Surendra Kumar Rai v. Zilla Parishad, Jhansi And Others
Structured Summary of the Opinion (R.R.K. Trivedi, J.)
Factual and Procedural Background
(All facts and procedural history below are drawn exclusively from the provided opinion.)
Two writ petitions filed by the same petitioner against the Zilla Parishad, Jhansi were taken up together and decided by a common order. Civil Misc. Writ Petition No. 23803 of 1990 was treated as the leading case.
Writ Petition No. 23803 of 1990: The Zilla Parishad conducted an auction to grant a licence to realise and collect tolls and fees from vehicles entering Zilla Parishad territory and using a Bus Adda for the year 1 April 1988 to 31 March 1989. The petitioner's bid of Rs. 1,75,000/- was accepted and a licence issued (Annexure-1). The petitioner paid Rs. 1,05,000/- but failed to pay the remaining Rs. 70,000/-. After several demands, a recovery certificate was sent to the Collector, Jhansi to realise the unpaid amount as arrears of land revenue. The Tahsildar served a citation dated 1 September 1990 seeking Rs. 70,150/- plus collection charges. The petitioner filed the writ petition challenging recovery and seeking quashing of the citation. The Court by interim order dated 7 September 1990 stayed recovery on condition that the petitioner deposit Rs. 10,000/- with the Zilla Parishad within one month.
Writ Petition No. 22366 of 1992: The petitioner (a registered contractor) completed a contract to construct a Government Girls High School. The approved final account was Rs. 1,10,923.85 p. After deductions the petitioner was entitled to Rs. 81,967.85 p. Respondent Zilla Parishad deducted Rs. 55,150/- from this amount towards the balance of the licence fee claimed under the agreement in the first writ petition and paid him only Rs. 26,817.85 p. Petitioner sought a direction to pay the withheld Rs. 55,150/-. A Division Bench on 21 December 1992 ordered this petition to be listed with W.P. No. 23803 and directed Zilla Parishad to pay Rs. 55,150/- to the petitioner in the meantime.
It is not disputed that the Rs. 55,150/- was paid to the petitioner pursuant to the interim order of 21 December 1992. Both petitions were heard together; counsel for both sides addressed the Court. The Court eventually delivered the final order described below.
Legal Issues Presented
- Whether the agreement between the petitioner and respondent Zilla Parishad granting the right to realise fees and tolls from vehicles was for an unlawful object and therefore void?
- If the agreement is void, whether the petitioner is nevertheless liable to pay back amounts he had already realised from the public during the licence period?
- Whether the unpaid balance can be recovered from the petitioner as arrears of land revenue under the provisions of the relevant Zilla Parishad Act and Rules?
- Whether the petitioner is bound by his affidavit dated 29-3-1988 (by which he purportedly consented to a particular mode of recovery) and is therefore estopped from challenging the mode of recovery?
- Whether recovery of Rs. 55,150/- by deducting it from sums payable to the petitioner under a later, independent contract (for construction of the school building) was permissible under law?
- What relief(s), if any, the petitioner is entitled to in the circumstances?
Arguments of the Parties
Petitioner's Arguments
- The licence contract was void because its object was not lawful; reliance placed on Sections 10, 14 and 16 of the Indian Contract Act (free consent, undue influence, lawful object).
- The unpaid amount is a premium on a private contract and therefore could not be realised as arrears of land revenue; the Collector had no authority to realise it as such and no statutory provision in The Kshetra Samities And Zilla Parishads Adhiniyam, 1961 (the "Act") or rules permitted such recovery.
- State instrumentalities cannot enter into private contracts that are not for a public purpose; if no public purpose exists the contract would be hit by Article 14 of the Constitution.
- If recovery as land revenue were permitted, the petitioner would suffer serious prejudice because there would be no machinery to quantify disputed sums and defences available in ordinary suits would be unavailable in revenue recovery proceedings.
- In the second writ petition, petitioner argued Rs. 55,150/- was due under an independent construction contract and was illegally deducted; he relied on a number of cases (listed in the petition) to support his contention that the deduction/recovery was improper.
Respondents' Arguments
- The petitioner voluntarily participated in an open auction that was free from fraud, coercion or undue influence; he worked for the entire licence period and realised fees and tolls on behalf of Zilla Parishad, yet failed to pay the agreed balance.
- Zilla Parishad has statutory authority to recover unpaid fees and tolls by the procedure provided in the Act. Sections 144 and 145 confer power to levy fees and tolls; Section 146 makes Chapter VIII's recovery procedure applicable to unpaid fees and tolls; Sections 158(2) and 159 (Chapter VIII) provide for recovery as arrears of land revenue in certain contexts.
- The petitioner filed an affidavit on 29 March 1988 before the Additional Mukhya Adhikari promising that unpaid amounts under the licence could be realised as arrears of land revenue; by that oath he consented to the mode of recovery and is estopped from challenging it.
- The sums realised by the petitioner were public money (fees/tolls) and he cannot retain them; Zilla Parishad lawfully deducted Rs. 55,150/- from amounts otherwise payable to the petitioner on the subsequent construction contract as an adjustment toward the unpaid licence balance.
- The interim order dated 7 September 1990 only stayed recovery as arrears of land revenue; it did not prohibit adjustment/deduction of the amount from subsequent payments. Reliance was placed on Sia Ram v. Collector/A.D.M. (Agra) in support of some contentions.
