(1) After January 1, 1995, each source that includes one or more affected units listed in table A is an affected source under this section. After January 1, 1995, it shall be unlawful for any affected unit (other than an eligible phase I unit under subsection (d)(2) of this section) to emit sulfur dioxide in excess of the tonnage limitation stated as a total number of allowances in table A for phase I, unless (A) the emissions reduction requirements applicable to such unit have been achieved pursuant to subsection (b) or (d) of this section, or (B) the owner or operator of such unit holds allowances to emit not less than the unit’s total annual emissions, except that, after January 1, 2000, the emissions limitations established in this section shall be superseded by those established in section 7651d of this title. The owner or operator of any unit in violation of this section shall be fully liable for such violation including, but not limited to, liability for fulfilling the obligations specified in section 7651j of this title.
(2)
(3) In addition to allowances allocated pursuant to paragraph (1), in each calendar year beginning in 1995 and ending in 1999, inclusive, the Administrator shall allocate for each unit on Table A that is located in the States of Illinois, Indiana, or Ohio (other than units at Kyger Creek, Clifty Creek and Joppa Steam), allowances in an amount equal to 200,000 multiplied by the unit’s pro rata share of the total number of allowances allocated for all units on Table A in the 3 States (other than units at Kyger Creek, Clifty Creek, and Joppa Steam) pursuant to paragraph (1). Such allowances shall be excluded from the calculation of the reserve under paragraph (2).
(1) the designation of the substitute unit or units to which any part of the reduction obligations of subsection (a) of this section shall be required, in addition to, or in lieu of, any original affected units designated under such subsection;
(2) the original affected unit’s baseline, the actual and allowable 1985 emissions rate for sulfur dioxide, and the authorized annual allowance allocation stated in table A;
(3) calculation of the annual average tonnage for calendar years 1985, 1986, and 1987, emitted by the substitute unit or units, based on the baseline for each unit, as defined in section 7651a(d) of this title, multiplied by the lesser of the unit’s actual or allowable 1985 emissions rate;
So in original. Probably should be section “7651a(4)”.
(4) the emissions rates and tonnage limitations that would be applicable to the original and substitute affected units under the substitution proposal;
(5) documentation, to the satisfaction of the Administrator, that the reassigned tonnage limits will, in total, achieve the same or greater emissions reduction than would have been achieved by the original affected unit and the substitute unit or units without such substitution; and
(6) such other information as the Administrator may require.
(1) The Administrator shall take final action on such substitution proposal in accordance with section 7651g(c) of this title if the substitution proposal fulfills the requirements of this subsection. The Administrator may approve a substitution proposal in whole or in part and with such modifications or conditions as may be consistent with the orderly functioning of the allowance system and which will ensure the emissions reductions contemplated by this subchapter. If a proposal does not meet the requirements of subsection (b) of this section, the Administrator shall disapprove it. The owner or operator of a unit listed in table A shall not substitute another unit or units without the prior approval of the Administrator.
(2) Upon approval of a substitution proposal, each substitute unit, and each source with such unit, shall be deemed affected under this subchapter, and the Administrator shall issue a permit to the original and substitute affected source and unit in accordance with the approved substitution plan and section 7651g of this title. The Administrator shall allocate allowances for the original and substitute affected units in accordance with the approved substitution proposal pursuant to section 7651b of this title. It shall be unlawful for any source or unit that is allocated allowances pursuant to this section to emit sulfur dioxide in excess of the emissions limitation provided for in the approved substitution permit and plan unless the owner or operator of each unit governed by the permit and approved substitution plan holds allowances to emit not less than the units total annual emissions. The owner or operator of any original or substitute affected unit operated in violation of this subsection shall be fully liable for such violation, including liability for fulfilling the obligations specified in section 7651j of this title. If a substitution proposal is disapproved, the Administrator shall allocate allowances to the original affected unit or units in accordance with subsection (a) of this section.
So in original. Probably should be “unit’s”.
(1) The owner or operator of any affected unit subject to an emissions limitation requirement under this section may petition the Administrator in its permit application under section 7651g of this title for an extension of 2 years of the deadline for meeting such requirement, provided that the owner or operator of any such unit holds allowances to emit not less than the unit’s total annual emissions for each of the 2 years of the period of extension. To qualify for such an extension, the affected unit must either employ a qualifying phase I technology, or transfer its phase I emissions reduction obligation to a unit employing a qualifying phase I technology. Such transfer shall be accomplished in accordance with a compliance plan, submitted and approved under section 7651g of this title, that shall govern operations at all units included in the transfer, and that specifies the emissions reduction requirements imposed pursuant to this subchapter.
