FINAL
Fiscal Year - 2022 Mississippi Drinking Water Systems Improvements Revolving Loan Fund Program Priority List
Project |
Project Description |
Zip Code |
Priority Service Area Points Population |
Eligible F Amount |
Green Project |
Loan Amount Requested |
Statewide Cum. $ |
|
Category III: Primary Drinking Water Standards Projects |
||||||||
Hazlehurst, Town of |
Water Treatment Facility\Water System |
39083 |
1074 |
3838 |
$500,000 |
$0 |
$3,379,000 |
$3,379,000 |
Taylorsville Water Association |
Water & Distribution System Improvements |
39073 |
227 |
1294 |
$0 |
$0 |
$1,800,000 |
$5,179,000 |
Doddsville, Town of |
New Well |
38736 |
180 |
215 |
$288,000 |
$0 |
$683,470 |
$5,862,470 |
Golding Acres Water Association, |
New Water Well |
38701 |
117 |
105 |
$190,895 |
$0 |
$424,212 |
$6,286,682 |
Category V: Pressure Deficiencies Projects |
||||||||
Central Yazoo Water Association, |
Water Distribution Improvements |
39194 |
1705 |
9960 |
$500,000 |
$0 |
$1,650,000 |
$7,936,682 |
Pisgah Water Association, Inc. |
New Water Well and Distribution Improvements |
39047 |
508 |
2144 |
$0 |
$0 |
$1,600,000 |
$9,536,682 |
Pearl, City of |
Distribution Improvements |
39208 |
270 |
26500 |
$287,500 |
$0 |
$1,150,000 |
$10,686,682 |
Category VII: System Capacity Expansion to Serve Existing Unserved Residences/Businesses |
||||||||
West Harrison Water and Sewer |
Improve Water Distribution System |
39571 |
125 |
17210 |
$184,550 |
$0 |
$1,230,529 |
$11,917,211 |
Category VIII: Back-up Water Supply Sources Projects |
||||||||
Meridian, City of |
New Well |
39301 |
2794 |
36347 |
$500,000 |
$0 |
$6,699,116 |
$18,616,327 |
Diamondhead Water & Sewer District |
New Elevated Storage Tank |
39525 |
2251 |
8048 |
$0 |
$0 |
$1,954,480 |
$20,570,807 |
NE Itawamba Water Assn., Inc. |
Water System Improvements |
38847 |
1594 |
4689 |
$371,532 |
$0 |
$1,061,520 |
$21,632,327 |
Southern Rankin Water Assn |
Water System Improvements |
39073 |
925 |
3700 |
$193,050 |
$0 |
$1,287,000 |
$22,919,327 |
Eudora Utilities Association |
New W.T. Plant/300,000. Gal Tank/12" Water Lines |
38632 |
708 |
3702 |
$0 |
$0 |
$1,980,000 |
$24,899,327 |
Rocky Creek Utilities, Inc. |
New Elevated Storage Tank |
39452 |
561 |
2200 |
$158,100 |
$0 |
$1,054,000 |
$25,953,327 |
_______________________$29,570,278 Funding Line_____________________________ |
||||||||
Wiggins, City of * |
Water Distribution Improvement/ New Well |
39577 |
440 |
4390 |
$416,191 |
$0 $3,773,463 |
$29,726,790 |
|
Central Water Association * |
Rehab/ Replacement of Existing Facilities |
39350 |
415 |
20143 |
$0 |
$0 $11,370,738 |
$41,097,528 |
|
Yokena Jeff Davis Water District * |
New Facilities/ Treatment |
39180 |
117 |
2800 |
$0 |
$0 $6,289,345 |
$47,386,873 |
|
Category IX: Existing Facilities Upgrade (Meeting Primary Standards) |
||||||||
Clarkdale Water Association * |
SCADA Upgrade |
39301 |
22133 |
4000 |
$7,721 |
$0 |
$51,470 |
$47,438,343 |
North Hinds Water Association * |
Rehab Storage Facilities |
39071 |
4693 |
10150 |
$187,950 |
$0 |
$537,000 |
$47,975,343 |
Hattiesburg, City of * |
Rehab/ Replacement of Existing Facilities |
39403 |
3741 |
45951 |
$500,000 |
$0 |
$5,573,133 |
$53,548,476 |
Brandon, City of |
Replace Water Lines |
