7 Del. Admin. Code § 1351-B-5.0 : Natural Resources and Environmental Control —Division of Waste and Hazardous Substances —Tank Management Section —Underground Storage Tank Systems — Requirements for Installation, Operation and Maintenance of Underground Storage Tank Systems Storing Regulated Substance Excluding Consumptive Use Heating Fuel UST Systems or Hazardous Substance UST Systems —B-5.0 - Change In Substance Stored Requirements for UST Systems Storing Regulated Substance excluding Consumptive Use Heating Fuel or Hazardous Substance
5.1 Change In Substance Stored Notification Requirements for UST Systems Storing Regulated Substance excluding Consumptive Use Heating Fuel or Hazardous Substance
5.1.1 Owners and Operators shall notify the Department of all Changes in Substance Stored in accordance with the requirements of §4.0 of Part A of these Regulations.
5.2 Change In Substance Stored General Requirements for UST Systems Storing Regulated Substance excluding Consumptive Use Heating Fuel or Hazardous Substance
5.2.1 Before the Change In Substance Stored, Owners and Operators shall empty and clean the UST System by removing all liquids and accumulated sludge in accordance with the following industry standards:
5.2.1.1 API RP 1604,
Closure of Underground Petroleum Storage Tanks.
5.2.1.2 API Standard 2015,
Safe Entry and Cleaning of Petroleum Storage Tanks.
5.2.1.3 OSHA,
29 CFR, 1910.146,
Permit Required Confined Spaces.
5.3 Change In Substance Stored Site Assessment Requirements for UST Systems Storing Regulated Substance excluding Consumptive Use Heating Fuel or Hazardous Substance
5.3.1 Within thirty (30) days of the completion of the cleaning of the UST System required in § 5.2 of this Part, Owners and Operators shall perform a Site Assessment to measure for the presence of a Release where contamination is most likely to be present at the UST site. In selecting sample types, sample locations and measurement methods, Owners and Operators shall consider the nature of the stored substance, the type of backfill, the depth to groundwater, and other factors appropriate for identifying the presence of a Release. A Site Assessment plan shall be approved by the Department prior to implementation.
5.3.2 If contaminated soils, contaminated groundwater, or LNAPL as a liquid or a vapor is discovered as a result of the Site Assessment performed in accordance with § 5.3.1 of this Part, or by any other manner, Owner and Operators shall begin a hydrogeologic investigation and Remedial Action in accordance with the requirements of Part E of these Regulations.
5.4 Change In Substance Stored Recordkeeping Requirements for UST Systems Storing Regulated Substance excluding Consumptive Use Heating Fuel or Hazardous Substance
5.4.1 Owners and Operators shall submit the following documents to the Department within sixty (60) days of the Change In Substance Stored in an UST System:
5.4.1.1 A site plan detailing the UST(s) location and surrounding area; and
5.4.1.2 The approved Site Assessment plan with sampling points clearly marked; and
5.4.1.3 Chain of custody for all samples submitted for laboratory analysis; and
5.4.1.4 Results of any on-site screening performed; and
5.4.1.5 Laboratory test results for all samples submitted for laboratory analysis; and
5.4.1.6 Documentation of proper disposal or recycling of solid or hazardous waste generated as a result of the Change in Substance Stored of the UST System, including manifests and receipts for soil, water, and Regulated Substances.
5.5 Change In Substance Stored Financial Responsibility Requirements for UST Systems Storing Regulated Substance excluding Consumptive Use Heating Fuel or Hazardous Substance
5.5.1 Owners and Operators shall comply with the requirements of Part F of these Regulations until the UST System is permanently Removed or Closed In Place in accordance with these Regulations or does not store a Regulated Substance and all requirements of Part E of these Regulations are completed.