(2)
(3) The Administrator shall review and take final action on each extension proposal in order of receipt, consistent with section 7651g of this title, and for an approved proposal shall designate the unit or units as an eligible phase I extension unit. The Administrator may approve an extension proposal in whole or in part, and with such modifications or conditions as may be necessary, consistent with the orderly functioning of the allowance system, and to ensure the emissions reductions contemplated by the subchapter.
So in original. Probably should be “this”.
(4)
(5) Each eligible Phase I extension unit shall receive allowances determined under subsection (a)(1) or (c) of this section. In addition, for calendar year 1995, the Administrator shall allocate to each eligible Phase I extension unit, from the allowance reserve created pursuant to subsection (a)(2) of this section, allowances equal to the difference between the lesser of the average annual emissions in calendar years 1988 and 1989 or its projected emissions tonnage for calendar year 1995 and the product of the unit’s baseline multiplied by an emission rate of 2.50 lbs/mmBtu, divided by 2,000. In calendar year 1996, the Administrator shall allocate for each eligible unit, from the allowance reserve created pursuant to subsection (a)(2) of this section, allowances equal to the difference between the lesser of the average annual emissions in calendar years 1988 and 1989 or its projected emissions tonnage for calendar year 1996 and the product of the unit’s baseline multiplied by an emission rate of 2.50 lbs/mmBtu, divided by 2,000. It shall be unlawful for any source or unit subject to an approved extension plan under this subsection to emit sulfur dioxide in excess of the emissions limitations provided for in the permit and approved extension plan, unless the owner or operator of each unit governed by the permit and approved plan holds allowances to emit not less than the unit’s total annual emissions.
(6) In addition to allowances specified in paragraph (5), the Administrator shall allocate for each eligible Phase I extension unit employing qualifying Phase I technology, for calendar years 1997, 1998, and 1999, additional allowances, from any remaining allowances in the reserve created pursuant to subsection (a)(2) of this section, following the reduction in the reserve provided for in paragraph (4), not to exceed the amount by which (A) the product of each eligible unit’s baseline times an emission rate of 1.20 lbs/mmBtu, divided by 2,000, exceeds (B) the tonnage level specified under subparagraph (E) of paragraph (2) of this subsection.
(7) After January 1, 1997, in addition to any liability under this chapter, including under section 7651j of this title, if any eligible phase I extension unit employing qualifying phase I technology or any transfer unit under this subsection emits sulfur dioxide in excess of the annual tonnage limitation specified in the extension plan, as approved in paragraph (3) of this subsection, the Administrator shall, in the calendar year following such excess, deduct allowances equal to the amount of such excess from such unit’s annual allowance allocation.
(1) In the case of a unit that receives authorization from the Governor of the State in which such unit is located to make reductions in the emissions of sulfur dioxide prior to calendar year 1995 and that is part of a utility system that meets the following requirements: (A) the total coal-fired generation within the utility system as a percentage of total system generation decreased by more than 20 percent between January 1, 1980, and December 31, 1985; and (B) the weighted capacity factor of all coal-fired units within the utility system averaged over the period from January 1, 1985, through December 31, 1987, was below 50 percent, the Administrator shall allocate allowances under this paragraph for the unit pursuant to this subsection. The Administrator shall allocate allowances for a unit that is an affected unit pursuant to section 7651d of this title (but is not also an affected unit under this section) and part of a utility system that includes 1 or more affected units under section 7651d of this title for reductions in the emissions of sulfur dioxide made during the period 1995–1999 if the unit meets the requirements of this subsection and the requirements of the preceding sentence, except that for the purposes of applying this subsection to any such unit, the prior year concerned as specified below, shall be any year after January 1, 1995 but prior to January 1, 2000.
(2) In the case of an affected unit under this section described in subparagraph (A), the allowances allocated under this subsection for early reductions in any prior year may not exceed the amount which (A) the product of the unit’s baseline multiplied by the unit’s 1985 actual sulfur dioxide emission rate (in lbs. per mmBtu), divided by 2,000, exceeds (B) the allowances specified for such unit in Table A. In the case of an affected unit under section 7651d of this title described in subparagraph (A), the allowances awarded under this subsection for early reductions in any prior year may not exceed the amount by which (i) the product of the quantity of fossil fuel consumed by the unit (in mmBtu) in the prior year multiplied by the lesser of 2.50 or the most stringent emission rate (in lbs. per mmBtu) applicable to the unit under the applicable implementation plan, divided by 2,000, exceeds (ii) the unit’s actual tonnage of sulfur dioxide emission for the prior year concerned. Allowances allocated under this subsection for units referred to in subparagraph (A) may be allocated only for emission reductions achieved as a result of physical changes or changes in the method of operation made after November 15, 1990, including changes in the type or quality of fossil fuel consumed.