39042 |
3288 |
26355 |
$0 |
$0 |
$3,403,500 |
$56,951,976 |
Copiah Water Association* |
Water System Improvements |
39083 |
1111 |
6400 |
$500,000 |
$0 |
$2,007,002 |
$58,958,978 |
Crystal Springs Water Service * |
Water System Improvements |
39059 |
1083 |
5050 |
$48,342 |
$0 |
$193,368 |
$59,152,346 |
Magee's Creek Water Assn. * |
Water System Improvements |
39667 |
598 |
7194 |
$219,800 |
$0 |
$628,000 |
$59,780,346 |
Hub Water Association * |
50,000 G Tank/400 GPM Well/Valves/Elec. Controls |
39429 |
579 |
3300 |
$436,063 |
$0 |
$1,744,250 |
$61,524,596 |
Clarkdale Water Association * |
Water Distribution and Radio Meters |
39301 |
551 |
4000 |
$309,900 |
$0 |
$2,066,000 |
$63,590,596 |
Mendenhall, City of |
New 500 GPM Well/250,000-Gal Tank/Treatment |
39114 |
476 |
2504 |
$500,000 |
$0 |
$2,634,100 |
$66,224,696 |
Union, City of * |
Rehab/ Replacement of Existing Facilities |
39365 |
442 |
1897 |
$500,000 |
$0 |
$3,066,750 |
$69,291,446 |
Quitman, City of * |
Rehab/ Replacement of Existing Facilities |
39355 |
424 |
2386 |
$500,000 |
$0 |
$2,613,060 |
$71,904,506 |
Union Church Waterworks Assn. * |
Treatment plant rehabilitation and backup well |
39668 |
414 |
1508 |
$473,060 |
$0 |
$1,351,600 |
$73,256,106 |
Friars Point, Town of * |
Distribution System Improvements |
38631 |
357 |
1200 |
$500,000 |
$0 |
$1,473,600 |
$74,729,706 |
Culkin Water District * |
Rehab/ Replacement of Existing Facilities |
39183 |
324 |
11409 |
$500,000 |
$0 |
$10,473,600 |
$85,203,306 |
Diamondhead Water & Sewer District |
Residential Waterline Rehabilitation |
39525 |
240 |
8048 |
$0 |
$0 |
$2,748,488 |
$87,951,794 |
Stonewall, Town of * |
Rehab/ Replacement of Existing Facilities |
39363 |
220 |
933 |
$500,000 |
$0 |
$3,300,725 |
$91,252,519 |
Decatur, Town of * |
Rehab/ Replacement of Existing Facilities |
39327 |
148 |
1705 |
$0 |
$0 |
$3,300,725 |
$94,553,244 |
Highway 98 East Water Association * |
Replace Approx. 50,000 LF Water Mains |
39429 |
128 |
1650 |
$427,000 |
$0 |
$1,220,000 |
$95,773,244 |
West Harrison Water & Sewer |
Installation of New Water Connections |
39571 |
125 |
20000 |
$184,579 |
$0 |
$1,230,330 |
$97,003,574 |
Diamondhead Water & Sewer District |
Replace Approximately 9,700 LF of PVC |
39525 |
73 |
9980 |
$0 |
$0 |
$1,653,283 |
$98,656,857 |
Kiln Utility & Fire District of |
Rehab Approx.10.3 Miles of Water Dist. System |
39556 |
63 |
6349 |
$0 |
$0 |
$2,935,797 |
$101,592,654 |
Diamondhead Water & Sewer District |
Commercial Waterline Rehabilitation |
39525 |
61 |
8048 |
$0 |
$0 |
$1,645,429 |
$103,238,083 |
Rose Hill Water Association * |
Rehab/ Replacement of Existing Facilities |
39356 |
32 |
1188 |
$500,000 |
$0 |
$2,028,345 |
$105,266,428 |
*- System has formally requested consideration for ARPA funding should MSDH be appropriated funding by the State. All projects listed on the Priority and Planning list will be considered for ARPA funding if appropriated to MSDH by the State. The State is still deliberating on the use of these funds and how they will be administered.
Note: See section VI.B. of this document for more details. Applications exceeding $5,000,000 amount require further approval by the Board. See section IV.C.1 of this document.