Table of Precedents Cited
| Precedent | Rule or Principle Cited For | Application by the Court |
|---|---|---|
| Mumtaj Ali v. Sub-Divisional Magistrate (reported in 1970 All LJ 11) | Cited (by petitioner) as authority on incapability of recovering certain municipal/town dues as arrears of land revenue (supporting petitioner's position). | The Court noted this Single Judge decision as one of the authorities which had taken the view that unpaid fees/tolls (or analogous dues) could not be recovered as land revenue; it treated the case as supportive of the proposition that recovery as land revenue was not permissible for unpaid fees/tolls. |
| U.P. State Electricity Board v. Official Liquidator, Lower Ganges Jamuna Electricity Distributing Co. Ltd. ((1973) 2 SCC 224 : AIR 1973 SC 2546) | Cited by the petitioner (as part of authorities relied upon) concerning propriety of recovering a sum from sums in hand (context: recovery/deduction from monies held). | The Court examined this Supreme Court decision and concluded it did not help the petitioner: that case disallowed a double recovery (the Development Reserve already given in assets), but did not undermine the Zilla Parishad's right to recover when there is no such double recovery. The Court therefore found the precedent inapplicable on the facts. |
| Angad/Anaad Pandey v. Town Area Committee, Karora Hamirpur (reported in 1980 All WC 500 : 1980 All LJW 1036) | Cited for an identical question in respect of dues under the U.P. Town Areas Act; used to support the view on non-recoverability as land revenue. | The Court treated this Division Bench decision as supportive of the conclusion that unpaid fees/tolls could not be recovered as arrears of land revenue, considering it an analogous and persuasive authority. |
| Dwarka Das Marfalia & Sons v. Board of Trustees of the Court of Bombay ((1989) 3 SCC 293 : AIR 1989 SC 1642) | Cited by the petitioner among authorities relied upon (context provided in petitioner’s list). | The case was included in the petitioner's list of authorities; the opinion records the citation but does not indicate that the Court relied upon it in its core statutory analysis. |
| Mahesh Chandra v. Zilla Panchayat, Mainpuri ((1996) 3 UPLBEC 1586) | Cited (Division Bench decision) for the proposition that unpaid fees and tolls cannot be recovered as arrears of land revenue after examining statutory provisions and rules. | The Court expressly agreed with this Division Bench's detailed statutory analysis and its conclusion; the opinion states respectful agreement with the view in Mahesh Chandra. |
| Munna Lal Garg v. Collector, Hamirpur (1974 All LJ 777) | Cited as another Single Judge decision taking the identical view on the question of recovering such dues as land revenue. | The Court referred to this Single Judge decision as among authorities supporting the proposition that unpaid fees/tolls cannot be recovered as land revenue arrears. |
| Sia Ram v. Collector / A.D.M. (Finance and Revenue), Agra (1996 All CJ 495 : 1996 All LJW 1545) | Relied upon by respondents; invoked in support of recovery/adjustment in the particular factual circumstances presented to that Division Bench. | The Court examined this Division Bench judgment and observed that it had not noticed the Uttar Pradesh Rules (Recovery of Arrears of Tax and Rent on Land) 1975; the Court concluded that Sia Ram did not assist respondents on the legal point that unpaid fees/tolls could be recovered as land revenue and therefore found it unhelpful on the specific statutory issue. |
Court's Reasoning and Analysis
The Court proceeded in a stepwise statutory and fact-based analysis addressing the enumerated issues.
1. Was the licence agreement void for unlawful object or lack of free consent?
The Court examined Sections 10, 14 and 16 of the Indian Contract Act (definitions of contract, free consent, undue influence). It found no material on record to show coercion, undue influence, fraud or misrepresentation: the petitioner participated in an open auction, voluntarily bid, deposited part payment and worked under the licence for the entire period. The Court also observed the licence and an affidavit by the petitioner referred to a Bus Adda maintained by Zilla Parishad and bye-laws for realisation of fees/tolls were in force. On these facts, the Court rejected the contention that the object of the agreement was unlawful.
Even assuming arguendo that the agreement were void, the Court applied Section 65 of the Contract Act (doctrine of pari delicto in the opinion's characterization) which provides that a person who has received any advantage under a void agreement must restore it or compensate the person from whom it was received. The petitioner had realised public fees/tolls by virtue of the licence and received that advantage; therefore he was bound to restore it to the Zilla Parishad (the public custodian of such funds). The Court concluded the petitioner cannot justify withholding the amounts on the ground that the contract's object was unlawful.
2. Can unpaid fees/tolls be recovered as arrears of land revenue?
The Court conducted a statutory construction of the Zilla Parishads Act provisions (as quoted in the opinion): Sections 119–123 (powers to impose taxes), Sections 142–146 (levy of fees and tolls), and the Chapter VIII recovery provisions including Sections 148, 153, 158(2) and 159. The Court distinguished the language of Section 120(3) (which permits arrears of tax on ‘Circumstances and Property’ to be made recoverable as arrears of land revenue in the Zilla Parishad's discretion) from Section 146 (which provides that unpaid fees and tolls referred to in Sections 144 and 145 may be recovered in the manner prescribed in Chapter VIII). Section 146 does not expressly permit recovery of unpaid fees and tolls as arrears of land revenue.
The Court observed that Sections 158(2) and 159 (and the Rules made under them, namely the Uttar Pradesh Zilla Parishads (Recovery of Arrears of Tax and Rent on Land) Rules, 1975) specifically address recovery as arrears of land revenue but do so in the contexts of arrears of tax on circumstances and property and rents on land. Those Rules and the statutory provisions, the Court held, have no application to unpaid fees and tolls. Consequently, a legislative reading of Sections 120(3), 146, 158(2) and 159 together with the 1975 Rules led the Court to conclude that unpaid fees and tolls cannot be recovered as arrears of land revenue. The Court held that neither an agreement between parties nor a petitioner’s affidavit could override this statutory scheme.
The Court noted prior authorities (Division Bench and Single Judge decisions) which had reached the same conclusion and expressly stated respectful agreement with the Division Bench decision in Mahesh Chandra v. Zilla Panchayat. The Court examined (and distinguished) Sia Ram, finding it did not consider the 1975 Rules and therefore was not persuasive on the statutory point.
