"All reasonable means were used to obtain information about natural gas transmission pipeline facilities in the area of the proposed development and pipeline operator(s) were contacted to verify the location of the pipeline and the pipeline easement. The developer has reviewed, or attempted to review, preliminary information about the proposed development with the pipeline operator."
RSA 674:76x