceeded by close textual and contextual examination of section 22(1) of SICA and Chapter III as a whole. The court:

  1. Identified the statutory objects: Chapter III (sections 15–22A) deals with references, inquiries and schemes; section 15 requires references when an industrial company becomes sick, section 16 contemplates inquiry, section 17 empowers orders, section 18 concerns preparation and sanction of schemes, section 19 rehabilitation, section 20 winding up after inquiry, section 21 inventories, and sections 22/22A relate to suspension of legal proceedings and preservation of assets.
  2. Examined definitions in SICA: 'Appellate Authority', 'Board', 'industrial company', and 'sick industrial company' as defined in section 3.
  3. Read the operative text of section 22(1): the provision bars (without consent of Board/Appellate Authority) the continuing or institution of proceedings for winding up, execution, distress, appointment of receiver, and “no suit for the recovery of money or for the enforcement of any security against the industrial company or of any guarantee in respect of any loans or advance granted to the industrial company shall lie or be proceeded with further.” The court highlighted the key phrase “be proceeded with further.”
  4. Rejected the petitioner's argument that section 22(1) applies only to proceedings initiated by others and not to proceedings initiated by the industrial company. The court explained that the present question related to the appellate stage (a stage “further” to the original proceedings), and that the statutory phrase “be proceeded with further” covers continuation at appellate stages.
  5. Accepted the respondents' submission — supported by decisions of the Apex Court — that “legal proceedings” and the phrase “be proceeded with further” should be given a wide interpretation to include proceedings where the issue is a monetary claim or enforcement of guarantees or securities related to loans or advances to the industrial company, even at appellate stages.
  6. Relied on Patheja Bros. (Apex Court) and Maharashtra Tubes (Apex Court) as authoritative authorities establishing a broad operation of section 22(1). Patheja emphasised that the words are clear and unambiguous and cover enforcement proceedings even where not strictly "against" the industrial company. Maharashtra Tubes articulated the underlying idea that every such action should be frozen unless the specified authority consents.
  7. Observed that a restrictive interpretation urged by the petitioner would lead to absurd consequences — for example, allowing an appeal by the industrial company to proceed while forbidding cross-objections or cross-appeals arising from the same transaction — and that statutory interpretation must avoid such absurdity.
  8. Distinguished the petitioner's authorities where appropriate: Nirfabrics was under a different statute; Duke Offshore was factually different and preceded Patheja; Real Value was understood to support immediate operation of the prohibitions once a reference and requisite procedural steps are registered and directions issued.

Holding and Implications

Holding: The court answered the point for consideration in the affirmative and found no fault with the Co-operative Appellate Court's application of section 22(1) of SICA. The petition was dismissed.

Core Ruling: Petition dismissed.

Immediate consequences for the parties:

  • The suspension of the Co-operative Appellate Court proceedings (under section 22(1) of SICA) was upheld — section 22(1) applies to the appellate-stage proceedings filed by the industrial company where the proceedings relate to monetary claims or enforcement of securities or guarantees connected to the industrial company.
  • The petition challenging that suspension failed and has been dismissed with no order as to costs (as stated in the opinion).

Broader implications (as reflected in the opinion):

  • The decision reinforces the established line of authority (including Patheja Bros. and Maharashtra Tubes) that section 22(1) operates broadly to freeze actions affecting monetary claims and enforcement concerned with a sick industrial company, including at appellate stages.
  • The opinion does not announce a new legal principle beyond applying and clarifying prior Supreme Court rulings; it applies existing precedent to hold that appeals filed by the industrial company are subject to section 22(1) restrictions where they relate to monetary claims against that company.
Petition dismissed.

This summary was prepared exclusively from the provided opinion text and does not add external information.

Show all summary ...

The short point for consideration which arises in the matter is whether the restrictions imposed against continuation of the proceedings without the consent of the Competent Authority under the provision of section 22(1) of the Sick Industrial Companies (Special Provisions) Act, 1985, hereinafter called as “SICA”, apply even to the appeals filed by an industrial company against the order of the lower Court/Authority pertaining to a monetary claim against such industry.