FFY-2022 Planning List
FINAL
Fiscal Year - 2023 and After Planning List
Mississippi Drinking Water Systems Improvements Revolving Loan Fund Program
(Projects included on the Planning List did not meet the September 30, 2021, deadline for submission of a complete facilities plan, or had multiple requests and asked to be placed on the Planning List. These projects have been ranked on the Planning List based on information provided on the Request for Ranking Form. A determination of project eligibility cannot be completed until the facilities plan has been submitted and reviewed.)
Project |
Project Description |
Zip Code |
Priority Points |
Service Area Population |
Eligible F Amount |
Green Project |
Loan Amount Requested |
Statewide Cum. $ |
Category IV: One Well Projects |
||||||||
Pilgrim Rest Water Association * |
Emergency Tie-in |
39051 |
126 |
340 |
$0 |
$0 |
$1,245,000 |
$1,245,000 |
Category VII: System Capacity Expansion to Serve Existing Unserved Residences/Businesses |
||||||||
Jackson Co. Utility Authority * |
Service to Existing Unserved Areas |
39567 |
94 |
12000 |
$0 |
$0 |
$1,587,500 |
$2,832,500 |
Jackson Co. Utility Authority * |
Service to Existing Unserved Areas |
39567 |
63 |
75000 |
$0 |
$0 |
$4,127,500 |
$6,960,000 |
Jackson Co. Utility Authority * |
Consolidation |
39567 |
28 |
6600 |
$0 |
$0 |
$1,270,000 |
$8,230,000 |
Category VIII: Back-up Water Supply Sources Projects |
||||||||
Batesville, City of |
New 750 GPM Well |
38606 |
6902 |
7600 |
$125,000 |
$0 |
$500,000 |
$8,730,000 |
Brandon, City of * |
New Water Well |
39042 |
6413 |
26355 |
$0 |
$0 |
$1,745,000 |
$10,475,000 |
Aberdeen, City of |
400 GPM Well/100,000 Gal. Elev.Tank/Rehab |
39730 |
2128 |
6415 |
$500,000 |
$0 |
$1,481,949 |
$11,956,949 |
Mt. Olivet Water Association |
New Well/Paint Elevated Tank |
38606 |
708 |
1300 |
$129,010 |
$0 |
$516,040 |
$12,472,989 |
Braxton, Town of |
Construction of New Well |
39044 |
372 |
775 |
$0 |
$0 |
$819,000 |
$13,291,989 |
Category IX: Existing Facilities Upgrade (Meeting Primary Standards) |
||||||||
Batesville, City of |
Installation of Water lines |
38606 |
27608 |
7600 |
$37,500 |
$0 |
$125,000 |
$13,416,989 |
Batesville, City of |
Installation of Water Lines |
38606 |
23007 |
7600 |
$37,500 |
$0 |
$150,000 |
$13,566,989 |
Batesville, City of |
Rehab/ Replacement of Existing Facilities |
38606 |
12549 |
7600 |
$68,750 |
$0 |
$275,000 |
$13,841,989 |
Batesville, City of |
Rehab Existing Facilities |
38606 |
9860 |
7600 |
$87,500 |
$0 |
$350,000 |
$14,191,989 |
Batesville, City of |
Rehab Existing Facilities |
38606 |
8417 |
7600 |
$102,500 |
$0 |
$410,000 |
$14,601,989 |
Hernando, City of |
Treatment Plant Upgrades and Distribution Impro |
38632 |
7626 |
15000 |
$0 |
$0 |
$931,000 |
$15,532,989 |
Batesville, City of |
Rehab Existing Infrastructure |
38606 |
6902 |
7600 |
$125,000 |
$0 |
$500,000 |
$16,032,989 |
CS&I Water Association * |
Rehab/ Replacement of Existing Facilities |
39150 |
6450 |
945 |
$0 |
$0 |
$80,000 |
$16,112,989 |
Crystal Springs, City of * |
Rehab/ Replacement of Existing Facilities |
39059 |
5271 |
5050 |
$0 |
$0 |
$396,800 |
$16,509,789 |