3. Could Zilla Parishad recover the unpaid amount by deduction/adjustment from sums due under a later contract?
The Court turned to Chapter VIII provisions (Sections 144, 145, 146, 148 and 153 reproduced in the opinion) and noted that Section 148 requires a bill be presented to a person who becomes liable for payment of any tax or other sum declared recoverable under the Chapter. Section 153 permits distrain (seizure) of movable property (subject to specified protections and limitations). Reading Sections 146 and 148 together, the Court concluded that unpaid licence fees (the unpaid balance in the petitioner's hands arising from his role in collecting fees/tolls) could be legitimately recovered pursuant to Chapter VIII procedures.
The Court reasoned that although the Zilla Parishad had authorised the petitioner to collect fees/tolls and had permitted him to retain a share as consideration, the amounts realised remained public money in the hands of the petitioner. The Zilla Parishad was therefore entitled to recover the unpaid balance by lawful processes under Chapter VIII, which included withholding or distraining property or deducting/adjusting sums due from the petitioner. The Court rejected the petitioner's reliance on the U.P. State Electricity Board case, observing that that case turned on prevention of double recovery in different factual circumstances and did not negate the Zilla Parishad's right to recover when no such double recovery was shown.
4. Effect of the interim orders (7-9-90 and 21-12-92)
The Court analyzed the interim order dated 7 September 1990 and found it stayed recovery proceedings only insofar as recovery as arrears of land revenue was concerned (it required deposit of Rs. 10,000/-). The Court held that adjustment/deduction under Chapter VIII was not proscribed by that interim order. The Court also noted that pursuant to the interim mandamus dated 21 December 1992 the Zilla Parishad paid Rs. 55,150/- to the petitioner; for reasons already stated, that payment should not have been made. Equity required restoring the parties to their original positions prior to the interim order so that the act of the Court itself does not prejudice any party (citing the maxim Actus Orior? Neminem Grarsabit as used in the opinion). The Court therefore held that the amount paid under the interim order was held by the petitioner in trust for the Zilla Parishad and must be repaid.
Holding and Implications
Core Ruling: The Court ordered that the petitioner must repay Rs. 55,150/- to the respondent Zilla Parishad within three months. The Court held that unpaid fees and tolls (collected under the licence) cannot be recovered as arrears of land revenue under the statutory scheme, but the Zilla Parishad may lawfully recover the unpaid licence balance by procedures available under Chapter VIII of the Act (including adjustment/deduction and distrain where appropriate). The amounts realised by the petitioner were public money and, if already paid to him under the interim mandamus, are held by him in trust and must be restored to the Zilla Parishad.
Specific consequential directions (as ordered by the Court):
- Petitioner shall pay Rs. 55,150/- to respondent Zilla Parishad within three months of the judgment.
- If the petitioner pays as directed, the recovery proceedings for Rs. 70,150/- as arrears of land revenue (and the citation dated 1-9-90 forming Annexure-1 to W.P. No. 23803 of 1990) shall stand quashed.
- If the petitioner fails to pay within the directed period, recovery proceedings shall continue for the amount referred to in the citation, and the petitioner shall be liable to pay interest at the rate of 15% on Rs. 55,150/- from the date he received that amount under the interim order dated 21-12-92 until actual recovery.
- The Rs. 10,000/- deposited by the petitioner under the interim order dated 7-9-90 shall be given due adjustment in the recovery under this judgment.
- In the special facts and circumstances of the case, each party shall bear their own costs.
Implications: The direct effect is to require restitution of the Rs. 55,150/- paid under the interim mandamus and to validate Zilla Parishad's use of Chapter VIII procedures (including deduction/adjustment) to recover unpaid licence balances. The opinion states the Court's alignment with earlier Division Bench and Single Judge decisions that unpaid fees and tolls cannot be recovered as arrears of land revenue; the Court did not purport to lay down that it was setting a novel new precedent beyond the statutory construction and application to these facts.
Order accordingly.
R.R.K Trivedi, J.:— Both the aforesaid writ petitions have been filed by same petitioner against Zilla Parishad, Jhansi and most of questions of fact and law involved are common. Thus both writ petitions can be decided by a common order against which parties have also to objection. Civil Misc. Writ Petition No. 23803 of 1990 shall be the leading case.
2. The facts, in brief, giving rise to Writ Petition No. 23803 of 1990 are that auction for grant of licence to realise and collect fee and tolls on vehicles entering Zilla Parishad territory and using Bus Adda for the period 1st April, 1988 to 31st March, 1989 took place in which, bid of the petitioners for Rs. 1,75,000/- being highest was accepted. In pursuance of which the licence was issued in favour of petitioner which is Annexure-1 to the writ petition. Out of the total bid money, petitioner paid Rs. 1,05,000/-. However, he failed to pay the remaining amount of Rs. 70,000. In spite of the several demands the amount was not paid, a recovery certificate was sent to the Collector, Jhansi to realise the amount as arrears of land revenue from petitioner. The respondent No. 3 Tahsildar, Jhansi served a citation dated 1st September, 1990 on petitioner requiring him to pay Rs. 70,150 and collection charges and to appear before him on 8th September, 1990. Aggrieved by this demand made through the citation, petitioner has filed this writ petition challenging the recovey of the amount and for quashing of the citation. In this writ petition, counter and rejoinder affidavits have been exchanged. This Court by interim order dated 7th September, 1990 stayed the recovery of the amount on condition that the petitioner deposits an amount of Rs. 10,000/- with the opposite party No. 1 Zilla Parishad within a period of one month.
3. The facts stated in Civil Misc. Writ Petition No. 22366 of 1992 are that the petitioner is a registered contractor. He got a contract to construct the Government Girls High School in village Rasoli, Block Babina, district Jhansi. The final account of this construction which was approved by the respondents was for Rs. 1,10,923,85 p. After certain deductions petitioner was entitled to get an amount of Rs. 81,967,85 p. Respondent Zilla Parishad deducted Rs. 55,150/- from this amount towards the payment of the balance of the licence fee under the agreement in question in first writ petition and paid him only Rupees 26,817,85 p. Petitioner filed this writ petition for a direction to the respondent No. 2 to comply with the interim order dated 7th September, 1990 and to pay him immediately the remaining amount of Rupees 55,150/- recovered from the final payment of the contract work. In this wirt petition a Division Bench of this Court on 21st December, 1992 passed an order to the following effect:—
“List this petition along with writ petition No. 23803 of 90 on 18-1-93.