2. The respondents filed dispute under section 9 of the Maharashtra Co-operative Societies Act, 1960 for recovery of the amount alleged to be due from the petitioner-company wherein ex parte Award dated 20-2-1999 came to be passed against the petitioner by the Co-operative Court and the same was challenged by the petitioner by an appeal filed in May, 1999. By an order dated 18-5-1999 passed by the Co-operative Appellate Court, the appeal was admitted for final hearing and the parties were directed to maintain status quo in relating to the alleged properties of the petitioner-company. Meanwhile, the petitioner, on the ground that the net worth of the company had been eroded, made a reference under SICA which was registered as Reference No. 152 of 2001. However, the said Reference came to be dismissed on 24-1-2003 whereupon the petitioner filed appeal under section 25 of sica being Appeal No. 89 of 2003 before the Appellate Authority and the same is pending for final disposal. Meanwhile, the Appeal No. 30 of 1999 before the Co-operative Appellate Court came up for hearing on 9-7-2003; however, applying the provision of section 22(1) of SICA the Co-operative Appellate Court suspended the proceedings till further orders. Hence the present petition.

3. The contention of the learned Advocate for the petitioner is that the provision of section 22 of sica apply to the proceedings initiated against the sick company and not to the proceedings filed by the sick company or the company claiming to be so. Reliance is sought to be placed in the decisions in the matters of Nirfabrics Limited… v. Nirlon Limited…, reported in 1999 (1) Mh. L.J 512 : 1999 (1) BCR 362, Duke Offshore Limited v. Burns Standard Company Limited, reported in 1999 (1) Mh. L.J 428 : 1999 (1) BCR 371, Reserve Bank of India v. Peerless General Finance and Investment Co. Ltd.,, reported in AIR 1987 SC 1023, and R (Quintavalle) v. Secretary of State, reported in (2003) 2 All. E.R 113. Attention is also sought to be drawn to the statements and objects of SICA. On the other hand, the learned Advocate appearing for the respondents has submitted that the restriction imposed under section 22 of sica apply to all the proceedings irrespective of the fact whether they are initially instituted against the sick company or by the sick company when they relate to monetary claim against the sick company. Reliance is placed in the decisions in the matters of Patheja Bros. Forgings and Stamping v. I.C.I.C.I Ltd.,, reported in AIR 2000 SC 2553 and Maharashtra Tubes Ltd. v. State Industrial and Investment Corporation of Maharashtra Ltd.,, reported in (1993) 2 SCC 144.

4. The section 22(1) of sica provides as:—

“Where in respect of an industrial company, an inquiry under section 16 is pending or any scheme referred to under section 17 is under preparation or consideration or a sanctioned scheme is under implementation or where an appeal under section 25 relating to an industrial company is pending, then, notwithstanding anything contained in the Companies Act, 1956 (I of 1956), or any other law or the memorandum and articles of association of the industrial company or any other instrument having effect under the said Act or other law, no proceedings for the winding up of the industrial company or for execution, distress or the like against any of the properties of the industrial company or for the appointment of a receiver in respect thereof (and no suit for the recovery of money or for the enforcement of any security against the industrial company or of any guarantee in respect of any loans or advance granted to the industrial company) shall lie or be proceeded with further, except with the consent of the Board or, as the case may be, the Appellate Authority.”

5. The term “Appellate Authority” is defined in section 3(a) of SICA to mean the Appellate Authority for Industrial and Financial Reconstruction constituted under section 5. The terms “Board” is defined in section 3(b) to mean the Board for Industrial and Financial Reconstruction established under section 4. The expression “industrial company” is specified in section 3(e) to mean a company which owns one or more industrial undertakings, and the expression “sick industrial company” has been defined in section 3(o) to mean an industrial company being a company registered for not less than five years which has at the end of any financial year accumulated losses equal to or exceeding its entire net worth.