Clarksdale Public Utilities * |
Rehab/ Replacement of Existing Facilities |
39814 |
4654 |
17962 |
$0 |
$0 |
$2,375,000 |
$18,884,789 |
Batesville, City of |
500,000 Gallon Elevated Tank |
38606 |
4601 |
7600 |
$187,500 |
$0 |
$750,000 |
$19,634,789 |
Carthage, City of * |
Rehab/ Replacement of Existing Facilities |
39051 |
4027 |
5075 |
$0 |
$0 |
$567,000 |
$20,201,789 |
Hattiesburg, City of * |
Rehab/ Replacement of Existing Facilities |
39403 |
3598 |
45591 |
$0 |
$0 |
$5,573,133 |
$25,774,922 |
Hattiesburg, City of * |
Rehab/ Replacement of Existing Facilities |
39403 |
3598 |
45951 |
$0 |
$0 |
$5,573,133 |
$31,348,055 |
Natchez Water Works * |
Rehab/ Replacement of Existing Facilities |
39121 |
2961 |
15792 |
$0 |
$0 |
$3,250,000 |
$34,598,055 |
Clinton, City of * |
New Well/ Distribution Improvements |
39056 |
2649 |
28100 |
$0 |
$0 |
$4,084,100 |
$38,682,155 |
West Tallahatchie Utilities Assn. * |
Rehab/ Replacement of Existing Facilities |
38966 |
2282 |
7500 |
$0 |
$0 |
$1,643,067 |
$40,325,222 |
N.E. Itawamba Water Assn. * |
Rehab/ Replacement of Existing Facilities |
38847 |
2100 |
4700 |
$0 |
$0 |
$810,500 |
$41,135,722 |
Bear Creek Water Assn., Inc. |
Replace Tank with New 2 Mil Gal Tank |
39046 |
1534 |
45000 |
$0 |
$0 |
$4,890,000 |
$46,025,722 |
Brookhaven, City of * |
Rehab/ Replacement of Existing Facilities |
39206 |
1482 |
12500 |
$0 |
$0 |
$3,870,350 |
$49,896,072 |
Morton, City of * |
Rehab/ Replacement of Existing Facilities |
39117 |
1362 |
7000 |
$0 |
$0 |
$1,500,000 |
$51,396,072 |
Webb, Town of * |
Repair/Rehab Water Tank |
38966 |
1250 |
586 |
$105,840 |
$0 |
$235,200 |
$51,631,272 |
Alcorn Co. Water Association #1 |
300,000-Gal Storage Tank/upgrade Facilities |
38834 |
1214 |
6500 |
$445,585 |
$0 |
$1,273,101 |
$52,904,373 |
Alcorn Co. Water Association #2 |
Renovate Elevated tanks/Replace Water Lines |
38834 |
1181 |
6500 |
$305,522 |
$0 |
$872,920 |
$53,777,293 |
Midway Community Water Assn. * |
Rehab/ Replacement of Existing Facilities |
39039 |
1161 |
1680 |
$0 |
$0 |
$700,000 |
$54,477,293 |
H&H Water System, Inc. * |
Distribution Improvements |
39080 |
1030 |
3012 |
$0 |
$0 |
$1,050,000 |
$55,527,293 |
Isola, Town of * |
Rehab/ Replacement of Existing Facilities |
38754 |
903 |
713 |
$0 |
$0 |
$465,000 |
$55,992,293 |
Harrison County Development |
Paint 2 Elevated Storage Tanks |
39503 |
846 |
6000 |
$0 |
$0 |
$354,675 |
$56,346,968 |
Clarksdale Public Utilities * |
Replacing Wells and Distribution |
39814 |
732 |
17962 |
$500,000 |
$0 |
$15,110,000 |
$71,456,968 |
Casey Jones Water Association * |
Rehab/ Replacement of Existing Facilities |
39179 |
713 |
1112 |
$0 |
$0 |
$900,000 |
$72,356,968 |
Shannon, Town of * |
Rehab/ Replacement of Existing Facilities |
38868 |
691 |
1850 |
$0 |
$0 |
$1,079,325 |
$73,436,293 |
Metcalfe, Town of |
Rehab/ Replacement of Existing Facilities |
38760 |
678 |
1125 |
$0 |
$0 |
$942,500 |
$74,378,793 |
Bolton, Town of * |
Rehab/ Replacement of Existing Facilities |
39041 |
665 |
640 |
$0 |
$0 |
$337,681 |
$74,716,474 |
Hattiesburg, City of * |
Rehab/ Replacement of Existing Facilities |
39403 |
638 |
45951 |
$0 |
$0 |