So in original. Probably should be “paragraph (1)”.
So in original. Probably should be “paragraph (1)”.
So in original. Probably should be “paragraph (1)”.
(3) In no event shall the provisions of this paragraph be interpreted as an event of force majeur or a commercial impractibility or in any other way as a basis for excused nonperformance by a utility system under a coal sales contract in effect before November 15, 1990.
| Table A.—Affected Sources and Units in Phase I and Their Sulfur Dioxide Allowances (tons) |
|||
|---|---|---|---|
| State |
Plant Name |
Generator |
Phase I Allowances |
| Alabama |
Colbert |
1 2 3 4 5 |
13,570 15,310 15,400 15,410 37,180 |
|
|
E.C. Gaston |
1 2 3 4 5 |
18,100 18,540 18,310 19,280 59,840 |
| Florida |
Big Bend |
1 2 3 |
28,410 27,100 26,740 |
|
|
Crist |
6 7 |
19,200 31,680 |
| Georgia |
Bowen |
1 2 3 4 |
56,320 54,770 71,750 71,740 |
|
|
Hammond |
1 2 3 4 |
8,780 9,220 8,910 37,640 |
|
|
J. McDonough |
1 2 |
19,910 20,600 |
|
|
Wansley |
1 2 |
70,770 65,430 |
|
|
Yates |
1 2 3 4 5 6 7 |
7,210 7,040 6,950 8,910 9,410 24,760 21,480 |
| Illinois |
Baldwin |
1 2 3 |
42,010 44,420 42,550 |
|
|
Coffeen |
1 2 |
11,790 35,670 |
|
|
Grand Tower |
4 |
5,910 |
|
|
Hennepin |
2 |
18,410 |
|
|
Joppa Steam |
1 2 3 4 5 6 |
12,590 10,770 12,270 11,360 11,420 10,620 |
|
|
Kincaid |
1 2 |
31,530 33,810 |
|
|
Meredosia |
3 |
13,890 |
|
|
Vermilion |
2 |
8,880 |
| Indiana |
Bailly |
7 8 |
11,180 15,630 |
|
|
Breed |
1 |
18,500 |
|
|
Cayuga |
1 2 |
33,370 34,130 |
|
|
Clifty Creek |
1 2 3 4 5 6 |
20,150 19,810 20,410 20,080 19,360 20,380 |
|
|
E. W. Stout |
5 6 7 |
3,880 4,770 23,610 |
|
|
F. B. Culley |
2 3 |
4,290 16,970 |
|
|
F. E. Ratts |
1 2 |
8,330 8,480 |
|
|
Gibson |
1 2 3 4 |
40,400 41,010 41,080 40,320 |
|
|
H. T. Pritchard |
6 |
5,770 |
|
|
Michigan City |
12 |
23,310 |
|
|
Petersburg |
1 2 |
16,430 32,380 |
|
|
R. Gallagher |
1 2 3 4 |
6,490 7,280 6,530 7,650 |
|
|
Tanners Creek |
4 |
24,820 |
|
|
Wabash River |
1 2 3 5 6 |
4,000 2,860 3,750 3,670 12,280 |
|
|
Warrick |
4 |
26,980 |
| Iowa |
Burlington |
1 |
10,710 |
|
|
Des Moines |
7 |
2,320 |
|
|
George Neal |
1 |
1,290 |
|
|
M.L. Kapp |
2 |
13,800 |
|
|
Prairie Creek |
4 |
8,180 |
|
|
Riverside |
5 |
3,990 |
| Kansas |
Quindaro |
2 |
4,220 |
| Kentucky |
Coleman |
1 2 3 |
11,250 12,840 12,340 |
|
|
Cooper |
1 2 |
7,450 15,320 |
|
|
E.W. Brown |
1 2 3 |
7,110 10,910 26,100 |
|
|
Elmer Smith |
1 2 |
6,520 14,410 |
|
|
Ghent |
1 |
28,410 |
|
|
Green River |
4 |
7,820 |
|
|
H.L. Spurlock |
1 |
22,780 |
|
|
Henderson II |
1 2 |
13,340 12,310 |
|
|
Paradise |
3 |
59,170 |
|
|
Shawnee |
10 |
10,170 |
| Maryland |
Chalk Point |
1 2 |
21,910 24,330 |
|
|
C. P. Crane |