In the mean time, we direct the respondent No. 1 Zilla parishad to pay a sum of Rs. 55,150/- to the petitioner which it has unlawfully deducted from payment despite the order of this Court dated 7.09.90 in Writ Petition No. 23803 of 90.”
4. It is not disputed that under the aforesaid interim order the amount has been paid to the petitioner.
5. We have heard Senior counsel Shri R.K Jain and Shri Arun Prakash for petitioner and Shri K.N Saxena and learned Standing counsel for respondents.
6. Shri Jain has submitted that the contract for realisation of the toll and fee from the vehicles was void as its object was not lawful. The Zilla Parishad had no authority under law to realise the toll tax from petitioner as the contract was void. Reliance has been place for this submission on Sections 10, 14 and 16 of the Contract Act, learned counsel has further submitted that in any case the unpaid amount of the contract money cannot be realised as land revenue arrears. The amount due from petitioner was neither the amount of tax nor fee but it was a premium on contract and in respect of which recovery certificate cannot be issued. It has been further submitted that in the circumstances of the case Collector could not have authority to realise the amount as land revenue arrears and this authority cannot be conferred on him by an agreement between the parties. The agreement, if any, is void for all purposes. There is no provision under The Kshetra Samities And Zilla Parishads Adhiniyam, 1961 (here-in-after referred to as Act) or Rules framed thereunder giving authority to Zilla Parishad to realise the amount as arrears of land revenue. It has been submitted that State or its instrumentalities cannot enter into a private contract which is not for a public purpose. If no public purpose is involved the contract will be hit by Article 14 of the Constitution. It has also been submitted that if the amount is realised as land revenue arrears petitioner shall suffer a serious prejudice as there is no machinery to quantify the amount which may be payable by petitioner. Various defences which may be available to petitioner in suit shall not be available to him in the present proceedings.
7. In respect of the second writ petition, it has been submitted by the learned counsel for the petitioner that the amount of Rs. 50,150/- was due to petitioner from Zila Parishad under a different, and independent contract for constructing the school building. The contract was duly completed and the petitioner had submitted the final bill for payment. The respondent Zilla Parishad however illegally deducted the amount of Rs. 55,156/- and paid only Rs. 26,817.85 p. which was accepted by petitioner under protest. The petitioner filed this writ petition to enforce his legal right to receive the amount which was illegally withheld by Zilla Parishad in spite of the interim order dated 7th Sept. 1990 passed in the first writ petition. Learned counsel has placed reliance on the following cases:— (1) Mumtaj Ali v. Sub-Divsional Magistrate reported in 1970 All LJ 114. (2), U.P State Electricity Board v. Official Liquidator Lower Ganges Jamuna Electricity Distributing Company Ltd., reported in (1973) 2 SCC 224 : AIR 1973 SC 2546. (3) Angad Pandey v. Town Area Committee Karora Hamirpur, reported in 1980 All WC 500 : (1980 All LJW 1036), (4) Dwarka Das Marfalia and Sons v. Board of Trustees of the Court of Bombay, reported in (1989) 3 SCC 293 : AIR 1989 SC 1642 and Mahesh Chandra v. Zilla Panchayat, at Mainpuri reported in (1996) 3 UPLBEC 1586.
8. Shri K.N Saxena, learned counsel appearing for the respondents has submitted that the petitioner participated in the open auction and his bid of Rs. 1,75,000/- was accepted being highest. There was no question of any fraud, coercion or undue influence involved in such open auction now was it in any was inequitable. The petitioner worked under the contract for the entire period of Ist April, 1988 to 31 March, 1989 and realised the amount from vehicles on behalf of Zilla Parishad. However he has not paid balance amount. Learned counsel has further submitted that Zilla Parishad has authority under law to issue the recovery certificate for realisation of such amount as arrears of land revenue. He has submitted that under Section 146 of the Act any amount of unpaid fee and tollscould be recovered in the manner prescribed in Chapter VIII of the Act. It has been submitted that Sections 159(2) and Section 158 falling in Chapter VIII of the Act contained provisions for realisation of the amount due to Zilla Parishad as arrears of land revenue. The action on the part of the Zilla Parishad and the Collector was thus well within the authority of law. It has also been submitted that the cases relied on by the petitioner were in respect of the amount due to town area which are clearly distingishable from the facts of the present case. It has been further submitted that besides the aforesaid legal provisions, petitioner filed an affidavit on 29 March, 1988 before the Additional Mukhya Adhikari of district Jhansi to the effect that if any amount payable under the condition No. 1 of the agreement is not paid by him, then the amount can be realised from him as arrears of land revenue through Collector. It has been submitted by the learned counsel that in view of the affidavit filed by petitioner there was no illegality involved in realising the amount as arrears of land revenue for which he expressly agreed. On signing of this affidavit licence was issued and petitioner was permitted to start realisation of the amount of fee and toll without paying the full money. In view of the aforesaid promise made by him, it is not open to him to go back from it. In fact he gave consent on oath for particular mode of recovery on his failure to pay the amount and he is estopped under law from challenging the same. It has also been submitted that the amount realised by the petitioner was fee or toll from the various vehicles of behalf of Zilla Parishad. It was not his personal money and he cannot be allowed to retain this money which is public money. Shri Saxena has also submitted that if the amount is realised from petitioner as arrears of land revenue, there is no question of suffering any prejudice by him as submitted. No quantification of the amount is involved. At no stage petitioner challenged the liability to pay the amount except in the present wril petition before this Court. The amount was already fixed under the contract and for apportionment or any remission of the contract money, on the allegations made in the writ petition, he should have filed a suit and such, disputed question cannot be resolved in the writ petition. Learned counsel for the respondents has placed reliance in case of Sia Ram v. Collector/D.M (Finance and Revenue) Agra reported in 1996 All CJ 495 : (1996 All LJW 1545).