6. The section 22(1) is to be found in Chapter III of SICA. The said chapter relates to “References, Inquiries and Schemes” and it comprises of the sections 15 to 22A. The section 15 thereunder relates to reference to Board. In terms of section 15(1) when an industrial company becomes a sick industrial company, such company has to make a reference to the Board within the period prescribed thereunder. Even otherwise the Central Government or the State Government as well as the Reserve Bank and other public financial institutions or scheduled banks are also entitled to make a reference under section 15(2). Inquiry into the working of the sick industrial companies is contemplated under section 16. On completion of such inquiry, section 17 empowers the Board to make suitable orders. Further, the section 18 provides for preparation and sanction of Schemes under SICA. The provisions relating to rehabilitation by giving financial assistance are to be found in section 19. The provisions for winding up of the sick industrial company after the inquiry under section 16 and on consideration of relevant facts and the circumstances have been made under section 20. The matters relating to preparation of complete inventory by operating agency of sick industries are dealt with under section 21. These provisions are followed by the provisions relating to suspension of legal proceedings, contracts, etc. The legal proceedings include the proceedings relating to winding up of such company as well as proceedings relating to properties, assets and liabilities of such company, including suits for recovery of money from and for enforcement of any security or of any guarantee in respect of loans or advance granted to such companies. The section 22A, which is the last section in Chapter III, empowers the Board to issue directions not to dispose of the assets of such company during the preparation or consideration of Scheme under section 18 or during the investigation relating to winding up under section 20 of SICA.

7. The section 22(1), in short, provides that in cases where there is any inquiry is pending under section 16 or any Scheme in terms of section 17 is either under preparation or sanction or even under consideration under section 18 or when there is an appeal pending under section 25 of sica relating to any industrial company, then irrespective of any provision of any other law or instructions having statutory recognition, there shall be no proceedings instituted or proceeded with further when such proceedings relate to any claim against the properties or assets or concerning monetary liability of such industrial company, except with the consent of the Competent Authority, i.e the Board or the Appellate Authority, as the case may be. In other words, any proceeding dealing with the monetary claim against or relating to the properties or assets of such industrial company cannot be instituted or proceeded with when the circumstances specified under section 22(2) are prevailing. The section nowhere specifically provides that the restrictions imposed upon such proceedings are applicable only in cases where such proceedings are originated consequent to initiation thereof by or at the instance of a party or person other than the industrial company, nor it specifies that the proceedings initiated or continued by the industrial company in relation to monetary claim or the matters relating to its properties or assets against such industrial company do not attract the said provision of law. Therefore, the provisions, as it stands, merely prescribes embargo over the proceedings relating to monetary claim and pertaining to the properties and assets against such industrial companies without the consent of the Board or the Appellate Authority, as the case may be.

8. Referring to the clause “…….. for the winding up of the industrial company or for execution, distress or the like against any of the properties of the industrial company or for the appointment of a receiver in respect thereof, and no suit for the recovery of money or for the enforcement of any security against the industrial company or of any guarantee in respect of any loans or advance granted to the industrial company…….”, it is sought to be contended that the said clause clearly indicates that the provision relating to bar for proceeding or suits against industrial company apply to those initiated by others and would not apply to those initiated by the industrial company itself. The argument is totally unrelated to the matter in issue under consideration. The point for consideration does not relate to the maintainability of the proceedings originated at the instance of such industrial company but it relates to the stage of appeal which is undisputedly a second stage in any judicial proceedings and those lie before the higher Courts than the Courts dealing with the matters at the original stage in such proceedings and therefore for the purpose of deciding the issue under consideration the expression important in section 22 is “……. be proceeded with further ……” and not the one which is sought to be referred to by the learned Advocate for the petitioner.

9. The expression “……… or be proceeded with further ……..” clearly denotes that any proceeding or suit instituted for enforcement of monetary claim either for the purpose of adjudication of right in that regard or for executing any order already passed on such adjudication, then such proceeding shall not be proceeded further once the circumstances enumerated under section 22(1) of sica are found to be prevailing. It cannot be disputed that while dealing with the points sought to be raised in the appeal by the industrial company, the Appellate Court will have to decide the issue relating to the claim against the industrial company by the respondent in the appeal, at whose instance the original proceedings had commenced. Being so, in fact, it would be an adjudication at the appellate stage of the claim against the industrial company. The Apex Court in Patheja Bros. Forgings and Stamping v. I.C.I.C.I Ltd., (supra), while interpreting section 22(i) of sica has clearly held that:—

“It is not possible to read the relevant words in section 22 as meaning that only a suit against the industrial company will not lie without such consent. There is no requirement in section 22, as analysed above, that, to be covered thereby, a suit for the enforcement of a guarantee in respect of a loan or advance to the industrial company should be against the industrial company.”

