The above referenced demonstration may require the installation of piezometers, the developing of a potentiometric-surface map of ground water, conducting geophysical surveys, dye tracing or other specific requirements deemed necessary by the Commissioner to evaluate the proposed site to his satisfaction.
If a successful demonstration is made, documented and approved, the owner or operator may continue detection monitoring as specified in subpart (ii) of this part. If, however, a demonstration is not made and approved within 90 days from sampling analysis showing a statistically significant increase over background in one or more constituents, then the owner or operator must initiate an assessment monitoring program as required in part 6.
The design of the final cover system shall be such that the infiltration volume of water will be equal to or less than the percolation volume through the bottom liner system or a design which includes a compacted soil layer of at least 24 inches which has a permeability no greater than 1 x -7 10 cm/sec, whichever is less. This design shall be supported by the use of the HELP model or other equivalent method approved by the Commissioner.
An alternate final cover system may be used provided that it is demonstrated to the satisfaction of the Commissioner that the final cover system provides equivalent or superior performance to the minimum performance standard in this subpart.
Tenn. Comp. R. & Regs. 1200-01-07-.04