9. With regard to second writ petition, it has been submitted that two works no doubt were different and under different agreement but as Zilla Parishad was entitled to recover the amount from petitioner, it would be deducted from the amount payable to petitioner by Zilla Parishad, against such a mode of recovery, there is no prohibition in law. There was nothing wrong if such adjustment is made. It is well within the authority of the Zilla Parishad to adjust the amount and the order of the Hon'ble High Court dated 7th Sept., 1990 was not violated in any manner under which only recovery of the amount as arrears of land revenue was prohibited. The adjustment of the amount was towards the fulfilment of the statutory obligation of Zilla Parishad to realise the public money from petitioner which was being illegally realised and was not paid to the respondent. It has also been submitied that under the interim order of this Court dated 21st December, 1992 respondent Zilla Parishad was compelled to pay the amount to petitioner but petitioner has not yet paid the amount due from him to Zilla Parishad though more than 7 years have passed. He illegally retained the amount and got enormous benefit out of the same. The conduct of the petitioner does not satisfy the principles of equity and fairplay in any way. Zilla Parishad is entitled in law to get back the amount from petitioner and Zilla Parishad in the special facts and circumstances of the case is entitled for protection of this Court.
10. We have thoroughly considered the rival submissions made by the learned counsel for the parlies. On the submissions made before us in the aforesaid two writ petitions, in our opinion, the following questions are involved:—
(1) Whether the agreement between petitioner and respondent Zilla Parishad under which the right was granted to petitioner to realise fee and toll from vehicles was for unlawful object and the agreement was void?
(2) Whether in case agreement was found to be void petitioner is not liable to pay the amount which he has already realised from public during the period for which licence was granted to him?
(3) Whether this amount can be recovered from petitioner as arrears of land revenue under the provisions of the Act and the Rules framed thereunder?
(4) Whether the petitioner is bound by his affidavit dated 29-3-1988 and it is not open to him to question the mode of recovery?
(5) Whether the recovery of the amount of Rs. 55,150/- by Zilla Parishad due from petitioner towards the payment of the balance of licence fee by deduction from the amount payable in respect of subsequent contract for construction of the school building, was permissible under the law? and:
(6) To what relief petitioner is entitled in the facts and circumstances of the present case?
11. For resolving questions land 2, it has to be seen as to whether the parties entered into any agreement which was not for lawful purpose and it was void and further its effect on the recovery of the amount from petitioner. Learned counsel for the petitioner has placed reliance on Sections 10, 14 and 16 of the Act. Section 10 provides that all agreements are contracts if they are made by free consent of parties competent to contract, for a lawful consideration and with a lawful object and which have not been expressly declared to be void. Under Section 14 of the Contract Act free consent has been defined and it is provided that the consent is said to be free when it is not caused by coercion, undue influence, fraud, misrepresentation and mistake. Section 16 of the Contract Act defines undue influence. We have considered the aforesaid provisions of the Contract Act in the facts and circumstances of the present case. However, in our opinion there is nothing on record on which basis it may be said that the petitioner was acting under any undue influence and the consent given by him was not free. He participated in the open auction and voluntarily made the bid with open dyes and thereafter deposited the money and worked for the whole of the period. There is also nothing on record to show that the object of the agreement was in any way unlawful, except the bare allegations made in the writ petition which have been reiterated during arguments. There is no material before us that Zilla parishad had no authority to realise fee and to 11 from the vehicle entering Zilla Parishad area during the relevant period. Contrary to it Zilla Parishad have been conferred specific authority in this respect under Sections 144 and 145 of the Act. Petitioner did not raise any objection during whole of the period that the realisation made by him on behalf of Zilla Parishad would be illegal. All these objections have been raised for the first time before this Court. From the licence filed as Annexure-1 to the first writ petition, it appears that some. Bus Adda was being maintained by Zilla Parishad and, the fees or rent was being realised for using the same from vehicles. This Adda has also been referred to in the petitioner's affidavit dated 29th March, 1988 which reads as under:—
12. From perusal of the affidavit it appears that there was some Bus Adda maintained by Zilla Parishad. Bye laws were also in existence for realisation of fee and toll and were in force during the relevant period. From reading of the aforesaid two documents it is difficult to accept the contention of the learned counsel for the petitioner that the agreement was for any unlawful object. The submission of the learned counsel for the petitioner cannot be also accepted for the reason that the petitioner entered into the agreement and worked under the same for whole of the stipulated period and realised the amount from the public now it is not open for him to say that he will not pay the amount which he has already realised. Even assuming for sake of argument that the agreement was void, petitioner was party to it and he has received benefit under the same by realising the amount. The doctrine of PARI DELICTO enshrined in Section 65 of the Contract Act is fully applicable. Section 65 reads as under:—
“When an agreement is discovered to be void, or when a contract becomes void, any person who has received any advantage under such agreement or contract is bound to restore it, or to make compensation for it, to the person from whom he received it.”
13. It cannot be denied that but for the contract, which is now alleged to be void, petitioner could not have realised the amount from public on behalf of Zilla Parishad and petitioner is now under obligation to pay it back. He cannot justify the refusal of the payment of the amount on the alleged ground that the object was not lawful. The amount is an advantage in hands of the petitioner which is public money and cannot be allowed to be retained by him. He is bound to restore it to the Zilla Parishad which is a public body and the custodian of the public funds. In our opinion, the submission of the learned counsel for the petitioner cannot be accepted.
14. The second submission of the learned counsel for the petitioner is that the amount in question could not be realised as arrears of land revenue.