1 2 |
10,330 9,230 |
|
|
Morgantown |
1 2 |
35,260 38,480 |
| Michigan |
J. H. Campbell |
1 2 |
19,280 23,060 |
| Minnesota |
High Bridge |
6 |
4,270 |
| Mississippi |
Jack Watson |
4 5 |
17,910 36,700 |
| Missouri |
Asbury |
1 |
16,190 |
|
|
James River |
5 |
4,850 |
|
|
Labadie |
1 2 3 4 |
40,110 37,710 40,310 35,940 |
|
|
Montrose |
1 2 3 |
7,390 8,200 10,090 |
|
|
New Madrid |
1 2 |
28,240 32,480 |
|
|
Sibley |
3 |
15,580 |
|
|
Sioux |
1 2 |
22,570 23,690 |
|
|
Thomas Hill |
1 2 |
10,250 19,390 |
| New Hampshire |
Merrimack |
1 2 |
10,190 22,000 |
| New Jersey |
B.L. England |
1 2 |
9,060 11,720 |
| New York |
Dunkirk |
3 4 |
12,600 14,060 |
|
|
Greenidge |
4 |
7,540 |
|
|
Milliken |
1 2 |
11,170 12,410 |
|
|
Northport |
1 2 3 |
19,810 24,110 26,480 |
|
|
Port Jefferson |
3 4 |
10,470 12,330 |
| Ohio |
Ashtabula |
5 |
16,740 |
|
|
Avon Lake |
8 9 |
11,650 30,480 |
|
|
Cardinal |
1 2 |
34,270 38,320 |
|
|
Conesville |
1 2 3 4 |
4,210 4,890 5,500 48,770 |
|
|
Eastlake |
1 2 3 4 5 |
7,800 8,640 10,020 14,510 34,070 |
|
|
Edgewater |
4 |
5,050 |
|
|
Gen. J.M. Gavin |
1 2 |
79,080 80,560 |
|
|
Kyger Creek |
1 2 3 4 5 |
19,280 18,560 17,910 18,710 18,740 |
|
|
Miami Fort |
5 6 7 |
760 11,380 38,510 |
|
|
Muskingum River |
1 2 3 4 5 |
14,880 14,170 13,950 11,780 40,470 |
|
|
Niles |
1 2 |
6,940 9,100 |
|
|
Picway |
5 |
4,930 |
|
|
R.E. Burger |
3 4 5 |
6,150 10,780 12,430 |
|
|
W.H. Sammis |
5 6 7 |
24,170 39,930 43,220 |
|
|
W.C. Beckjord |
5 6 |
8,950 23,020 |
| Pennsylvania |
Armstrong |
1 2 |
14,410 15,430 |
|
|
Brunner Island |
1 2 3 |
27,760 31,100 53,820 |
|
|
Cheswick |
1 |
39,170 |
|
|
Conemaugh |
1 2 |
59,790 66,450 |
|
|
Hatfield’s Ferry |
1 2 3 |
37,830 37,320 40,270 |
|
|
Martins Creek |
1 2 |
12,660 12,820 |
|
|
Portland |
1 2 |
5,940 10,230 |
|
|
Shawville |
1 2 3 4 |
10,320 10,320 14,220 14,070 |
|
|
Sunbury |
3 4 |
8,760 11,450 |
| Tennessee |
Allen |
1 2 3 |
15,320 16,770 15,670 |
|
|
Cumberland |
1 2 |
86,700 94,840 |
|
|
Gallatin |
1 2 3 4 |
17,870 17,310 20,020 21,260 |
|
|
Johnsonville |
1 2 3 4 5 6 7 8 9 10 |
7,790 8,040 8,410 7,990 8,240 7,890 8,980 8,700 7,080 7,550 |
| West Virginia |
Albright |
3 |
12,000 |
|
|
Fort Martin |
1 2 |
41,590 41,200 |
|
|
Harrison |
1 2 3 |
48,620 46,150 41,500 |
|
|
Kammer |
1 2 3 |
18,740 19,460 17,390 |
|
|
Mitchell |
1 2 |
43,980 45,510 |
|
|
Mount Storm |
1 2 3 |
43,720 35,580 42,430 |
| Wisconsin |
Edgewater |
4 |
24,750 |
|
|
La Crosse/Genoa |
3 |
22,700 |
|
|
Nelson Dewey |
1 2 |
6,010 6,680 |
|
|
N. Oak Creek |
1 2 3 4 |
5,220 5,140 5,370 6,320 |
|
|
Pulliam |
8 |
7,510 |
|
|
S. Oak Creek |
5 6 7 8 |
9,670 12,040 16,180 15,790 |
So in original. Probably should be “subsection”.