$5,951,500 |
$80,667,974 |
Hattiesburg, City of * |
Rehab/ Replacement of Existing Facilities |
39403 |
638 |
45951 |
$0 |
$0 |
$5,951,500 |
$86,619,474 |
Hattiesburg, City of * |
Rehab/ Replacement of Existing Facilities |
39403 |
638 |
41951 |
$0 |
$0 |
$5,951,500 |
$92,570,974 |
Acona Water Association * |
Rehab/ Replacement of Existing Facilities |
39095 |
549 |
1550 |
$0 |
$0 |
$1,419,800 |
$93,990,774 |
East Madison Water Assn.,Inc. * |
Distribution Improvements |
39046 |
544 |
7265 |
$0 |
$0 |
$5,000,000 |
$98,990,774 |
Topisaw Creek Water Assn. * |
Rehab/ Replacement of Existing Facilities |
39662 |
473 |
4910 |
$0 |
$0 |
$3,185,000 |
$102,175,774 |
Greenville, City of * |
Rehab Facilities |
38701 |
459 |
30000 |
$500,000 |
$0 |
$40,000,000 |
$142,175,774 |
Looxahoma Water Assn. * |
Distribution Improvement/ AMR Upgrade |
38668 |
457 |
686 |
$0 |
$0 |
$500,000 |
$142,675,774 |
Raymond, City of * |
Replace Water Mains/Hydrants/Rehab Storage Tank |
39154 |
431 |
2894 |
$0 |
$0 |
$2,400,000 |
$145,075,774 |
South Sunflower Water Assn. * |
Rehab/ Replacement of Existing Facilities |
38756 |
385 |
1132 |
$0 |
$0 |
$1,245,000 |
$146,320,774 |
Utica, Town of * |
Rehab/ Replacement of Existing Facilities |
39175 |
376 |
820 |
$0 |
$0 |
$1,842,513 |
$148,163,287 |
Big Field Water Association * |
Rehab/ Replacement of Existing Facilities |
38646 |
371 |
599 |
$0 |
$0 |
$852,057 |
$149,015,344 |
Magnolia, City of * |
Rehab/ Replacement of Existing Facilities |
39652 |
353 |
2420 |
$0 |
$0 |
$2,798,860 |
$151,814,204 |
Multi-Mart Water Association * |
Rehab/ Replacement of Existing Facilities |
39452 |
345 |
950 |
$0 |
$0 |
$333,172 |
$152,147,376 |
Lumberton, City of |
Replace Existing Water Lines/Mains |
39455 |
328 |
2200 |
$500,000 |
$0 |
$3,453,197 |
$155,600,573 |
Lake Eddins * |
Rehab/ Replacement of Existing Facilities |
39347 |
319 |
294 |
$0 |
$0 |
$1,369,941 |
$156,970,514 |
Combined Utilities, Inc. * |
Rehab/ Replacement of Existing Facilities |
39452 |
307 |
7500 |
$0 |
$0 |
$7,075,000 |
$164,045,514 |
Fannin Water Association * |
New 300,000-Gal Tank |
39047 |
297 |
6500 |
$0 |
$0 |
$3,372,320 |
$167,417,834 |
Morton, City of * |
Replace Water Mains/Hydrants/Rehab Storage Tank |
39117 |
292 |
7000 |
$500,000 |
$0 |
$7,000,000 |
$174,417,834 |
Raymond, City of |
Replace Water Mains/ Hydrants/ Rehab Storage |
39154 |
276 |
2894 |
$0 |
$0 |
$3,750,000 |
$178,167,834 |
Lake City Water Association, Inc. * |
Rehab/ Replacement of Existing Facilities |
39071 |
266 |
1911 |
$0 |
$0 |
$2,500,000 |
$180,667,834 |
East Laflore Water & Sewer Assn. * |
Rehab/ Replacement of Existing Facilities |
38930 |
264 |
5161 |
$0 |
$0 |
$11,168,871 |
$191,836,705 |
North Tallahatchie Water Assn. * |
Rehab/ Replacement of Existing Facilities |
38921 |
258 |
2982 |
$0 |
$0 |
$4,635,319 |
$196,472,024 |
Jumpertown, Town of * |
Rehab/ Replacement of Existing Facilities |
38829 |
242 |
1150 |
$0 |
$0 |
$2,458,600 |
$198,930,624 |
Leesburg Water Association * |
Rehab/ Replacement of Existing Facilities |
39145 |
219 |
4182 |
$0 |
$0 |
$2,205,000 |
$201,135,624 |
Black Bayou Water Assn. * |
Distribution Improvements |