15. The learned counsel for the respondents, on the other hand, has seriously disputed this submission.
16. The second submission of the learned counsel for the petitioner and its reply made by the learned counsel for the respondents relate to questions 3 and 4 formulated earlier and it is to be seen whether balance amount not paid by the petitioner can be recovered as arrears of the land revenue. Chapter VII of the Act contains provisions for imposition of the taxes and levy of fees and tolls. Section 120(3) provides that the recovery of any arrears of the tax on circumstances and Property may be made under Chapter VII, or as arrears of land revenue in the discretion of the Zilla Parishad. Section 121 confers power on Zilla Parishad to impose a tax on Circumstances and property subject to certain conditions and restrictions. Section 123 confers power on Zilla Parishad to impose taxes by special resolution. The tax, being one of the taxes described in Section 119 which it desires to impose. Sections 142 to 145 of Chapter VII deal with the levy of fees and tolls. Section 146 provides that any unpaid fees and tolls referred to in Sections 144 and 145 may be recovered in the manner prescribed in Chapter VIII. Thus there is a material difference in the language used in Section 120(3) and Section 146 falling in Chapter VII. Under both sections provisions of Chapter VIII have been made applicable for recovery of the amount but in respect of arrears of taxes on Circumstances and Property with reference to Chapter VIII it has been made specific that it may be recovered as arrears of land revenue in the discretion of the Zilla Parishad under Section 120(3). However in Section 146 language used is different. It does not say that any unpaid fees and tolls referred to may be recovered as arrears of land revenue. It only provides that unpaid fees and tolls may be recovered in the manner prescribed in Chapter VIII. Thus the legislative intent is very clear that so far as the amount of arrears of taxes are concerned, it has been provided that they may be recovered as arrears of land revenue. However in respect of unpaid fees and tolls only the manner provided in Chapter VIII for recovery of the amount has been made applicable. Section 146 does not confer authority on Zilla Parishad to recover the amount as arrears of land revenue. The legislative intent in this regard is further clear from the language used in Sections 158(2) and 159. Section 158(2) provides that in the case of an arrear of tax on Circumstances and Property a Zilla Parishad may in addition to the power to take the recourse to the provisions of Section 148 or sub-section (1) of this section, but subject to and in accordance with rules made in this behalf recover them as arrears of land revenue. Similarly Section 159 provides that where any sum is due on account of rent from a person to a Zilla Parishad in respect of land vested in or entrusted to the management of the Zilla Parishad, the Zilla Parishad subject to and in accordance with rules made in this behalf may recover any such arrear as arrear of land revenue. Thus under both the aforesaid sections the recovery of the arrears of tax on Circumstances and Property and the sum due on account of rent of land recovery is permissible as arrears of land revenue subject to rules made in this behalf. Under the aforesaid section Governor of Uttar Pradesh has also made the Rules known as Uttar Pradesh Zilla Parishads (Recovery of Arrears of Tax and Rent on Land) Rules, 1975. These Rules contained elaborate procedure as to how amount referred to in Sections 158(2) and 159 shall be recovered as arrears of land revenue. These rules have no application so far as unpaid fees and tolls are concerned. Thus on reading of Sections 120(3), 146, 158(2) and 159 together with the Rules of 1975 referred to above, the legal position is very clear that the amounts in respect of unpaid fees and tolls cannot be recovered by Zilla Parishad as arrears of land revenue. This legal position could not be altered by agreement of parties or on basis of the promise made or undertaking given under the affidavit dated 29th March, 1988. A Division Bench of this Court in case of Mahesh Chandra v. Zilla Panchayat at Mainpuri reported in (1996) 3 UPLBEC 1586 has taken the same view after examining the legal provisions in detail. We are in respectful agreement with the view expressed by the aforesaid Division Bench. This view also finds support by another Division Bench judgment or this Court in case of Anaad Pandey v. Town Area Committee, Karora Hamirpur, reported in 1980 All WC 500 : (1980 All LJW 1036). The Division Bench in the aforesaid case was considering the identical question though in respect of dues under U.P Town Areas Act, 1940. The identical view was taken in two judgments given by learned Single Judge in cases of Mumtaj Ali v. Sub-Divisional Magistrate reported in 1970 All LJ 11 and Munna Lal Garg v. Collector, Hamirpur, reported in 1974 All LJ 777.
17. Learned counsel for the respondents Zilla Parishad, however placed strong reliance on a Division Bench judgment in case of Sia Ram v. Collector/A.D.M (Finance and Revenue) Agra reported in 1996 All CJ 495 : (1996 All LJW 1545), we have thoroughly examined the judgment. However, we find that Uttar Pradesh Zilla Parishads Recovery of Arrears of Tax and Rent on Land) Rules, 1975 examined by us and also by the Division Bench in case of Mahesh Chandra (1996 (3) UPLBEC 1586)(supra) have not been noticed in the judgment. It appears that the Division Bench mainly decided that case on the finding that the equity is against petitioner. In our opinion in the facts and circumstances of the case as the amount due from petitioner cannot be realised as arrears of land revenue, this judgment does not help respondents in view of the clear legal position noticed above.
18. The next question for consideration is as to whether Zilla Parishad can recover the balance amount due from petitioner by way of deduction from the amount payable to him in respect of the subsequent contract for construction of the school building. In this regard certain provisions are necessary to be looked into. For convenience Sections 144, 145, 146 falling in Chapter VII of the Act and Sections 148 and 153 falling in Chapter VII are being reproduced below:—
“144. With the previous sanction of the State Government, a Zilla Parishad or a Kshettra Samiti may fix and levy school fees fee for the use of libraries and Sarais and paraos fees for the use of or benefits derived from, any of the works or institutions constructed and maintained by the Zilla parishad or the Kshettra Samili originally undertaken as famine preventive or relief works fees for the service of bulls and stallions, and for registration of animals, and fees at fairs, markets, agricultural shows, and industrial exhibitions held under its authority or otherwise, for which the public is allowed access and at which the Zilla Parishad or the Kshettra Samiti provides sanitary and other facilities for the public and tolls for the use of bridges constructed, repaired or maintained by the Zilla Parishad or the Kshettra Samiti:
Provided that a Zilla Parishad or Kshettra Samiti shall not fix or levy fees for the use of paraos which are not vested in it.