So in original. Probably should be “majeure”.
So in original. Probably should be “impracticability”.
The term “qualified energy conservation measure” means a cost effective measure, as identified by the Administrator in consultation with the Secretary of Energy, that increases the efficiency of the use of electricity provided by an electric utility to its customers. The term “qualified renewable energy” means energy derived from biomass, solar, geothermal, or wind as identified by the Administrator in consultation with the Secretary of Energy. The term “electric utility” means any person, State agency, or Federal agency, which sells electric energy.
(1) Definitions
(A) Qualified energy conservation measure
(B) Qualified renewable energy
(C) Electric utility
The regulations under paragraph (4) of this subsection shall provide that for each ton of sulfur dioxide emissions avoided by an electric utility, during the applicable period, through the use of qualified energy conservation measures or qualified renewable energy, the Administrator shall allocate a single allowance to such electric utility, on a first-come-first-served basis from the Conservation and Renewable Energy Reserve established under subsection (g) of this section, up to a total of 300,000 allowances for allocation from such Reserve. Allowances under this subsection shall be allocated only with respect to kilowatt hours of electric energy saved by qualified energy conservation measures or generated by qualified renewable energy after January 1, 1992 and before the earlier of (i) December 31, 2000, or (ii) the date on which any electric utility steam generating unit owned or operated by the electric utility to which the allowances are allocated becomes subject to this subchapter (including those sources that elect to become affected by this subchapter, pursuant to section 7651i of this title). So in original. The comma probably should be a semicolon.
(2) Allowances for emissions avoided through energy conservation and renewable energy
(A) In general
(B) Requirements for issuance
(C) Period of applicability
(D) Determination of avoided emissions
(i) Application
(E) Avoided emissions from qualified energy conservation measures
(F) Avoided emissions from the use of qualified renewable energy
(G) Prohibitions
(3) Savings provision
Nothing in this subsection precludes a State or State regulatory authority from providing additional incentives to utilities to encourage investment in demand-side resources.
(4) Regulations
Not later than 18 months after November 15, 1990, and in conjunction with the regulations required to be promulgated under subsections (b) and (c) of this section, the Administrator shall, in consultation with the Secretary of Energy, promulgate regulations under this subsection. Such regulations shall list energy conservation measures and renewable energy sources which may be treated as qualified energy conservation measures and qualified renewable energy for purposes of this subsection. Allowances shall only be allocated if all requirements of this subsection and the rules promulgated to implement this subsection are complied with. The Administrator shall review the determinations of each State regulatory authority under this subsection to encourage consistency from electric utility to electric utility and from State to State in accordance with the Administrator’s rules. The Administrator shall publish the findings of this review no less than annually.
The Administrator shall establish a Conservation and Renewable Energy Reserve under this subsection. Beginning on January 1, 1995, the Administrator may allocate from the Conservation and Renewable Energy Reserve an amount equal to a total of 300,000 allowances for emissions of sulfur dioxide pursuant to section 7651b of this title. In order to provide 300,000 allowances for such reserve, in each year beginning in calendar year 2000 and until calendar year 2009, inclusive, the Administrator shall reduce each unit’s basic Phase II allowance allocation on the basis of its pro rata share of 30,000 allowances. If allowances remain in the reserve after January 2, 2010, the Administrator shall allocate such allowances for affected units under section 7651d of this title on a pro rata basis. For purposes of this subsection, for any unit subject to the emissions limitation requirements of section 7651d of this title, the term “pro rata basis” refers to the ratio which the reductions made in such unit’s allowances in order to establish the reserve under this subsection bears to the total of such reductions for all such units.
(1) Optional baseline for units in certain systems
(2) Allowance allocation
Whenever a unit referred to in paragraph (1) elects to calculate its baseline as provided in clause (ii) of paragraph (1), the Administrator shall allocate allowances for the unit pursuant to section 7651b(a)(1) of this title, this section, and section 7651d of this title (as basic Phase II allowance allocations) in an amount equal to the baseline selected multiplied by the lower of the average annual emission rate for such unit in 1989, or 1.0 lbs./mmBtu. Such allowance allocation shall be in lieu of any allocation of allowances under this section and section 7651d of this title.