10. The above ruling, read with the decision in Maharashtra Tubes Ltd. v. State Industrial and Investment Corporation of Maharashtra Ltd., (supra) clearly reveals that the expressions “legal proceedings” and “be proceeded with further” should be given wider interpretation so as to include all the proceedings wherein the issue relates to the monetary claim or enforcement of guarantee or security pertaining to loans or advance to the industrial company and the same is made against such company.

11. Referring to the statements of objects and reasons as well as the notes on the clauses appended thereto, it was sought to be contended that the same clearly bring out the intention of the Legislature to give protection to such industries and with that view the claim against those companies are sought to be suspended and not the claim of those companies against others. Again, this is also de hors the issue for consideration for the reasons stated above which need not be repeated. However, it is true that reference to the statement of objects and reasons is certainly permissible for understanding the background, the antecedent state of affairs, surrounding circumstances in relation to the statute and evil which the statute was sought to remedy but not as an aid to the construction of the statute or for ascertaining the meaning of the words used in the statute and the law in that regard is well-settled by the decision of the Apex Court in State of West Bengal v. Subodh Gopal Bose, reported in AIR 1954 SC 92.

12. It is then sought to be contended that the construction of the statutory provisions should be contextual and textual and bearing in mind the object behind the statute, the section 22(1) cannot be interpreted to include the proceedings, even at the stage of appeal, at the instance of the industrial company against others, as otherwise it would be contrary to the objects and purpose of SICA. Attention is drawn to the observations by the House of Lords in R (Quintavalle) v. Secretary of State (supra) to the effect that “controversial provisions should be read in the context of the statute as a whole and the statute as a whole should be read in the historical context of the statute which led to its enactment”. In the matter of interpretation of the statutory provision due importance is required to be given to the context in which every word is used, has been reiterated by our Apex Court time and again and in Reserve Bank of India v. Peerless General Finance and Investment Co. Ltd., (supra), it was held that:—

“Interpretation must depend on the text and the context. They are the bases of interpretation. One may well say if the text is the texture, context is what gives the colour. Neither can be ignored. Both are important. That interpretation is best which makes the textual interpretation match the contextual.”

13. If one considers the objects and the purpose of the statute, it is primarily to safeguard the economy of the country and in the process to provide measures for salvaging and securing the public money, to afford adequate protection to employment, and revitalise and rehabilitate the sick industries. The preamble of SICA reads that “An Act to make, in the public interest, special provisions with a view to securing the timely detection of sick and potentially sick companies owning industrial undertakings, the speedy determination by a Board of experts of the preventive, ameliorative, remedial and other measures which need to be taken with respect to such companies and the expeditious enforcement of the measures so determined and for matters connected therewith or incidental thereto.” Even the notes on the clauses appended to the statements of objects and reasons to which attention was drawn by the learned Advocate for the petitioner, speak of suspension of legal proceedings with respect to such industrial companies, in relation to the provisions contained in section 22 of sica, without any reservation or exclusion of the proceedings continued by such company against an order passed in the matter originated from the proceedings instituted by others against the company.

14. In Maharashtra Tubes Ltd., it was held by the Apex Court that:—

“……. Section 22(1) provides that during the pendency of (i) an inquiry under section 16 or (ii) preparation or consideration of a scheme under section 17 or (iii) an appeal under section 25, no proceedings for winding up of the concerned industrial company or for execution, distress or the like shall lie or be proceeded with in relation to the properties of that concern unless BIFR/appellate authority has consented thereto. The underlying idea is that every such action should be frozen unless expressly permitted by the specified authority until the investigation for the revival of the industrial undertaking is finally determined. ……”

(emphasis supplied)

15. The observation “every such action should be frozen” clearly relate to the continuation of any such proceedings without exclusion of the proceedings instituted by the industrial company.