145. Subject to any rule made by the State Government in this behalf, a Zilla Parishad or a Kshettra Samiti may impose in any market established maintained or managed by it any one or more of the following fees or tolls:
(a) licence fees on brokers, commission agents, weighmen or measurers practising their calling within such markets:
(b) toll on vehicles, pack animals or porters bringing goods for sale into such a market.
(c) market fees for the right to expose goods for sale in such market or for the use of any building or structure therein:
(d) fees on the registration of animals sold in market.
146. Any unpaid fees and tolls referred to in Sections 144 and 145 may be recovered in the manner prescribed in Chapter VIII.
148.(1) As soon as a person becomes liable for the payment of—
(a) any sum on account of a tax imposed by the Zilla Parishad; or
(b) any other sum declared by or under this Act or by any rule or bye-law made under the Northern India Ferries Act, 1878, to be recoverable in the manner provided by this Chapter.
the Zilla Parishad shall with all convenient speed, cause a bill to be presented to the person so liable.
(2) Unless otherwise provided by rule, a person shall be deemed to become liable to the payment of every tax and licence fee upon the commencement of the period in respect of which such tax or fees is payable.
153.(1) It shall also be lawful for the officer mentioned in Section 152 to distrain, wherever it may be found within the rural area, any movable properly of the defaulter, subject to provisions of sub-section (2).
(2) The following property shall not be distrained—
(a) the necessary wearing apparel and bedding of the defaulter, his wife and children, and his necessary cooking utensils.
(b) the tools of artisans.
(c) books of account.
(d) when the defaulter is an agriculturist, his implements of husbandry, seed grain, and such cattle as may be necessary to enable him to earn his livelihood.
(3) The distress shall not be excessive, that is to say the property distrained shall be as nearly as possible equal in value the amount recoverable under the warrant, and if any articles have been distrained which, in the opinion of a person authorised by or under sub-section (2) of Section 158 to sign a warrant, should not have been so distrained they shall all forthwith be returned.
(4) The officer shall, on seizing the property, forthwith make an inventory thereof, and shall before removing the same, give to the person in possession thereof at the time of seizure a copy of the inventory signed by him and a written notice in such form as the parishad may, by regulation, prescribe that the said property will be sold as specified in such notice.”
19. From perusal of the aforesaid sections, it is clear that Section 144 provides that with the previous sanction of the State Government. Zilla Parishad may levy various kinds of fees including that of sarais and paroos. Under Section 145(b) Zilla Parishad may levy fees or tolls on vehicles, pack animals or porters bringing goods for sale in such market. Section 146 provides that any unpaid fees and tolls referred to in Sections 144 and 145 may be recovered in the manner prescribed in Chapter VIII. Section 148 provides that as soon as a Person becomes liable for payment of any sum on account of a tax imposed by the Zilla Parishad or any other sum declared by or under this Act or by any rule or bye-law made under the Northern India Ferries Act, 1878 to be recoverable in the manner provided by this Chapter, the Zilla Parishad shall, with all convenient speed, cause a bill to be presented to the person so liable. Sub-section (2) of Section 148 provides that unless otherwise provided by rule, a person shall be deemed to become liable for the payment of every tax and licence fee upon the commencement of the period in respect of which such tax or fee is payable. Section 153 provides that it shall be lawful for the officer mentioned in Section 152 to distrain, wherever it may be found within the rural area, any movable property of the defaulter, subject to the provisions of sub-section (2). Sub-section (2) of Section 153 excludes certain movable properties from being distrained. Sub-section (3) provides that the distress shall not be excessive, that is to say the properly distrained shall be as nearly as possible equal in value to the amount recoverable. Thus if Sections 146 and 48 are read together any other sum declared under the Act to be recoverable in the manner provided under Chapter VIII may be recovered by Zilla Parishad. Sub-section (2) of Section 148 also makes Chapter VIII applicable with regard to licence fee. Thus the amount in hands of petitioner, which can be termed only unpaid licence fee for giving right to petitioner to collect the fees and tolls, can be legitimately recovered from him under the procedure provided under Chapter VIII. The Zilla Parishad instead of employing its own machinary for purposes of realising fees and tolls, authorised petitioner to recover the sum and further agreed to accept the accumulated amount and part with some of the amount of fees and tolls as benefit to the petitioner in lieu of the service rendered by him but it cannot be said that the amount in hands of the petitioner changed this nature. It continued to be as fees or tolls realised by him. It was not his personal money. It continued to be a public money in hands of petitioner. Money has been realised from various persons as fees and tolls and petitioner cannot shirk his liability to pay it. In fact the Court cannot permit such unjust enrichment in favour of petitioner. Thus the amount can be recovered under Section 148. The balance amount can be recovered from petitioner under Chapter VIII of the Act. Section 153 clearly provides for distrain of any movable property of petitioner found within the rural area for which Zilla Parishad has authority or jurisdiction. The office of the Zilla Parishad where the amount was payable to petitioner can be safely deemed to be an area within the authority or jurisdiction of Zilla Parishad though office may be situated outside rural area or situated in rural area. The only limitation contained in sub-section (3) of Section 153 against distress, which means legal seizure of goods to enforce payment is that it should not be excessive and it should be as nearly as possible equal in value to the amount recoverable from petitioner. The Zilla Parishad only withheld or distrained the amount due from petitioner. It is also not disputed that demand notices were served on petitioner and he was given sufficient time to pay the amount but he failed in discharging his legal obligation. In our opinion. Zilla Parishad acted within its authority in withholding the amount of Rs. 55,150/- which was by way of recovery of the amount payable by him and in this process it could be legitimately recovered also by adjustment of the amount. We have not been pointed out any bar or prohibition against such mode of recovery, rather such mode of recovery appears implied in the provisions contained in Chapter VIII. Learned counsel for the petitioner, however, submitted that the amount cannot be recovered from petitioner in the manner adopted by Zila Parishad and for this purpose reliance was placed on the judgment in case of U.P State Electricity Board v. Official Liquidator Lower Ganges Jamuna Electricity Distributing Company Ltd., (1973) 2 SCC 224 : AIR 1973 SC p. 2546. However, in our opinion, this case does not help petitioner in any way. It was a case of recovery of the amount towards the development reserve. The Court came to conclusion that Development Reserve was already paid in shape of assets and the amount cannot be allowed to realise twice over. Hon. Court has not disputed the right or mode of recovery of the amount from the purchase money lying in hands of the Board, but it was disapproved as the amount had already been paid in shape of assets. The relevant part of the finding is being reproduced below:—
“………………………………The demand of the Board really amounts to saying that it must be paid twice over, once in the form of the assets granted out of the Development Reserve which it has already had, and again the same Development Reserve in cash as though it is still available in cash. There is no justification either in law or in equity for such a demand.”