38756 |
212 |
2785 |
$0 |
$0 |
$14,100,000 |
$215,235,624 |
West Jackson Co. Utility District * |
Rehab/ Replacement of Existing Facilities |
39564 |
205 |
29000 |
$0 |
$0 |
$12,215,220 |
$227,450,844 |
Leesburg Water Association * |
Rehab/ Replacement of Existing Facilities |
193 |
4182 |
$0 |
$0 |
$2,505,000 |
$229,955,844 |
|
Crossroads Water Assn. * |
Rehab/ Replacement of Existing Facilities |
38916 |
174 |
1600 |
$0 |
$0 |
$3,057,336 |
$233,013,180 |
Pachuta, Village of * |
Rehab/ Replacement of Existing Facilities |
39347 |
165 |
143 |
$0 |
$0 |
$948,145 |
$233,961,325 |
Winterville Water Association * |
Rehab/ Replacement of Existing Facilities |
38703 |
130 |
90 |
$0 |
$0 |
$518,000 |
$234,479,325 |
McCarley Water Assn. * |
Rehab/ Replacement of Existing Facilities |
38943 |
120 |
647 |
$0 |
$0 |
$2,394,289 |
$236,873,614 |
Pittsboro, Town of * |
Rehab/ Replacement of Existing Facilities |
38951 |
100 |
1077 |
$0 |
$0 |
$4,055,512 |
$240,929,126 |
Copiah Water Association * |
Rehab/ Replacement of Existing Facilities |
39083 |
99 |
2200 |
$0 |
$0 |
$4,100,000 |
$245,029,126 |
Morgan City Water Assn. * |
Rehab/ Replacement of Existing Facilities |
38946 |
97 |
250 |
$0 |
$0 |
$1,552,953 |
$246,582,079 |
Poplar Springs Water District * |
Rehab/ Replacement of Existing Facilities |
39114 |
88 |
1188 |
$0 |
$0 |
$4,534,031 |
$251,116,110 |
Rocky Creek Utilities * |
Rehab/ Replacement of Existing Facilities |
39452 |
85 |
2200 |
$0 |
$0 |
$3,503,948 |
$254,620,058 |
St. Thomas Water Association * |
Rehab/ Replacement of Existing Facilities |
39041 |
73 |
732 |
$0 |
$0 |
$2,075,290 |
$256,695,348 |
Lake, Town of * |
Rehab/ Replacement of Existing Facilities |
39092 |
66 |
439 |
$0 |
$0 |
$3,300,725 |
$259,996,073 |
Big Black Water Association * |
Rehab/ Replacement of Existing Facilities |
39046 |
58 |
26719 |
$0 |
$0 |
$7,328,980 |
$267,325,053 |
Valley Park Water Association, Inc. * |
Water System Improvements |
39177 |
23 |
448 |
$125,055 |
$0 |
$500,221 |
$267,825,274 |
Category XII: Consolidation Projects |
||||||||
Jackson Co. Utility Authority * |
Consolidation |
39567 |
118 |
12000 |
$0 |
$0 |
$3,810,000 |
$271,635,274 |
Jackson Co. Utility Authority * |
Consolidation |
39567 |
76 |
75000 |
$0 |
$0 |
$31,750,000 |
$303,385,274 |
Jackson Co. Utility Authority * |
Consolidation |
39567 |
71 |
75000 |
$0 |
$0 |
$1,270,000 |
$304,655,274 |
Jackson Co. Utility Authority * |
Consolidation |
39567 |
32 |
6600 |
$0 |
$0 |
$279,400 |
$304,934,674 |
Jackson Co. Utility Authority * |
Consolidation |
39567 |
1 |
12000 |
$0 |
$0 |
$2,540,000 |
$307,474,674 |
*- System has formally requested consideration for ARPA funding should MSDH be appropriated funding by the State. All projects listed on the Priority and Planning list will be considered for ARPA funding if appropriated to MSDH by the State. The State is still deliberating on the use of these funds and how they will be administered.
33 Miss. Code. R. § 13-VII
See section VI.B. of this document for more details. Applications exceeding $5,000,000 amount require further approval by the Board. See section IV.C.1 of this document.