16. In Patheja Bros., (supra), while disapproving the decision of the Division Bench of this Court in Madalsa International Ltd. v. Central Bank of India, 1998 (1) Mh. L.J 666 : AIR 1998 Bom. 247, it was held that:—

“We have analysed the relevant words in section 22 and found that they are clear and unambiguous and that they provide that no suit for the enforcement of a guarantee in respect of any loan or advance granted to the concerned industrial company will lie or can be proceeded with without the consent of the Board or the Appellate Authority. When the words of a legislation are clear, the Court must give effect to them as they stand and cannot demur on the ground that the Legislature must have intended otherwise.”

17. There is yet another reason for not accepting the interpretation sought to be given on behalf of the petitioner. If one accepts the interpretation as suggested by the petitioner's Advocate, it would virtually lead to absurdity inasmuch as that in a case where the respondent files cross appeal or cross objections in the very appeal filed by the industrial company, the Appellate Court would be entitled to proceed with the appeal but will be forbidden from proceeding with such cross objections or cross appeal arising out of the same transaction or from the same set of facts and evidence. No statutory provision can be interpreted to lead to absurdity or ambiguity. On the contrary, the interpretation has to be to eradicate the ambiguity. Even where two interpretations are possible, the Court has to adopt the one which ensures smooth and harmonious working and enforcement of the statute and should avoid the one which may lead to absurdity or which may result in inconvenience for effective implementation of the statute for the purpose for which it is enacted or provision being rendered nugatory.

18. The decision in Nirfabrics Limited… v. Nirlon Limited… (supra) is in relation to the provisions of the Bombay Relief Undertakings (Special Provisions) Act, 1958 which are not in pari materia with those of SICA and, therefore, the ruling therein is of no help to the case in hand.

19. Another decision of the learned single Judge in Duke Offshore Limited v. Burns Standard Company Limited (supra) does not lay down any proposition of law relating to the point in issue. No doubt there is an observation to the effect that the decision of the Apex Court in the case of Real Value Appliances Ltd. v. Canara Bank, reported in AIR 1998 SC 2064, nowhere lays down that the company against which proceedings have been initiated is prohibited from taking legal steps for enforcement of its rights. That cannot be construed to mean contrary to the statutory provision in section 22(1), prescribing restrictions on the continuation of such proceedings in any manner and more particularly in view of the ruling by the Apex Court in Maharashtra Tubes Limited. The decision of the Apex Court in Real Value's case was in totally different set of facts and the question involved was not the one under consideration in the matter in hand. Therein the point raised was to the effect that for the application of the provision of section 22(1), BIFR, subsequent to the registration of the reference vide section 15, shall apply its mind and consider it necessary vide section 16 to make an inquiry and issue notices on reference to the affected parties who are required to be heard and only then it can be said that an inquiry is pending and unless an inquiry is pending there cannot be statutory stay of proceedings as contemplated by the section 22 of sica. Rejecting the said contention, it was held that:—

“……. Once the reference is registered and when once it is mandatory simultaneously to all for information/documents from the informant and such a direction is given, then inquiry under section 16(1) must - for the purposes of section 22 - be deemed to have commenced. Section 22 and the prohibitions contained in it shall immediately come into play.

20. The decision of the learned single Judge in Duke Offshore Limited was delivered on 2-9-1998, i.e prior to the decision in Patheja Bros's case. The decision in Duke Offshore's case was in the facts of the said case. In the said case, the industrial company was seeking to enforce the bank guarantee given by the third party - the petitioner in the said case. In other words, the petitioner therein was seeking to restrain the industrial company from initiating the proceedings at the original stage. The matter in the said case did not pertain to the proceedings at the appellate stage or at the stage “further” to the stage on conclusion of the one at the stage of the proceedings initiated by others against the industrial company.

21. In the circumstances, while answering the point for consideration in affirmative, as no fault can be found with the impugned order, the petition fails and is dismissed with no order as to costs.

Petition dismissed.