20. Thus in the aforesaid facts and circumstances, the Hon'ble Court did not allow the reduction of the amount from the purchase money. We have not been pointed out any such circumstance in the present case in which Zilla Parishad could not be legally entitled to recover the amount from petitioner on the contrary petitioner was under obligation to pay the amount. From material on record, it is clear that he worked for the entire period and realised the amount of fee and tolls under the agreement. The action on the part of the Zilla Parishad in realising the amount from petitioner thus was neither against law or against equity.
21. The last submission in this connection was that the amount could not be recovered in view of the interim order dated 7th September, 1990 granted by this Court in Civil Misc. Writ Petition No. 23803 of 1990. However, we are not impressed by this submission also. In Writ Petition No. 23803 of 1990 the challenge was against the recovery of the amount as arrears of land revenue. The interim order passed by the Division Bench was in the following terms:—
“The impugned recovery shall remain stayed subject to the condition that the petitioner deposits an amount of Rs. 10,000/- (Ten thousand) with opposite party No. 1, Zila Parishad, Jhansi within a period of one month from today.”
22. In Writ Petition No. 23803 of 1990 the challenge was against the mode of recovery. The challenge is clear from the reliefs claimed in the writ petition which are as under:—
(1) to issue a writ, order or direction in the nature of certiorari quashing the citation contained in Annexure-4 to the writ petition.
(2) to issue a writ, order or direction commanding the respondents not to recover the amount of Rs. 70,150/- plus collection charges as arrears of land revenue:
(3) to issue any other writ, order or direction as this Hon'ble Court may deem fit and proper in the circumstances of the case; and
(4) to award cost of the petition to the petitioner.
23. Thus from the reliefs claimed in the writ petition and from the averments made in the writ petition, it is manifest that the challenge in the writ petition was against the mode of recovery though incidentally it was also said that the petitioner was not liable to pay the whole of the amount as there was strike by truck owners and he could not realise the amount for the full period on account of the strike of the truck owners which continued for 45 days which has been denied by respondent Zila Parishad and it has been contended that the petitioner realised fees and tolls during whole of the period and even after expiry of the period in respect of which separate demand was made from him. Thus it was a disputed question of fact and no relief in this regard can be rightly claimed. Thus the interim order dated 7-9-90 was against recovery proceedings and was confined against recovery as arrears of land revenue and the amount realised by Zila Parishad was in no way in violation of the interim order granted by this Court. Thus in our view, the Zila Parishad was well within its authority to recover the amount from petitioner by way of adjustment or by reduction of the amount payable to petitioner in respect of the subsequent contract and the action of the Zila Parishad was neither against law or equity nor against the interim order dated 7-9-90.
24. It is not disputed that in pursuance of the interim mandamus dated 21st December, 1992 granted in Writ Petition No. 22362 of 1992 Zila Parishad was compelled to pay Rs. 55,150/- to petitioner which, for the reasons recorded above should not have been paid to petitioner. But for the interim mandamus dated 21st December 1992, petitioner could have received this amount. Thus the change in position of the parties which has been brought about by the interim order dated 21st December, 1992 requires to be rectified. In the facts of this case its now duty of the Court to see that the parties are restored to the position which was prevailing before the interim order dated 21st December, 1992. The legal maxim ‘Actus Oriae Neminem Grarsabit’, that the act of the Court should not prejudice any one is fully applicable in the facts of the present case. The amount thus received by petitioner under the interim order is held by him in trust and he is under legal obligation to pay it back to the respondent Zilla Parishad.
25. For the reasons stated above and in the ends of justice, we dispose of both petitions finally with the following directions to the parties:—
(1) Petitioner shall pay to respondent Zilla Parishad an amount of Rs. 55,150/- within a period of three months from the date of this judgment.
(2) If the amount is paid by the petitioner as directed above, the recovery proceedings for recovery of the amount of Rs. 70,150/- as arrears of land revenue and the citation dated 1-9-90. Annexure-1 to the Writ Petition No. 23803 of 1990 shall stand quashed.
(3) However, in case the amount is not paid by petitioner, as directed above, the recovery proceedings shall be continued against petitioner under this order for the amount referred to in the citation and he shall be further liable in the same proceedings to pay the interest at the rate of 15% on amount of Rs. 55,150/- from the date he received this amount under interim order dated 21-12-92 from Zila Parishad till the actual recovery of the amount.
(4) The amount of Rs. 10,000/- deposited by petitioner with Zila Parishad respondent No. 1 under the order dated 7-9-90 shall be given due adjustment in recovery of the amount under the order of this Court.
(5) However, in special facts and circumstances of the case, the parties shall bear their own costs.
26. Order accordingly.